deep dry soil mixing - thrandeston bog
DESCRIPTION
Stabilisation of an existing railway embankment in Colchester, England using dry cement binderTRANSCRIPT
Deep Dry Soil Mixingat
Thrandeston Bog
Client: Network RailM/C: Nuttall John Martin
Consultant: Mott MacDonald
Site Location – nr Colchester
Design Challenge
Design Challenge• Peats:
– Very soft to soft (cU = 5 to 10kPa)– Moisture contents up to 400%– Upper zone highly responsive to climatic
conditions• Clays:
– Soft to firm to stiff – Sandy bands
• Chalk:– Very soft at surface– Artesian water at depth
Binder is injected as mixing tool is extracted with reversed rotation
1 2
Rotating mixing tool penetrates to desired depth of treatment
3 4
Completed Column Completed Adjacent Columns
Ground Stabilisation Solution
Ground Stabilisation Solution
Ground Stabilisation Solution
Design Case: Rotational Slip
Ground Stabilisation Solution
Design Case: Consolidation Settlement
Ground Stabilisation Solution
Design Case: Soil Migration
Mix Design Considerations
• Laboratory testing undertaken on Borehole samples
• CEM I binder rates of 150 to 300kg/m3
• Column Strength Constraints:– Moisture Content – pH Level – Inclusions – Contamination
Laboratory Testing
• Testing indicated design strength only achievable with high binder dosage rate.
• This gave practical & commercial concerns
• Engineer revised design strength with no change in panel spacing or width
Site Trials & Validation
• In situ testing– Push-In Resistance Testing– Pull-Out Resistance Testing– Undrained & drained triaxial testing– CPT’s to assess early strength
• Additional SI - CPT’s to characterize site
• Environmental Monitoring
0
1
2
3
4
5
6
7
8
0 25 50 75 100 125 150 175 200 225 250 275 300
Undrained Shear Strength (kPa)
Dep
th b
elow
hau
l roa
d (m
)
3 day testresults7 day testresults14 day testresults
Specifcation requirement 125 kPa
Approximate extent of working platform
Site Trials
Final Design binder dosage rates ranged between 175kg/m3 to 275kg/m3
Column Push in Test Results
Site Operations
•Stable Rig•Robust Platform Design•Restrained Mast•Embankment Monitored
Main Works
0
2
4
6
8
10
12
0 50 100 150 200
Dep
th (m
)
Binder Dosage (kg/m3) and RPM
Binder DosageTool RPM
0 100 200 300 400
Blade Rotation Number (BRN)
Stabilised Column
Soft Peatbetween
2.0m
• Scheme gave a saving of £6M to the client (50 –65% saving)
• First use of DDSM on UK infrastructure & in live transport environment
• 11,000 columns installed, 85,000 linear metres• Completed in 19 weeks (5 weeks early)• £90k saved through CPT site characterisation• The line stayed open for the entire project and is
now operating at 100mph• Ground Engineering Award for UK Project with a
Geotechnical Value over £1M
Summary
Completed profile
Total number of piles
Total length of piles (m)
Weight of steel (ton)
Embodied energy (GJ) Embodied CO2 (kg)
Tubular steel piles 1,200 18,329 7,331 256,585 17,594,400
Total number of columns
Total length of columns (m)
Weight of cement (ton)
Embodied energy (GJ) Embodied CO2 (kg)
Dry soil mixing 11,024 75,382 5,524 43,087 5,430,092
Sustainability Comparison