dc hybrid power unit for telecom towers in rural area - raymond casas

22
SINCE 1986

Upload: energy-for-all

Post on 07-Nov-2014

179 views

Category:

Documents


3 download

DESCRIPTION

Presentations from the International Workshop on Energy Storage Technologies and Applications, April 2013, ADB Headquarters, Manila

TRANSCRIPT

Page 1: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

SINCE 1986

Page 2: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

FACTORY-

SINCE 1986

Page 3: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

INSTALLED AND DISTRIBUTED IN 28 COUNTRIES • AFRICA • MIDDLE EAST • ASIA PACIFIC • LATIN AMERICA

SINCE 1986

APPLICATIONS

Page 4: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

THE ONLY SYSTEM IN THE WORLD THAT ALLOWS: • ENERGY STORAGE • CONNECTION TO SOLAR PANEL, WIND TURBINE AND GRID • INCREASED ENERGY EFFICIENCY • SAVES CAPEX and OPEX • MAXIMIZE THE INVESTMENT

Page 5: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

SINCE 1986

FINALLY THE ONLY TELECOM MISSING PIECE OF THE PUZZLE FOR A GREENER WORLD THAT…..

Page 6: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

…. PROVIDES

•68% of Fuel Reduction •68% of Lube Oil Reduction •68% of CO2 and NOx Reduction •Low running hours (4-6 hours per day)

NOTE:

- If integrated with SOLAR Panel and/or Wind Turbine, above savings can reach more than 90%

Page 7: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

+ BTS + Rectifier

AC DGS 2

DC Power directly to the load at -48VDC.

Rectifier

AC DGS 1 Fuel Tank

Fuel Tank

+ +

Ascot Hybrid Power Unit (HPU) How to save CAPEX

ALL in ONE, Plug&Play in a single baseplate. Installation in few

hours. The DC HPU is a solution to supply power to Indoor/Outdoor

Telecom “OFF-GRID” or “PARTIAL GRID” sites with less than 12

hours per day.

BTS

• Traditional Configuration with AC Generators

• ASCOT Configuration with DC-HPU

Page 8: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

Running on generator only 4-6 hours per day Running on batteries 18-20 hours per day Average fuel consumption – 18 liters per day Service maintenance interval every 1000 hours or 6 months Average refueling – 40 days up to 6 months System before overhaul 7 years

Ascot Hybrid Power Unit (HPU) How to save OPEX:

Page 9: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

Battery (3 Years Guarantee)

Auto refilling kit (Battery Liquid)

INPUTS : Generator or GRID, SOLAR,

and Wind Turbine

WEB Remote control for NMS and FMS

Integrated Inverter for AC Load and

Charger for Battery

Integrated FUEL Tank

Control Panel

Canopy retroffited Depending on site

situation

GSM/GPS Antenna

COMPONENTS OF HYBRID POWER UNIT (HPU)

Page 10: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas
Page 11: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

• High quality product installed from all big telecom operators in the world.

• DC-HPU’s Performances are confirmed in 28 countries in Africa, Middle East, South America, Latin

America, and Asia Pacific

OUR MAJOR CUSTOMERS:

Page 12: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

• High quality product installed from all big telecom operators in the world.

OUR MAJOR CUSTOMERS:

• DC-HPU’s Performances are confirmed in 28 countries in Africa, Middle East, South America, Latin

America, and Asia Pacific

Page 13: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

• High quality product installed from all big telecom operators in the world.

OUR MAJOR CUSTOMERS:

• DC-HPU’s Performances are confirmed in 28 countries in Africa, Middle East, South America, Latin

America, and Asia Pacific

Page 14: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

NOW… IN ONE OF THE LEADING TELCOS IN PHILIPPINES SINCE 2011

Page 15: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

ACTUAL DATA DURING ONE YEAR OF OPERATION

Page 16: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

The DC_HPUs can be installed on mountainous sites not

reachable by delivery trucks. The design was customized in

order to deliver the DC_HPU by parts and can be dismantled

and re-assemble at site

DC-HPU

DC Generator Canopy 1 Canopy 2 Fuel Tank Batteries Base

Page 17: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

DOUBLE THE SAVING WITH SOLAR

DC HPU AUTO-DETECT ANY GREEN ENERGY SOURCE

BTS

- 48 V DC

LOAD

WIND

SOLAR

DC Hybrid Power Unit

Page 18: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

With ASCOT continuous upgrade,

the BTS equipment can be

installed inside the canopy of the

HPU for lesser footprint

New Feature

BTS Included in DC-HPU

RF Cables.

Page 19: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

BECAUSE IT IS WEB BASE (CONTROLLED REMOTELY)

Page 20: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

PORTABLE AND EMERGENCY BACK UP DC Genset

MODEL LOAD RPM DC-MODULE

PMG-DCG 48/5 5 kW 1700-3000 Ascot PMG5-48

PMG-DCG 48/7 7 kW 1700-3000 Ascot PMG7-48

Page 21: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

YOUR ENERGY PARTNER WITH

TAILOR MADE SOLUTION TO SATISFY YOUR NEEDS

ENGINEERING TEAM - GELA

Page 22: DC Hybrid Power Unit for Telecom Towers in Rural Area - Raymond Casas

ASCOT (Manufacturing) Zona Industriale III strada 93012 Gela (CL) - Italy tel. +39 0933 901192 fax +39 0933 915448

www.ascotinternational.it [email protected]