deactivated nuclear power plant program sm ......sm-1a timeline: details • sm1a construction start...

9
217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 237 80 119 27 252 174 .59 “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.” WM2018 Session 097b US Army Corps of Engineers - Deactivated NPP Program D&D Contracting Opportunities Brenda Barber, P.E. Hans Honerlah, CHMM Baltimore District, CENAB-ENE March 2018 DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM-1A, FT GREELY, AK 1

Upload: others

Post on 07-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

WM2018Session 097b US Army Corps of Engineers - Deactivated NPP Program D&D Contracting Opportunities

Brenda Barber, P.E.Hans Honerlah, CHMMBaltimore District, CENAB-ENE

March 2018

DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM-1A, FT GREELY, AK

1

Page 2: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

TOPICS

• History• Decommissioning Planning

2

Page 3: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

SM-1A TIMELINE: DETAILS• SM1A Construction start 1958• SM-1 Reactor Startup: March 1962

• Core II installed, April 1964• Core III installed, Jan 1966• Core IV, installed Aug 1970

• Pressure Vessel annealed, Aug 1967• Last operation: March 1972• Minimal Decommissioning and entombment: 1973 • USACHPPM Survey: June 1997• BRAC Pipeline and Dilution Well Removal: 1997 - 2000• Core Component Activation Analysis: 2008• Contractor Historical Site Assessment: 2008• Contractor Gamma Walkover Report: 2011• Contractor Characterization Survey Report: 2014

Page 4: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

PRE/POST-SHUTDOWNDECOMMISSIONING ACTIVITIES

• Decontamination of Primary and Secondary Systems

• Encasement of Vapor Container, Spent Fuel Pit, Hot waste tanks, pipe pit, dilution station, condenser deck, fuel storage vault, and Building J5 floor

• Placed a time capsule• Shipped fuel elements and control

rods• Transferred calibration sources• Disposed of radioactive wastes• Removal of wastewater pipeline and

dilution station

Page 5: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

PRIOR CHARACTERIZATION EFFORTS TO SUPPORT DECOMMISSIONING PLANNING• BRAC Activities 1997-2000• Gamma Walkover Surveys 2011• All Hazards Assessment 2011• All Hazards Assessment Characterization Report 2014

Page 6: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

DECOMMISSIONING PLANNING EFFORTS

• Decommissioning Planning is underway – anticipate completion by 2021• Contract was awarded in Dec 2017• Scope includes:

• Review of historical documents associated with the All Hazards Analysis • Prepare planning documents that will support the Army Reactor Office issuing the USACE a decommissioning permit

for the SM-1A reactor• Comply with other relevant Federal and State requirements that will support the long term decommissioning planning• Ensure adherence of project activities to NRC, Army, and Federal standards and guidance , as well as, other Federal

standards and guidance where relevant, and• Coordinate with appropriate federal, state, and public parties to support issuance of decommissioning permit and other

NEPA requirements.

Page 7: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

MAJOR DECOMMISSIONING PLANNING DOCUMENTS• Final Disposal Plan, Schedule and Cost Estimate• Waste Management Plan • Environmental Assessment• Section 106 Effects Assessment and agreement document• Decommissioning Plan

Page 8: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

DECOMMISSIONING CHALLENGES

• Remote location• Harsh climate• Potential for a limited decommissioning schedule (May – Sep) due

to climate• Limited housing support for temporary staff in local community• Deactivated Nuclear Power Plant co-located with Installations

current central heating power plant• Central heating power plant operations privatized with Army Contract

• Major components were encased with grout and concrete within the Vapor Containment which will likely need to be mined to allow for removal of components• Reactor Pressure Vessel, Pressurizer, Steam Generator

Page 9: DEACTIVATED NUCLEAR POWER PLANT PROGRAM SM ......SM-1A TIMELINE: DETAILS • SM1A Construction start 1958 • SM-1 Reactor Startup: March 1962 • Core II installed, April 1964 •

Questions?

9