delay analysis and optimality of scheduling policies for multihop wireless networks gagan raj gupta...
TRANSCRIPT
![Page 1: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/1.jpg)
Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks
Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel Programming Laboratory, University of Illinois at Urbana–Champaign.
Ness B. ShroffOhio Eminent Scholar in Networking and Communications Chaired Professor of ECE and CSE, Ohio State University
Published in IEEE/ACM Transactions on Networking, Feb. 2011
![Page 2: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/2.jpg)
2
OutlineIntroductionSystem modelDeriving lower bounds on
average delayDesign of delay-efficient policiesIllustrative examplesConclusion
![Page 3: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/3.jpg)
3
IntroductionA large number of studies on multihop
wireless networks have been devoted to system stability while maximizing metrics like throughput or utility.
The delay performance of wireless networks, however, has largely been an open problem.◦ the mutual interference inherent in wireless
networks.
This paper presented a new, systematic methodology to obtain a fundamental lower bound on the average packet delay under any scheduling policy.
![Page 4: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/4.jpg)
4
Introduction (cont’d)
The delay performance of any scheduling policy is primarily limited by the interference.
Many bottlenecks to be formed in the network◦ The transmission medium is shared◦ A bottleneck contains multiple links
![Page 5: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/5.jpg)
5
Introduction (cont’d)
In this paper, the authors development of a new queue grouping technique to handle the complex correlations of the service process resulting from the multihop nature of the flows◦ (K,X)-bottlenecks Queueing model
![Page 6: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/6.jpg)
6
System modelThe service structure is slotted. Each packet has
a deterministic service time equal to one unit.
A(t)=(A1(t),…,AN(t)) : the vector of exogenous arrivals ◦ Ai(t) : the number of packets injected into the system
by the source si during time slot t.
=(1,…, N) : the corresponding arrival rate vector.
Pi=(vi0, vi
1,…, vi|Pi|) : the path on which flow i is
routed◦ vi
j is a node at a j-hop distance from the source node
![Page 7: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/7.jpg)
7
System model (cont’d)The queue length vector is denoted by
Q(t) = (Qij(t): i=1,2,…N)
At each time slot, an activation vector I(t) is scheduled depending on the scheduling policy and the underlying interference model.◦ Iij(t) indicates whether or not flow i received service
at the j-th hop from source si at time slot t.
![Page 8: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/8.jpg)
8
(K,X)-bottleneck We partition the flows into several
groups. ◦ Each group passes through a (K,X)-
bottleneck, and the queueing for each group is analyzed individually.
(K,X)-bottleneck : a set of links X such that no more than K of its links can be scheduled simultaneously
(K,X)-bottleneck G/D/K queue
![Page 9: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/9.jpg)
9
Characterizing Bottlenecks in the System
1{iX} : indicate whether the flow passes through the (K,X)-bottleneck.
The total flow rate X crossing the bottleneck X is given by
Let the flow I enter the (K,X)-bottleneck at the node vi
ki and leave it at the node vili .
number of hops in bottleneck
![Page 10: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/10.jpg)
10
Deriving lower bounds on average delay
The sum of queues upstream of each link in X at time t is given by SX(t)
bottleneckpacket packet
Si1=1 Si
2=1 Si3=1 Si
4=2 Si5=2 Si
6=2 SX=6Si
4=1 Si5=2 Si
6=2 SX=5
![Page 11: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/11.jpg)
11
Reduced System
Let be the queue length of this system at time t. The queue evolution of the reduced system is given by the following equation:
![Page 12: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/12.jpg)
12
Bound on Expected Delay
delay from vili to vi
|Pi|delay from vi
1 to vi
li
where
![Page 13: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/13.jpg)
13
Flow PartitionHow to compute the lower bound on the
average delay for a system containing multiple bottlenecks ?
![Page 14: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/14.jpg)
14
Flow Partition (cont’d)Assume that we have precomputed a
list of bottlenecks in the systemLet Z be the set of flows in the system. Let π be a partition on Z such that each
element p π is a set of flows passing through a common (Kp, Xp)-bottleneck.
Our objective is to compute a partition π such that the lower bound on can be maximized.
![Page 15: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/15.jpg)
15
Flow Partition (cont’d)Greedily search for a set of flows pP
and the corresponding (Kp,Xp)-bottleneck that yields the maximum lower bound
![Page 16: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/16.jpg)
16
Design of delay-efficient policiesSuch a scheduler must satisfy the
following properties:◦Ensure high throughput
◦Allocate resources equitably Starvation leads to an increase in the
average delay in the system.
K
![Page 17: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/17.jpg)
17
The clique networkA clique network is one in which
the interference constraints allow only one link to be scheduledat any given time.◦ (1,X)-bottleneck◦ Any work-conserving policy will achieve
the lower bound on SX.
◦ Note that a policy that minimizes SX may not minimize the sum of queue lengths in the system at all times, nor is it guaranteed to be delay-optimal.
![Page 18: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/18.jpg)
18
The clique network (cont’d)The optimal policy
◦Last Buffer First Serve (LBFS) Scheduling the packet that is closest to
its destination is optimal.
1-hop to dest.
2-hop to dest.
3-hop to dest.
Delay time: 1, 3, 6
Delay time: 3, 5, 6
![Page 19: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/19.jpg)
19
Back-Pressure PolicyA throughput-optimal scheduling policy.Define the differential backlog of flow i
passing through a link as
For each link, the flow with the maximum differential backlog is chosen.
The link-scheduling component schedules the activation vector with the maximum weight at every time slot.
![Page 20: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/20.jpg)
20
Back-Pressure Policy (cont’d)
![Page 21: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/21.jpg)
21
Illustrative examplesTandem Queue
The differential backlog at the last hop becomes comparativelylarge for small values of , thereby increasing the relative priorityof the last link.
![Page 22: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/22.jpg)
22
Illustrative examples (cont’d)Simulation results for Tandem
Queue
![Page 23: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/23.jpg)
23
Illustrative examples (cont’d)Clique
![Page 24: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/24.jpg)
24
Illustrative examples (cont’d)Dumbbell Topology
![Page 25: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/25.jpg)
25
Illustrative examples (cont’d)Tree topology
![Page 26: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/26.jpg)
26
Illustrative examples (cont’d)Cycle topology
K=2: X={1,2,3,4,5,6,7,8}
K=1: X1={1,2,3} X2={6,7,8}
![Page 27: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/27.jpg)
27
ConclusionThis paper develop a new approach to
reduce the bottlenecks in a multihop wireless to single-queue systems to carry out lower bound analysis.
The analysis is very general and admits a large class of arrival processes.
The analysis can be readily extended to handle channel variations.
![Page 28: Delay Analysis and Optimality of Scheduling Policies for Multihop Wireless Networks Gagan Raj Gupta Post-Doctoral Research Associate with the Parallel](https://reader035.vdocuments.site/reader035/viewer/2022062421/56649c745503460f94926b9d/html5/thumbnails/28.jpg)
28
CommentsHow to identify the bottlenecks in a
wireless mesh network ?
The analysis model can only obtain the lower bound of “expected delay time”
How good is the lower bound ?◦ especially when K is large.