DELAY DELAY IN GOVERNMENT CONSTRUCTION IN GOVERNMENT CONSTRUCTION PROJECTS,PROJECTS,
Types Types & & CausesCauses
Prepared by: :
Twana Ahmed Xeyat.Civil Engineer (1996-2000)Master of Business Administration(2013-2015) , [email protected] , 07701528521
1
![Page 2: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/2.jpg)
INTRODUCTION
� Definition� Types� Factors & Causes � Impacts� Conclusion
2
![Page 3: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/3.jpg)
• To make something happen later than expected,or to be performed later than planned.
Delay Definition
later than planned.
• A situation where the contractor and the project owner jointly or severally contribute to the non-completion of the project within the agreed contract period.
3
![Page 4: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/4.jpg)
Types Of Delay :
4
![Page 5: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/5.jpg)
1. Critical & non Critical Delay:
• Critical delays: Prevent the contractor from finishing the work on the scheduled completion date
• Non critical delays:affect the progress of the work.
5
![Page 6: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/6.jpg)
2. Excusable Or Non Excusable Delay:
Excusable Delays: Unpredicted
1. General labor strikes,Fires,Floods , Owner-directed changes.
2. Errors & omissions in the plans and specifications.2. Errors & omissions in the plans and specifications.
3. Differing site conditions or concealed conditions.
4. Usually sever weathers.
5. Intervention by outside agencies.
6
![Page 7: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/7.jpg)
2. Excusable Or Non Excusable Delay:
Non excusable :
1. Late performance of subcontractors.2. Untimely performance by suppliers.3. Faulty workmanship by the contractor and subcontractors.4. A project specific labor strike.
7
![Page 8: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/8.jpg)
3. Compensable or Noncompensable Delay:
A compensable delay:
• Time extension • Additional compensation. • Only excusable delays can be compensable.
A noncompensable delay:
• Neither additional compensation nor a time extension.
8
![Page 9: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/9.jpg)
Note:
Compensable depends primarily on the terms of the contract.
But in most cases:Does not receive any additional money but time extension.
9
![Page 10: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/10.jpg)
4.Concurrent or Non Concurrent Delay:
• Two or more delays that occur or overlap within the same period,
• One an employer risk event, the other a contractor risk event
• The effects of which are felt at the same time.
10
![Page 11: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/11.jpg)
Factors and Causes of Delay :
1. Internal Factors
2. External Factors
11
![Page 12: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/12.jpg)
Delay Factors
Internal Factors
Consultant Related
Contractor Related
Design Related
External Factors
Natural Disasters, Government Laws,
Economic Conditions, etc.
Design Related
Client Related
Labor Related
Material Related
Equipment Related
12
![Page 13: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/13.jpg)
Internal Related Factors of Delay Internal Related Factors of Delay
13
![Page 14: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/14.jpg)
14
![Page 15: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/15.jpg)
15
![Page 16: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/16.jpg)
16
![Page 17: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/17.jpg)
17
![Page 18: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/18.jpg)
18
![Page 19: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/19.jpg)
19
![Page 20: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/20.jpg)
20
![Page 21: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/21.jpg)
21
![Page 22: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/22.jpg)
22
![Page 23: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/23.jpg)
23
![Page 24: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/24.jpg)
External Related Factors of Delay External Related Factors of Delay
24
![Page 25: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/25.jpg)
25
![Page 26: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/26.jpg)
Methodology
Likert five-point scale ranging from 1 (Very Low) to 5 (Very High).
five point scale starting from (1 =Very Low), (2= Low). (3= High), (4= Medium) and (5 =Very High). The Relative Importance Indices (RII) is computed as follows;follows;
Where,
W is the weighting given to each factor by the respondents starting from 1 to 5
A is the highest weight in the scale which is 5,
N is the total number of respondents (which is 47 people).
26
![Page 27: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/27.jpg)
Impacts of Delay
1. Cost overrun.2. Overtime .3. Disputes.3. Disputes.4. Lawsuits.5. Abandonement.
27
![Page 28: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/28.jpg)
Conclusion
Delays are inevitable( unavoidable);
But can be minimized by:But can be minimized by:● Detailed Site Investigations.● Careful monitoring and regular meetings.● Effective site management.● Collaborative working and effective coordination.● Careful scheduling.● Full commitment to the project by all parties.
28
![Page 29: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors](https://reader034.vdocuments.site/reader034/viewer/2022042517/588015a91a28abbc128b4b4b/html5/thumbnails/29.jpg)
1] Construction Delay: Understanding them clearly, analyzing them correctly. Second edition by Theodore J. Trauner Jr.Ar25,2009 ,PP( 25-31) [2] Construction Project Delays: Assessing the Effectiveness of Supervisor Paperback – May 2, 2013by Najat Krima (Author)[3] Analysis of Construction Project Delays and Cost overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan as Case Study Paperback – April 9, 2014by Attaullah Shah (Author)[4] Factors Causing Delay in Construction Projects: Delay and Speed Factors of Construction Projects in Malaysia Paperback – January
Refrences
3, 2012 by Wa'el Alaghbari (Author)[5] Enshassi, A., Hallaq, K. and Mohamed, S. (2006). Causes of contractor’s business failure in developing countries: the case of Palestine. Journal of Construction in Developing Countries, Vol. 11, No. 2. [6] Chitkara, K. (2004). Construction Project Management, Planning, Scheduling, and Controlling. Tata McGraw Hill, 4th edition, India.
[7] Gündüz, M., Nielsen, Y., and Özdemir, M., 2013, Quantification of delay factors using the relative importance index method for construction projects in Turkey, Journal of Management in Engineering, 29(2), pp. 133–139. [8] Hemanta, D., Anil, S., Iyer, K. C., and Sameer, R. 2012, Analysing factors affecting delays in Indian construction projects, International journal of Project Management, 30(4), pp. 479 – 489. [9] Aibinu, A. A., and Odeyinka, H. A., 2006, Construction delays and their causative factors in Nigeria, Journal of Construction Engineering and Management, 132, pp. 667–677.
29