Venture / Operation Prepared By Mothobekhi, L and vd Westhuizen, D
Project Version No 2
Project Ref No Revision date 2015/03
TAPES:Task,Activity, Product, Equipment or Service
*Refer to Energies list in "Inventory" worksheet for hard copy
Area of Responsibility Activity, Task, Process,Products and service
Routine / NonRoutine
Energy Hazard/Aspect Consequences/ Impact/ Event(opportunity and threat).
Cause (S) *Inherent Risk Rating
Critical Controls Hierarchy ofcontrol
Emergency Measures
**Residual RiskRating
Comments
Office Admin Office Work Routine Resource usage Use of electricity (office sanitary andkitchen)
Depletion of non-renewable energyresources
Operational 5 Use of energy saving devices andenvironmental awareness
Engineering &Admintrative
Non-required 2
Office Admin Office Work Routine Environmental impact Use of Water (Kitchen and sanitary) Depletion of water resources Operational 5 Toolbox discussion-Environmentalawareness
Admintrative Non-required 2
Office Admin Office Work Routine Environmental impact Generation of general waste Reduction of space in landfill site andloss of land productivity
Operational 5 EXP_02-Prospecting procedure -Minimisation of domestic wastegeneration at the house. Toolboxdiscussion
Admintrative Non-required 2
Office Admin Office Work Routine Environmental impact Generation of recyclable waste Resource conservation Operational 5 EXP_02-Prospecting procedure -Wasteseparation and Environmentalawareness
Substitution &Admintrative
Non-required 2
Parking Parked vehicles Non Routine Environmental impact Potential Oil spillage Contamination of soil Indicental 4 Oil spill kit readily available,environmental awareness, Vehiclesregularly serviced and daily pre-startcheck.
Administrative Oil spill kit 2
Parking Parked vehicles Non Routine Environmental impact Potential Oil spillage Contamination of water Indicental 4 Oil spill kit readily available,environmental awareness, Vehiclesregularly serviced and daily pre-startcheck.
Administrative Oil spill kit 2
Parking Parked vehicles Non Routine Environmental impact Generation of hazardous waste - Cleaningof oil spillages and contaminated soil.
Reduction of space in landfill site Indicental 3 Traing and awareness Administrative Non-required 3
Travelling Vehicle driving (travel to sitefor ground geophysicalsurvey, drilling & sampling)
Routine Environmental impact Exhaust emissions Air pollution Operational 16 Vehicles serviced as per manufactoryrecommendation, driving within speedlimits and toolbox talk
Administrative Non-required 11
Travelling Vehicle driving (travel to sitefor ground geophysicalsurvey, drilling & sampling)
Routine Environmental impact Fossil fuel consumption Depletion of non-renewable energyresources
Operational 16 Vehicles serviced as per manufactoryrecommendation, driving within speedlimits and toolbox talk
Administrative Non-required 11
Travelling Vehicle driving (travel to sitefor ground geophysicalsurvey, drilling & sampling)
Routine Environmental impact Dust generation Air pollution Operational 12Awareness and reduced speed
Administrative Non-required 7
Travelling Vehicle driving (travel to sitefor ground geophysicalsurvey, drilling & sampling)
Routine Environmental impact Generation of general waste Reduction of space in landfill site andloss of land productivity
Operational 5 EXP_02-Prospecting procedure -Minimisation of domestic wastegeneration at the house. Toolboxdiscussion
Admintrative Non-required 2
Travelling Potential road accident Emergency Community impact Animals/Livestock/People Moving vehicles may accidentally hitpersons or animal causing injuries/deaths.
Accident 8 Toolbox Talks; Adherence to vehicleprocedures and speed limits
Admintrative Emergency procedure to befollowed.
5
Travelling Potential road accident Emergency Environmental impact Potential Oil spillage Contamination of soil Accident 8 Toolbox Talks; Adherence to vehicleprocedures and speed limits
Administrative andawareness
Spill Kit 5
Travelling Potential road accident Emergency Environmental impact Potential Oil spillage Contamination of water Accident 8 Toolbox Talks; Adherence to vehicleprocedures and speed limits
Administrative andawareness
Spill Kit 5
Field Airborne and Groundgeophisical work -Wastegeneration
Routine Environmental Generation of general waste Environmental/land pollution Poor riskassessment andbriefing
8 EXP_02-Prospecting procedure -Toolbox
talks and Emplan Briefing
Administrative Non-required 4
Airport Aircraft efueling - oil and jetfuel spiilage
Non Routine Environmental impact oil and jet fuel spiilage Contamination of soil Indicental 4 Spill kit readily available, environmentalawareness,
Administrative Oil spill kit 2
Airport Oil and jet fuel spillage clean-up.
Non Routine Environmental impact Generation of hazardous waste - Cleaningof oil spillages and contaminated soil.
Reduction of space in landfill site Indicental 3 EXP_02-Prospecting procedure -Traingand awareness
Administrative Non-required 3
Field Airborne geophysics Routine Environmental impact Exhaust emissions Air pollution Operational 16 Aircraft serviced as per manufactoryrecommendation.
Administrative Non-required 11
Field Airborne geophysics Routine Environmental impact Jet fuel consumption Depletion of non-renewable energyresources
Operational 16 Aircraft serviced as per manufactoryrecommendation.
Administrative Non-required 11
Desktop Study
Travelling by road to and from suites
Field_Geophysics
De Beers Group Exploration
ECOHS Baseline Risk Assessment Form
RSA Exploration Approved By
Gabisile Simelane
Free State
Medium Significant Significant High High
Medium Medium Significant High High
Low Medium Significant Significant High
Low Low Medium Significant Significant
Low Low Medium Medium Significant
Medium Significant Significant High High
Medium Medium Significant High High
Low Medium Significant Significant High
Low Low Medium Significant Significant
Low Low Medium Medium Significant
Prepared by: GE ECOHS Version No: 02
Issue Date: 07/02/2011Version Date: 19/06/2012
Field Airborne accident Emergency Environmental impact Potential Oil spillage Contamination of soil Accident 8 Aircraft serviced as per manufactoryrecommendation.
Administrative andawareness
Emergency procedure to befollowed, Spill Kit
5
Prepared by: GE ECOHS Version No: 02
Issue Date: 07/02/2011Version Date: 19/06/2012
Field Airborne accident Emergency Environmental impact Potential Oil spillage Contamination of water Accident 8 Aircraft serviced as per manufactoryrecommendation.
Administrative andawareness
Emergency procedure to befollowed, Spill Kit
5
Field Airborne accident Emergency Environmental impact Fire or explosions Air pollution Accident 5 Aircraft serviced as per manufactoryrecommendation.
Administrative andawareness
Emergency procedure to befollowed.
5
Field accommodation Accomodation Routine Electrical Use of electricity for field office, Kitchenetc.
Depletion of non-renewable energyresources
Operational 11 Awareness Administrative Non-required 5
Field accommodation Accomodation Routine Environmental impact Use of Water (Kitchen and sanitary) Depletion of water resources Operational 8 Awareness Administrative Non-required 5
Field accommodation Accomodation Routine Environmental impact Generation of general Waste Reduction of space in landfill site andloss of land productivity
Operational 8 EXP_02-Prospecting procedure -Awareness, Waste separation
Administrative Non-required 5
Field accommodation Accomodation Routine Environmental impact Generation of Recyclable waste Reduction of space in landfill site andloss of land productivity
Operational 8 EXP_02-Prospecting procedure -Awareness, Waste separation
Administrative Non-required 5
Field Human waste Routine Environmental impact Sewage generation potentail soil, ground and surfacewater contamination
No proper toile
provided
17 EXP_02-Prospecting procedure -Chemical toilets to be providedatprospecting sites.
Engineering, Administrative
Non-required 5
Field Site establishment/clearing Routine Environmental impact Removal of endangered tree species Extinction of endangered tree species.Land degradation
Operational 8 EXP-02-PR_Prospcting operationalprocedure. Induction. Shift drill positionif in area with protected species.Transplanting trees if no alternative isavailable .No endangered and Nationaprotected trees onsites
Administrative Non-required 5
Field Site establishment/clearing Routine Environmental impact Vegetation clearance Loss of vegetation, increased erosion Operational 8 Induction, Minimise are of disturbance ,only 2m of fire break is created arounddrillsite
Administrative Non-required 5
Field Site establishment/clearing Routine Environmental impact Increased erosion due to vegitationclearance
Loss of topsoil Operational 8 Induction, Minimise are of disturbance ,only 2m of fire break is created arounddrillsite
Administrative Non-required 5
Field Site establishment/clearing Routine Environmental impact Disturbance to heritage site i.e graves Destroyed heritage site or assets Operational 8 EXP-02-PR_Prospcting operationalprocedure 2.2.3 and awareness andInduction.
Substitute andadministrative
Non-required 5
Field Site establishment/clearing Non Routine Environmental impact Potential Oil spillage Contamination of soil Indicental 4 Oil spill kit readily available,environmental awareness, machineryregularly serviced and daily pre-startcheck.
Administrative Oil spill kit 2
Field Site establishment/clearing Non Routine Environmental impact Potential Oil spillage Contamination of water Indicental 4 Oil spill kit readily available,environmental awareness, machineryregularly serviced and daily pre-startcheck.
Administrative Oil spill kit 2
Field Site establishment/clearing Non Routine Environmental impact Generation of hazardous waste - Cleaningof oil spillages and contaminated soil.
Reduction of space in landfill site Indicental 3 Traing and awareness Administrative Non-required 3
Field/ Camp site Site establishment Routine Environmental impact Generation of general waste Reduction of space in landfill site andloss of land productivity
Operational 5 Minimisation of domestic wastegeneration at the house. Toolboxdiscussion
Admintrative Non-required 2
Filed Drill rig operation Non Routine Environmental impact Prospecting within riparian zone Impact on stream flow Operational 18 EXP_02-Prospecting procedure 2.1.1 Administrative Non-required 8
Filed Drill rig operation Non Routine Environmental impact Abstration of water for drilling purposes. Reduction on water availability forother existing land users
Operational 18 EXP_02-Prospecting procedure 2.1.2 Administrative Non-required 8
Field Drill rig operation Routine Environmental impact Pollution by spillages (hydraulic oil &fuel). Drill string left on the ground
Breakages of hoses, valves or controls;loss of drilling equipment downhole.
Poor inspectionand maintenance
8 EXP-03-PR_Drilling Procedure- Pre-startchecklist and service of equipment
Engineering, Administrative
Oil spill kit 5
Field Drill rig operation Routine Environmental impact Drlling into natural gas Fire and/or explosion Operational 22 EXP-03-PR_Drilling Procedure Administrative Emergency procedure to befollowed.
8
Field Drill rig operation Routine Environmental impact Fire Safety risk, impact on both flora andfauna
Indicedental 8 EXP_02-Prospecting procedure administrative Emergency procedure to befollowed.
5
Field Drill rig operation Routine Environmental impact Chemicals used as lubricant Ground water pollution Poor RiskAssessment, awareness
8 Only use non-toxic and biodegradablechemicals. Provide MSDS for allchemicals used.
Administration andsubstitute
Oil spill kit 5
Field Human waste Routine Environmental impact Sewage generation potentail soil, ground and surfacewater contamination
No proper toileprovided
17 EXP_02-Prospecting procedure -Chemical toilets to be providedatprospecting sites. Pit toilets only to beused away from watercourses.
Engineering, Administrative
Oil spill kit 5
Field site rehabilitation Dewatering of sump Routine Environmental impact Spillage of contaminated water Soil contamination Poor Risk
Assessment,
8 EXP-06-PR_Prospecting SiteRehabilitation procedure -Riskassessment, Secondary containment
Administrative Oil spill kit 5
Field site rehabilitation Excavations and reshaping Routine Environmental impact Distibution of weeds/invesive speciesseeds
Infestation of weeds/invasive species Operational 6 EXP-06-PR_Prospecting SiteRehabilitation procedure -Weeds/invesive species seedseradication procedure
administrative Non-required 4
Field site rehabilitation Excavations and reshaping Routine Environmental impact Soil erosion Loss of topsoil Operational 6 EXP-06-PR_Prospecting SiteRehabilitation procedure
administrative Non-required 5
Field site closure Closing exploration activitiesfrom one camp
Non Routine Environmental impact Post closure residual environmentalaspects – invasive plant species, erosionand water pollution
invasive plant species, erosion andwater pollution
Operational 6 EXP-06-PR_Prospecting SiteRehabilitation procedure and financialprovision
administrative Non-required 5
Accomodation/temporary camps
Site establishment - drill site,
Drilling
Field site rehabilitation
Field site closure
Prepared by: GE ECOHS Version No: 02
Issue Date: 07/02/2011Version Date: 19/06/2012
Field site closure Closing exploration activitiesfrom one camp
Non Routine Community impact Community expectation Company Reputation and community
relationship getting affected
Lack of job forlocal people andcontractors maypossibly create anegative impactfor futureexploration
15 Propoer communication between theengaged community and Debeersrepresentative. Buliding Goodrelationship with the stakehiolders
Administrative Non-required 5
Prepared by: GE ECOHS Version No: 02
Issue Date: 07/02/2011Version Date: 19/06/2012
Significant Risk rating methodology
Anglo American 5x5 Risk Matrices Anglo American 5x5 Risk Matrix is a systematic methodology that has been adopted to evaluate the risk of each respective impacts/unwanted event. The risk of each impacts/unwanted events is determined for Safety, health and Environment. The fundamental principle of Risk Matrices is to recognise that it is simply a tool to prioritise risks and the actions required to manage the risk to an acceptable level. It is a risk ranking tool that provides a qualitative means to determine the significance of risks and the required effort to address priorities in addressing the risk. A minimum of two factors are considered for each risk identified:
Likelihood: chance/probability that the risk will occur within a time period
The definition of likelihood provides time based frequency guideline for evaluating risks associated with (repeat) events on a 5 point scale.
Consequence: The impact the risk will have, should it materialise
Given the types of headline risks that the Family of Companies encounters, the consequences/ impact of these risks are categorised across the following areas:
People Safety Delivery of Results Occupational Health Financial Environmental Legal Reputational
Note: The risk are categorised into low, medium, significance and high. Anglo American has adopted a ranking approach from 1 to 25, meaning there are unique Risk Numbers for each risk rated: Low: 1 -5: Medium: 6 to 12: significant: 12 to 20 and high: 21 to 25 Note: When rating significance of environmental aspects the duration and extent of impact must be taken into consideration as follows: For Pollution impacts – Toxicity, Volume and nature of the substance in question. For habitat disturbance – sensitivity of the habitat, the size of the area affected and
the ability of the environment to rehabilitate (Assimilative capacity). For biodiversity impact – red data rating of the species and the range of the species For resource use – amount of resource used, resource availability and whether it is
renewable or not.
T
2
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
Note: This
from
Table of Con
1. PURP
2. PROC
2.1. CON
2.2. SPERESOURC
2.2.1. 2.2.2. 2.2.3. 2.2.4.
2.3. ACE
2.4. SIT2.4.1. 2.4.2. 2.4.3. 2.4.4. 2.4.5.
2.5. VEH
2.6. WA
2.7. GEO
2.8. DRI
xploration RS
Operational
Next
4 S
BY: Theo Rikhotso
s document m this docum
ntents
POSE ............
CEDURAL RE
NTRACT ON-
ECIFIC ENVICES ..............
Riparian ZoWater SuppCultural anRemoval of
ESS TO SITE
E ESTABLISHSHE risk asSmoking arSanitation Waste manHydrocarbo
HICLES, EQU
LKING IN TH
OPHYSICAL S
ILLING ........
SA Based Op
l Procedure
t Review dat
Sept. 2016
and Lucas Lemotlo
is controlledment are dee
....................
QUIREMENT
BOARDING .
RONMENTA....................ones ............ply ...............
nd historical f Vegetation
AND TRACK
HMNET ........ssessment ..rea ..............Facilities ....
nagement ...on/chemical
UIPMENT, FU
HE FIELD ......
SURVEYS ....
....................
perations RS
te Pr
EXP-02
o
d when storeemed to be u
....................
T ..................
....................
L LEGAL RE............................................................sites ........... (Limpopo P
K/PATH CON
....................................................................................................l spillage ma
UELS AND OI
....................
....................
....................
SA Exploratio
rocedure no
2-PR
APPROVED BY
ed on documuncontrolled
...................
...................
...................
EQUIREMENT...............................................................................
Province or ot
STRUCTION
...................
....................
....................
....................
....................anagement ..
LS ...............
...................
...................
...................
on
:
1
Y: Gabisile Simelan
ment managed and are on
....................
....................
....................
TS WITH RE...................................................................................ther provinc
....................
.............................................................................................................................
....................
....................
....................
....................
Page:
Of 7
ne
ement systenly valid on th
....................
....................
....................
EGARDS TO ...................................................................................
ce as specifie
....................
....................
.....................
.....................
.....................
.....................
.....................
....................
....................
....................
....................
Version
em Printed cohe day of pri
....................
....................
....................
PROTECTED................................................................................ed) ..............
....................
........................................................................................................................
....................
....................
....................
....................
5
opies createinting.
....................
....................
....................
D AREAS AN....................................................................................................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ed
.. 2
.. 2
.. 2
ND .. 2 . 2 . 2 . 3 . 3
.. 4
.. 5 . 5 . 5 . 5 . 5 . 5
.. 6
.. 6
.. 7
.. 7
2
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
1. PURPOSThe pu
2. PROCEDA photor has
2.1.
2.2.
xploration RS
Operational
Next
4 S
BY: Theo Rikhotso
SE urpose of thTo documerequiremen
DURAL REQUtographic gas environme
CONTRA
The tender contractor. The Exploracontractors other requirOnce the teadhere to twill be madThe Exploraassessmentrelevant conEveryone woccupationa
SPECIFICAND RES
2.2.1. R
Section 21 with, shouldactivities. The above applicable, prescribed fRecord of co
2.2.2. W
The Projectwith landow
SA Based Op
l Procedure
t Review dat
Sept. 2016
and Lucas Lemotlo
is prospectinent, ensure ts, that mus
UIREMENT allery of befontal impacts
ACT ON-BOAR
process sh
ation Program containing rements.
ender is accethe operatine available fation Prograt, prestart cntractors. working for al health scr
C ENVIRONMSOURCES
Riparian Zo
(c) and (i) ofd prospectin
section requto the com
format as amompliance w
Water Supp
t Manager mwners, to pre
perations RS
te Pr
EXP-02
o
ng operationthe implem
st be adhere
ore, during as shall be es
RDING
all be comp
mme Managall relevant
epted and sigg procedurefrom time toamme Manchecklist an
or on behreening and
MENTAL LEG
ones
f National Wg take place
uires applicampetent autmended fromwith the requ
ply
must establisevent impact
SA Exploratio
rocedure no
2-PR
APPROVED BY
nal procedurmentation an
d at all time
and after dritablished, im
plied with by
ger shall ens operational
gned by the es and other time by the ager/Projectd other insp
half of De a possible s
GAL REQUIR
Water Act, (ace within the
ation for a pthority (Depm time to timuirements m
sh water avat on landown
on
:
2
Y: Gabisile Simelan
re is: nd maintenas by all field
lling and/or mplemented
y both the E
sure that te procedures
contractor, r requireme Project mant Manager pection are
Beers RSAsecurity back
EMENTS WI
ct No 36 of Riparian Zon
permit or Wartment res
me. ust be main
ailability for ners water ne
Page:
Of 7
ne
ance of the staff and dr
any other a and mainta
Exploration
nder docums, required ri
the contractnts of De Bnager. shall ensur
carried out
A Explorationkground chec
ITH REGARD
1998) as amne, prior to t
Water Use Licsponsible fo
tained.
prospectingeeds.
Version
e prospectinrilling contra
ctivities thatained.
Programme
ments are seisk assessm
tor is then leeers RSA Ex
re that sitet, with the in
n shall be ck.
DS TO PROT
mended musthe commen
cense (WULor water res
g activities i
5
ng operationactors.
t has potent
Manager a
nt to potentment, legal a
egally boundxploration th
e specific rinvolvement
subjected
TECTED AREA
st be complincement of t
L) whicheversources), in
n consultati
nal
tial
nd
tial nd
to hat
isk of
to
AS
ed the
r is a
on
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
In theLEDET
xploration RS
Operational
Next
4 S
BY: Theo Rikhotso
Should watsupplier, auwater will beProspecting39 of 1998from time to
(“Small Induuse more thClassificatio1993, as am(a) 1: Foo(b) 2: Pro(c) 3: Ma(d) 5: con
Therefore thGovernmenas follows: Subm
Regisprior t
Estaband/o
2.2.3. C
For drilling out by a recultural andSuch findinAfrican ResoEveryone wocourse of accourse of th Stop w If the
ProgrAsses
The oproce
2.2.4. R
Limpopo PrT will be app
SA Based Op
l Procedure
t Review dat
Sept. 2016
and Lucas Lemotlo
ter not be suthorized to e available.
g is classified8 – Regulatio time.
ustrial User”han twenty con of All Ecomended andod Processinospecting, manufacturingnstruction.
he requiremt Notice 339
mit to the Mstration in a to commenc
blish and maor stored in a Cultural and
and/or bulkgistered arc
d historical regs and mitiources Agenorking for orction if any aheir prospectwork in the v Project Geoamme Manssment. outcome of
eed in the vic Removal of
rovince, (Limproached for
perations RS
te Pr
EXP-02
o
sufficient onissues wateAgreement md as “Small ion and Not
” Means watcubic metresnomic Activi
d supplemenng
mining and qg; and
ents of Natio9 of March 2
Minister respprescribed r
cement with aintain a moa prescribed
d historical
k sampling achaeologist, esources. gation meas
ncy (SAHRA).r on behalf oartefacts or sting work: vicinity of theologist is notnager must
f this assescinity of the d
Vegetation
mpopo Depar the permit
SA Exploratio
rocedure no
2-PR
APPROVED BY
n site to cater shall be amust be reco Industrial Utice – Gover
er user who s per day (20ities (5th editnted, under t
uarrying;
onal Water A2004 as ame
ponsible for registration f the activity onitoring prod manner.
sites
a phase 1 Heto identify t
sures shall
of De Beers Rstructures o
e discovery at sure, that t be contac
ssment will discovery.
n (Limpopo
rtment of Ec in terms of
on
:
3
Y: Gabisile Simelan
ter for prosapproached torded and reser” which irnment Noti
qualify as w
0 m3) and idetion), publishthe following
Act, No 39 ofended from
Water resoform and/orin terms of s
ogramme to
eritage Impathe potentia
be commun
RSA exploratr remains of
and report tothe structurected to org
determine
Province or
conomic DevLimpopo En
Page:
Of 7
ne
pecting actito ascertainecord maintas regulated ce 339 of M
work creatingentified in thhed by Centrg:
f 1998 – Retime to time
ources an ar supporting section 21 (a measure th
act Assessml impacts of
nicated to a
tion must bef buildings ar
o the Projecte is modernganize a Ph
whether an
r other prov
velopment, Environmenta
Version
ivities, a loc if the requiained. by National March 2004
g enterpriseshe Standardral Statistics
egulation ande must be co
application fg informationa) and/or (b
he quantity o
ment (HIA) mf the propos
nd/or appro
e briefed there encounte
t Geologist. (< 50 yearshase 2 He
nd how pro
vince as spe
Environmentl Manageme
5
cal bulk watired volume
Water Act, N4 as amend
s that do nod Industrial s Services,
d Notice – omplied with
for Water Un as request). of water tak
must be carrised activity
oved by Sou
e following red during th
s old) then teritage Impa
ospecting m
ecified)
t and Tourisent Act (Act N
ter of
No ed
t
Use ted
ken
ed on
uth
he
the act
may
m) No
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
7 of 2vegeta
2.3.
xploration RS
Operational
Next
4 S
BY: Theo Rikhotso
20030 as amation during
ACESS TThe landowNo fences wcompletion As far as poIn cases wconsultationand the efftrimming tr(<3m) if absOff-road accOff-road accUse 3-point The landowThe route wno driving oIf a footpatincreased. If the track checked witIf the areaestablishedPlan tracks defined. If the trackcementing troad, reducflows into awill be remoIn very steeappropriateAny rocks otopsoil if it nThe open othroughout Reasonablelivestock. Tracks shouincidents anFor rehabilprocedure.
SA Based Op
l Procedure
t Review dat
Sept. 2016
and Lucas Lemotlo
mended, se the course o
TO SITE AND ner must bewill be cut w of work at aossible existihere off-roan with landofects to vegees and busolutely nececess by this cess will be turns when ner will be c
will be demaoutside this fh is made, i
traverses ath a botanist is very ste. to impact a
k is such thatwo strips, m
ce velocity oan area wheoved during ep areas or we engineer wor stones renecessary tor closed stat the prospece speeds mu
uld not be usnd accidentsitation of tr
perations RS
te Pr
EXP-02
o
ction 64 Proof prospecti
TRACK/PATe consulted iwithout the pa cost to RSAng tracks an
ad driving isowner (unlesgetation will
shes only wessary. means will brestricted to turning arou
consulted as rcated (use
footprint so ait will be dem
an area whet prior to beieep a slope
as little as p
at traversingmaking use of water andre there is lerehabilitatiowhere the haill be used to
emoved will o remove anytus of gates
cting period. ust be obse
sed during vs and impactracks and f
SA Exploratio
rocedure no
2-PR
APPROVED BY
otection of ing.
TH CONSTRUn order to gapermission oA Explorationnd roads shas unavoidabss it is a stebe minimize
where neces
be for short po a single traund in the fie to the posit rocks or stoas to prevenmarcated in
ere it is knong confirme
e stability t
possible on t
g it is likely of water brd silt traps teast chance
on, unless lanabitat is veryo design andbe stored fy soil. shall be cla
erved to avo
very wet weats on the enfootpaths –
on
:
4
Y: Gabisile Simelan
indigenous
UCTION ain access toof the surfacn. all be used. ble, the shoeep slope in ed by sticki
ssary and on
periods onlyck. eld, not largetion of the ofones along tnt the disturb the same w
wn there ared. est will be
the most sen
to cause ereaks and mto allow sede of erosion ndowners rey sensitive od build the trfor replacem
arified with t
id accidents
ather as the vironment w See EXP-P
Page:
Of 7
ne
plants, for t
o the site. ce owner; th
rtest possib which caseng to fencenly removing
y (< 3 month
e turning cirff-road routethe edge if pbed area fromway such tha
re red data
conducted
nsitive areas
rosion, consmitre drains diment to se or damage equest that itor prone to erack.
ment during
the landown
s, excessive
impact of cowill be much R-06 Prospe
Version
the removal
hese must b
ble route wie a zig-zag we lines as fag bushes an
s).
rcles. e. possible) andm getting anat the footp
species, the
prior to th
s, where the
sideration w to take theettle out befto a wetlandt be left in perosion, the
rehabilitatio
er/tenant an
noise, dust
ompaction a higher. ecting Site
5
of indigeno
be repaired
ll be taken will be optimar as possibnd small tre
d there will ny wider. rint cannot
e route will
e track bei
ese have be
will be given e water off tfore the watd. The ceme
place. services of
on, as will a
nd maintain
t and injury
and chances
Rehabilitati
ous
on
in al)
ble, ees
be
be
be
ng
en
to the ter ent
an
any
ed
to
of
on
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.4. Everyothems
xploration RS
Operational
Next
4 S
BY: Theo Rikhotso
SITE ESTone workingselves in a m
2.4.1. SAn onsite Sto minimize
2.4.2. SA smoking adry grass toSmoking iscompliance
2.4.3. SThe drill conthe form of EnvironmenThe toilet coThe toilet wA copy of thThe record o
2.4.4. W
A waste maHazardous wNo waste wBefore takiDepartmentGeneral wasdisposal siteHazardous avoid any awaste site. Records wil
2.4.5. HA spill kit wshould be cDrip trays afor oil leak. All oil contaSpare drip servicing an
SA Based Op
l Procedure
t Review dat
Sept. 2016
and Lucas Lemotlo
TABLISHMENg for and doimanner that
SHE risk assHE risk asse
e the potentia
Smoking ararea must b
o prevent fires restricted and may re
Sanitation Fntractor sha a portable tontally friendlyontents will bill be maintae registratioof disposal s Waste mannagement awaste will beill be disposng waste tot of Environmste will be ree. waste shall
additional sp
l be kept of t
Hydrocarboith all items
checked regund/or PVC s iners kept otrays shall b
nd repair of m
perations RS
te Pr
EXP-02
o
NT ng work on projects our
sessment essment mual SHE risk,
ea be establishee, smoking s
to the smosult disciplin
Facilities all at all drilloilet. y agents willbe disposedained so thaton of the treashall be mai
agement area shall bee kept separ
sed of on-siteo the nearemental Affairemoved from
be disposepillage when
the disposa
on/chemica up to date ularly. sheeting will
n site must be kept andmachinery a
SA Exploratio
rocedure no
2-PR
APPROVED BY
behalf of Der values.
st conduct ain the presc
ed, with the ignage, and oking area. nary action.
ing sites pro
be used in t of at a regist it remains atment workntained.
e demarcatedrate from gee and no litteest municiprs and Foresm the site on
ed in a demn stored, unt
l of all hazar
l spillage mmust be kep
be placed u
be kept in dd used to cond vehicles.
on
:
5
Y: Gabisile Simelan
e Beers RSA
and controls/ribed forman
following as fire extinguiSmoking in
ovide adequ
the toilets tostered waterin an accept
ks / sewerag
d with clearlneral wasteering is allowal landfill a
stry should bn a weekly b
arcated bin til it can be
rdous waste
managemenpt on site at
under any ma
rip trays. ollect oils an
Page:
Of 7
ne
A Exploration
/ mitigation nt.
s minimum: Cisher. n any other
ate and wel
o biodegrader treatment wtable conditi
ge works sho
y marked wa.
wed. a copy of thbe asked for basis and dis
and precau disposed of
.
nt all times. Th
achinery on
nd fluids fro
Version
n are expect
measures b
Cigarette bu
r area will
ll maintained
e the contenworks / sewion.
ould be obta
aste bins wit
he license and kept onsposed of at
utions shoulf at a licens
he content o
site that has
om any eme
5
ted to condu
be put in pla
utt bin, clear
result in no
d sanitation
nts. erage works
ined.
th lids.
issued by tn file. an authoriz
d be taken sed hazardo
of the spill k
s the potent
ergency on-s
uct
ace
red
on-
in
s.
the
zed
to ous
kits
tial
ite
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.5.
2.6.
xploration RS
Operational
Next
4 S
BY: Theo Rikhotso
The contentdisposed ofAny spill ontas saw dusof as hazard
VEHICLEIt is the dutensure thathydraulic lechecks musIt is not plareceive atteOther equipminimize spEnsure all hA log book iThe amountThese are fthe consumusage. Should therthe case witOld tyres arBattery servdistilled watBattery chathe battery. If the battean exchang
WALKINGPlan the waduration of Walkers shcompass. Avoid wherextreme weWater/ClothappropriateBe aware of Deh Sho Ank Bon
SA Based Op
l Procedure
t Review dat
Sept. 2016
and Lucas Lemotlo
ts of drip paf at as hazarto the grount and removdous waste (
ES, EQUIPMEty of each dt all componaks which m
st be documnned to do a
ention. pment usedpillage of fueheavy items as kept for eat of fuel usedforwarded to
mption of fue
re be a probth routine pre retained bvicing shoulter to the indrging, if req ry does not
ge basis from
G IN THE FIEalk and consthe walk.
hould ensure
re possible eather and behing/Equipmely and wear f the followin
hydration, suock arising frkle sprain ne fracture
perations RS
te Pr
EXP-02
o
ns / PVC linrdous waste nd should beving the con(see 2.4.4).
ENT, FUELS Ariver to perf
nents of the may causes dented any mainten
d in the proel and oils duare raised ofach vehicle. d and kilomeo the Projecel against kil
blem; vehiclereventative m
by the supplied be done dicated leveuired, will b
charge due m outside con
ELD ider location
e they have
hazards sue informed o
ment – wa suitable hikng risks whilunburn and srom injury
SA Exploratio
rocedure no
2-PR
APPROVED BY
ings must b (see 2.4.4).
e cleaned upntaminated s
AND OILS form a daily vehicle are damage to o
nance of veh
ospecting pruring operatff the ground eters travelle
ct Manager alometers tra
es are sent maintenanceers for retreaby outside cl. e done in a
to damagedntractors.
n, degree of
e appropriat
ch as cliff on the naturlkers shoul
king footweae walking in
sun/heat str
on
:
6
Y: Gabisile Simelan
be soaked up immediatelsoil, spillage
and weekly in a good stour environm
hicles on pro
rocess musions which cd to limit com
ed per montand/or Oper
avelled. This
in for mainte. ating or dispcontractors;
well-ventila
d cells a rep
difficulty, en
te navigatio
edges, slippre of the terrld ensure r. the field:
roke
Page:
Of 7
ne
p with oil bio
y by using oe and absorb
y pre-start chtate of repa
ment if it lea
ospecting sit
st also be acause pollutimpaction wh
th are calculrations Supp highlights p
tenance by
posal. De Beers’s
ted area, w
placement b
nvironmenta
onal equipm
pery tracks,ain to be trathey carry
Version
odegrading lo
il absorbentbent materia
heck on his/ir and that iks onto the
tes. Only em
adequately on of the en
here practica
ated from thport Manageproblems of
outside con
s staff shou
ith a drip tra
battery will b
l sensitivity o
ment e.g. GP
, rocks, danavelled over.
adequate
5
oose fibre a
t material sual and dispo
/her vehicle it has no oil ground. The
mergencies w
maintained nvironment. able.
he log book. er who checexcessive fu
ntractors, as
ld only top
ay undernea
be obtained
of the site a
PS maps a
ngerous tree water, dre
nd
uch ose
to or
ese
will
to
cks uel
s is
up
ath
on
nd
nd
es,
ess
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.7.
2.8. Refer
xploration RS
Operational
Next
4 S
BY: Theo Rikhotso
Sym Asp Burn Sna Smo
Senior Fieldabove risksBush Walkeonly footprinAdditional eeven in winwaterproof gaiters, mobObserve - Ebehind to reDo not rely that you areBe careful –
GEOPHYGround geostraight lineLine cuttingtrees or largSome survebiodegradathese shoulOccasionallreference. Apurpose. Th
DRILLING to EXP-PR-0
SA Based Op
l Procedure
t Review dat
Sept. 2016
and Lucas Lemotlo
mptoms sugghyxiation anns
ake bites oke and fored Officer/Sup. ers code – ants! equipment tonter). The fol
matches, pbile phone, s
Each membeeduce the ris on others foe fully prepar– avoid walk
YSICAL SURVophysical sures collecting g shall be limge bushes iseys require ble flagging ld be removey, a permanA steel fenc
he position o
G 03 Drilling pr
perations RS
te Pr
EXP-02
o
gesting the od smoke inh
eign matter ipervisors of
aim for mini
o be carried llowing addi
penknife, idesun glasses,er of the grosk of the groor your welfared.
king alone int
VEYS rveys usually data. mited to thes permitted. the marking tape. Occased on complnent markerce dropper,
of the perma
rocedure and
SA Exploratio
rocedure no
2-PR
APPROVED BY
onset of hypohalation
n eyes teams walk
imal impact
in a hands ftional equip
entification, , whistle, tor
oup should koup becominare. Bring th
to unknown
y require op
e trimming o
g of positionsionally wooetion
r will be req cemented nent marker
d EXP-PR-06
on
:
7
Y: Gabisile Simelan
othermia
king should b
bush walki
free back papment items
money, surch and warm
keep in sightg split.
he correct eq
terrain.
perators of g
of branches
ns along eaoden stakes
uired to mato the grour will be clea
6 Prospecting
Page:
Of 7
ne
be trained in
ng. Take on
ack: sun hat s may also brvival bag/bm top. t the walker
quipment, cl
geophysical i
and underg
ch survey lis are used to
ark the positund if requirared with the
g Site Rehab
Version
n first aid to
nly photogra
and sunscrebe considerelanket, spa
rs immediate
lothing, food
instruments
growth; no cu
ine; this is do mark the
tion of a surred, will be e landowner.
bilitation pro
5
cope with t
phs and lea
een (essentied: a lighter re boot lace
ely ahead a
d and water
to walk alo
utting down
done by usi ends of line
rvey for futu used for th.
ocedure.
the
ave
ial, or es,
nd
so
ong
of
ng es;
ure his
T
2
De Beers Ex
Drilling Proc
Date
Sept. 201
PREPARED B
Note: This
from Table of Con
1. PURP
2. PROC
2.1. GEN
2.2. THE
2.3. COD2.3.1. 2.3.2. 2.3.3. 2.3.4. 2.3.5. 2.3.6. 2.3.7. 2.3.8.
2.4. EM
2.5. DRI2.5.1. 2.5.2. 2.5.3. 2.5.4.
xploration RS
edure
Next
4 S
BY: Theo Rikhotso
s document m this docum
ntents
POSE ............
CEDURAL RE
NERAL SAFE
E USE OF DR
DE OF PRACStatus of CGeneral InfProperties Risk AssessIdentificatioDetection FProcedure Control of G
ERGENCY P
ILLING SITE Access andPreparationRehabilitatClosure......
SA Based Op
t Review dat
Sept. 2016
and Lucas Lemotlo
is controlledment are dee
....................
QUIREMENT
ETY AT DRILL
RILLING AGE
TICE FOR THCode of Practformation anand Dangersment .........on of FlammFlammable G at Drill Site .Gas Emissio
REPAREDNE
MANAGEMEd Siting ........n and Drillintion of a Drill....................
perations RS
te Pr
EXP-03
o
d when storeemed to be u
....................
T ..................
L SITES ........
NTS AND LU
HE PREVENTtice (COP) ...nd Terms ans of Methan....................
mable Gas SoGas ..................................ns ...............
ESS FOR FIR
ENT ..................................g .................l Site ...............................
SA Exploratio
rocedure no
3-PR
APPROVED BY
ed on documuncontrolled
...................
...................
...................
UBRICANTS .
TION OF FLAM....................d Definitionse .....................................ources .....................................................................
RE ................
...................
....................
....................
....................
....................
on
:
1
Y: Gabisile Simelan
ment managed and are on
....................
....................
....................
....................
MMABLE GA.....................s ................................................................................................................................................
....................
........................................................................................................
Page:
Of 11
ne
ement systenly valid on th
....................
....................
....................
....................
AS EXPLOSIO........................................................................................................................................................................
....................
....................
.....................
.....................
.....................
.....................
Version
em Printed cohe day of pri
....................
....................
....................
....................
ONS ..............................................................................................................................................................................
....................
....................................................................................................
5
opies createinting.
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ed
.. 1
.. 1
.. 1
.. 1
.. 2 . 2 . 2 . 2 . 2 . 2 . 3 . 3 . 3
.. 4
.. 4 . 4 . 4 . 5 . 5
2
De Beers Ex
Drilling Proc
Date
Sept. 201
PREPARED B
1. PURPOSThe pu
2. PROCED2.1. G
2.2. T
xploration RS
edure
Next
4 S
BY: Theo Rikhotso
SE urpose of thTo implememanage poincludes siteTo include thigh to medpresent.
DURAL REQUGENERAL SA
A risk assesAn area of cwith the drisafety shoeThis area wgas being eDust and eywind may bAll staff anperson (usuOnly qualifiitself. Do not drilTerminate d
THE USE OF D
The quantitbe kept by tThe potentiPR-02 ProspThe 16 posubstancesWherever pshould be u
SA Based Op
t Review dat
Sept. 2016
and Lucas Lemotlo
e Drilling proent and maotential signe preparatiothe procedudium risk e.
UIREMENT FETY AT DRI
ssment mustcontrol is to ll contractors/boots, eyeill corresponncountered ye protectiolow dust in dd contracto
ually the drilled persons
l during an drilling for th
DRILLING AG
ty of drill agethe project gal impacts cpecting Opeoint Materia used by the
possible and used.
perations RS
te Pr
EXP-03
o
ocedure is: aintain Safetificant impa
on, large diamure for preve.g. where Ka
ILL SITES
t be conduct be demarcar/operator, we protection,nd with the “ (see below)n should alsdifferent direors must ob manager / (usually the
electric stoe day or wai
GENTS AND
ents and lubgeologist (Apcaused by orational Proc
al Safety Dae drilling con available, e
SA Exploratio
rocedure no
3-PR
APPROVED BY
ty Health aacts/significmeter drillingention of flaaroo rocks o
ted in a presated (with dawithin which, dust and he“No smoking. so be providections. ey safety inforeman). e drill contra
orm. Lightninit out the sto
LUBRICANTS
bricants usependix I: Reil leaks fromcedures. ata Sheets tractor shou
environment
on
:
1
Y: Gabisile Simelan
nd Environmant impactsg and small mmable gasor other pot
scribed formanger tape ah relevant PPearing proteg” area defin
ded to all sta
nstructions i
actor’s staff
ng striking torm inside ve
S
ed shall be rcord of quan
m machinery
containing uld be obtaintally friendly
Page:
Of 11
ne
mental (SHEs related to diameter drs explosionstential sourc
ant. and/or paintPE must be ction).
ned where th
aff outside t
issued by th
f) are allowe
the drill maehicles park
ecorded by ntity of drilliny used at su
all relevanned. drilling age
Version
E) working o explorationrilling. s when drillices of flamm
ted stakes) iused (hard
here is a risk
the area of
he appointe
ed to opera
ast is a veryked away from
the contractng agent userface are co
nt data per
nts and drill
5
procedures n drilling. Th
ng in areas mable gas a
n consultatihats, overal
k of flammab
control as t
ed responsib
te the drill
y real dangm the drill ri
tor and recoed) overed by EX
rtaining to
l bit lubrican
to his
of are
on lls,
ble
the
ble
rig
er. g.
ord
XP-
all
nts
De Beers Ex
Drilling Proc
Date
Sept. 201
PREPARED B
2.3. C
2
2
This Cthe RSdistinc
2
2
2
xploration RS
edure
Next
4 S
BY: Theo Rikhotso
CODE OF PRA
2.3.1. Statu
Inland occuSouth Africaof Practice (This mandaA2 issued bThis is a maThis COP mwhether theThis COP suAll managerprevention ensure com
2.3.2. Gene
COP is to be SA. As suchction betwee
2.3.3. Prope
Methane is Methane gaColourless, CombustibleExplosive beOver 15% it
2.3.4. Risk AThe occurreHowever duunnoticed implementaThe main risCOP therefoIt is not envfrom the ho
2.3.5. Ident
SA Based Op
t Review dat
Sept. 2016
and Lucas Lemotlo
ACTICE FOR
s of Code of
urrences of a. When drill(COP) will be
atory COP waby the Chief Iandatory COP
may be used e COP is effeupercedes alrial instructioof flammab
mpliance.
ral Informat
used by De , the words "en prospecti
erties and Da
often mixedas is lighter t odourless ae below 5%.etween 5% at replaces th
Assessmentence of gas pue to the higor without
ation of the Csk therefore
ore concentrvisaged that ole and there
ification of F
perations RS
te Pr
EXP-03
o
THE PREVEN
f Practice (CO
natural gas ling through e adhered toas drawn upnspector of P in terms of in accident
ective and fitll previous reons or recom
ble gas explo
ion and Term
Beers Conso"mine" or "mng and mini
angers of M
d with other fthan air (S.Gnd tasteless and 15%. e oxygen in t
pocket intersgh probabilit taking duCOP exists. e exists in norates on dete any drilling efore proced
Flammable G
SA Exploratio
rocedure no
3-PR
APPROVED BY
NTION OF FL
OP)
are restricte rocks belon
o. in accordan Mines. f sections (2 investigatiot for the purpelevant COP'mmended prosions must
ms and Defin
olidated Minmining" shoul
ng in the Mi
ethane
flammable gG. 0.55). s and can on
the air and c
sections whity of seriouse precautio
on-detectionection proceshall be conures around
Gas Sources
on
:
2
Y: Gabisile Simelan
LAMMABLE G
ed to the senging to the
nce with Gui
2) and (3) of ons to ascertpose. 's. rocedures (vt comply wit
nitions
nes Limited dld be read asnerals Act.
gases (hydro
nly be detect
can cause su
lst drilling sus injury shouons, the ne
n of possibleedures. nducted whild spark and f
Page:
Of 11
ne
GAS EXPLOS
ediments of Karoo Supe
deline DME
the MHSA. tain complia
voluntary COth this COP
during explos indicating
ogen, butane
ted by an ins
uffocation in
urface borehuld such a geed to mo
e gas emissio
st detected flame suppr
Version
SIONS
the Karoo rgroup, the f
Ref. No. DM
ance and als
OP's) and staand must b
ration for dia prospecting
e, etc.)
strument.
n confined sp
holes is fairlygas pocket bonitor gas
ons from the
gas emissioression are n
5
Supergroup following Co
ME 16/3/2/
so to establi
andards on tbe reviewed
amonds withg as there is
paces.
y rare. be intersectemissions
e hole and t
ons are flowinot looked at
in de
1 -
ish
the to
hin no
ted by
the
ng t.
De Beers Ex
Drilling Proc
Date
Sept. 201
PREPARED B
2
2
2
When
xploration RS
edure
Next
4 S
BY: Theo Rikhotso
Pockets of gThese pockborehole pe
2.3.6. Detec
Prior to comthe drill holinstrument.The flammaproject and than 3 mon
2.3.7. Proce
An area up fencing. Symbolic sigFire extinguPrior to comthe drill holeDuring drillshould not by swingingAlways ensuon the drill should not tResults for purpose. Maintenancand during
2.3.8. Contr
flammable Stop all worWithdraw adangers. Inform the Mine HealthContinue mexceeding 1If the explohours. If thsupervision
SA Based Op
t Review dat
Sept. 2016
and Lucas Lemotlo
gas trapped ets of gas ar
enetrates the
ction Flamm
mmencing ane and in the
able gas mea at least eveths).
edure at Dril
to 40 (forty
gns, such asishers will b
mmencing ane and in the ing, gas reabe further th
g rods if the rure that the rods that thtake less tha all tests, w
ce on the drmaintenanc
rol of Gas Em
gas exceedsrk and immeall personne
Exploration h and Safety
monitoring an1 hour, the roosive mixture
e mixture re of a person
perations RS
te Pr
EXP-03
o
by impermere likely to be impermea
able Gas
ny work eace drill rods b
asuring instery three mo
l Site
y) metres ar
s “No Smokibe placed at ny work eac drill rods. adings are than 1m fromreading is taoperator is ahey are not an 30 secon
whether nega
rill equipmene, periodic r
missions
s 1% by voluediately shutl to outside
Programmey Act and thend if the expods may be e remains aemains consn in position
SA Exploratio
rocedure no
3-PR
APPROVED BY
eable strata e under presble strata.
ch day, a flay a geologis
ruments wilnths during
round the d
ng, No Openstrategic po
ch day, a fla
taken at them the hole b
ken too closaware that y being move
nds. ative or pos
nt will only breadings will
me, the follot down all ene of the 40
e Manager, e Principal Inplosive mixtu removed frobove 1%, th
stant at 4% o of authority
on
:
3
Y: Gabisile Simelan
undergroundssure, result
mmable gasst who is trai
l be fully cha a drilling pro
rill site will
n Flames, Daints within ammable gas
e hole durinut care shouse to the holyou are takined whilst the
sitive, must
be done if th be taken at
owing steps ngines. m barricad
the appointnspector of Mure drops toom the hole the hole musor less, the ry. With the r
Page:
Of 11
ne
d. ting in sudde
s reading muined to use f
arged and coject (if the d
be fenced o
anger Keep Oand without ts reading mu
ng the chanuld be takene.
ng the readine reading is
be recorde
he flammabt intervals no
must be foll
e and fully
ted ManageMines of the o less than 1to allow the
st be monitorods may be rods remove
Version
en release o
ust be takenflammable g
alibrated pridrilling proje
off with wire
Out”, will be the demarcaust be taken
nging of rodsn in that a da
ng and alway being taken
d in a book
le gas readiot exceeding
lowed:
inform them
er under sec Region. 1% by volum free flow of ored for a m removed un
ed, the hole
5
of gas once t
n at the top gas measuri
ior to a drilliect lasts long
e fencing/ga
posted. ated area. n at the top
s. The metanger is pos
ys keep an en. The readi
k kept for th
ing is negatig 1 hour.
m of potent
ction 3 of t
me for a peri gas.
minimum of 2nder the diremust again
the
of ng
ng ger
ate
of
ter ed
eye ng
his
ive
tial
the
od
24 ect be
De Beers Ex
Drilling Proc
Date
Sept. 201
PREPARED B
2.4. E
See EX
2.5. D
Photohas en The esthat ththat is
2
Refer
2
xploration RS
edure
Next
4 S
BY: Theo Rikhotso
left with fremust then bIf the explosbe in close c
EMERGENCY
XP-PR-O5 Em
DRILLING SIT
graphic gallenvironmenta
stablishmenhe rehabilitas suitable for
2.5.1. Acce
to EXP-02-P
2.5.2. Prepa
This section2.4.) The Project for each driDetermine wRestrict drilWhere drilliheight) onlyconsultationbushes will If practicabplanning hoIn areas cochecked witto be adjustIn arid areastore in a drRemove all Level only remove safely
SA Based Op
t Review dat
Sept. 2016
and Lucas Lemotlo
ee flow for abe cementedsive mixtureconsultation
Y PREPARED
mergency Pr
TE MANAGEM
ery of beforeal impacts sh
nt of a drill sated area mur the agreed
ess and Sitin
PR Prospectin
aration and D
n must be re
Geologist mll hole compwhat anti-erol site to the ng is necessy. No large tn with the pl be stored on
ble, design dole direction,ntaining redth a botanisted so as no
as, remove arum. vegetation, equired areay to rig.
perations RS
te Pr
EXP-03
o
a minimum pd. remains in
n with the Pr
NESS FOR F
reparedness
MENT
e, during andhall be estab
site must beust be re-veg
d post closur
g
ng Operation
Drilling
ead with (EX
must complepleted (Appeosion measuminimum sizsary in thicktrees will belantation own a tarpaulindrill holes to, drilling mord data plant st to see if aot disturb theall plus centi
logs, stonesa for safe an
SA Exploratio
rocedure no
3-PR
APPROVED BY
period of 24
excess of 4%incipal Inspe
FIRE
s and Respon
d after drillinblished, impl
e establishegetated, safee land use.
nal procedur
XP-02-PR Pro
ete the drill sndix II: Drill sures are necze of cleared
kly vegetatede removed,
wner and withn for rehabilio avoid havire than one h species, the
any red data ese if at all pmetre size q
s and rocks ond effective o
on
:
4
Y: Gabisile Simelan
4 hours. If g
% for a perioector of Mine
nse Procedu
ng and/or anlemented an
d with closue, stable, no
re, section 2
ospecting op
site check psite checklis
cessary and d area. d area, tree cexcept if ach due compeitation. ng to set uhole from a e planned d species are
possible, prioquartz or oth
on surface aoperation of
Page:
Of 11
ne
gas remains
od of 1 weekes of the Reg
ure.
ny other activnd maintaine
ure, in mindon-polluting,
2.3.
perational p
provided at tst) implement t
cutting is limccessing exoensation be
p on the msingle cleare
drill sites ande present, anor to the posher light colo
nd store sepf the drill rig
Version
s constant t
k, any work tgion.
vities that haed.
taking into non-eroded
rocedure, se
he back of t
these.
mited to smaotic timber ping agreed t
ost sensitiveed site d access rond if these p
sitions being oured float, i
parately. or as requir
5
the entire ho
to be done w
as potential
considerati and in a sta
ection 2.2 a
this procedu
all trees (< 3plantations, to. The clear
e area e.g.
utes are to positions ne confirmed. if present, a
red for truck
ole
will
or
on ate
nd
ure
3m in red
by
be ed
nd
to
De Beers Ex
Drilling Proc
Date
Sept. 201
PREPARED B
2
Refer
2
Refer
xploration RS
edure
Next
4 S
BY: Theo Rikhotso
Where it is plastic sheewind and raWater comileft to flow recycled. Thground contPlan the suis no pollutiEnsure the fine sedimeThe only chhazardous aare used onOn some compressedused will b(Appendix I:Ensure thatavoid leaks Ensure thatLarge diamefrom site anOn completrehabilitatioAt the end provided on
2.5.3. Reha
to EXP-06-P
2.5.4. Closu
to EXP-06-P
SA Based Op
t Review dat
Sept. 2016
and Lucas Lemotlo
necessary et shall be pain. ng out of the in a controhe small tretamination amp to be duon by fine secapacity of t
ent. emicals to band is not tonly when siderigs, small d air systembe recorded: Record of qt all equipme or spills ontt all heavy iteeter drill samnd not placedtion the areaon procedureof the drillin
nce satisfied
bilitation of
PR Prospectin
ure
PR Prospectin
perations RS
te Pr
EXP-03
o
to remove tput in place
e hole whilstolled manne
ench will be and/or soil eug in less senediment formthe sump is
be used dowoxic to grounewall stabilisamounts o
m and the md by the drquantity of dent at the drto the groundems are raismples are plad elsewhere
as around the be adheredng programm with the reh
a Drill Site
ng Site Reha
ng Site Reha
SA Exploratio
rocedure no
3-PR
APPROVED BY
the topsoil to tempora
t drilling willer into the slined with h
erosion. nsitive area ming a layer adequate s
wn the hole and water or dsation is reqof bio-degra
moving partsilling contrarilling agent rill site that d. Repair an
sed off the graced directly
e on the grouhe drill hole wd to, referenme the landhabilitation.
abilitation pr
abilitation pr
on
:
5
Y: Gabisile Simelan
(e.g. diggingrily store an
be directedsump so asheavy duty p
if possible a over the soi
so as to avoi
are the detedrilling mudsuired.
adable rock . The amoun
actor and d used) can leak is i
ny leaks as sround to limy into bulk b
und. will be clear
nce below. d owner is t
rocedure.
rocedure, 2.
Page:
Of 11
ne
g a sump), ad cover the
d away from s not to cauplastic sheet
and line the sil in which ved pollution o
rgent baseds which mus
grease arnt of this biocumented
in drip trays oon as possit compactio
bags which s
ed of all dril
o be asked
7 closure an
Version
a tarpaulin topsoil to p
the rig alonguse erosion.t or tarpauli
sump to ensery little vegeof the surrou
d drilling foamst also not b
e used to o-degradabl by the pro
or on tarpasible. on, where prshould be rem
l sludge and
to sign the
nd landowne
5
or heavy duprotect again
g a trench a. This will in to minimi
sure that theetation growunding area
m which is nbe toxic. The
lubricate tle rock greaoject geolog
ulins bunds
acticable. moved direc
d litter and t
closure lett
er letter.
uty nst
nd be ise
ere ws. by
not ese
the ase gist
to
ctly
the
ter
Appendix I: Record of quantity of drilling agent used
Approved by: DBGS-GE Advanced Exploration
Hole ID/ Furo :
Data Hora Profund. Bentonita Viscopol T Viscopol TLV Cimento Soda Gesso (KG) Compactonit Graxa (KG) Cap 21 Rotafoam Dodigem Tempo no Filtro (1L) Assistente Sondador(Date) (00H00) ( m ) KG KG KG KG Fine Medium Coarse Fine Medium Coarse KG (Plaster) KG (Grease) (L) (L) (L) (Segundos) (Helper) (Driller)
TOTAL
Nutshells (KG) Mica (KG)
Project/ Projecto:
Geologist (Geologo)
Driller (Sondador)
Appendix II: Drill site checklist
DRILL SITE CHECKLIST
DATE / TIME START HOLE_____/_____ DATE / TIME END HOLE______/______ DATE / TIME REHAB COMPLETE _________/__________ HOLE POSITION (cape datum) LAT_____________ LONG_______________ FARM NAME______________NUMBER ____________DISTRICT______________ DRILL HOLE REFERENCE NO:_____________________ CASING METRES___________________ CASING RETRIEVED? Y/ N LDD METRES DRILLED______________ METRES CORED___________ GEOLOGIST: _____________________ DRILLING FOREMAN________________ ITEM Y N COMMENTS
GAS METER CALIBRATED PRE START
BEFORE PHOTOGRAPH
CHEVRON TAPE AROUND SITE
NO SMOKING SIGN
FIRE EXTINGUISHER AVAILABLE
PVC SHEETING UNDER DRILL TRUCKS
SAFETY SHOES, HARD HATS, EAR PLUGS, DUST MASKS WORN BY ALL
RECORD GAS METER READINGS
MSDS FOR OF OIL DRILLING FOAM & OIL
ANY LOOSE FIBRE USED
HOLE FILLED WITH DRILL CHIPS
1M STEEL PLATE COVERING HOLE AT 50cm / 1m DEPTH VIRGIN/CULTIVATED
NO DRILL CHIPS LEFT AT SURFACE
AFTER REHABILITATION PHOTOGRAPH
HOLE GROUTED WITH BENTONITE
SIGNATURE: __________________________ Project Geologist
Group Exploration Information Centre (GE IC) Reference No. or Location/link
Approved by: DBGS-GE Advanced Explo ration
YES NO
GEOLOGIST SIGNATURE DATE
DRILLER SIGNATURE DATE
ECOHS REP SIGNATURE DATE
PROJECT MANAGER SIGNATURE DATE
ACTIVITY
As drilled coordinates surveyed?
All core trays consigned to the coreshed
All scoped downhole geophysical surveys done?
Comments
Bore Hole No.
Date
Drill Rig Name
Depth of Hole
Hole depth as drilled confirmed by measuring drill string when pulling out?
All mud pits and sumps backfilled and levelled?
ADDITIONAL COMMENTS
All forms signed off by geologist and project Manager?
Pictures of drill site captured and on server?
Drill site left in as reasonable state?
Geologist
Driller
All drilling equipement removed?
All rubbish cleaned and properly dispossed off?
All spilages cleaned up?
DE BEERS GROUP SERVICES
Resource Development cycle
CORE HOLE CLOSURE FORM
Drillhole capped and clearly marked?
f
T
2
2
2
2
2
2
2
2
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
Note: This from this do
Table of Con
1. PURP
2. PROC
2.1. SMAL
2.2. REHA
2.3. GROU
2.4. USE O2.4.1. 2.4.2. 2.4.3.
2.5. INVAS
2.6. MONI
2.7. CLOS
xploration RS
Site Rehabi
Next
4 S
BY: Theo Rikhotso
document iocument are
ntents
POSE ............
CEDURAL RE
LL AND LARG
ABILITATION
UTING OF BO
OF ECO-T IN General .....As a DrencAs a Seed T
SIVE SPECIES
TORING AND
URE AND LA
SA Based Op
litation Proc
t Review dat
Sept. 2016
and Lucas Lemotlo
is controlled deemed to
....................
QUIREMENT
GE DIAMETE
OF FOOTPAT
OREHOLES ...
REHABILITA....................h: ................Treatment: .
S CONTROL.
D REPORTIN
ANDOWNER
perations RS
cedure
te Pr
EXP-06
o
d when store be uncontro
....................
T ..................
R DRILLING
THS, ROADS
....................
ATION OF DR............................................................
....................
NG ................
LETTER .......
SA Exploratio
rocedure no
6-PR
APPROVED BY
ed on documolled and are
...................
...................
SITE REHAB
AND TRACK
...................
ILL SITES AN............................................................
...................
...................
...................
on
:
1
Y: Gabisile Simelan
ment manage only valid o
....................
....................
BILITATION ...
KS ................
....................
ND OF PATHS...............................................................
....................
....................
....................
Page:
Of 14
ne
gement systeon the day of
....................
....................
....................
....................
....................
S / TRACKS ...............................................................
....................
....................
....................
Version
em Printed cf printing.
....................
....................
....................
....................
....................
................................................................................
....................
....................
....................
5
copies creat
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ted
.. 1
.. 1
.. 1
.. 2
.. 2
.. 3 . 3 . 3 . 4
.. 4
.. 5
.. 6
2
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
1. PURPOThe pu
2. PROC
2.1.
xploration RS
Site Rehabi
Next
4 S
BY: Theo Rikhotso
OSE urpose of thTo implemeimpacts relaTo implemesignificantlyaccess trac
EDURAL REQ
SMALL AN
The areas aThe excess some time drowning ofRemove theFill the sumstored on a Restore proLoosen comReplace stoand aid watIf quartz or scattered ecreating micIf any soil owater and sin bands onIf the sloperehabilitatioDetermine materials (sreduce the cIf vegetatioseeds, and Check with the steps inAll equipmePortable toiEXP-02-PR PAll waste mto Refer to E
SA Based Op
litation Proc
t Review dat
Sept. 2016
and Lucas Lemotlo
is prospectinent and maated to apprent and may disturbed ks and/or ro
QUIREMENT
ND LARGE DI
around the h drill sludge on site to df livestock ane lining of themp with the tarpaulin.
ofile of site tompacted grouored rocks ater retention other light cevenly over tcrohabitats. on the site seed penetran the contoure is very ston measuresif the grad
stones, rockchances of en was remohelp prevenproject geol
n 2.5. ent, fencing, lets must beProspecting ust be remoEXP-02-PR P
perations RS
cedure
te Pr
EXP-06
o
ng operationaintain procropriate rehaaintain a pby De Beer
oads, drilling
T
IAMETER DR
ole will be c must be diry, the area nd/or wild gae sump. material ori
o fit in with aund. nd stones e.
coloured pebthe area – has been sation. If ther, leaving soteep the ads so as to endient requireks, brancheserosion. oved and stot erosion. ogist if a) se
fuel etc muse removed a Operational
oved from sitProspecting O
SA Exploratio
rocedure no
6-PR
APPROVED BY
nal proceduredures to m
abilitation of procedure fors RSA explog).
RILLING SITE
leared of all spose of at shall be baame.
ginally move
adjacent gro
venly over s
bbles were ccausing hea
severely come gradient is me undisturdvice of a cnsure minimaes berms tos) to reduce
ored, scatte
eeding is to
st be removeand the contl procedure ste and dispoOperational
on
:
1
Y: Gabisile Simelan
re is to : manage pot all prospector the eradoration for
E REHABILITA
drilling chip the designarricaded to
ed to make
und – first o
site to preven
collected sepat to be ref
mpacted, it m steep, this rbed sectioncompetent al chance ofo be constre the veloc
er this over
be done and
ed from sitetents dispossection 2.4.3
osed of at th procedure s
Page:
Of 14
ne
tential signifting activitiesdication of prospecting
ATION
ps. ated site. Wavoid accide
the excavat
overburden, s
nt wind and
parately (in aflected and
must be looloosening / s between tperson mus
f erosion. ructed acroity of rain w
the site as
d if b) Eco-T
. sed of at an 3). e appropriat
section 2.4.4
Version
ficant impas. alien specie purposes (
Where the sluental access
tion, and wh
subsoil and
water erosio
arid areas), tthus cooling
osened /sca scarifying shhe loosenedst be obtain
ss the site water and c
a mulch to
is to be use
approved fa
tely licenced4).
5
cts/significa
es from sitnewly creat
udge is left fs and possib
hich has be
then topsoil
on, trap see
these must g the surfac
arified to allohould be do
d sections. ned regardi
from natucatch soil a
hold soil a
ed. If so follo
acility (Refer
d facility (Ref
ant
tes ted
for ble
en
l
eds
be ce,
ow ne
ng
ral nd
nd
ow
to
fer
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.2.
2.3.
xploration RS
Site Rehabi
Next
4 S
BY: Theo Rikhotso
All tarpaulinGenerally bover the hoborehole nuAny drill holcasing will casing to cotakes respothe water HANDOVER Establish an
REHABILIT
Ensure all ePlace a natto prevent fRemove anyLoosen comIf on a slopeCheck with the steps inPhotograph
GROUTING
In cases wcontaminatdrilling, boreThe groutingsee (Appendand sludge If not, makeRemove an(Refer to EXTake drill whydrocarbonUse remainA grout mix blend of be(BWOC) alonThe cementthan or equ
SA Based Op
litation Proc
t Review dat
Sept. 2016
and Lucas Lemotlo
ns must be reoreholes sh
ole at a depumber. es which habe left stick
over the holeonsibility by usage licen LETTER). nd maintain
TATION OF F
equipment, ftural barrier further accesy cemented
mpacted soil e, reduce poproject geol
n 2.4. rehabilitate
G OF BOREH
where thereion of groueholes will bg proceduredix II: Email for bentonite preparationy hydrocarb
XP-02-PR Prowater samplen and chemiing drill wate for cementi
entonite and ng with Portt mix, when
ual to 1378 k
perations RS
cedure
te Pr
EXP-06
o
emoved fromall be coverth of not les
ave intersectking out of te from contacompleting
nse. Relevan
record (inclu
FOOTPATHS,
fuel, waste, t at the junctss. strips on ste on tracks w
otential wateogist if a) se
ed footpath,
HOLES
e are concndwater by
be grouted ase has been a received by te mix in grouns for groution from sur
ospecting Ope and submical concenter (uncontamng the smal drill sludge land cementcombined wkg/m³, the a
SA Exploratio
rocedure no
6-PR
APPROVED BY
m the site. red and madss than 50c
ted water arthe concreteaminants. Ththe necessant documen
uding photog
ROADS AND
tarpaulins ettion to the fo
eep / loose shen track no
er erosion witeeding is to
track / road
cerns over acidic leacs specified i
agreed upon Jan Phelan uting of boreng of borehorface of drill perational pr
mit the samptrations fall wminated) andll diameter e / fines andt is suggeste
with mix wateamount of m
on
:
2
Y: Gabisile Simelan
de safe by mcm (1m in c
e to be left oe slab. A stehe drill hole mary forms anntation mus
graphs) of th
D TRACKS
tc. have beeootpath/trac
slopes but cot needed agth contour bbe done and
and update
disruptions chate from n this proced with depart from DWAFeholes). ole where re water in surocedure 2.4ple for testinwithin limits.d fine sludgeexploration bd building saed. er in the cem
mix water in t
Page:
Of 14
ne
means of a cultivated la
open at the eel plate willmay only be nd lodging thst be kept
he rehabilita
n removed fck/road bein
reate contougain.
barriers d if b) Eco-T
e record.
to groundparticular rdure. tment respo
F confirming
quired. ump and dis4.4. and 2.4ng and conf. e in the mixinboreholes whand of up to
mentitious sthe cementit
Version
1m² concretnd), and ma
request of tl be welded left open if hese with D(Appendix I
ation.
from site. ng rehabilita
ur barriers in
is to be use
water flow,rocks encou
nsible for wa use of recyc
spose as haz.5). irm with sta
ng of the behich contain 55% by wei
lurry having tious slurry b
5
te slab placarked with t
the landown on top of tthe landownWAF to obtaII: BOREHO
ated e.g. roc
n their place
ed. If so follo
, or potentuntered duri
ater resourccled drill wat
zardous was
andard that
ntonite. s a synergisight of ceme
a density lebeing betwe
ed the
er; the ner ain
OLE
cks
.
ow
tial ng
ces ter
ste
all
stic ent
ess en
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.4.
xploration RS
Site Rehabi
Next
4 S
BY: Theo Rikhotso
from about left in the sufrom the weand grease grout a smathe unconsoFor groutingsuggested fas the narcutting slud
USE OF EC2.4.1. GenThe use of prospectingalso enhanctried and teyoung seedEco-T must When takensun. Eco-T may bThe optimuis after the time, seediperiod whicDiscuss with
2.4.2. As aRead GenerMix 1 heapea. Small
b. Footp
c. Large
SA Based Op
litation Proc
t Review dat
Sept. 2016
and Lucas Lemotlo
200 to aboump that haell also in the would respeall diameter olidated zong large diamfor the bulk row diamet
dge.
CO-T IN REHAneral a microbe
g sites. Eco-ce plant grow
ested and wolings handle be stored inn into the fie
be used as am time to apfirst rains ang and the h falls betweh botanist as
a Drench: ral (2.4.1) abed teaspoonl diameter dUse 3 to 4 x
path: 1 x 20 litrethe mixture
e Diameter DA water carbe adequatUse spray aPhotograph
perations RS
cedure
te Pr
EXP-06
o
ut 560 percas been circue sump (maxectively prov hole ( +/- 0e as well as meter borehof the fill, wer borehole
ABILITATION
called Eco-T-T will controwth. This efforks well. It we any stressen cool conditeld it should
a drench or apply seed annd during thuse of Eco-Teen Octobers to which se
bove. n (5g) of Eco-rill site: x 20 litre mi
of drench me for a vehicl
Drill Site or Mrt filled with te for a largeattachment ah the site an
SA Exploratio
rocedure no
6-PR
APPROVED BY
cent by weighulating the hx 0.2m³), wh
vide roughly d0.8m³ per 1 formation lo
holes, a dry hile the top
es, incorpora
N OF DRILL S
T can be beol root diseafect is particwill help the es such as dions prefera be taken in
a seed treatmnd microbeshe active groT should ber – Decembeeeds should
-T in 20 litre
xes per 64m
mixture will de track depe
Mechanised P 700 litres oe diameter dand wet sited update rec
on
:
3
Y: Gabisile Simelan
ht of cemenhole (max 1.5hich have bedouble to on00m hole), oss. Mixture fill consisti 10m of the ating any le
SITES AND O
eneficial in ses, increas
cularly notice seeds get erought (by a
ably in the fri a coolbox, a
ment. s would be bowing season postponed
er. d be used for
s of water.
m² site using
do about 20ending on w
Pit Site: of water to wdrill site or a as evenly acords.
Page:
Of 14
ne
t (BWOC). S5m³) as welleen checkedne and a halthus allowin
e hardens toing of grave hole can beeftover drilli
OF PATHS / T
ensuring suse root side eable under established s stronger roodge. It has a
and should N
between Octon. If rehabilit and done d
r re-seeding.
g 5 / 10 litre
0m of a 1m width.
which 1 cup mechaniseds possible.
Version
uch a mix ul as the fine
d and skimmf of the mixt
ng for possibo 110 Psi witel, sand ande grouted in ng circulati
TRACKS
uccessful reshoots and stress condslightly fasteot system). a shelf life ofNOT be left s
ober and Detation is donduring the fi
.
watering ca
wide path; d
(175g) Eco-Td pit site.( 62
5
sing the wat cutting slud
med for any oture neededble outwash thin 72 hourd bentonite the same won water a
ehabilitation root hairs aitions. Eco-T
er and help t
f 6 months. standing in t
ecember whine outside thrst monitori
n.
double or trip
T is added w25-750m²)
ter ge
oils to of
rs. is
way nd
of nd
T is the
the
ich his ng
ple
will
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.5.
xploration RS
Site Rehabi
Next
4 S
BY: Theo Rikhotso
2.4.3. As aRead Genera. Small
b. Large
INVASIVE
Newly creatafter rehabinvasive alieAny speciesSome of th(Back & SilCestrum (InControl of sSpecies Pines
Gums
Bugweed
Inkberry (Cestrum)
Wattles
Other specia person coeach specieTraining wilsafety and eThe specificthe environmIf herbicide the speciesBrush and bor wetland. There are re
SA Based Op
litation Proc
t Review dat
Sept. 2016
and Lucas Lemotlo
a Seed Treatral (2.4.1) abl Diameter DUse 200g t
e Diameter DUse 2 kg tre
E SPECIES CO
ted access tilitation, unten species. s present wile more comlver Wattle),kberry) pecies shou
Below KPull out, feet. Hand pu
Hand pu
Hand pu
Hand pu
es present wompetent ines and the nl be done foenvironmentc methods ament and re is taken into. basin must b estrictions o
perations RS
cedure
te Pr
EXP-06
o
tment: bove
Drill Site (64mtreated seed
Drill Site (625eated seed
ONTROL
racks/roadstil prospectin
l be recordemmon specie, Pinus spec
ld be as follonee High tramp flat w
ll if possib
ll
ll
ll if possible
will be identn invasive aleed for wett
or the persotal measures
and productseaching the do the field, it
be rinsed ou
n using herb
SA Exploratio
rocedure no
6-PR
APPROVED BY
m²) : d per site.
5 – 750m²):per site.
s and large dng right clos
ed and photoes likely to cies, Eucaly
ows: Waist
with Slash poppe
ble Cut dostumpherbicCut dostumpherbicSlash with re
e Spray recom
ified and thelien plant coting agents wns who will s. s used will bdesired goalt must be ta
ut where wat
bicides near
on
:
4
Y: Gabisile Simelan
diameter drilsure is obta
ographed. be encounte
yptus specie
High / ringbarker dependingown/slash ap with cide. own /slash ap with cide. and Paintecommende
seedlmmended he
e appropriatontrol. Concwill be estabundertake t
be updated /.
aken in a bas
ter goes into
wetlands an
Page:
Of 14
ne
lling sites wiined, to che
ered are Aces, Solanum
k or use tg on situatioand paint st
recommend
and paint strecommend
t stem stued herbicide.
lings wrbicide.
te control decentrations olished. this work. Th
/ amended i
sin (drip tray
o a French d
nd waterway
Version
ill be monitoeck for the a
acia dealba mauritianu
Tall tree n.
tem ded
tem ded
Cut dorecom
ump .
Cut dostumpherbic
with
etermined, wof herbicide
his will inclu
f this is in th
y) and will be
rain and not
ys.
5
ored 6 monthappearance
ata & mearnum (Bugwee
own and pammended her
own and pap with recomcide.
with input fro for control
de health a
he interests
e painted on
t into a strea
hly of
nsii d),
aint with rbicide.
aint stem mmended
om of
nd
of
nto
am
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.6.
xploration RS
Site Rehabi
Next
4 S
BY: Theo Rikhotso
Any spillagefacility as haOnly registecarefully. Herbicides to cause spA register mClean waterCareful recoperations,
MONITOR
The Projectconducted aThe Monitoperspectiveintervals coMonitoring erosion, proFollowing dmonitoring atreatment oInvasive plaPioneer spechance andAppropriateIf water quathe samplesbacteriologidelivered tochecked aginformationrelinquishedThe Projectafter major of all signifiregulation 5An internal number of fDMR do ad Records of This will congranted.
SA Based Op
litation Proc
t Review dat
Sept. 2016
and Lucas Lemotlo
e of herbicidazardous waered herbic
must be stoilling of cont
must be kept r must be usords must b quantities, a
RING AND RE
t Geologist and maintai
oring shall ines. The “Aftemmencing awill be done
ogress in rehdiscussions and treatme
of invasive spants will be recies on pro
d in this way e action will bality is monis must be cical analysiso the registegainst the lim can be id. t Geologist w activities sucant impact
55 of the MinEMS audit w
field sites. T hoc inspectmonitoring wntinue until t
perations RS
cedure
te Pr
EXP-06
o
de must be caste. ides should
red where atents. to account f
sed to ensurbe kept of and monitor
EPORTING
shall ensurened. nvolve beforer” photograafter the come every 6 m
habilitation awith the la
ent of an arepecies. emoved, cutospecting sithasten the pbe taken to ctored, the a
collected in s). All samered laboratomits for comncorporated
will include uch as drillint sites currennerals and Pwill be condThese auditsions to checwill be filed athe agreed c
SA Exploratio
rocedure no
6-PR
APPROVED BY
collected up
d be used a
access is res
for use of hee good uptaareas treate
ring of these
e that ongo
re, during aaphing will mpletion of amonths to taand to see if ndowners,
ea larger tha
t down or tretes will alsoprogress of scorrect any s
accurate locabottles, withples must bory for testinpliance and
d in the c
a report onng. This shontly under obPetroleum Reucted annua
s will check cck compliancand used in tclosure obje
on
:
5
Y: Gabisile Simelan
p and taken
and herbicid
stricted and w
erbicides. ke of herbiced, chemica areas follow
oing monitor
nd after phtake place
activity at theake a photo the invasiveconsideratio
an just the p
eated with tho be cut dowsuccession, signs of erosation of monh the site idebe kept coong within 24 action takelosure repo
environmeould include bservation, iesources Deally and the compliance wce with the Sthe annual r
ective is achi
Page:
Of 14
ne
back to be
de concentr
where conta
ides. als or other wing treatme
ring of sign
otographingas close as
e site. graphic reco
e plants haveon could berospecting s
he appropriawn to give t if so advisedsion. nitoring poinentified on tol (fridge an4 hours of con if there arort when t
ntal complia photograph.e. drill. This
evelopment A external auwith the SHESHE MP. report to DMieved and/o
Version
disposed of
rations mus
ainers canno
methods uent.
ificant impa
g of drilling ss possible t
ord, to chece come ontoe given to asites, for the
ate herbicidethe grassesd by a botan
nts must be these (sterilend coolbox) ollecting. Rere non-confohe Prospec
ance in the s and writte
s includes reAct. dit could inc
E MP.
MR. or closure pe
5
at recognis
st be follow
ot be damag
used, dates
acts on site
sites from sto six month
ck for signs o the site. a co-operati presence a
e (see 2.5). an increas
nist.
recorded ae bottles if f and must esults must ormances. Thcting Right
project repoen descriptioequirements
clude one or
ermit has be
ed
wed
ged
of
is
set hly
of
ive nd
ed
nd for be be his
is
ort ons of
r a
en
De Beers Ex
Prospecting
Date
Sept. 201
PREPARED B
2.7.
xploration RS
Site Rehabi
Next
4 S
BY: Theo Rikhotso
CLOSURE
Minimum cl To ensure stable, non-use. When sites F.4.2 in EMfor closure oPrior to closassessmentIf any post cfor the respConsideratiand if agrelandowner tthese Approach la
SA Based Op
litation Proc
t Review dat
Sept. 2016
and Lucas Lemotlo
E AND LAND
losure objec
that the re-polluting, no
have reache Plan) and/oof the permisure being at will be carrclosure main
ponsible person will be geement canto continue
andowners to
perations RS
cedure
te Pr
EXP-06
o
OWNER LET
ctive requirem
habilitated on-eroded a
ed a satisfacor agreed clt being granapplied for, ried out and ntenance is son to contingiven to discn be reachewith some m
o sign the cl
SA Exploratio
rocedure no
6-PR
APPROVED BY
TTER
ments:
area is re-vand in a state
ctory level ofosure object
nted. a final perf submitted t necessary, tnue with andcussing certed, environmmonitoring s
osure letter
on
:
6
Y: Gabisile Simelan
vegetated (ae that is suit
f rehabilitatitive, sites ar
formance asto DMR togetthis will be d
d report on thtain post clomental respsuch as inva
(Appendix I:
Page:
Of 14
ne
and/or soil table for the
on accordinre inspected
ssessment ather with thedocumentedhis accordinosure monitoponsibility wasive alien s
Closure Let
Version
erosion mee agreed pos
g to the set d by DMR pri
and an envire closure apd and arrangg to F5.3 beoring with th
will be transpecies, and
tter).
5
easures), sast closure la
goals (F.4.1ior to approv
ronmental riplication.
gements maelow. he landownsferred to t the control
fe, nd
1 & val
isk
de
er, the of
Appe
endix I: Clos
ure Letter
CLO TO WThis 1.
2. 3. ThisSyst Sign Full Date Proje Full Sign Date
SURE LETTE
WHOM IT MA letter serve
De BeerNumber
During t
The De B
note formstem.
ned by: _____
Name: ____
e: _________
ect Geologis
Name: ____
nature: _____
e: _________
ER
AY CONCERNes to confirm
rs RSA Explor __________
his time the
Beers emplo
s part of th
___________ Surfa
___________
___________
st
___________
___________
___________
N m the followin
oration cond______, Dist
De Beers em
oyees left the
he Group E
__________ace Owner
___________
____
___________
___________
_____
ng with regar
ducted a dririct _______
mployees ca
e farm in a g
Exploration R
__
__
_
_
rd to De Bee
lling program___________
aused no las
good conditio
RSA based
ers Exploratio
mme on the__ from (date
sting environ
on.
operation’s
on:
e farm _____e) _________
mental impa
ISO14001
_______________ to (date
act.
Environme
___________e) ________
ntal Manag
_____, ____
gement
Appemix Emagrou Hi Ja
endix II: Emain grouting o
ail received uting of bore
an,
ail received of boreholes
by Jan Pheholes.
by Jan Phelas.
lan from DW
an from DWA
WAF confirm
AF confirmin
ming use of
ng use of rec
recycled dri
cycled drill w
ill water and
water and slu
d sludge for
udge for ben
r bentonite
ntonite
mix in
If thbeenseal Wille -----OFromSentTo: DSubj Dea It habe teskimbest Cemmon The A groand cemdensaboubeenm3)one poss As fasuggnarrInfor I wodrill RegaJan EnviPhoCell: DISCThismesprohwhe
e test resultn removed ing and grou
em
Original Messm: Jan Phelat: 08 JanuarDu Toit Willeject: Use of
r Willem,
as been propested for qu
mmed off. Tht practice me
ment and benitoring bore
suggested sout mix for c drill sludge/
ment is suggesity less thaut 200 to abn circulating, which have and a half osible outwas
ar as groutigested for trow diametrmation on b
ould really ap water will m
ards, Phelan. ironmental Ane:033 330: 082 876 0
CLAIMER: message a
ssage in errohibited. Thether it be dir
ts of the remI don't see wuting of bore
sage----- an [mailto:mwry 2009 09:4em Drill Water fo
posed that ouality to ensuhe water willethod of disp
enonite mixholes), hole
specificationcementing t/fines and bested. The cn or equal t
bout 560 peg the hole (me been checof the mixtu
sh of the unc
ng the largethe bulk of ter borehobentonite is
ppreciate hemeet the requ
Assessment 0 2948.
003
nd any attacor, please noe Departmenrect, indirect
maining recywhy DWAF w
eholes ourse
wplanit@mw45 AM
or Grouting o
once the drilure that therl then be useposal.
xtures have abandonme
ns are as follhe small diabuilding sancement mix,to 1378 kg/ercent by wemax 1.5 m3cked and skiure needed tconsolidated
e diameter b the fill, whles, incorpattached.
earing from yuirements of
Practitioner
chments areotify the sysnt of Watert or consequ
ycled water awould have
elves and ha
web.co.za]
of Boreholes
ling operatiore was nothied for the m
historically ent etc.
ows: ameter explod of up to 5 when comb
/m3, the amight of ceme) as well as mmed for ato grout a smd zone as we
borehole arehile the topporating an
you as to whf your depart
e confidentiastem managr Affairs anduential, arisin
are of accep any objectiove no proble
s
on is compleng of concer
mixing of the
been used
oration bore55 % percenbined with mount of mix
ent (BWOC). the fine cutny oils and gmall diameteell as formati
e concernedp 10 m of tny leftover
hether this rtment as it w
al and intendger/sender. d Forestry fng from this
ptable standons to the mem with it.
ete at each srn, and any benonite mi
d in the dri
holes whichnt by weight mix water, m water in the Such a mix tting sludge grease wouler hole (± 0ion loss. Mix
a dry fill cothe hole ca
drilling c
recommendwill form par
ded solely fo Any unauthfurther acce e-mail, nor f
dard and themethod. We
site that the hyrdocarbonixture for the
lling industr
contains a of cement
may render ae cementitio using the w from the wed respective
0.8 m3 per 1xture harden
onsisting of an be groutirculation w
ed best pracrt of the ame
or the addresorized use,
epts no liabfor any cons
e hydrocarboe have used
remaining rn componene grouting of
ry for seals
synergistic b(BWOC) alon
a cementitioous slurry bewater left in tell also in th
ely provide ro100 m hole)ns to 110Psi
gravel, sandted in the swater and
ctice for theended EM Pl
ssee. If you alteration oility whatsoe
sequence of
on compone bentonite f
recycled drillt on the surf
f the boreho
s (pierzomet
blend of benng with a Pous slurry ha
eing betweenthe sump thhe sump (moughly doub, thus allow within 72 ho
d and bentosame way a cutting s
e use / dispoan.
have receiveor disseminaever for any its use or st
nt has for the
l water face is le as a
ters in
ntonite ortland aving a n from at has ax 0.2
ble to a ing for ours.
onite is as the sludge.
osal of
ed this ation is y loss, torage.
Appeendix
III: BOOREHOLE
HANDOVVER L
LETTER
BOR TO WThis 4.
5.
Bore
6.
7.
ThisMan Sign Full Date
REHOLE HAN
WHOM IT MA letter serve
De BeerNumberDistrict _The folloto use it/
ehole No.
I acknowabove b
I herebyown exp
note formnagement Sy
ned by: _____
Name: ____
e: _________
NDOVER LETT
AY CONCERNes to confirm
rs RSA Explor _____________________owing borehot/them for w
Lo(D
wledge that orehole(s) fo
y take respopense.
ms part of tystem.
___________ (Surf
___________
___________
TER
N m the followin
oration cond______, ________ froole(s) that inater supply
ongitude DD WGS84)
I may needor water sup
onsibility for
the De Bee
__________face Owner)
___________
____
ng:
ducted a dri
om (date) __ntersected wpurposes, at
d to apply fopply purposes
the further
ers Group
__
___
lling program
___________water was/wt my own exp
Latitude (DD WGS84
or permissios in terms of
manageme
Exploration
________
________
_
mme on the
_ to (date) __ere only tempense:
4)
on to the relf the Nationa
nt and reha
RSA Based
___________(Proje
___________
___________
e farm _____
__________ mporarily cap
EOH Dept
levant goveral Water Act
abilitation of
d Operation
________ ect Geologis
________
_________
___________
pped at my r
th (m)
rnment autht or other rel
f the above
ns’ ISO1400
st – De Beers
___________
request as I
horities to usevant legisla
borehole(s)
01 Environm
s)
_____,
intend
se the ation.
at my
mental