Page 1: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 2: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

DGM Structures

Vara Prasad

Sr. GET Vageesh

GET Electrical

Intyaz

GET HVAC

Sharath

Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENT T N. I

cyn Sushil Mantri

Head Design DD-2 Deepa Bhavasar

Head Design DD-1 Sowmya Prakash

Sr. Manager Sunitha

Manager Mitra

Manager Debabrata

Manager Gayathri

Sr Manager Vasudha

Manager Mahesh

Manager Anu

Manager Preeti

Manager Karthik G

IShared Resources

DGM MEP Services

Bhadresh

System Support Gopal

Manager PHE/FIRE

Sri Lakshmi

Manager PHE/FIRE

Hema

Sr. Engineer Keerthi

Secretary Kavitha

Office Boy Das

Audit / Drafting Support Sheeba

Sr. Manager lnte brs Tashlim

DGM MOEF

Damothiran

Manager MOEF Savitha

Manager Horticulture

Sarvesh

Manager Electrical Naga raj

Execiitiv:! Cis , a

"ffir -A

. i4, 06 16

-e ad Desig - DD 1 Head Design- DD 2 Director-Marketing & HR CMD

LEGEND.

Design Department

Existing

29

To Be Hired if new Projects are added

4

Total

33

Page 3: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 4: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

c...-r-:r - -

BANGALORE DEVELOPMENT AUTHORITY

No. BDA/TPM: DLP-42/2011-12/6023/ 2012-13 Date: 19-01-13

To, M/ s. Mantri Technology Constellations Pvt. Ltd. No.41, Vittal Mallya Road, Bengaluru - 560 001

Sir,

Sub: Application from M/s. Mantri Technology Constellations Pvt. Ltd. (GPA Holder for M/s. Manyata Promoters Pvt. Ltd & others) requesting to delete the land bearing Sy. No. 29/1, 30/3, 31/5, 32/l, 32/2, 32/3, 33/1, 33/2, 34/1, 34/2, 34/3, 35/1, 35/2, 42, 43/1, 43/2 & 43/3 to an extent of 13 acres 34 guntas {out of total extent of 13 acres 37 guntas excluding 0 acres 03 guntas kharab) and Sy. No. 32/1, 2 & 3, 33/1 & 2, 34/1, 2&3 and 35/1&2 to an total extent of 12640.90 sq.mts. at Rachenahalli Village, K. R. Puram Hobli, Bengaluru East Taluk, from sensitive zone as the same falls within the resident ial (main) sensitive zone.

Ref: 1. 2.

Your application dated 09-08-2011. Subject No. 117 /2013 of the Authority's Sensitive Zone Sub- Committee Meeting dated 11/01/2013.

The contents of the Application mentioned in Ref. No. l, was examined and was put forth in the Authority's Sensitive Zone Sub Committee Meeting in mentioned in Ref. No. 2, wherein, it was decided that, the Nala running through the aforesaid proposed property, is proposed to be categorized as Secondary Nala as per RMP 2015, with a condition that the applicant shall at its own cost and expense, develop the pit in the aforesaid proposed property and take up cross drainage work for the pit, after obtaining sanction for the technical design from the Storm Water Drain Department.

It is hereby informed that it is been decided to delete the aforesaid proposed property from the sensitive zone on a condition that Nala buffer is earmarked on both sides of the Nala at a 25.0 mtr distance from the middle potion of the Nala as per Zoning Regulations of RMP 2015, along with other general conditions as set out hereunder:

1. Facility to be provided for the rain water that generally flows down to reach the valley through drain.

2. During building plan sanction, water table report to be obtained regarding ground floor requirement and action to be taken suitably.

3. Building plan sanction to be obtained from the concerned Authority. 4. The concerned Authority issuing plan sanction to examine the road to the cited property.

5. Provision of Sewage Treatment Plan and Sewerage system for the flow of drinking water and sewage water.

6. During development of aforesaid property, the applicant to design the plan such that the rain water is appropriately harvested and gets absorbed in the cited property itself. Also provide full details on the same in the design.

7. The waste from residential project has to be segregated as plastic and others and a suitable

Vijayalaxmi EHSPL
Highlight
Page 5: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

place to be earmarked for compost. Dual piping system to be adapted.

8 . Electrical cables to be adapted under the ground during development of cited property

9 In the event of Strom Water Drain or Sewerage System and Roads being developed, by the local authority or BWSSB or Government or Semi- Government Authorities, the reserved buffer

area around the Nala is required to be relinquished to this Authority free of cost.

10 To grow plants and trees in the buffer area.

11 To obtain necessary approval from the concerned authority as per Zoning regulations.

Yours Sincerely,

Town Planning Member

BOA, Bengaluru

Page 6: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

SUN 5 RESIDENTIAL - CS0 R1

Page 7: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

SUN 6 RESIDENTIAL

Page 8: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

•••••

" :~: . ";;,: .~:\ ;',

2;':75:'62 2274B59Phone

. "., \\ ~b._ )jJ (~§ . ~<l'Jr>-

'23oneJ~tb ~~cb ;jdWVCl~ ~~ z-iJ~do~ ~o~~ ~

BANGALORE WATER SUPPLY AND SEWERAGE BOARD

. .~ 7 J 7 .oc;no~'] '.\ I. - r-t ..;J.oo 2­,;10: do. t::.;:bo. ] CE(M)/ACE(M)-lfTA-9fDllf /2002-03 :' f. .1.: .

0a1eNo. BWSSB

To

The Chainnan & Managing Director, MIs. Manyata Promoters (P) Ltd., No.9f1. Richmond Road, Bangalore-2S. .

• Sir,

! . ..~ Su~: Issue ofNOC to Biotech Park, In.fonnation Technology. and . ,Infrastructure Project at Nagawara and Rachanahalli village.

Ref: Your leller daled 26-6:2002.

Please ·find herein enclosed a copy or plan endorsed for "No Objection" from BWSSB for PWSF & UGOF to the foUowing conditions:

]) The· promoter has lo. provide '~ufficient space for laying' water supply and U.G.~: line~ in the layout . .1 .... _ .

. 2) .The Water supply Will be given subject to the availability .of water at the time of sanctionil1g of the water.supply connection. At present there is no waler supply lUId U.G.D.. Ii.nes near lhe premises.

3) The party has to make t\leir own arrangements for water during the conslruclion period. .. _...... . .

4) Th~' promoter has to bear the entire ·estimated cost of laying water supply and .U.G.D. lines. ' .

5) The promoter cannot undel1ake laying of water supply and u'G.D. lines. The cntire~s~has tobedeposite<i with BWSSB and Board will take up the work.

6) The n~~sary prorata chaq,'CS at the prCv~iling rate,has to be paid by the promoters. wherever applicable.

7) The promOter should not provide'sanitary points to the CellarlBF.

8) The promoter should abide by the rules and regulations of the BWSSB prevailing from time to time.

9) Party should spare· land required for construction of OHT, GLR, sump tank etc. (free of Cost). I

10) The party has paidfuA,04,700/- only vide receipt No.30091 dated 10-7-2002 towards·NOC charges. I·

E!1cl: One approved plan

. . _ •• ,~. ". _._" • _ .~_ ••_."' ,..,_~ ._~~ _ ••'. __r."..

:..,.~~.: .. ,"

Page 9: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 10: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

PROPOSED RE

“MANTRI

M/s MANTRI TEC

ESIDENTIAL DEVELOPMENT PR

LITHOS, SUN 5 & 6” Bangal

HNOLOGY CONSTELLATIONLIMITED

ROJECT

ore.

S PRIVATE

Page 11: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 12: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 13: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 14: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 15: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 16: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 17: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 18: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 19: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 20: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 21: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 22: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 23: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 24: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 25: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 26: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 27: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 28: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 29: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 30: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 31: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 32: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 33: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 34: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 35: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

1. Drain No. A

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m. Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

Drain No. B - deleted

3. Drain No. C

Page 36: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m. Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

4. Drain No. D

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m. Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

Page 37: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

5. Drain No. E - Deleted

6. Drain No. F

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m. Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

7. Drain No. G

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Page 38: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Manning’s Formula

8. Drain No. H

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

9. Drain No. I

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Page 39: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Manning’s Formula

10. Drain No. J

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

11. Drain No. K

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Page 40: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Manning’s Formula

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

Page 41: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

Wetted area A = 0.60 x 0.30 = 0.18 Sq.m Wetted perimeter P=

0.30+0.30+0.60 = 1.20 m

Manning’s Formula

Page 42: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 43: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 44: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 45: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 46: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 47: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 48: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 49: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 50: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 51: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 52: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 53: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 54: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 55: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

ANNEXURE’S

Page 56: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

AN

NEX

UR

E-I

Page 57: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 58: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

ANNEXURE-IISITE PHOTOGRAPHS

Page 59: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 60: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 61: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 62: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 63: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

ANNEXURE-IIICATCHMENT YIELD CALCULATIONS BY STRANGE METHOD

Catchment area=20 Acres=0.080 Sq.Kms.(20x0.00158=0.0316 sq. mile)

Nature of Catchment = Avarage50% dependable Rainfall = 32 inchesBased on 30 years rainfall data

ESTIMATION OF YIELD:By referring to Strange’s table of Total monsoon rainfall and estimated

runoff, the yield per square area of catchment is given by

Monsoon Rainfall Yield in M C.ft/Sq.mile

In inches

For 32 inches 15.891 M C.ft/Sq.mile

For 0.022 Sq mile

So yield for 32 inches rainfall per year

=15.891 x 0.0316= 0.502 M C.ft.

CALCULATION OF YIELD BY IN PROJECT SITE AREA BY RATIONAL METHOD

Peak discharge Q = C x I x A where C = weighted

360 impervious factor = 0.60

where I = intensity of rainfall

in mm / hr = 110 mm/hr.

where A = drainage area

in hectares = 20 / 2.7

= 8.10 hectares.

Peak discharge Q = 0.60x 110 x 8.10 = 1.485 cumecs

360

The value of discharge Q as per Ryves’ formula = 1.95 Cumecs

almost nearing to this value, hence discharge worked out is alright.

Page 64: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

 

AMBIENT AIR QUALITY MONITORING RESULTS FOR "M/s Mantri Sun 5, 6 & Lithos."

PROJECT SITE

MONTH DATE WEEK PM10 PM2.5 SO2 NO2 CO

Mar

ch

02.03.2016

I

68.00 19.00 8.10 11.60 1.21

05.03.2016 61.00 23.00 8.20 13.70 0.69

08.03.2016

II

57.00 22.00 8.70 11.50 0.92

11.03.2016 61.00 18.00 8.50 9.70 1.06

14.03.2016

III

65.00 23.00 7.20 10.30 0.97

17.03.2016 67.00 22.00 7.80 12.90 1.04

22.03.2016

IV

71.00 26.00 7.90 10.40 1.08

26.03.2016 58.00 22.00 7.50 9.30 0.92

Apr

il

04.04.2016 I

69.00 21.00 6.80 9.50 1.36 07.04.2016 63.00 24.00 7.80 11.40 0.97 12.04.2016

II

59.00 18.00 6.65 10.85 0.88 16.04.2016 60.00 19.00 7.90 9.80 1.08 20.04.2016

III

66.00 21.00 6.70 9.90 1.12 22.04.2016 68.00 24.00 7.40 11.80 1.14 25.04.2016

IV

64.00 22.00 6.40 9.80 1.18 29.04.2016 62.00 18.00 6.60 9.20 0.88

May

02.05.2016

I

64.00 21.00 6.23 10.58 1.42 05.05.2016 66.00 26.00 6.25 12.58 0.94 10.05.2016

II

66.00 26.00 6.25 12.58 0.94 13.05.2016 62.00 25.00 9.36 11.54 0.96 18.05.2016

III

59.00 22.00 8.66 12.32 1.17 21.05.2016 62.00 24.00 7.58 11.32 1.32 24.05.2016

IV

61.00 22.00 8.20 12.36 1.22 26.05.2016 60.00 19.00 4.73 7.73 0.96

KEMPAPUR MONTH DATE WEEK PM10 PM2.5 SO2 NO2 CO

Mar

ch

02.03.2016

I

55.00 15.00 7.40 10.20 1.09 05.03.2016 57.00 16.00 7.10 12.60 1.23 08.03.2016

II

58.00 16.00 7.20 9.40 1.26 11.03.2016 57.00 15.00 6.40 9.80 1.18 14.03.2016

III

60.00 16.00 7.60 9.40 1.28 17.03.2016 52.00 16.00 6.90 9.40 1.21 22.03.2016

IV

54.00 14.00 8.50 12.70 1.14 26.03.2016 59.00 17.00 5.90 8.70 1.24

Ap ril 04.04.2016 I 58.00 16.00 7.80 9.60 1.11

Page 65: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

07.04.2016 60.00 18.00 6.50 9.60 1.36 12.04.2016

II

59.00 17.00 6.38 8.70 1.36 16.04.2016 58.00 16.00 6.80 9.20 1.22 20.04.2016

III

62.00 18.00 7.30 10.10 1.36 22.04.2016 54.00 19.00 6.20 10.20 1.29

25.04.2016 IV

56.00 17.00 7.60 11.30 1.23 29.04.2016 60.00 16.00 5.60 8.70 1.36

May

02.05.2016

I

59.00 17.00 7.69 11.69 1.19 05.05.2016 62.00 21.00 8.65 11.95 1.41 10.05.2016

II

58.00 23.00 11.20 17.40 1.45 13.05.2016 59.00 16.00 7.52 9.36 1.18 18.05.2016

III

64.00 20.00 10.32 11.22 1.47 21.05.2016 66.00 22.00 8.65 12.47 1.41 24.05.2016

IV

58.00 24.00 9.54 11.38 1.40 26.05.2016 61.00 27.00 5.65 8.98 1.27

MARIYANNANAPALYA MONTH DATE WEEK PM10 PM2.5 SO2 NO2 CO

Mar

ch

02.03.2016

I

62.00 16.00 8.50 12.80 1.65 05.03.2016 59.00 17.00 7.58 9.98 1.32 08.03.2016

II

63.00 21.00 6.50 10.40 1.38 11.03.2016 55.00 13.00 7.50 9.90 1.20 14.03.2016

III

59.00 15.00 8.70 10.50 1.35 17.03.2016 54.00 17.00 8.20 10.50 1.19 22.03.2016

IV

59.00 16.00 6.90 10.40 1.29 26.03.2016 55.00 16.00 8.50 12.70 1.53

Apr

il

04.04.2016 I

64.00 17.00 8.10 11.90 1.54 07.04.2016 62.00 19.00 7.50 9.70 1.48 12.04.2016

II

64.00 19.00 7.80 9.80 1.18 16.04.2016 56.00 15.00 6.90 8.30 1.19 20.04.2016

III

60.00 16.00 7.90 10.70 1.45 22.04.2016 55.00 18.00 7.90 11.40 1.38 25.04.2016

IV

60.00 19.00 7.60 11.40 1.35 29.04.2016 58.00 15.00 7.80 11.40 1.23

May

02.05.2016

I

66.00 18.00 8.66 10.69 1.63 05.05.2016 64.00 28.00 7.69 11.04 1.55 10.05.2016

II

58.00 23.00 6.46 10.85 1.22 13.05.2016 58.00 20.00 8.74 13.80 1.10 18.05.2016

III

52.00 19.00 9.51 12.58 1.28 21.05.2016 58.00 18.00 9.32 12.64 1.38 24.05.2016

IV

52.00 20.00 8.54 12.08 1.62 26.05.2016 44.00 18.00 6.98 9.06 1.33

DASARAHALLI

Page 66: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

MONTH DATE WEEK PM10 PM2.5 SO2 NO2 CO

Mar

ch

02.03.2016

I

64.00 17.00 9.10 12.70 1.48 05.03.2016 56.00 15.00 8.40 13.50 1.28 08.03.2016

II

64.00 19.00 8.50 14.60 1.51 11.03.2016 61.00 16.00 9.60 12.50 1.16 14.03.2016

III

64.00 18.00 8.60 12.70 1.26 17.03.2016 61.00 20.00 7.10 9.60 1.38 22.03.2016

IV

63.00 18.00 8.10 9.60 1.43

26.03.2016 63.00 18.00 7.60 9.80 1.32

Apr

il

04.04.2016 I

66.00 18.00 8.80 10.40 1.65 07.04.2016 56.00 17.00 6.70 11.40 1.22 12.04.2016

II

65.00 20.00 8.60 12.90 1.62 16.04.2016 62.00 18.00 7.40 11.20 1.36 20.04.2016

III

63.00 19.00 8.50 11.20 1.33 22.04.2016 62.00 22.00 7.10 9.80 1.44 25.04.2016

IV

58.00 18.00 6.90 10.40 1.46 29.04.2016 64.00 19.00 6.90 10.40 1.18

May

02.05.2016

I

68.00 19.00 7.96 11.69 1.28 05.05.2016 58.00 20.00 8.44 12.35 1.38 10.05.2016

II

65.00 19.00 7.69 9.44 1.52 13.05.2016 64.00 26.00 9.40 13.54 1.28 18.05.2016

III

50.00 23.00 8.64 11.36 1.25 21.05.2016 53.00 21.00 9.41 11.02 1.26 24.05.2016

IV

59.00 21.00 9.41 14.47 1.32 26.05.2016 46.00 20.00 6.12 10.18 1.09

RACHENAHALLI MONTH DATE WEEK PM10 PM2.5 SO2 NO2 CO

Mar

ch

02.03.2016

I

65.00 18.00 7.80 11.60 1.26 05.03.2016 63.00 18.00 9.40 15.30 1.36 08.03.2016

II

62.00 18.00 8.40 13.90 1.18 11.03.2016 64.00 19.00 9.10 13.30 1.22

14.03.2016

III

61.00 17.00 7.80 13.60 1.15

17.03.2016 58.00 18.00 8.10 13.70 1.23 22.03.2016

IV

67.00 19.00 9.40 14.30 1.27 26.03.2016 65.00 21.00 9.10 12.80 1.21

Apr

il

04.04.2016 I

68.00 19.00 6.90 10.80 1.48 07.04.2016 65.00 21.00 8.90 14.60 1.42 12.04.2016

II

63.00 18.00 7.90 12.80 1.28 16.04.2016 65.00 20.00 7.90 10.30 1.14 20.04.2016

III

65.00 20.00 6.90 12.40 1.19 22.04.2016 59.00 19.00 8.30 12.50 1.27 25.04.2016 IV 63.00 20.00 8.70 13.60 1.38

Page 67: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

29.04.2016 66.00 20.00 8.40 11.80 1.29

May

02.05.2016

I

70.00 20.00 8.26 12.68 1.36 05.05.2016 65.00 21.00 12.74 17.09 1.36 10.05.2016

II

62.00 28.00 11.60 16.63 1.40 13.05.2016 67.00 29.00 13.40 16.63 1.22 18.05.2016

III

67.00 28.00 11.40 15.87 1.38 21.05.2016 61.00 29.00 12.40 16.35 1.30 24.05.2016

IV

71.00 28.00 13.40 18.69 1.42 26.05.2016 68.00 27.00 10.40 15.47 1.22

NAGAVARA MONTH DATE WEEK PM10 PM2.5 SO2 NO2 CO

Mar

ch

02.03.2016

I

74.00 23.00 8.90 15.30 1.32 05.03.2016 77.00 25.00 8.90 13.10 0.98 08.03.2016

II

70.00 24.00 9.80 15.40 1.35 11.03.2016 67.00 22.00 9.60 16.40 1.33 14.03.2016

III

71.00 22.00 9.70 15.20 1.38 17.03.2016 72.00 26.00 9.40 15.40 1.42 22.03.2016

IV

74.00 22.00 8.40 13.70 1.35 26.03.2016 75.00 26.00 8.10 10.90 1.19

Apr

il

04.04.2016 I

75.00 24.00 7.60 12.50 1.61 07.04.2016 78.00 26.00 7.60 12.70 1.18

12.04.2016 II

72.00 22.00 9.20 12.60 1.42 16.04.2016 68.00 20.00 8.40 15.30 1.40 20.04.2016

III

71.00 23.00 7.80 14.60 1.40 22.04.2016 74.00 25.00 8.60 14.40 1.25 25.04.2016

IV

72.00 23.00 7.80 12.70 1.44 29.04.2016 72.00 24.00 9.20 12.40 1.39

May

02.05.2016

I

71.00 22.00 8.88 11.62 1.56 05.05.2016 72.00 23.00 12.10 16.58 1.27 10.05.2016

II

70.00 24.00 9.16 14.56 1.38 13.05.2016 69.00 20.00 14.80 18.20 1.35 18.05.2016

III

73.00 32.00 14.36 19.87 1.43 21.05.2016 72.00 30.00 12.10 17.19 1.28 24.05.2016

IV

69.00 31.00 12.90 15.20 1.28 26.05.2016 70.00 23.00 14.20 19.15 1.42

SARAYAPALYA MONTH DATE WEEK PM10 PM2.5 SO2 NO2 CO

Mar

ch

02.03.2016

I

69.00 20.00 7.70 9.50 1.18 05.03.2016 65.00 22.00 9.70 15.20 1.11 08.03.2016

II

67.00 22.00 8.30 10.60 1.21 11.03.2016 66.00 20.00 7.80 9.20 1.28 14.03.2016 III 68.00 20.00 6.40 9.20 1.20

Page 68: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

17.03.2016 64.00 21.00 7.80 11.60 1.25 22.03.2016

IV

69.00 21.00 7.40 9.60 1.29 26.03.2016 71.00 24.00 6.20 8.70 1.34

Apr

il

04.04.2016 I

71.00 22.00 6.80 8.80 1.28 07.04.2016 66.00 19.00 8.60 14.30 1.25

12.04.2016 II

69.00 20.00 7.80 11.50 1.38 16.04.2016 67.00 23.00 8.20 10.60 1.33 20.04.2016

III

69.00 22.00 7.20 9.40 1.26 22.04.2016 66.00 23.00 7.40 12.60 1.35 25.04.2016

IV

64.00 21.00 6.10 8.90 1.07 29.04.2016 74.00 23.00 7.20 10.60 1.46

May

02.05.2016

I

67.00 20.00 6.62 10.05 1.22 05.05.2016 67.00 28.00 8.88 12.84 1.33 10.05.2016

II

67.00 22.00 9.09 12.19 1.36 13.05.2016 71.00 22.00 8.66 13.36 1.42 18.05.2016

III

58.00 18.00 9.78 12.47 1.54 21.05.2016 51.00 23.00 9.65 12.59 1.18 24.05.2016

IV

69.00 27.00 9.65 12.01 1.18 26.05.2016 53.00 24.00 8.16 11.46 1.38

 

Page 69: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 70: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN
Page 71: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 1 M /s EHS Consultants Pvt Ltd, Bengaluru

Baseline data - comparative statement with present & earlier condition.

Table -1 Ambient Air Quality Monitoring

A1-Project Site ; A2- Dasarahalli Unit - g/m3 ; Average –24 Hours

PM 10 March -2016-May 2016

LOCATION MAX MIN AVG SD GM

PERCENTILE

98 85 50 35

A1 71 57.00 63.29 3.75 63.19 70.08 67.55 62.50 61.05

A2 68 46.00 60.63 5.29 60.39 67.08 64.55 62.50 61.00

PM 10 December 2011- February 2012

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 88 74.10 79.79 4.17 79.68 87.48 83.82 80.05 77.14 A2 95 79.30 85.77 4.35 85.66 93.97 90.59 85.60 83.74

0.0020.0040.0060.0080.00100.00120.00

A1 A2

µg / m

3

Monitoring location

PM 10

PM10

NAAQ Standard

80.0085.0090.0095.00100.00105.00

A1 A2

µg / m

3

Monitoring location

PM 10

PM10

NAAQ Standard

Page 72: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 2 M /s EHS Consultants Pvt Ltd, Bengaluru

PM2.5 March -2016-May 2016

LOCATION MAX MIN AVG SD GM

PERCENTILE

98 85 50 35

A1 26 18 22.0 2.54 21.82 26.00 24.55 22.00 21.05

A2 26 15 15.0 2.32 19.08 24.62 21.00 19.00 18.00

PM2.5 December 2011- February 2012

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 50 42 45.1 2.10 45.06 49.41 47.24 44.90 44.21A2 55 45 44.8 2.78 48.26 54.51 50.77 48.20 47.13

0.00

20.00

40.00

60.00

80.00

A1 A2

µg / m

3

Monitoring location

PM2.5

PM2.5

NAAQ Standards

0.00

20.00

40.00

60.00

80.00

A1 A2

µg / m

3

Monitoring location

PM2.5

PM2.5

NAAQ Standards

Page 73: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 3 M /s EHS Consultants Pvt Ltd, Bengaluru

SO2 March -2016-May 2016

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 9.36 4.73 7.39 1.05 7.32 9.06 8.37 7.54 6.82A2 9.60 6.12 8.12 0.97 8.07 9.51 9.27 8.42 7.70

SO2 December 2011- February 2012

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 11.80 6.80 8.79 1.11 8.72 11.16 9.77 8.70 8.40A2 18.40 10.30 13.95 1.86 13.83 17.66 15.38 14.15 13.80

0.00

20.00

40.00

60.00

80.00

100.00

A1 A2

µg / m

3

Monitoring location

SO2

SO2

NAAQ Standards

0.00

20.00

40.00

60.00

80.00

100.00

A1 A2

µg / m

3

Monitoring location

SO2

SO2

NAAQ Standards

Page 74: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 4 M /s EHS Consultants Pvt Ltd, Bengaluru

NO2 March -2016-May 2016

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 13.70 7.73 10.94 1.43 10.85 13.33 12.48 11.09 10.31

A2 14.60 9.44 11.53 1.56 11.43 14.54 13.23 11.28 10.43

NO2 December 2011- February 2012

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 23.40 16.70 19.16 1.59 19.10 22.71 20.56 18.90 18.30

A2 34.40 22.10 26.65 3.39 26.45 33.66 30.31 25.40 24.51

0.0020.0040.0060.0080.00100.00

A1 A2

µg / m

3

Monitoring location

NO2

NO2

NAAQ Standards

0.0020.0040.0060.0080.00

100.00

A1 A2

µg / m

3

Monitoring location

NO2

NO2

NAAQ Standards

Page 75: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 5 M /s EHS Consultants Pvt Ltd, Bengaluru

CO March -2016-May 2016

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 1.42 0.69 1.06 0.17 1.05 1.39 1.22 1.05 0.96A2 1.65 1.09 1.35 0.14 1.35 1.64 1.50 1.33 1.28

CO December 2011- February 2012

LOCATION MAX MIN AVG SD GM PERCENTILE

98 85 50 35 A1 0.81 0.54 0.69 0.07 0.69 0.80 0.76 0.71 0.66A2 1.03 0.72 0.88 0.07 0.88 1.02 0.97 0.87 0.85

0.001.002.003.004.005.00

A1 A2

mg / m

3

Monitoring location

CO

CO

NAAQ Standards

0.001.002.003.004.005.00

A1A2

mg / m

3

Monitoring location

CO

CO

NAAQ Standards

Page 76: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 6 M /s EHS Consultants Pvt Ltd, Bengaluru

Table -2 Results of Noise monitoring

Monitoring Station Code

No

Sample Location

Zone (Residential)

CPCB Standards in dB(A)

Results in dB (A) Day

Results in dB

(A) Night

Day Time

Night Time

Leq

Day Leq

Night March -2016-May 2016

N1 Project

site Residential 55 45 51.5 37.1

December 2011- February 2012

N1 Project

site Residential 55 45 52.1 41.2

Note: Day – 6 am to 10 pm, Night: 10 pm – 6 am

Page 77: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 7 M /s EHS Consultants Pvt Ltd, Bengaluru

Results of Surface Water Quality

March-May 2016 December 2011- February 2012

Sl.No Parameters Unit Nagavara

Lake Rachenahalli

Lake Parameters Unit

Nagavara Lake

Rachenahalli Lake

1. pH - 8.16 7.9 pH - 7.68 7.78 2. Colour Hazen <1 <1 Dissolved oxygen mg/L 7 6.4 3. Odour -- Objectionable Objectionable BOD3 @270C mg/L 2 3 4. Turbidity NTU 21.5 2.4 Free Ammonia (As N) mg/L <0.1 <0.1 5. Total Dissolved

Solids mg/L 453 658 Sodium Adsorption

Ratio -- 2.53 2.96

6. Dissolved Oxygen mg/L 5.3 4.7 Boron mg/L 0.2 0.1 7. Temperature oC 25 25 Conductivity mhos/cm 955 1128 8. Conductivity s /cm 703 1048 Temperature oC 25 23 9. Total Suspended

Solids mg/L 27 71 Turbidity NTU 4 4

10. Phosphate as PO4 mg/L 0.60 1.2 Magnesium Hardness (as CaCO3)

mg/L 73 81

11. BOD3 @270C mg/L 12 20 Total Alkalinity (as CaCo3)

mg/L 160 191

12. COD mg/L 44 72 Chloride (as Cl) mg/L 168 196 13. Total Hardness mg/L 122 198 Sulphate (As SO4) mg/L 23 25 14. Total Kjeldahl

Nitrogen mg/L 19.32 21.84 Nitrate (as NO3) mg/L 3.1 3.2

15. Ammonical Nitrogen mg/L 1.49 0.84 Fluoride (as F) mg/L 0.5 0.4 16. Hexavalent

Chromium mg/L Not detected Not detected Sodium (as Na) mg/L 86 106

17. Total Nitrogen mg/L 22.0 22.58 Potassium (as K) mg/L 11 13 18. Potassium as K mg/L 30.4 34.4 TKN (as N) mg/L 1.6 1.9 19. Oil and Grease mg/L Not detected Not detected Total Phosphorous

(as P) mg/L 0.1 0.11

20. Calcium as Ca mg/L 13.6 42.4 COD mg/L 11 16

Page 78: Date: 30-May-2016 ORGANIZATION CHART — DESIGN DEPARTMENTenvironmentclearance.nic.in/writereaddata/online/EC/... · 2017-07-10 · Date: 30-May-2016 ORGANIZATION CHART — DESIGN

Mantri Sun 5, 6 & Lithos, EIA Report

M/s Mantri Technology Constellation Pvt. Ltd 8 M /s EHS Consultants Pvt Ltd, Bengaluru

21. Magnesium as Mg mg/L 21.38 22.35 Phenolic compounds (as C6H5OH)

mg/L <0.001 <0.001

22. Sulphate as SO4 mg/L 44.73 49.63 Lead (as Pb) mg/L <0.01 <0.01 23. Bicarbonate mg/L 128 164 Iron (as Fe) mg/L 0.36 0.4 24. Carbonate mg/L 12 72 Cadmium (As Cd) mg/L <0.01 <0.01 25. Phenolic Compounds mg/L Not detected Not detected Zinc (as Zn) mg/L 0.09 0.1 26. Residual Free

Chlorine mg/L Not detected Not detected Arsenic (as As) mg/L <0.01 <0.01

27. Free Ammonia mg/L Not detected 0.23 Mercury (as Hg) mg/L <0.001 <0.001 28. Free Carbon

Dioxide* mg/L

Not detected Not detected Chromium (as Cr) mg/L <0.01 <0.01

29. Fluoride as F mg/L 0.25 0.59 Nickel (as Ni) mg/L <0.01 <0.01 30. Nitrate as NO3 mg/L 0.73 0.75 TDS mg/L 581 665 31. Chloride as Cl mg/L 141.95 228.53 Total Coliform MPN/100ml 340 5000 32. Iron as Fe mg/L 1.26 0.34 Faecal coliform MPN/100ml 170 2200 33. Alkalinity mg/L 140 236 34. Mercury as Hg mg/L Not detected Not detected 35. Lead as Pb mg/L 0.002 Not detected 36. Cadmium as Cd mg/L Not detected Not detected 37. Zinc as Zn mg/L 0.008 0.006 38. Cyanide as CN mg/L Not detected Not detected 39. Copper as Cu mg/L 0.006 0.006 40. Selenium as Se mg/L Not detected Not detected 41. Arsenic as As mg/L 0.004 0.003 42. Silver as Ag mg/L Not detected Not detected 43. Pesticides µg/L Absent Absent 44. E-Coli CFU/100

ml Present Present

45. Total Coliforms CFU/100ml

Present Present