TRANSCRIPT
Cement Industry Energy SectorPetroleum, Oil & Gas Iron & Steel Industry Environmental Technologies
DEHA TECHCompany Presentation
DEHA TECH Group of companies
has taken the first step in its activities inthe supply of machinery equipment of industrial plants in 2007
manufacturing special parts for Cement Plant for years.
• DEHA TECH established as engineering and design department with the experience gained from
previous studies and expanding with the participation of key technical and administrative personnel to
serve as a turnkey Engineering & Contracting Group. DEHA TECH started to serve for industrial plants,
power plants, cement plants construction, manufacturing andassembly areas and quickly took its place
among the leading companies inthe country.
DEHA TECH, with more than 30 years of experience in the sector, provides below services
- Design and Engineering,
- Procurement of Equipments and Mechineries
- Manufacturing Activities
- Erection and Dismantling Works
- Project Coordination andManagement Services
for industrial facilities in integration with other group companies, creating customer-specific projects.
ABOUT US
ABOUT US 2
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
. Workshop ……………………..………………
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
Total Area 18.000 m2
Capacity 1.000 ton/month Steel Structure750 ton/month Mechanical Works
No Equipment Name Description Qty1 CNC "T" BOHRWERK Ø180 Five axis. X: 6 m., Y: 2, 45 m., Z: 1,8m. 40 tons capacity 1 pcs.
2 HYDRAULIC PRESS Capacity 400 Tons 1 pcs.
3 BOHRWERK Ø90 1 pcs.
4 MILLING MACHINE Universal Milling Machine 1 pcs.
5 LATHE MACHINE Ø1000x3000mm Universal Lathe Machine 1 pcs.
6 LATHE MACHINE L:4000mm Universal Lathe Machine 1 pcs.
7 LATHE MACHINE L:2000mm Universal Lathe Machine 1 pcs.
8 LATHE MACHINE L:1500mm Universal Lathe Machine 1 pcs.
9 BANDSAW MACHINE Ø280mm 1 pcs.
10 BANDSAW MACHINE Ø350mm 1 pcs.
11 DRILL MACHINE Drill Machine 2 pcs.
12 CNC OXY-PLASMA MACHINE 3000x12000mm 1 pcs.
13 BENDING MACHINE L:2000mm t: 50mm 1 pcs.
14 BENDING MACHINE L:1500mm t: 20mm 1 pcs.
15 COMPRESSOR Screw Compressor 1 pcs.
16 10,15,20 TONS CRANE 10, 15, 20 Ton Capacity Overhead Crane 4 pcs.
17 GENARATOR 400 KW Generator 1 pcs.
18 WELDING MACHINE Electric Arc Welding Machine 47 pcs.
19 WELDING MACHINE MIG/MAG Welding Machine 20 pcs.
20 WELDING MACHINE TIG Welding Machine 4 pcs.
21 WELDING MACHINE Synergistic Welding Machine 1 pcs.
22 HI-UP CRANE 60 Tons Capacity 1 pcs.
23 HAND TOOLS Different Type Equipment 10 sets
WORKSHOP
3
ABOUT US 2
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
MISSION and VISIONMission and Vision
To be the leading company in Design, Engineering, Manufacturing and Construction sector fordeveloping and supplying industrial solutions. Our target is to establish long term relationships inbusiness to carry on green field andtechnological solutions to our consultants and customers.
Believing that value of the business is trust.Our goals; To make engineering studies following new technology with cost efficient solutions andto build environmentally sensitive facilities. Forming modern, fast and secure Industrial facilitiesConstructions consistent with the environment
Human is the best value for the companies and our young, dynamic and experienced team cansuccess by jointing new values to us. To use the qualified human resource will be one of ourstrategies inour developing period.
To be a leader company by developing new engineering solutions according to the changes in thenew century by providing quick innovative solutions and support for all kind of projects forinvestors and contractors.
Our MISSION
STRATEGY
TEAM
Our VISION
4
ABOUT US 2
. Mission and Vision ……………… . Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
DEHA TECH, "RESPECT TO THE NATURE, " the principle which aims to minimize the environmental impact of allthe activities of management and not to harm the environment, sensitive and careful search for ways to protectnatural resources as an integral part of the agreed activities.
Administration, Environmental Management System continuously develops & provides training to our employeesto prevent environmental pollution, education, sustainability, environment-related legislation and administrativeregulations in force, is subject to self-acceptance, undertakes to comply with requirements.
DEHA TECH, to applyadequate healthand safety requirements, providing excellent and timely completion of tasksto operate, employees and other persons affected by the activities in order to minimize losses on them to informemployees about occupational health and safety, the notice required, training andawareness-raising activities.
Seeing as the most important priority of applicable Occupational Health&Safety Legislation and to comply with theterms of Membership Organizations, Hazard & Risk assessment, identifying existing hazards and risks and toprovide possible protection, activities and products are brought into an integral commitment, work environmentand occupational Healtha& Continuous improvement in safety practices adopted as policy.
Environmental Policy
Health & Safety Policy
DEHA TECH Group Companies quality policy aims to understand customer requirements, demands andexpectation and to construct according to standard, serve and to achieve quality target for the specific projects.
To intend the best for quality and meet all required standards for manufacturing, procurement and constructionfacilities and to Cooperate and execute the project facilities as human oriented to satisfy customer demands andwork effectively and efficiently on Quality basis and value added to each work disciplines. Also, to provide allmanagers and staff responsible from quality and quality management system, to Improve and provide permanentrehabilitation of Quality Management System
Quality Assurance and Quality Control
POLICIES
5
ABOUT US 2
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
TS EN ISO 9001:2008
EN ISO 3834-2
TS EN ISO 14001:2004 TS EN ISO 18001:2008. EN ISO 3834-2. TS EN ISO 9001:2008. TS EN ISO 14001:2004. TS EN ISO 18001:2008
CERTIFICATES
6
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Our main business areas are as following;
PETROLEUM, OIL and GAS INDUSTRYVertical & Horizontal Cylindrical Storage Tanks ,Sphere tank, Pressure vessel
IRON & STEEL INDUSTRYElectric arc furnace, Ladle furnace, Cooling ducts…
Services and Capabilities;
• Design and Engineering
• Procurement & Supply of Equipments and Machinery
• Manufacturing
• Structure Steel Manufacturing
• Civil Construction Work
• Mechanical & Structural Steel Erection and Dismantling
• Electric and Automation Supply and Erection Works
• Transport and Logistic
• Project Management and Coordination
CEMENT and MINERAL Industry Rotary kilns, Vertical Roller Mills, Ball Mills, Dynamic & V-Separator, System Fans…
ENERGY SECTORBoiler, Stack, Air Cooling CondenserPenstock and Pipe Line
ENVIRONMENTAL TECHNOLOGIESElectric arc furnace, Ladle furnace, Cooling ducts…
INDUSTRIES – Services & Capabilities
7
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
REFERENCES
8
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2011 AFYON Cement Plant - ESP conversion to Bag Filter 1 set ManufactureErection
ITALCEMENTITURKEY Completed
2011 Rotary Kiln Shell and Ring 1 set Manufacture DAL-MILIHOUSE CEMENTSYRIA Completed
2011 Coal Mill System Bag Filter 1 set Manufacture VYNKE / CTP RUSSIA Completed
2010 Coal Mill System Bag Filter 1 set Manufacture CTP MOROCCO Completed
2009 Vertical Roller Mill Housing and Parts 1 Set Manufacture DAL MAKINATURKEY Completed
2008Rotary Kiln ShellsKiln RollersKiln Inlet and Outlet Sealings
1 Set Manufacture YURT CEMENT-DALTURKEY Completed
2007 API 650 Fuel Oil Storage Tank with 2.500 m3 1 pcs Manufacture YURT CEMENTTURKEY Completed
2007 Cement Mill SealingssCement Mill Girth Gear Cover 1 Set Manufacture ADO CEMENT- DAL
TURKEY Completed
2007 Process Electrostatic Filter Casing and Steel Structure Body 1 Set Manufacture DAL MAKINATURKEY Completed
2006
Vertical Raw Mill - Mill Foundation Frame- Main Reducer Frame- Mill Casing- Separator Casing - Feeding Chute and FlapVertical Coal Mill- Mill Foundation Frame- Main Reducer Frame- Mill Casing - Separator Casing- Feeding Chute and FlapCement Mill SEPAX Separator - Dynamic Rotor and Sealings
1 set Manufacture MARDIN CEMENT-DALTURKEY Completed
CEMENT INDUSTRY REFERENCES
9
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
ENERGY SECTOR REFERENCES ( ½ )
10
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
CUSTOMER
COUNTR Y
Manufacture ÇALIK Energy
Erect ion TURKEY
Manufacture ÇALIK Energy
Erect ion TURKEY
RAIN POW ER
NORWAY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
BGM Eng. /TEÜAŞ
TURKEY
SPIG / AKSA
TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
Erect ion YAYLABEL HES
Commiss ioning TURKEY
Manufacture KULP 4 HES
Erect ion TURKEY
AKSA Energy
TURKEY
TÜBİTAK
TURKEY
Manufacture PALMET/DELTA Energy
Erect ion TURKEY
Manufacture PALMET/DELTA Energy
Erect ion TURKEY
AKSA Energy
TURKEY
AKSA Energy
TURKEY
2012 IRAQ / Nai naw a Power Plant /Tank Farm Project, 92.400 m³ 3.250 ton Completed
2012 Aslanci k Dam Cool ing Water System EPC On Goi ng EPC
2009 Terti ar y Pipi ng Materi al take, A ll oy Steel Attachment Manufacture Compl eted
2009 Last Stage Attemperator Li ner and Pi n Manufacture Compl eted
2009 Steel Structure Compl eted
2009 ACC Compl eted
2009 Steam Tur bine Manufacture Compl eted
2009 DN 800-900-2500 Pipe, El bow s and Reducti ons Manufacture Compl eted
2009 Turbine and Generator for 2 x 2,8 MW 1 set Completed
2009 200 Tons Radi al Cover for 2 x 7 MW 1 set Completed
2010 DN 1200 and DN 1400 Flanges Manufacture Completed
2010 Stainl ess St eel Supports Manufacture Completed
2010 Auxil iary Equi pments Manufacture Completed
2010 Drain and Blow Dow n Tank Manufacture Completed
2010 DN 1400 and DN 1600 Flanges Manufacture Completed
2010 Pipi ng Suppor ts Manufacture Completed
2010 6 Bar Dr ai n Tank w ith 9 m³ 1 pcs Manufacture Completed
2010 6 Bar HRSG Bl ow dow n Tank wi th 9 m³ 2 pcs Manufacture Completed
2011 HP-LP Cr os sover Pi pi ng 4 pcs Manufacture Completed
2011 Cooli ng Tower Fan Frames and Technol ogic Parts Manufacture Completed
2011 API 650 Raw Water Storage Tank w ith 3000 m³ 1 pcs Manufacture Completed
2011 LO Servi ce Tank w ith capacity of 20 m³ 2 pcs Manufacture Completed
DATE PROJECT SCOPE &DESCRIPTION Amount SER VICE STATUS
2012IRAQ / Nai naw a Power Plant / 20.000 WDI Pipi ng Spool Fabri cati on & Erecti on 20.000 WDI On Goi ng
DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2008 Turbine and Generator for 2 x 7 MW ErectionCommissioning
KULP 4 HES TURKEY Completed
2008 Turbine and Generator for 2 x 12 MW ErectionCommissioning
KULP 1 HES TURKEY Completed
2008 400 Ton Radial Cover for 2 x 12 MW ManufactureErection
KULP 1 HES TURKEY Completed
2008 Stainless Steel Cover Manufacture DERİNER HEPPTURKEY Completed
2007 5 Bar Condense Tank with 3 m³ 1 pcs Manufacture DELTA Energy TURKEY Completed
2006 40 Bar Nitrogen Gas Tank with 100 m³ 2 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2006 30 Bar Oxygen Gas Tank with 100 m³ 6 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2006 40 Bar Oxygen Gas Tank with 100 m³ 6 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2006 5 Bar Sand Filter Tank with 5 / 10 / 15 m³ 25 pcs Manufacture ARTAŞ A.Ş.TURKEY Completed
2005 API 650 Demineralized Water Tank with 100 m3 1 pcs Manufacture EREN EnergyTURKEY Completed
1990 API 650 Chemical Disposal Storage Tank with 2000 m³ 5 pcs Manufacture KORUMA TARIM TURKEY Completed
1989 API 650 Chemical Disposal Storage Tank with 1000 m³ 5 pcs Manufacture KORUMA TARIM TURKEY Completed
ENERGY SECTOR REFERENCES ( 2/2 )
11
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2011 API 650 HFO Buffer Tank with 1.000 m³ 1 pcs Manufacture RASA EnergyTURKEY Completed
2011 API 650 HFO Daily Tank with 200 m³ 1 pcs Manufacture RASA EnergyTURKEY Completed
2008 17,5 Bar LPG Underground Storage Tank with 10 m³ 5 pcs Manufacture PETROLOFISITURKEY Completed
2007 API 650 Fuel Oil Storage Tank with 2.500 m3 1 pcs Manufacture YURT CEMENTTURKEY Completed
1987 API 650 Crude Oil Storage Tank with 1.000 m³ 2 pcs Manufacture TOROS GUBRETURKEY Completed
1985 API 650 Crude Oil Storage Tank with 50.000 m³ 2 pcs Manufacture TUPRAŞTURKEY Completed
PETROLEUM , OIL & GAS
12
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2009 160 TONS Capacity Steel Melting Pot 6 pcs Manufacture YOLBULANTURKEY Completed
2009 160 Tons Capacity Electric Arc Furnace Upper&Lower Parts 2 pcs Manufacture YOLBULANTURKEY Completed
2009 120 Tons Capacity Eaf Body 1 pcs Manufacture KAPTAN D.Ç.TURKEY Completed
2008 Dedusting System Modification Modification KAPTAN D.Ç. TURKEY Completed
2008 Structural Steel ManufactureErection
DAL-MILIHOUSE CEMENTSYRIA Completed
2008 Auxiliary Steel Structure Manufacture İÇDAŞ A.Ş. TURKEY Completed
2007 25 Tons Capacity Steel Melting Pot 6 pcs Manufacture ÇEMTAŞ A.Ş. TURKEY Completed
2007 250 Tons Capacity Steel Melting Pot 8 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2007 250 m³ Capacity Scrap Bucket 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY Completed
2006-07 Electric Arc Furnace 1 set Manufacture KÜRÜM
TURKEY Completed
2006-08 Steel Melting Pot 14 pcs Manufacture ASİL ÇELİK
TURKEY Completed
2006 Steel Melting Pot and Scrap Bucket Manufacture İZMİR D.Ç. TURKEY Completed
2006 90 Tons Capacity Steel Melting Pot 6 pcs Manufacture NURSAN A.Ş. TURKEY Completed
2005 100 Tons Eaf Body 1 pcs Manufacture İÇDAŞ A.Ş. TURKEY
Completed
2002 175 Tons Capacity Steel Melting Pots 8 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2002 185 m³ Scrap Bucket 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY Completed
2002 100 m³ Gas Oxygen Tanks 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY Completed
2002 100 m³ Nitrogen Tanks 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY Completed
1996 100 Tons Capacity Steel Melting Pot 11 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
IRON & STEEL INDUSTRY
13
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2011 Fuel Oil Fired Power Plant DE-SOx Unit 1 set ManufactureErection
AKSA EnergyCyprus Completed
2011 DE-SOx Tower 1 pcs Manufacture RASA Energy TURKEY Completed
2010 DE-SOx System and Bag Filter 1 set ManufactureErection
TAI TURKEY Completed
20082011
Rotary Kiln and PartsRoller Base PlatesKiln Inlet and Outlet SealingsKiln Inlet ChamberTertiary Air Duct Double Dedusting Cyclone
1 set
DesignEngineeringManufacturi
ngErection
MARZINC WAELZ TURKEY On-Going
ENVIRONMENTAL TECHNOLOGIES
14
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Head Office Kemeraltı Cd. No:28 Kat 334425 Karaköyİstanbul, Turkey
Head OfficeTel : +90 212 252 48 00Fax: +90 212 252 48 18
E-mail: [email protected]
CONTACTS
15
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DIVISION Contacts :
. Commercial ManagementMr. Berk DAL , [email protected]
. Technical ManagementMr. Hakan YILDIRIM, [email protected]
. Account & Finance Mr. Ertuğrul ARICAN, [email protected]
. Desing & Engineering Mr. Goksel YAĞDIRAN, [email protected]
. Logistic & Procurement Mss. Duygu SUNGUR, [email protected]
. QA & QC Department Mr. Mustafa KESKİN, [email protected]
• Preheater Tower• Rotary Kiln• Clinker Cooler
• Raw Material Grinding• Kiln Dedusting • Homogenizing Silo & Kiln Feeding
• Raw Material Handling • Crushing and Transport• Raw Material Storage
• Clinker Silo• Cement Grinding• Cement Silo & Loading
• Quarry Operations • Raw Material Transport
• Raw Mill Feeding• Component Dosing
DEHA TECH provides following specified activities for Cement and Grinding Plants Project in any case of needs of
customer. We are also capacable of dealing EPC basis turnkey green fie ld contract and/or defined battery limits to
specific projects.
• Design and Engineering Services
- Soil Investigation,
- General Arrangement of Plant & - Process Unit Arrangements,
- Civil, Mechanical and Steel Structure Designs,
- Architectural Design,
- Heat Isolation and Refractory Lininig Designs,
- Process Water and Compressed Air Pipe Line Design,
• Consulting Services,
• Project Organization and Management,
• Civil Construction, Erection and Dismounting Works,
• Civil Design and Application Works
• Process & Non-Process Equipment & Machinery Procurement,
• Steel Structure/Infrastructure Manufacturing and Erection Work,
• Heat Isolation Material Procurement and Applications,
• Refractory Lining Works
• Material and Equipments Procurement
• Electric and Automation Works,
• Start-Up and Commissioning,
• Process Operation & Technical Services,
• Supervision
• Training
CEMENT and MINERAL INDUSTRY
16
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
• Preheater Tower• Rotary Kiln• Clinker Cooler
• Raw Material Grinding• Kiln Dedusting • Homogenizing Silo & Kiln Feeding
• Raw Material Handling • Crushing and Transport• Raw Material Storage
• Clinker Silo• Cement Grinding• Cement Silo & Loading
• Quarry Operations • Raw Material Transport
• Raw Mill Feeding• Component Dosing
DEHA TECH gives a primordial importance to quality control by separated Quality Assurance / Quality Control (QA/QC) groups on the
construction sites from the routine plant site and manufacturing activities.
Quality assurance work is not only carried out on construction sites but also in the workshops, during manufacturing. QA/QC is being enact their
full power of authority on the manufacture to alter any work found to be defective by obeying related standard such as ISO, AS'I'M, NFPA, BS
and also the standards of the countries where work is being performed, such as GOST, SNIP, etc...
Manufacturing Activities….
Civil Construction Works Mechanical and Electrical Erection Structural Steel Erection• Excavation and Earth Works
• Backfilling and Compaction
• Pilling Works
• Grouting
• R/C Concrete for
• Main Foundations
• Elevations
• Buildings
• Sliding form Silos
• With Post Tensioning
• Process Equipment & Machinery Installation
• Lubrication and Hydraulic Connections
• Piping and Insulation
• Compressed Air Networks
• Process Water Networks
• Refractory Lining Works
• Heat Insulation Applications
• Other related Non-Process Unit Erection
• Electric & Automation
• Infrastructure of Buildings
• Walkways and Platforms
• Secondary Steel Erection
• Grating
• Cladding
• Sizing Grid
• Roof & Facade Covering
• Painting
CEMENT and MINERAL INDUSTRY
17
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
• Preheater Tower• Rotary Kiln• Clinker Cooler
• Raw Material Grinding• Kiln Dedusting • Homogenizing Silo & Kiln Feeding
• Raw Material Handling • Crushing and Transport• Raw Material Storage
• Clinker Silo• Cement Grinding• Cement Silo & Loading
• Quarry Operations • Raw Material Transport
• Raw Mill Feeding• Component Dosing
DEHA TECH Group Company supplies erection services for Civil, Mechanical and E lectric & Automation erection services by qualified
erection team. Erection works are executed under the safety and regulated working conditions of each country features. During
erection period, necessary tests, norms and standard are applied to fullfill work compliance in proper installation.
Construction and Erection Works….
Main Equipment and Machinery Transport and Conveying Equipments Site Manufacturing
• Vertical Roller Mill
• Rotary Kiln Shell Manufacturing
• Clinker Cooler Main Frame
• Dynamic Separator
• Process Bag Filter
• Electrostatic Precipitators …etc
• Belt Conveyors and Supporting Frames
• Bucket Elevators Casings and Buckets
• Air Slides
• Screw, Chain and Drag Chain Conveyors
• Rotary Feeders,
• Diverter Gates and Pendulum Flaps
• Bins, Hoppers or Bunker
• Preheater Cyclones
• Dedusting Cyclones
• Process Gas Ducts
• Process Chimneys
• Chutes and Spillage Box
CEMENT and MINERAL INDUSTRY
18
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
References….DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER
COUNTRY STATUS
2011 AFYON Cement Plant - ESP conversion to Bag Filter 1 set ManufactureErection
ITALCEMENTITURKEY Completed
2011 Rotary Kiln Shell and Ring 1 set Manufacture DAL-MILIHOUSE CEMENTSYRIA Completed
2011 Coal Mill System Bag Filter 1 set Manufacture VYNKE / CTP RUSSIA Completed
2010 Coal Mill System Bag Filter 1 set Manufacture CTP MOROCCO Completed
2009 Vertical Roller Mill Housing and Parts 1 Set Manufacture DAL MAKINATURKEY Completed
2008Rotary Kiln ShellsKiln RollersKiln Inlet and Outlet Sealings
1 Set Manufacture YURT CEMENT-DALTURKEY
Completed
2007 API 650 Fuel Oil Storage Tank with 2.500 m3 1 pcs Manufacture YURT CEMENTTURKEY Completed
2007 Cement Mill SealingssCement Mill Girth Gear Cover 1 Set Manufacture ADO CEMENT- DAL
TURKEY Completed
2007 Process Electrostatic Filter Casing and Steel Structure Body 1 Set Manufacture DAL MAKINATURKEY Completed
2006
Vertical Raw Mill - Mill Foundation Frame- Main Reducer Frame- Mill Casing- Separator Casing - Feeding Chute and FlapVertical Coal Mill- Mill Foundation Frame- Main Reducer Frame- Mill Casing - Separator Casing- Feeding Chute and FlapCement Mill SEPAX Separator - Dynamic Rotor and Sealings
1 set Manufacture MARDIN CEMENT-DALTURKEY Completed
CEMENT and MINERAL INDUSTRY
19
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos….
Total Project Scope of ESP Conversion to Bag Filter 89 Tons
Steel Structure Weight (Manufacture and Erection) 80 Tons
Project Start Date (Manufacture) April , 2011
Project Finish Date (incl. Manufacture and Erection) July, 2011
ITALCEMENTI –AFYON Cement PLANT in TURKEYESP Conversion to Bag Filter Project
CEMENT and MINERAL INDUSTRY
20
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Rotary Kiln Weight 850 Tons
Dust Dedusting System Weight 210 Tons
Project Start Date February 2008
Project Finish Date February 2009
Project Cost 11.000.000 $
ZINC RECOVERY PLANT WORKS FOR MARZINC COMPANY
CEMENT and MINERAL INDUSTRY
References….
21
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
MANUFACTURE SITE VIEW at Our Workshop
ROTARY KILN MANUFACTURINGfor
ZINC RECOVERY PLANT - MARZINC COMPANY
CEMENT and MINERAL INDUSTRY
Site Photos….
22
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
MARDIN CEMENT PLANT Manufactures and Erection Works
Total RAW MILL EMPTY WEIGHT 400 Tons
Total ROTARY KILN EMPTY WEIGHT 800 Tons
Project Start Date May 2006
Project Finish Date AprilL 2007
Project Cost 10.000.000 €
CEMENT and MINERAL INDUSTRY
Site Photos….
23
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
ROTARY KILN for MARDIN CEMENT PLANT
MANUFACTURE VIEW at Our WorkshopAnd
ERECTION WORKS
CEMENT and MINERAL INDUSTRY
Site Photos….
24
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
VERTICAL RAW MILL for MARDIN CEMENT PLANT
MANUFACTURE VIEW at Our WorkshopAnd
ERECTION WORKS
CEMENT and MINERAL INDUSTRY
25
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
CEMENT GRINDING SYSTEM for MARDIN CEMENT PLANT
MANUFACTURE VIEW at Our WorkshopAnd
ERECTION WORKS
CEMENT and MINERAL INDUSTRY
26
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
MUS CEMENT PLANT Manufactures and Erection Works
Total ROTARY KILN EMPTY WEIGHT 780 Tons
Project Start Date January 2008
Project Finish Date September 2008
Project Cost 2.500.000 €
CEMENT and MINERAL INDUSTRY
27
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Total RAW MILL EMPTY WEIGHT 450 Tons
Project Start Date May 2008
Project Finish Date November 2008
Project Cost 540.0000 €
MUS CEMENT PLANT Vertical Raw Mill Erection Works
CEMENT and MINERAL INDUSTRY
28
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Total ROTARY KILN EMPTY WEIGHT 650 Tons
Project Start Date March 2007
Project Finish Date September 2007
Project Cost 1.000.000 $
GEORGIA KARTULI CEMENT PLANT
CEMENT and MINERAL INDUSTRY
29
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
ROTARY KILN Revision and Erection WorksGEORGIA KARTULI CEMENT PLANT
CEMENT and MINERAL INDUSTRY
30
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Our strategy is being an international contractor providing full-service engineering design,
construction, management services in the fields of energy refinery, oil& gas. Our manufacturing
and engineering groups are working for following services;
API Storage Tanks & Fuel Terminal• API Petroleum Storage Tanks• Fuel Terminal• Off-Loading and Loading Terminal• Filter and Pump Base• Piping process• Instrumentation• Special design Skid system• Electric and Automation Works,• Start-Up and Commissioning,• Process Operation & Technical Services,• Supervision
Pressure Vessel Systems• Spherical Tanks• LNG &LPG Tanks and Systems• Cryogenic Tanks
- LIN - LO - LH2- LCH4
Refinery Jobs• Piping• Isolations• T.A.B works• (Testing-Adjustment and Balancing)
PETROLEUM,OIL & GAS INDUSTRY
31
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DEHA TECH company specialized in the field staff with the API Petroleum tank farms and pumping stations, filter
responds to the needs of transport pipelines. Concluded projects in the Petroleum, both international and domestic
market.
API Petroleum Storage Tank
Fuel oil transfer and we work with international brands to the terminals and applying the standards we can offer
the best solutions to this issue.Use our experience to design and construction of fuel terminals DEHA TECH.
DEHA TECH terminal engineering capabilities include design service for a wide range of petroleum terminal
facilities.
Storage tanks, pump and piping , tank and pipe insulation, fire protection systems, truck loading and unloading ,
filter and separator skids, JP8/Kerosen/Jet A1blending additive injection.
FUEL TERMINAL
PETROLEUM,OIL & GAS INDUSTRY
32
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DEHA TECH knows the best international standards designed to provide the most appropriate solutions. Loading
of the terminals and Unloading hardware, engineering and automation systems in the world-famous companies
have been working with the best
Off Loading & Loading Terminal
• Similar standards such as API and any particle separator, water separator filters for the solutions we can
offer, such as.
• Petroleum in the business and to supply heavy-duty pumps erection options we can offer to work
smoothly.
Filter and Pump Base
PETROLEUM,OIL & GAS INDUSTRY
33
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DEHA TECH has engineered and fabricated many units of ASME & CE Stamp thin, heavy wall vessels amounting to
8.000 tons as of last years by adding value to customers with high skill, top quality and on time delivery at least total
installed cost.
The design and engineering according to A.D. Merkblätter and ASME Sec. VIII, supply, fabrication and construction,
including PWHT at site after erection where required of Spherical Gas Storage Tanks up to 5.000 cum, with leg
supports or skirt-support on turn-key basis.
Pressure Vessel Systems
PETROLEUM,OIL & GAS INDUSTRY
34
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
References….DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER
COUNTRY STATUS
2011 API 650 HFO Buffer Tank with 1000 m³ 1 pcs Manufacture RASA EnergyTURKEY Completed
2011 API 650 HFO Daily Tank with 200 m³ 1 pcs Manufacture RASA EnergyTURKEY Completed
2008 17,5 Bar LPG Underground Storage Tank with 10 m³ 5 pcs Manufacture PETROLOFISITURKEY Completed
2007 API 650 Fuel Oil Storage Tank with 2500 m3 1 pcs Manufacture YURT CEMENTTURKEY Completed
1987 API 650 Crude Oil Storage Tank with 1.000 m³ 2 pcs Manufacture TOROS GUBRETURKEY Completed
1985 API 650 Crude Oil Storage Tank with 50.000 m³ 2 pcs Manufacture TUPRAŞTURKEY Completed
PETROLEUM,OIL & GAS INDUSTRY
35
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
As a member of this universe Deha Tech believes that the engineering have to be done by the correct and
the Greenfield ways. We want to live on a clear planet. For this reason Deha Tech will supply returnable
energy solutions in all engineering applications.
Innovative energy technology area has provided cheap energy and health for investors. Hydro electric
power, wind power and natural or thermal power plants are preference as per region source. Our
manufacturing and engineering groups are working for following services;
Power Plants• Air Cooling Condenser • Tube Bundle • Distribution Pipe • Condensate Drainage Tanks • Boiler • Tanks
Solar Energy Systems
In the half of this century the energy supplies will carry on from the petroleum and other fossil fuels to the alternative
returnable energy. By the help of the changes in nano-technologies, solar energy is the best energy sector which will be
change and develop for high effective solutions. Therefore to be on a part of this sector is one of our big goals.
• Solar Designs by architectural solutions • Photovoltaic panels • Solar Thermal technology • Invertors • Solar energy keeping solutions
Dam• Piping • Generator • Turbine
Wind Power Systems• Wind Tower • Hub • Generator frame
ENERGY SECTOR
36
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2011 Nainawa Power Plant / Tank Farm Project, total 92.800 m³ 12 pcs ManufactureErection
ÇALIK EnergyTURKEY / Iraq Under Construction
2011 API 650 Raw Water Storage Tank with 3000 m³ 1 pcs Manufacture AKSA EnergyTURKEY Completed
2011 LO Service Tank with capacity of 20 m³ 2 pcs Manufacture AKSA Energy TURKEY Completed
2011 HP-LP Crossover Piping 4 pcs Manufacture BGM Eng. /TEÜAŞTURKEY Completed
2011 Cooling Tower Fan Frames and Technologic Parts Manufacture SPIG / AKSA TURKEY Completed
2010 6 Bar Drain Tank with 9 m³ 1 pcs Manufacture AKSA Energy TURKEY Completed
2010 6 Bar HRSG Blow down Tank with 9 m³ 2 pcs Manufacture AKSA Energy TURKEY Completed
2010 DN 1400 and DN 1600 Flanges Manufacture AKSA Energy TURKEY Completed
2010 Piping Supports Manufacture AKSA Energy TURKEY Completed
2010 Auxiliary Equipments Manufacture AKSA Energy TURKEY Completed
2010 Drain and Blow Down Tank Manufacture AKSA Energy TURKEY Completed
2010 DN 1200 and DN 1400 Flanges Manufacture AKSA Energy TURKEY
Completed
2010 Stainless Steel Supports Manufacture AKSA Energy TURKEY Completed
2009 Turbine and Generator for 2 x 2,8 MW 1 set ErectionCommissioning
YAYLABEL HES TURKEY Completed
2009 200 Tons Radial Cover for 2 x 7 MW 1 set ManufactureErection
KULP 4 HES TURKEY Completed
2009 DN 800-900-2500 Pipe, Elbows and Reductions Manufacture AKSA Energy TURKEY Completed
2009 Steam Turbine Manufacture TÜBİTAK TURKEY Completed
2009 Steel Structure ManufactureErection
PALMET/DELTA EnergyTURKEY Completed
2009 ACC ManufactureErection
PALMET/DELTA EnergyTURKEY Completed
2009 Last Stage Attemperator Liner and Pin Manufacture AKSA Energy TURKEY Completed
2009 Tertiary Piping Material take, Alloy Steel Attachment Manufacture AKSA Energy TURKEY Completed
2009 Steam Turbine Anchorage Manufacture AKSA Energy TURKEY Completed
ENERGY SECTOR
References….
37
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2008 Turbine and Generator for 2 x 7 MW ErectionCommissioning
KULP 4 HES TURKEY Completed
2008 Turbine and Generator for 2 x 12 MW ErectionCommissioning
KULP 1 HES TURKEY Completed
2008 400 Ton Radial Cover for 2 x 12 MW ManufactureErection
KULP 1 HES TURKEY Completed
2008 Stainless Steel Cover Manufacture DERİNER HEPPTURKEY Completed
2007 5 Bar Condense Tank with 3 m³ 1 pcs Manufacture DELTA Energy TURKEY Completed
2006 40 Bar Nitrogen Gas Tank with 100 m³ 2 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2006 30 Bar Oxygen Gas Tank with 100 m³ 6 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2006 40 Bar Oxygen Gas Tank with 100 m³ 6 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2006 5 Bar Sand Filter Tank with 5 / 10 / 15 m³ 25 pcs Manufacture ARTAŞ A.Ş.TURKEY Completed
2005 API 650 Demineralized Water Tank with 100 m3 1 pcs Manufacture EREN EnergyTURKEY Completed
1990 API 650 Chemical Disposal Storage Tank with 2000 m³ 5 pcs Manufacture KORUMA TARIM TURKEY Completed
1989 API 650 Chemical Disposal Storage Tank with 1000 m³ 5 pcs Manufacture KORUMA TARIM TURKEY Completed
References….
ENERGY SECTOR
38
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos…. ÇALIK ENERGY / Nainawa Power Plant / Tank Farm ProjectManufacturing and Erection Works
Project Scope : 12 pcs tanks with total 92.400 m3 including Painting WorksManufacturing of Tanks and AuxiliariesTransportation of Whole Scope of MaterialsErection Works
3,500 tons3.500 tons
Manufacturing Site
ENERGY SECTOR
39
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos….
Manufacturing and Erection Works
FERNAS ENERGY
Pipe Line for inside of Tunnel with Diameter : 4.900 mm.
Thickness : 14 mm.Length : 1.800 m.
Other Penstock, hydro mechanical equipment and inlet of turbinewith Diameter : 4.700 mm.
Thickness : 30 mm.Length : 880 m.
ENERGY SECTOR
40
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos….
Mechanical Manufacturing and Erection Works
PALMET ENERGY PLANT
Air Cooler Condenser (ACC)Steel Structure Condensate Tanks Engineering and ManufacturingManufacturing and Erection Works
ENERGY SECTOR
41
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos….
Mechanical Manufacturing and Erection Works
AKSA ENERGY PLANT
LO Service Tank with 200 m3 capacityRaw Water Tank with 3.000 m3 capacityDrain Tank with 6 bar, 9 m3Piping, Spool Manufacturing and Their SupportsDN 1400 and DN 1600 FlangesDN 800-900-2.500 Pipe, Elbow and ReductionsBlow Down Tank with 8 bar, 30 m3Stainless Steel SupportsAuxiliary Equipments Manufacturing and Erection Works
ENERGY SECTOR
42
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos….
Mechanical Manufacturing and Erection Works
RASA – Mardin
HFO Daily Tank with 200 m3 Raw Water Tank with 1.000 m3 Capacity
ENERGY SECTOR
43
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos….
Mechanical Manufacturing and Erection Works
RASA – Samsun
HFO Daily Tank with 20 m3 , 2 pcs
ENERGY SECTOR
44
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos….
Mechanical Manufacturing and Erection Works
TUBİTAK - MAM
Heat Recovery Steam Turbine System
ENERGY SECTOR
45
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
DEHA TECH focuses exclusively on processes and technologies for the long product steel making sector.
Regardless of steel grades or shapes, DEHA TECH has the high quality engineering, manufacturing and
favorable cost to meet customers objectives.
The design and supply of the following system and technology equipments are a part of our scope;
• EBT Slide Mechanism
• Ladle Furnace, Body and Cover
• Production of Liquid Steel Casting Ladles
• Ladle Transfer Cars
• Scrub Bucket and Bucket Transfer Car
• Tundish and Runne
• Combustion Chamber Panel sand Smoke Absorption Systems
• Production of Cap and Elbows
• Complete Melt Shop Plant
• Complete Rolling Mill Plant
• Electrical Arc Furnaces
• Dedusting Systems
• Electrode Columns and Locking's
• Lower Shell, Gentry and Platform
• Cover and Cooling Panels
• Upper Shell and its Panels
• Cover Lifting System
IRON & STEEL INDUSTRY
46
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
References….DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER
COUNTRY STATUS
2009 160 TONS Capacity Steel Melting Pot 6 pcs Manufacture YOLBULANTURKEY Completed
2009 160 Tons Capacity Electric Arc Furnace Upper&Lower Parts 2 pcs Manufacture YOLBULANTURKEY Completed
2009 120 Tons Capacity Eaf Body 1 pcs Manufacture KAPTAN D.Ç.TURKEY Completed
2008 Dedusting System Modification Modification KAPTAN D.Ç. TURKEY Completed
2008 Structural Steel ManufactureErection
DAL-MILIHOUSE CEMENTSYRIA Completed
2008 Auxiliary Steel Structure Manufacture İÇDAŞ A.Ş. TURKEY Completed
2007 25 Tons Capacity Steel Melting Pot 6 pcs Manufacture ÇEMTAŞ A.Ş. TURKEY Completed
2007 250 Tons Capacity Steel Melting Pot 8 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2007 250 m³ Capacity Scrap Bucket 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY Completed
2006-07 Electric Arc Furnace 1 set Manufacture KÜRÜM
TURKEY Completed
2006-08 Steel Melting Pot 14 pcs Manufacture ASİL ÇELİK
TURKEY Completed
2006 Steel Melting Pot and Scrap Bucket Manufacture İZMİR D.Ç. TURKEY Completed
2006 90 Tons Capacity Steel Melting Pot 6 pcs Manufacture NURSAN A.Ş. TURKEY Completed
2005 100 Tons Eaf Body 1 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2002 175 Tons Capacity Steel Melting Pots 8 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
2002 185 m³ Scrap Bucket 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY Completed
2002 100 m³ Gas Oxygen Tanks 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY Completed
2002 100 m³ Nitrogen Tanks 6 pcs Manufacture İÇDAŞ A.Ş.TURKEY
Completed
1996 100 Tons Capacity Steel Melting Pot 11 pcs Manufacture İÇDAŞ A.Ş. TURKEY Completed
IRON & STEEL INDUSTRY
47
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Water Technologies
Clean water and wastewater treatment plant equipment technology are most important for industry. We
are losing our water because of global heating and we give importance to this topic. With this purpose,
Deha Tech is providing following services;
• Process and Portable Water Treatment Plants
• Wastewater Treatment Plants
• Arsenic Removal
• Solid Waste Disposal
• Desulphurization Plants
Recovery Technologies
Electric Arc Furnace dust is very dangerous for the habitat, and this goal we have been part of the steel
industries. Deha Tech made rotary kiln shell for first Waelz Plant in Turkey. Also, our studies are
continuous in solid waste facilities. Our engineering groups are working for following services;
• Zinc Recovery Plant
• Solid Waste Treatment Plant
• Waelz Oxide Rotary Kiln
• Settling Chamber Unit
• De-dusting Filters
• Conveyors
• Elevators
• Demineralization Plants
• Waste Water Reuse
• Treatment Filter Tanks
• Biogas Storage Tanks
ENVIRONMENTAL TECHNOLOGIES
48
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
References….DATE PROJECT SCOPE &DESCRIPTION Amount SERVICE CUSTOMER COUNTRY STATUS
2011 DE-SOx Tower 1 pcs Manufacture RASA Energy TURKEY Completed
2010 DE-SOx System and Bag Filter 1 set ManufactureErection
TAI TURKEY Completed
20082011
Rotary Kiln and PartsRoller Base PlatesKiln Inlet and Outlet SealingsKiln Inlet ChamberTertiary Air Duct Double Dedusting Cyclone
1 set
DesignEngineeringManufacturi
ngErection
MARZINC WAELZ TURKEY On-Going
Mechanical Manufacturing, Transport to Plant Site and Erection WorksMARZINC WAELZ
Others
ENVIRONMENTAL TECHNOLOGIES
49
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Total DE-SOx EMPTY WEIGHT / Each Project 110 Tons
Project Scope: EPC 4 Months
Site Photos….
DE-SOx Tower Rasa Energy / AKSA MARDİN / TURKEY
DE-SOx Tower Rasa Energy / AKSA
GAZI MAGUSA / CYPRUS
Cooling Tower AKSA Energy
Antalya / TURKEY
ENVIRONMENTAL TECHNOLOGIES
50
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Total DE-SOx System and Bag Filter 2 x 85.000 m3/h
Project Start Date March 2011
Project Finish Date July 2011
Project Cost 323.000 €
Site Photos…. DE-SOx System and Bag Filter for TAIManufactures and Erection Works
ENVIRONMENTAL TECHNOLOGIES
51
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
Site Photos…. MANUFACTURE SITE VIEW at Our Workshop
ROTARY KILN MANUFACTURINGfor
ZINC RECOVERY PLANT - MARZINC COMPANY
ENVIRONMENTAL TECHNOLOGIES
52
. Mission and Vision ……………………
. Our Mission
. Our Vision
. Our Team
. Our Strategy
. Policies …………………...……………………
. QA & QC
. Health and Safety
. Environmental
. Certificates ……………………..
INDUSTRIES . Services & Capabilities ……...
REFERENCES …………….………. Cement Industry
. Energy Sector
. Petroleum, Oil & Gas
. Iron & Steel Industry
. Environmental Tech.
CONTACTS ……………………….
DEHA TECH Presentation 2
Cement & Mineral ………….
Petroleum, Oil & Gas ………
Energy Sector ………………….
Iron & Steel ……………………
Environmental Technology
3
4
7
6
5
8
15
16
31
36
46
48
. Workshop ……………………..………………
ABOUT US 2
. Head Office Kemeraltı Cd. No:28 Kat 334425 Karaköyİstanbul, Turkey
E-mail: [email protected]
Head OfficeTel : +90 212 252 48 00Fax: +90 212 252 48 18
DIVISION Contacts :
. Commercial ManagementMr. Berk DAL , [email protected]
. Technical ManagementMr. Hakan YILDIRIM, [email protected]
. Account & Finance Mr. Ertuğrul ARICAN, [email protected]
. Desing & Engineering Mr. Goksel YAĞDIRAN, [email protected]
. Logistic & Procurement Mss. Duygu SUNGUR, [email protected]
. QA & QC Department Mr. Mustafa KESKİN, [email protected]
CONTACTS
. Head Office Kemeraltı Cd. No:28 Kat 334425 Karaköyİstanbul, Turkey
E-mail: [email protected]