Page 1: DELHI-AGRA ROAD PROJECT

Page 1

DELHI-AGRA ROAD PROJECTby L & T Pvt. Ltd.

Intership Présentation by:

Sachin KumarRoll no.:111000129

Page 2: DELHI-AGRA ROAD PROJECT

Page 2

PROJECT:

Page 3: DELHI-AGRA ROAD PROJECT

Page 3

Project Details:

PROJECT TITLE DELHI-AGRA ROAD PROJECT

CUSTOMERM/S RELIANCE

INFRASTRUCTURE LTD.

CONSULTANTSAI/ FEEDBACK

CONTRACTORLARSEN & TOUBRO LTD

CONTRACT AGREEMENT

DATE

21/08/2012

CONTRACT VALUE

Rs.2040 cr

CONTRACT DURATION

27 MONTHS

PROJECT START DATE

01/10/2012

Page 4: DELHI-AGRA ROAD PROJECT

Page 4

Kosi Plant:

1. QA/QC department

2. Highway department

3. Structure department

4. Planning department

5. Safety department (deals with the safety of

staff i.e. proper shoes, helmet, jacket, etc)

6. Store (provides tools, diesel and material)

7. Account department (that maintain the

account)Also there are 1 HOT MIX PLANT, 2 BATCHING PLANT AND 1 WET MIX PLANT

Page 5: DELHI-AGRA ROAD PROJECT

Page 5

HOT MIX PLANT

Page 6: DELHI-AGRA ROAD PROJECT

Page 6

BATCHING PLANT 1

Page 7: DELHI-AGRA ROAD PROJECT

Page 7

BATCHING PLANT 2

Page 8: DELHI-AGRA ROAD PROJECT

Page 8

WET MIX PLANT

Page 9: DELHI-AGRA ROAD PROJECT

Page 9

Also all field work is done on chainage noted on curb

Page 10: DELHI-AGRA ROAD PROJECT

Page 10

QUALITY ASSURANCE AND QUALITY CONTROL DEPARTMENT

QA/QC deals with the all test of minerals which

are using in construction at the site i.e. soil,

aggregate, cement, sand etc and check their

quality also because quality is major pillar of

strength and serviceability after which site

means highway construction comes in which

different layers of the crust spreaded over each

other so that distribution of load should be

uniform , this part comes under Highway

department

Page 11: DELHI-AGRA ROAD PROJECT

1 2 3

4 5 6 6

Page 12: DELHI-AGRA ROAD PROJECT

9

87

Page 13: DELHI-AGRA ROAD PROJECT

Page 13

1. Moisture content and Density of soil

2. Free swell index

3. Grain size analysis

4. Compressive strength of concrete

cubes

5. Marshall test of DBM ( Dense

bituminous concrete )

Test Going On:

Page 14: DELHI-AGRA ROAD PROJECT

Page 14

MOISTURE CONTENT AND DENSITY OF SOIL:

This test is conducted on the soil to calculate its

moisture content and dry density, so that, the

control on settlement of layer can be done

Rammer

Mould

Sample

Page 15: DELHI-AGRA ROAD PROJECT

Page 15

This test is done for getting the failure of soil in

condition arises in which water get stagnated for long

period of time and settlement occurs in the layer.

Kerosene

water

Sample

Sample

FREE SWELL INDEX:

Page 16: DELHI-AGRA ROAD PROJECT

Page 16

GRAIN SIZE ANALYSIS:

This test is done to found the percentage of gravel, sand , silt and clay in soil sample. Gravel (75mm - 4.75mm), sand (4.75mm – 0.075mm ) and silt & clay (0.075mm passing)

PROCEDURE:

1. Take soil sample and wash it to remove dust

2. Sieve it with 0.075mm sieve

3. Dry the sand and weight it W gm

4. Do sieve analysis

Page 17: DELHI-AGRA ROAD PROJECT

Page 17

I.S. SIEVE WT. RETAINED

(gm)W1

% RETAINEDW1/W*100

CUMMULATIVE %AGE RETAINED

(A)

CUMMULATIVE %AGE PASSING(100-A)%

100mm

75mm

50mm

19mm

10mm

4.75mm

2.36mm

0.425mm

0.075mm

pan

Page 18: DELHI-AGRA ROAD PROJECT

Page 18

COMPRESSIVE STRENGTH OF CONCRETE CUBES:

This test is conducted to check the compressive strength of concrete cube after 3rd day, 7th day and 28th day of casting

PROCEDURE:

1. Cast the cube of 150mm*150mm*150mm

dimension mould by using fresh concrete which

is mixed according to design.

2. Remove the cubes from mould after 24 hours

and put it in water tank for curing

3. Take out the cubes after 3rd day , 7th day and

28th day of casting

4. Put the cube immediately in the machine and

applied the load , record the loadat failure ,L

Page 19: DELHI-AGRA ROAD PROJECT

Page 19

Compression machine

Cubes to be tested

Curing Tank

Page 20: DELHI-AGRA ROAD PROJECT

Page 20

MARSHALL TEST OF DBM ( DENSE BITUMINOUS CONCRETE )

This test is done to calculate the compressive strength

of DBM by marshall stability apparatus

Sample

Page 21: DELHI-AGRA ROAD PROJECT

Page 21

HIGHWAY DEPARTMENT

Highway department deals with all the

construction related to the road that can be

embankment and crust construction. Before

cutting or excavating the land , the most

important part is to know the reduced level of

land where we have to start working.

Page 22: DELHI-AGRA ROAD PROJECT

Page 22

Reduced level:

Step 1: Height of instrument (H.I.)= back sight(B.S.)+ temporary bench mark (T.B.M.)

Step 2: Reduced level (R.L.) = H.I. – I.S.

Page 23: DELHI-AGRA ROAD PROJECT

Page 23

EMBANKMENT:

After acquaintance of land , process of clearing and grubbing is done i.e. cutting of tree and root removal from land. Then, the process of embankment filling by soil works in which we calculate reduced level of land at 8 points and then, average it, A. Let crust thickness be C , then , embankment thickness, E comes to be

E=A-C

After calculating E, the numbers of soil layer, N in embankment is calculated by taking each layer of 200 mm thickness such that each layer can be compacted tightly as

N=E/200

Page 24: DELHI-AGRA ROAD PROJECT

Page 24

CRUST:

Page 25: DELHI-AGRA ROAD PROJECT

1 2

43

Page 26: DELHI-AGRA ROAD PROJECT
Page 27: DELHI-AGRA ROAD PROJECT

Page 27

Page 28: DELHI-AGRA ROAD PROJECT

Page 28

After settling the layer by roller (fig.17), there is test conducted under the supervision of costumer for calculating:

1.Wet density2.Moisture content3.Degree of compaction

Page 29: DELHI-AGRA ROAD PROJECT

Page 29

STRUCTURE DEPARTMENT

This department deals with the construction

of all the structures related to road i.e.

1.Flyover

2.Railway over bridges

3.Pedestal under pass

4.Vehicular under pass

Page 30: DELHI-AGRA ROAD PROJECT

12

3

Page 31: DELHI-AGRA ROAD PROJECT

5

8

6

7

Page 32: DELHI-AGRA ROAD PROJECT

Page 32

9

10

Page 33: DELHI-AGRA ROAD PROJECT

Page 33

PLANNING DEPARTMENT

Planning department plays a major role in controlling all the

activities which are related to the project. This can be usage

of material, machines, manpower each and every thing related

to project always pass through this department. The five

major things which I had learned in it :

1.Drawings

2.Daily Progress Report

3.Bar bending Schedule

4.Strip Chart

Page 34: DELHI-AGRA ROAD PROJECT

Page 34

1. Drawings: All the drawings of pavements,

culverts, pedestal under pass, vehicular under pass and

flyover.

Page 35: DELHI-AGRA ROAD PROJECT

Page 35

2. Daily progress report: This report consist an excel chart which tells about all the daily work to be completed and how much work completed. This chart forwards to heads so that they can easily examine the project progress easily.

3. Bar bending schedule: This consists of the information about bars shape , size and dimensions that are used in construction.

4. Strip chart: This chart is representation of road on an excel file which tell us about the section progress of road

Page 36: DELHI-AGRA ROAD PROJECT

CONCLUSION

As day by day number traffic volume is

increasing ,so , this road is widening which is very

necessary because it decrease the rush and

accidental chances on road. Also from all the staff

of L&T ltd. I learned that doing work with proper

dedication, responsibility and honesty makes the

person successful.

Page 37: DELHI-AGRA ROAD PROJECT
Page 38: DELHI-AGRA ROAD PROJECT