delaware - vertiv€¦ · vertiv power systems test center vertiv power test center features...

8
Delaware Power Systems Test Center

Upload: others

Post on 31-Jul-2020

8 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

Delaware

Power Systems Test Center

Page 2: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

2

Vertiv™ Power Systems Test Center

Testing includes individual UPS modules as well as the complete power system—including large UPS units and associated switchgear and ancillary products—and is essential to the smooth, rapid installation and commissioning of large power systems.

Customers leave the Power Test Center with documented test results and confidence that their complex power system will operate seamlessly and in accordance with business-critical availability requirements.

Power-Packed Testing Center Proves Business-Critical Reliability

The Vertiv™ Power Test Center for large UPS systems is a state-of-the-art test facility designed to provide customers with pre-installation testing of the performance, interoperability, and efficiency of Vertiv power modules and systems under a variety of conditions. Located in Delaware, Ohio, the 41,000 square-foot facility, including a 2,600 square-foot customer observation suite, is the largest and most comprehensive in the industry.

Page 3: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

3

Test results certify the input and output, AC and DC characteristics of the system. Performance comparisons against specifications include, but are not limited to:

yy Voltage and waveform

yy Voltage regulation

yy Voltage and current harmonics

yy Frequency

yy Current and waveform

yy I/O power factor

yy Efficiency based on kW in and out

yy System switching, control and monitoring functionality

Customers may request special tests in addition to the above.

The Power Test Center for large UPS systems consists of multiple test stations in each of seven test bays. Testing is customized based on the complexity, size and number of UPS components in the configuration, but always includes analysis of every module as well as the entire system. Module and system tests include:

yy Steady-state – 0% to 100% plus overload, unbalanced loading; non-linear loading

yy Dynamic – 0% to 100% step loads plus overload, unbalanced loading; non-linear loading

yy Overload and faults – (>100%, 125%, 150%)

yy Plus other customer-specified special test requirements

Testing on large UPS systems, may include UPS power modules, input and output switchgear, power distribution units, static transfer switches, and battery cabinets

Test Capacity and Performance of Vertiv™ Power Solutions

Page 4: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

4

Vertiv™ Power Systems Test Center

Vertiv Power Test Center Features

yy Eight test bays, each containing multiple distinct test stations.

yy Power test viewing suites overlooking test bays and equipped with displays that project relevant information.

Factory Witness testing for large UPS systems is usually conducted over a period of multiple days. During testing, customers and consulting engineers may oversee the entire process from one of the Power Test Center observation suites which overlook the test bays or in the specific test bay itself. Multiple flat-screen displays offer the ability to present presentations, test data, waveforms, testing procedures and results. Once testing is completed, a report of the results is provided.

The Power Test Center features seven test bays, each containing multiple test stations, where module and complete system analysis is conducted in full view of the customer.

Typical Testing Capabilities per Station

yy 1.1 MVA UPS Module

yy 1.5 MW Resistive Load

yy 0.8 pf Lagging Inductive Load

yy 0.9 pf Leading Capacitive Load

yy Non-Linear Load

yy 208, 480 or 600 VAC I/O

yy 5000A Load Bus Capacity

yy DC Battery Simulators

Factory Witness Testing: View the Entire Testing Process

BAY #1

AC INPUT

BYPASS

AC INPUT LINK

BYPASS LINK

500

0A

500

0A

TEST LOAD LINK

5000A

5000A

200

0A

200

0A

200

0A

200

0A

DC POWER

TEST LOAD

DC POWER

DC POWER

DC POWER

DC POWER

SYSTEM SWITCHGEAR

STA

TIO

N 1

STA

TIO

N 2

STA

TIO

N 3

STA

TIO

N 4

yy Results are provided at the conclusion of each test.

yy All I/O circuit breakers can be remotely controlled.

yy Voltage, current, frequency and watts monitored on all I/O circuit breakers.

yy Total power of >12 MW available via the facility utilities.

yy Higher capacities supported through a 1.75 MVA, 750 kVA, and 350 kVA 50/60 Hz engine generator as well as plug-ins for additional generators.

Page 5: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

5

21

BAY A

543

BAY B

TRANSFORMER MEZZANINE

BAY 7

4.2 MVA 600V 480V

A B

AC POWER

TRANSFORMER MEZZAN INE4.2 MVA

600V 480V

AC POWER

I/O BUSS 1. AC INPUT2. BYPASS INPUT3. TEST LOADS

BAYS 1-4

BAY #1 BAY #2

CRO

SS L

INK

S

CRO

SS L

INK

S

BAY #3 BAY #4

TRANSFORMER MEZZANINE

TRANSFORMER MEZZANINE

4.2 MVA600V 208V 480V

2 MVA1.75

MVA

4.2 MVA600V 208V 480V

2 MVA

DC POWER

AC POWER

DC POWER

DC POWER

DC POWER

TEST LOADS

TEST LOADS

TEST LOADS

TEST LOADS

I/O BUSS 1. AC INPUT2. BYPASS INPUT3. TEST LOADS

AC POWER

1 432 5 876

16 131415 12 91011

1 2

4 3

1 432

1600 A BUS

5 76

BAY #5

TRANSFORMER MEZZANINE4.2 MVA

600V 208V 480V

2 MVA 1.75

MVA

1

DC POWER

AC POWER

DC POWER

DC POWER

DC POWER

TEST LOADS

TEST LOADS

TEST LOADS

TEST LOADS

I/O BUSS 1. AC INPUT2. BYPASS INPUT3. TEST LOADS

BAY 5

TESTING STATION

TRANSFORMER

GENERATOR

DC POWER

TEST LOADS

SYSTEM

Page 6: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

6

Vertiv™ Power Systems Test Center

The Liebert® Power Systems Test Center is fully equipped to test all of our large UPS systems and related power equipment. These products may include:

On-Site or Remote Viewing of Your Power System Test

The ability to test individual UPS modules as well as complete UPS systems is essential to a smooth, rapid installation and commissioning of large UPS power systems.

Customers and consulting engineers are encouraged to witness the testing in person or to participate in the testing process remotely via the Internet, as an alternate to attending in person. This process allows customers to understand the installation configuration and document the performance of multimodule UPS systems prior to installation. Offering you the UPS industry’s largest power systems testing center is another way that Vertiv™ strives to make sure our product solutions are a perfect match for your critical power requirements.

Testing To UL 1778 Fifth Edition

Testing your large UPS systems to UL Standard 1778 fifth edition will provide you with the assurance that your critical power systems will meet agency requirements throughout the world. This more harmonized global standard requires testing of every major international specification, for a more stringent and reliable UPS.

The best power protection equipment deserves the best testing facility in the business

Liebert NXL UPS Liebert EXL S1 UPS Liebert Trinergy Cube UPS

Switchgear Battery Cabinets (VRLA and Lithium-ion)

Liebert STS2/PDULiebert STS2

Liebert EXM

Page 7: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

7

Benefits of Power System Testing

yy Provides complete pre-installation testing of large UPS systems and associated support equipment.

yy Tests the performance, interoperability and efficiency of critical power systems.

yy Assures rapid installation and commissioning of large UPS power systems.

yy Confirms the functionality of all subsystems.

yy Allows customers to document performance of multi-module UPS systems prior to installation.

yy Optimizes the testing process with the use of the latest agency standards.

Learn More About The Vertiv™ Power Test Center

The Power Test Center is just one more reason Vertiv is the global leader in enabling Business-Critical availability. Contact your local Vertiv Representative or Solutions Partner to learn more about the Power Test Center.

Shipping and Staging

A related benefit of utilizing our Power Test Center is the ability to leverage our logistics teams. We can receive, unpack and reship all key testing equipment — saving customers time and shipping costs.

Page 8: Delaware - Vertiv€¦ · Vertiv Power Systems Test Center Vertiv Power Test Center Features yyEight test bays, each containing multiple distinct test stations. yyPower test viewing

Vertiv.com | Vertiv Headquarters, 1050 Dearborn Drive, Columbus, OH, 43085, USA

© 2019 Vertiv Group Corp. All rights reserved. Vertiv™ and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp. All other names and logos referred to are trade names, trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness here, Vertiv Group Corp. assumes no responsibility, and disclaims all liability, for damages resulting from use of this information or for any errors or omissions. Specifications, rebates and other promotional offers are subject to change at Vertiv’s sole discretion upon notice.

SL-11298 (R09/19)