ddl overview 2009

15
About Us – DDL’s 17 Year Growth About Us – DDL’s 17 Year Growth and

Upload: patrick-nolan-cpp-iopp-fellow

Post on 03-Jun-2015

684 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

and

Page 2: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year GrowthDDL - West

DDL – Eden Prairie

Page 3: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Professional Associations• Chairman for the ASTM Committee D-10 on

Packaging• Involved with ASTM since 1981 • Member of the AAMI committee to draft a

Technical Information Report (TIR)• Institute of Environmental Sciences (IES) • Society of Automotive Engineers (SAE)• ISTA Certified Lab• DOT Third Party Testing Lab• IoPP Members (8 Staff are members)• Member of LifeScience Alley (formerly Medical

Alley)

Page 4: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Testing Capabilities• Medical Device Package Testing

• Pharmaceutical Package Testing

• Environmental Package Testing

• Hazmat Package Certification

• Mechanical Testing

Page 5: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Medical Device Package Strength and Integrity Testing

Seal Peel Testing –ASTM F88

Bubble Leak Testing –ASTM F2096Dye Penetration Leak Testing ASTM F1980

Burst Testing - ASTM F1140

Package Strength Tests

Package Integrity Tests

Page 6: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Dynamic Testing Equipment Resources

Page 7: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Thermal Package Performance TestingStability TestingOver a 72 – 120 hour timeframe, DDL conducts a stability test and develops a specification designed to inform pharmaceutical package testing clients of conditions that will push a thermal container out of the 2-8 centigrade (an indication that contents may lose active ingredients or even spoil) desired shipping

and storage temperature.

                          

            

 

                          

           

Thermal Performance over time for Profile #1

Thermal Performance over time for Profile #2

Thermocouple set-up in package

Page 8: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Environmental Testing Equipment Resources

45 Chambers in MN

8 Chambers in CA

1 cu.ft. to 900 cu.ft.

-70C to 200C

Page 9: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Material Testing Equipment Resources

Page 10: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Project Process Flow

Marketing

Sales AdminLab

ProjectManagement

LabTechnician

ProjectManagement

QualityAdmin

Inputs: CustomerSatisfaction Survey,Report Card Survey,

QIC meeting info,Strategic Planning

Meeting info

Outputs: MarketStrategy, Direct

Mailings, ProspectLeads

Inputs: MarketStrategy,

Prospect Leads,Web 'ContactUs' form, Price

list

Outputs:Quotes,

Protocols,Customer PO,

Contract Review

Inputs: Jobfile,

CustomerPO

Outputs: Jobslogged in

Peachtree andDDL tracking,Job number

Inputs: Job file,calibration status,equipment status,

job load status,SOPs and work

instructions

Outputs:Project

assignment,Lab tech and

testingschedules

Inputs: Projectassignment, Lab techand testing schedule,equipment status, testsamples, SOPs and

work instructions

Outputs: Intro tocustomer,Schedule

finalized, testingrequirements to

Lab tech,worksheets

Inputs: testsamples, project

info, testrequirements,

workinstructions

Outputs: Rawdata, pictures,

test statusinformation

Inputs: Raw data,pictures, test

status, worksheets

Outputs: Data analyzedand recorded, projectupdated, Report draft,

Invoice draft,communication to

customer, disposition ofsamples, report

customer survey card

Inputs: Report draft,signed report final,

project file, customercompleted report card

Outputs: ReviewedReport draft, signed finalreport draft, project file,

report card trending

Inputs: Draft invoice,final invoice, project file

Outputs: Draft invoice,final invoice

Strategic Planning andQIC Meetings

Inputs: Customer SatisfactionSurveys, Report Card Surveys,

Management Process Reviews,

Outputs: Corporate Vision, Mission,Goals, Objectives and Values,

Departmental Plans

Page 11: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

CA/PA

Amendments

DocumentControl

Records

Customers

Satisfaction

Management Responsibility

Service Deviaions

Customer Complaints

EmployeeRecommendations

Internal Audits

Customer Audits

Calibration &Equipment

QualificationsSales Contract

Review

Project ContractReview

Preventive Mainetance

Training

Purchasing

Test Method, Equipment,Procedural (Policy), Supplier,Facilites/Workenvironment

DirectInDirect

Surveys, Report CardsOne-on-one, phone, email,

letter

Quality Management Process

Page 12: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

Common Packaging Mistakes

Page 13: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

ISO 11607 -Key Points• Proof of sterile barrier integrity (by physical means) is

sufficient to demonstrate sterility of the product.

• Medical devices with the same package system may be grouped for purposes of package system validation.

• The worst case package configuration must be determined, documented, and used for testing for compliance…this will require performing ‘process validation’.

• Results of the design development process shall be documented, verified and approved prior to product release.

• Physical testing (e.g. bubble leak, dye penetration, etc.) along with microbial barrier testing of materials can be used to demonstrate sterile barrier integrity.

Page 14: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth

ISO 11607 Key Points• Use Standardized Test Methods.

• Testing is performed on packages produced at the lower limits of the process parameters established during compliance with Part 2 of this standard.

• The package system must provide adequate protection to the product through the rigors of handling, distribution and storage. (Laboratory distribution simulation or actual ship testing).

• Accelerated aging is sufficient evidence for expiry dates until real time aging is completed. Accelerated and real time studies should begin simultaneously.

• Stability testing and performance testing are separate entities

Page 15: Ddl Overview 2009

About Us – DDL’s 17 Year GrowthAbout Us – DDL’s 17 Year Growth