Details required for Project site / Service site
Project site / Service site Address : 400kV Substation, Dhanondha,
Mahendra Garh, Haryana
Nature of project site/ Service site: Civil, Electrical & Erection
activitiesClient name : HVPNL
Period of contract : 14.09.2012
Site Manager's name : Mr. Rajesh Kumar SharmaContact number : 09896909996
Email id. : [email protected]
Number of ABB employees : 03
Status of ABB : Main Contractor
If main contractor FORM V from Client and RC copy
Particulars of labour license :
License Number :
License Strength :
Date of Issue :
Particulars of BOCW Registration
Regd. Number
Strength
Details of Sub contractors
List of sub contract labours under each contractor.
Abstract and Notices display
Monthly attendance details
If engaging sub contractors:furnish the following details/ documents
1. Copy of EPF code allotment letter, If he has own code
2. Copy of ESI code allotment letter, if he has own code*
3. Proof of remittance of EPF from Mar 2012 to current month**
4. Proof of remittance of ESI from Apr 2012 to current month*
If ESI is not applicable, details of WC policy
(Policy number, number of workmen covered, validity)
* If applicable and remitting on own code
** If remitting on own code
Date: 31-05-2013
-
7/28/2019 days for the mo-may-13
2/6
Remarks( To be filled by site manager)
As per Annexure - 1A
As per Annexure - 2
Not Displayed
Annexure 5
Not Available
Signature :
Name : Rajesh Kumar Sharma
Incharge of Project site / Service site
-
7/28/2019 days for the mo-may-13
3/6
ANNEXURE -1A
1Location office:
Site Location:
Site & Location:-400kv, Sub Station
Dhanondha Haryana
2 Sub Contractor Name: M/s Efco Tech Infrastructure Pvt. Ltd.
3Sub Contractor Address, with
phone number & mail id
Plot no. -23, 1st floor, C & T centre,
New Gurgaon Plaza Opposite ICICI
Bank, Sect.-14, Gurgaon, Haryana
4Agreement / PO number and
validity periodFrom To From- To
5 Nature of Job Civil
6 Category Time Rate Time Rate
7 License number ( if applicable) NA
8 Renewal date ( if applicable) NA
9 License strength ( if applicable) NA
10 Engaged strength 13
11 PF code HR/GGN/30711
12 PF remitting place GURGAON
13 ESI code 13-48162-1001
14 ESI remitt ing place GURGAON
15Authorised Representative's
Name & contact Number
. . , -
Madyou, Po-Naogaun, Bijnor, UP,
16 Providing service only for ABB?
17 WC Policy No. 4010/74858282/00/000
SUB CONTRACTOR ENGAGEMENT / INDUCTION FORMAT
-
7/28/2019 days for the mo-may-13
4/6
-
7/28/2019 days for the mo-may-13
5/6
SL
NoCONTRACT LABOUR NAME FATHER'S NAME
MALE/FEMALE
(M/F)
MARITALSTATUS
(U/M)
DATE OF
BIRTH
DATE OF
JOINING
SKILL/DESIGNATION
BASICWAGES/DAY
ALLOWANCES/DAY,
IFANY
MONTH
MONTH,
IFANY
PF NUMBER
NOMINEENAME
1 Yakub Ali Zarif Ahmad M M 17/10/1987 01.03.2012 Unskill HR/GGN/30711/00073 Zarif Ahmad2 Iqubal Anis Ahmad M M 05.03.1991 01.04.2013 Unskill HR/GGN/30711/00079 Anis Ahmad
3 Rakesh Partap singh Deshraj Singh M M 15.07.1975 01.03.2011 skill HR/GGN/30711/00040 Deshraj Singh
4 Virender Kumar Ram Pal Tyagi M M 08.03.1980 01.05.2011 Unskill HR/GGN/30711/00043 Ram Pal Tyagi
5 Sharif Akhtar Akhtar Ali M Um 20.08.1992 01.04.2013 skill Exempted Akhtar Ali
6 Shakeel Ahmad Tasleem Ahmad M M 06.05.1983 01.04.2013 skill Exempted Tasleem Ahmad
DETAILS OF CONTRACT LABOURER
CONTRACTOR NAME: Efcotech Site & Location:-400kv, Sub Station Dhanondha Haryana
-
7/28/2019 days for the mo-may-13
6/6
Sl No CL Name 1 2 3 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 22 23 24 25 26 27
1 Yakub Ali P P P P P P P P X X P P P P P X P P P X P P P P
2 Iqubal PP
P P P P XP
P X P X PX
P P P X PP
XP
P X
3 Rakesh Partap singh X X X P P P P P X X P P P X X P X P P P P P P P
4 Virender Kumar P P P P P P P X X P P P P P P X P P P X P P P P
5 Sharif Akhtar P P P P P P P X P X P P P X P P P P P X X X P P
CONTRACT LABOUR ATTENDANCE FOR THE MONTH OF : May-
SUNDAY
SUNDAY
SUNDAY
SUNDAY
NNEXURE - 5
CONTRACTOR NAME : M/s Efco Tech Project site : 400kV, S/stn, Dhanondha Haryana ZONE: North