defined methods in engineered labor standards
DESCRIPTION
Defined Methods in Engineered Labor Standards. Greg Melroy Manager, West Monroe Partners. Agenda. The System, the Process, the Problem The Engineered Labor Standard Process Engineering a Labor Standard Managing with a Labor Standard Faster , Safer, More Accurate - PowerPoint PPT PresentationTRANSCRIPT
Defined Methods in Engineered Labor StandardsGreg MelroyManager, West Monroe Partners
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 2
Agenda
I. The System, the Process, the Problem
II. The Engineered Labor Standard Process
III.Engineering a Labor Standard
IV.Managing with a Labor Standard
V. Faster, Safer, More Accurate
VI.Questions and Comments
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 3
Labor Standards Engineers see more than the bags and the handler
The System, the Process, the Problem
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 4
Labor Standards Engineers see the process and tasks
Walk 23 steps around a fuel hose from the tug to the baggage cart, open the luggage cart curtain (A42 B6 G3 A1 B0 P3 A0)
Walk 5 steps to obtain the scan gun, return to baggage cart (A10 B0 G1 A0 B0 P0 A10)
Reach and grab for the luggage, (A1 B6 G3 M3 X0 I0 A0), scan the tag (A1 B0 G1 A1 B0 P3 A0), turn the bag (A1 B6 G3 M3 X0 I0 A0), and finally place the bag (A3 B0 G0 A0 B0 P1 A0)
The System, the Process, the Problem
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 5
We want faster, safer, more accurate, more dependable
What happens if we simply build a standard on this process?
Will we achieve the desired results?
Would the process we’re watching get better?
The System, the Process, the Problem
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 6
We can easily build a standard on this process, and the employees may do well
But there will be no improvement in the system or the throughput, despite their achievements
The System, the Process, the Problem
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 7
So, how do we do it?
How do we build and use an Engineered Labor Standard to get the most out of the system?
How do we get safe, efficient, productive employees to support the overall needs of our systems and processes if an ELS alone is not the answer?
The System, the Process, the Problem
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 8
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 9
An Engineered Labor Standard (or “ELS”) is only as good as the process for which it is built
The system must first be properly dissected and optimized for efficiency
Methods development and documentation followed by workforce training ensure operational success and accountability
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 10
The Engineered Labor Standard Process
Define the System
-Processes-Sub Processes-Tasks
Optimize Processes and Tasks
-Safety-Accuracy-Efficiency
Write Preferred Methods
-"The Right Way"-Every Process-Every Task
Teaching, Training and Accountability
-Processes-Sub Processes-Tasks
Engineer the Labor Standard
-Work Study-Data Analysis-Elemental Development
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 11
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 12
Define the Processes of the System
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 13
Define the Sub Processes
Process = Baggage Handling• Unload Aircraft• Load Baggage Cart• Drive to/from Aircraft• Load Aircraft
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 14
Define the Tasks of a Sub Process
Sub Process = Unload Baggage Cart• Walk from Tug to Baggage Cart 1• Open Baggage Curtain• Obtain Scan Gun• Scan Baggage Tag• Obtain Bag• Place Bag on Belt
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 15
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 16
Optimize each process
Eliminate non-value added tasks
Change the procedure
Change the job set-up
Look at the process in its entirety – can a simple methods change upstream eliminate a task later?
If necessary, re-build the process from the ground (tasks) up, using the safest, most efficient job set-ups and methods
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 17
The question and answer phase of the ELS process may raise as many questions as it answers
The solutions developed during this phase could mean everything to success of the overall system once the ELS has been implemented
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 18
Optimizing the Baggage Handler
Can the tug be parked in a different position?
Can the walk to the carts be shortened?
Can the luggage tag be scanned before it is removed from the cart to eliminate the extra handle?
What can be done upstream to improve the efficiency in this process?
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 19
Optimizing the Baggage Handler
Improved positioning of the tug eliminates the need to walk around the fuel hose, eliminating 10 steps (A24 B6 G3 A1 B0 P3 A0)
Adding a holster for the scanner eliminates the need to retrieve the scan gun (A1 B0 G1 A0 B0 P0 A0)
Methods change in loading eliminates the need to turn the bag allowing handler to scan the tag in the cart (A1 B0 G1 A1 B0 P3 A0) then reach and grab for the luggage (A1 B6 G3 M3 X0 I0 A0), and place the bag on the belt without turning it (A3 B0 G0 A0 B0 P1 A0)
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 20
Optimizing the Baggage Handler
The sum of the MOST values for the original process: 1120 TMU (40.28 sec)
The sum of the MOST values once optimized: 620 TMU (22.30 sec)
This is for the first bag only, remaining bags would benefit from only the tag scan and handling (original: 360 TMU, optimized: 230 TMU)
At Atlanta’s Hartsfield-Jackson International Airport where Delta Airlines handles approximately 100,000 bags per day, eliminating the excess bag turn would translate into 130 fewer hours of bag handling per day
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 21
The Engineered Labor Standard Process
Define the System
-Processes-Sub Processes-Tasks
Optimize Processes and Tasks
-Safety-Accuracy-Efficiency
Write Preferred Methods
-"The Right Way"-Every Process-Every Task
Teaching, Training and Accountability
-Processes-Sub Processes-Tasks
Engineer the Labor Standard
-Work Study-Data Analysis-Elemental Development
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 22
Once the process has been optimized at the task level, it must be documented thoroughly to avoid any confusion during the training and
follow-up phases
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 23
Define the System
-Processes-Sub Processes-Tasks
Optimize Processes and Tasks
-Safety-Accuracy-Efficiency
Write Preferred Methods
-"The Right Way"-Every Process-Every Task
Teaching, Training and Accountability
-Processes-Sub Processes-Tasks
Engineer the Labor Standard
-Work Study-Data Analysis-Elemental Development
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 24
Training, Follow-up and Demonstration
Have an effective trainer
Include both written and verbal communication
Include demonstration in the work environment
Schedule follow-up to check for understanding and ensure compliance
Results should be documented
The Engineered Labor Standard Process
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 25
Engineering the Labor Standard
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 26
Begin work sampling and operational observation
Build elements based on the written methods and observation
Engineer appropriate allowances
Engineer appropriate variances for conditions
Test and Validate the new ELS
Engineering the Labor Standard
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 27
Managing with an Engineered Labor Standard
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 28
Front-line management people are the “keepers of the standard”
130% is as bad as 70% on the Operation Reports
Recognition, re-training and accountability are continuous processes
Update the ELS with changing conditions to maintain accuracy
Managing with an Engineered Labor Standard
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 29
Faster, Safer, More Accurate
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 30
The Engineered Labor Standard is not the “silver bullet” to “Faster, Safer, More Accurate”
An ELS is the final measuring stick for the greater Engineered Labor Standard Process
Successful Engineered Labor Standards are rooted in the properly defined work processes and tasks that are enforced with proper training and follow-up
Faster, Safer, More Accurate
© 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited 31
Questions / Comments