LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between Levick St. & Cottman Ave. 9 AM - 3 PM 10/15/17- 10/21/17 Walsh Construction Company $212,325,000.00 *US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. 10/16/17-10/19/17 Maintenance *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. 10/16/17-10/19/17 Maintenance *I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. 10/16/17-10/19/17 Maintenance *I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM. 10/16/17-10/19/17 Maintenance *I-76 West Shielding: Right LANE CLOSURE & DETOUR between South St. off Ramp & 676 Vine St. Expressway. 9 PM - 5 AM. DETOUR POSTED 10/16/17-10/19/17 Buckley & Company, Inc. $103.5 million *I-95 North Paving & Line Striping: INTERMITTENT RIGHT & LEFT LANE CLOSURES between Allegheny Ave. & Bridge St. 8 PM - 5 AM. 10/16/17-10/19/17 Driscoll Construction Company, Inc./Richard E. Pierson Construction Company, Inc. $160.2 million DATE: 10-18-2017 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways. 10/18/2017 Page 1 of 25

Upload: lydieu

Post on 21-Apr-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

LOCATION RESTRICTION DATE CONTRACTOR COST

PHILADELPHIA

PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between

Levick St. & Cottman Ave. 9 AM - 3 PM

10/15/17- 10/21/17 Walsh Construction

Company

$212,325,000.00

*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & 9th St. 9:30

AM - 2 PM.

10/16/17-10/19/17 Maintenance

*I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & I-95. 9:30 AM -

2 PM.

10/16/17-10/19/17 Maintenance

*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between Phila. Int. Airport &

PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.

10/16/17-10/19/17 Maintenance

*I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between US 1 (City Ave.) &

26th St. 9:30 AM - 2 PM.

10/16/17-10/19/17 Maintenance

*I-76 West Shielding: Right LANE CLOSURE & DETOUR

between South St. off Ramp & 676 Vine St.

Expressway. 9 PM - 5 AM. DETOUR POSTED

10/16/17-10/19/17 Buckley & Company,

Inc.

$103.5 million

*I-95 North Paving & Line Striping: INTERMITTENT RIGHT &

LEFT LANE CLOSURES between Allegheny Ave. &

Bridge St. 8 PM - 5 AM.

10/16/17-10/19/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

DATE: 10-18-2017

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

ENGINEERING DISTRICT 6-0

TRAFFIC RESTRICTION BULLETIN

(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)

(All restrictions 24 hours/day, 7 days/week unless otherwise noted)

PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD

Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.

10/18/2017 Page 1 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 South Paving & Line Striping: INTERMITTENT RIGHT &

LEFT LANE CLOSURES between Bridge St. &

Allegheny Ave. 8 PM - 5 AM.

10/16/17-10/19/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

10/16/17-10/20/17 James J. Anderson $869,700.00

Ridge Ave. Trench/Foundations: LANE CLOSURES between 16th

St. & Poplar St. 9 AM - 3 PM.

10/16/17-10/20/17 Armour and Sons

Electric

$1,698,438.00

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED

between 20th St & Schuylkill Ave. DETOUR

POSTED. 24 HOUR DETOUR

10/16/17-10/20/17 Abbonizio

Contractors, Inc.

$15.8 million

*US 1 N & S (Roosevelt Blvd.) Tree Removal: RIGHT LANE CLOUSRE between

Berkley St. & Ridge Ave 9 AM - 3 PM

10/16/17-10/20/17 Townscapes Inc.

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: LANE CLOSURES between Bucks

County line & 9th St. 9 AM - 3 PM & 7 PM - 9 AM.

10/16/17-10/21/17 H&K Group, Inc. $7.6 million

PA 63 (Woodhaven Rd.) W Traffic Sign Testing: RIGHT SHOULDER CLOSURE

between Thorton Rd. & U.S. 1 (Roosevelt Blvd.). 9 AM

to 3 PM

10/17/17-10/18/17 Wampole-Miller, Inc. $15 million

*I-95 South Surveying: RIGHT SHOULDER CLOSED between

Cottman Ave./Rhawn St. & Betsy Ross

Bridge/Aramingo Ave. exits. 9 AM - 1 PM.

10/18/17 Pickering, Corts &

Summerson

*I-95 North Surveying: RIGHT SHOULDER CLOSED between

Bridge St./Harbison Ave. & Cottman Ave./Rhawn St.

exits. 11 AM - 3 PM.

10/18/17 Pickering, Corts &

Summerson

*I- 95 South ramp from Besty Ross

Bridge

Line Striping: INTERMITTEN RIGHT & LEFT LANE

CLOSURES on ramp. 8 PM- 5 AM

10/19/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

$160.2 million

10/18/2017 Page 2 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 West Ramp to 30th Street Bridge Inspection: RAMP CLOSURE between South

St & I-676.  9 AM - 3 PM.

10/21/17 SPECIALTY

Engineering, Inc.

*I-95 South Bridge Inspection: RIGHT LANE CLOSURE between

Girard Ave & I-676. 9 AM - 3 PM.

10/22/17 SPECIALTY

Engineering, Inc.

*I-95 South Bridge Inspection: LEFT LANE CLOSURE between

Girard Ave & I-676. 9 AM - 3 PM.

10/23/17 SPECIALTY

Engineering, Inc.

JFK Blvd. West Bridge Rehabilitation: CLOSED & DETOURED

between 20th St & Schuylkill Ave. DETOUR POSTED.

24 HOUR DETOUR

10/27/17-10/30/17 Abbonizio

Contractors, Inc.

$15.8 million

New State Rd. Roadway Construction: LANE CLOSURE between

Levick Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM & 8

PM - 5 AM.

10/8/17-10/14/17 Walsh Construction

Company

$212.3 million

*I-95 North Paving & Line Striping: INTERMITTENT RIGHT &

LEFT LANE CLOSURES between Allegheny Ave. &

Bridge St. 8 PM - 5 AM.

10/9/17-10/13/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

*I-95 South Paving & Line Striping: INTERMITTENT RIGHT &

LEFT LANE CLOSURES between Bridge St. &

Allegheny Ave. 8 PM - 5 AM.

10/9/17-10/13/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

*I-76 E & W Graffiti Removal: LANE & SHOULDER CLOSURES

between City Ave. & Green Lane exits. 10:30 PM - 5

AM.

10/9/17 & 10/11/17

& 10/13/17

SEPTA

Delaware Ave. Milling & Paving: LANE RESTRICTIONS between

Oregon Ave. & Walt Whitman Bridge. 7 AM - 4 PM &

7 PM - 5 AM.

10/9/17-10/13/17 Tony DePaul & Son $550,000.00

10/18/2017 Page 3 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between

Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 5

AM. Friday 7 PM - Saturday 9 AM.

10/9/17-10/14/17 H&K Group, Inc. $7.6 million

*I- 95 South ramp from Besty Ross

Bridge

Line Striping: INTERMITTEN RIGHT & LEFT LANE

CLOSURES on ramp. 8 PM- 5 AM

10/13/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

$160.2 million

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between

Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 9

AM.

10/13/17 H&K Group, Inc. $7.6 million

Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO

RIGHT TURN at Walnut onto Schuylkill. 24-HOUR

RESTRICTIONS.

8/28/17-12/31/17 Buckley & Company,

Inc.

$103 million

Cheltenham Ave. Utility Installation: LANE RESTRICTIONS between

Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.

8/30/17-11/2/17 PECO Energy

Holme Ave. Bridge Repair: LANE CLOSURE between Longford St.

& Arthur St. 24-HOUR RESTRICTIONS.

8/7/17-5/2018 Road-Con, Inc. $1.3 million

I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE

LANE 24-HOUR

7/21/17-10/31/17 Buckley & Company,

Inc.

$64.8 million

Roosevelt Blvd. Curb, Sidewalk, Bus Shelters & Pedestrian Lights:

LANE CLOSURES at Cottman Ave.; Rhawn St.;

Welsh Rd.; Grant Ave. & Red Lion Rd. 6 AM - 4:30

PM.

7/31/17-10/25/17 A.P. Construction,

Inc.

Aramingo Ave. Utility Installation: LANE CLOSURES between

Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM.

7/20/17-4/1/18 A.P. Construction,

Inc.

$87 million

Palmer St. Overhead Bridge Construction: CLOSED &

DETOURED between Wildey St. & Delaware Ave. 24-

HOUR DETOUR. DETOUR POSTED.

6/15/16-5/1/18 James J. Anderson $211 million

Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between

Wildy St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/15/17-5/1/18 James J. Anderson $211 million

10/18/2017 Page 4 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Richmond St. N & S Bridge Demolition: CLOSED & DETOURED between

Marlborough St. & Columbia Ave. 24-HOUR

DETOUR. DETOUR POSTED.

6/5/17-10/14/17 James J. Anderson $211 million

Columbia Ave. Bridge Demolition: CLOSED & DETOURED between

Wildey St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/5/17-10/14/17 James J. Anderson $211 million

18th St. Roadwork: CLOSED & DETOURED between Vine St.

Local E/B & Vine St. Local W/B. 24-HOUR

CLOSURE. DETOUR POSTED.

5/15/17-10/27/17 Buckley & Company,

Inc.

$64.8 million

22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

21st St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St.

(PA 611) & Rising Sun Ave. 9 AM - 3 PM.

12/2/15-11/2017 Armour and Sons

Electric

$4.7 million

Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Somerset St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Girard Ave. on-ramp to I-95 North Highway and Ramp Reconstruction: RAMP CLOSED

& DETOURED. 24-HOUR CLOSURE. DETOUR

POSTED.

12/16/15-10/20/17 James J. Anderson $211 million

Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between

Columbia Ave. & Aramingo Ave. 24-HOUR

RESTRICTIONS.

4/1/15-10/2018 James J. Anderson $211.7 million

BUCKS COUNTY

Fretz Valley Rd. Bedminster Twp. Tree Removal: LANE RESTRICTION at Deer Run Rd.

9 AM - 3 PM

10/16/17 Bustleton Services

10/18/2017 Page 5 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Durham Rd., Bensalem, Bristol twps. Bridge Beams: CLOSED & DETOURED between New

Rodger Rd. & New Falls Rd. 8 PM - 5 AM. DETOUR

POSTED.

10/16/17-10/17/17 Pennsylvania

Turnpike Commission

$142 million

Swamp Rd., Newtown Twp. Utility Installation: LANE RESTRICTIONS between

Sawmill Lane & Liberty Drive. 9 AM - 3 PM.

10/16/17-10/17/17 Newtown Artesian

Water Authority

*I-95 North, Bensalem, Middletown,

Lower Makefiel twps.

Guide Rail Repair: LANE CLOSURE between

Woodhaven Rd & New Hope exits. 10 AM - 2 PM.

10/16/17-10/18/17 Collinson, Inc. $2.6 million

Marienstein Rd., Nockamixon,

Bridgeton twps.

Patching, Milling & Overlay: LANE RESTRICTIONS

between PA 611 (Easton Rd.) & PA 32 (River Rd.). 9

AM - 3 PM.

10/16/17-10/20/17 James D. Morrissey $3.2 million

*I-95 North, Middletown Twp. Traffic Marking Installation: INTERMITTENT LANE

CLOSURES between New Falls Rd. & Newtown-

Yardley Interchange. 7 PM - 5 AM.

10/16/17-10/20/17 James J. Anderson $29,633,134

*I-95 South, Middletown Twp. Brdige Dam and Traffic Marking Installation:

INTERMITTENT LANE CLOSURES between

Newtown-Yardley Interchange and New Falls Rd. 7

PM - 6 AM.

10/16/17-10/20/17 James J. Anderson $29,633,134

Pennsylvania Ave., Morrisville Bor. Utility Installation: LANE CLOSURE between

Hendrickson St. & Franklin St. 9 AM - 3 PM Weekdays

10/16/17-10/23/17 PECO Energy

Kumry Rd., Milford Twp. Milling & Paving: LANE RESTRICTIONS between

Sleepy Hollow Rd. & Creamery Rd. 7 AM - 5 PM.

10/16/17-10/31/17 Blooming Glen

Contractors, Inc.

$3.7 million

*I-95 North, Bensalem Twp. Traffic Sign Testing: RIGHT SHOULDER CLOSURE

between Woodhaven Rd & Street Rd. exits. 9 AM to 3

PM

10/17/17-10/18/17 Wampole-Miller, Inc. $15 million

*I-95 North, Bensalem, Bristol twps. Reset Barrier: LANE RESTRICTION between PA 413

(Veterans Hwy.) & US 1 (Lincoln Hwy.). 8 PM - 5 AM.

10/17/17-10/19/17 Pennsylvania

Turnpike Commission

$118.8 million

PA 412 N (Durham Rd.),

Nockamixon Twp.

Tree Removal: LANE RESTRICTION at Traugers

Crossing Rd. 9 AM - 3 PM

10/18/17 Bustleton Services

10/18/2017 Page 6 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

U.S. 202 North, Buckingham Twp. Guide Rail Repair: LANE CLOSURE between Ash Mill

Rd. & U.S. 263. 9 AM to 3 PM

10/19/17 Collinson, Inc. $2.6 million

Bath Rd., Bristol Twp. Utility Installation: LANE RESTRICTIONS between

Bayard St. & Lower Bucks Hospital Entrance.

Weekdays. 9 AM - 3 PM.

10/23/17-11/30/17 PECO Energy

Pennsylvania Ave.,Morrisville Boro Utility Installation: LANE CLOSURE between

Hendrickson St. & Franklin St. 9 AM - 3 PM Weekdays

10/25/17-11/1/17 PECO Energy

PA 611 South, Doylestown Twp.,

Doylestown Bor.

Line Painting: RIGHT LANE CLOSED between N.

Broad St. & W. State St. 9 AM - 3 PM.

10/9/17-10/20/17 Rohm and Haas

Chemicals, LLC

PA 611 (Easton Rd.), Warrington

Twp.

Curb Ramp Installation: LANE CLOSURES at

Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison

Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol

Rd.; Kelly Rd.; Freedoms Way/Oxford Drive;

Doylestown Plaza. 9 AM - 3 PM.

10/9/17-10/20/17 James D. Morrissey $4.3 million

Radcliffe St., Bristol Boro. Utility Installation: LANE CLOSURE between Mulberry

St. & Walnut St. Weekdays. 9 AM - 3 PM.

10/12/17-10/19/17 PECO Energy

US 13 N & S (Bristol Pike), Bristol

Twp.

Storm Pipe Installation: LANE RESTRICTIONS

between Haunted Lane & Cedar Ave. Weekdays. 9

AM - 3 PM.

9/25/17-10/27/17 Bencardino

Excavating, Inc.

$634,265.00

Jacksonville Rd., Warminster,

Northampton twps., Ivyland Bor.

Milling & Paving: LANE RESTRICTIONS between

County Line Rd. & Almshouse Rd. Weeknights. 7 PM

- 5 AM.

9/25/17-10/31/17 Blooming Glen

Contractors, Inc.

$4.4 million

N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between

Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3

PM.

9/25/17-11/15/17 Bencardino

Excavating, Inc.

$155,000.00

Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED

between PA 152 & Constitution Ave. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-11/25/18 H&K Group, Inc.

10/18/2017 Page 7 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Street Rd., New Hope Bor. Bridge Rehabilitation: CLOSED & DETOURED

between Atkinson Rd. & Windy Bush Rd. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-11/30/17 Loftus Construction,

Inc.

$6.8 million

Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Creamery Rd. & Paxson Rd. 24-HOUR

CLOSURE. DETOUR POSTED.

10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00

*I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332

(Yardley-Newtown Rd.) & NJ state line. 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

*I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between JJ state line &

PA 332 (Yardley-Newtown Rd.). 24-HOUR

RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

PA 32 (River Rd.), Lower Makefield

Twp.

Roadwork: LANE RESTRICTIONS between Woodside

Rd. & I-95. 24-HOUR RESTRICTIONS POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Woodside Rd., Lower Makefield

Twp.

Roadwork: ALTERNATING TRAFFIC between River

Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Taylorsville Rd., Lower Makefield

Twp.

Roadwork: LANE CLOSURES between Woodside Rd.

& Highland Drive. 24-HOUR RESTRICTIONS

POSSIBLE.

9/16/17-Indef. Delaware River Joint

Toll Bridge

Commission

Brownsville Rd., Middletown Twp. Utility Installation: CLOSED & DETOURED between

Broadview Ave. & Old Lincoln Hwy. Weekdays. 9 AM

- 3 PM. DETOUR POSTED.

9/13/17-10/10/17 PECO Energy

Oxford Valley Rd., Falls Twp. Uitility Installation: LANE CLOSURE between Olds

Boulevard & Queen Anne Drive. Weekdays. 9 AM - 3

PM

10/4/17-10/12/17 Township of Falls

Authority

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between Plumbridge Drive & Bath Rd./Durham Rd. 8

PM - 5 AM. DETOUR POSTED.

8/20/17-11/10/17 Pennsylvania

Turnpike Commission

$142 million

10/18/2017 Page 8 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: LANE RESTRICTIONS & 15-

MINUTE STOPPAGES between Plumbridge Drive &

Bath Rd./Durham Rd. 7 AM - 3 PM.

8/20/17-11/10/17 Pennsylvania

Turnpike Commission

$142 million

Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413

& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.

8/20/17-11/10/17 Pennsylvania

Turnpike Commission

$142 million

PA 611 (Easton Rd.), Warrington

Twp.

Utility Installation: LANE CLOSURE between Street

Rd. & Paul Valley Drive. Weekdays. 9 AM - 3 PM.

8/22/17-10/13/17 Warrington Township

Authority

$29.13 million

Main St., Dublin Bor. ADA Ramp Installation: CURB LANE RESTRICTIONS

between High St. & Manor Drive. 7 AM - 3 PM.

8/24/17-10/19/17 Dublin Borough $29.19 million

PA 263 (York Rd.), Warminster Twp. Milling & Paving: LANE CLOSURE between County

Line Rd. & Tennyson Drive. Weeknights. 7 PM - 5

AM.

8/14/17-10/31/17 Blooming Glen

Contractors, Inc.

$4.4 million

Loux Covered Bridge over Cabin

Run on Carver-Wismer Road,

Bedminster Township

CLOSED & DETOURED INDEFINITELY: Due to

structural damage sustained from an oversized vehicle

DETOUR POSTED

8/1/17-Indef.

Lower State Rd., Doylestown Twp. Multi-Use Trail Installation: LANE RESTRICTIONS

between US 202 & Memorial Drive. Weekdays. 9 AM

- 3 PM.

5/30/17-10/17/17 James D. Morrissey,

Inc.

$29.17 million

Steinsburg Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Hieter Rd. & Wentz Rd. 24-HOUR DETOUR.

DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

$29.10 million

Trumbauersville Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Canary Rd. & Esten Rd. 24-HOUR

DETOUR. DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

$29.10 million

PA 152 (Limekiln Pike), Warrington,

Twp.

Utility Installation & Paving: CLOSED & DETOURED

between Westminster Drive & County Line Rd. 24-

HOUR DETOUR. DETOUR POSTED.

12/13/16-10/12/17 James D. Morrissey,

Inc.

$14.8 million

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

East Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

10/18/2017 Page 9 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between

Bristol Rd. & Sugar Bottom Rd. 24-HOUR

RESTRICTIONS.

3/17/14-10/2017 J.D. Eckman, Inc. $31.6 million

Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between

Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.

3/2/11-Indef. $29.2 million

CHESTER COUNTY

Birmingham Rd. Birmingham, East

Bradford twps.

Paving: LANE RESTRICTIONS between Old

Wilmington Pike & Lenape Rd. 6 PM - 6 AM

10/15/17-10/18/17 Allan Myers $3.7 million

Kings Hwy, West Caln, West

Brandywine, Caln, Valley twps.

Milling: LANE RESTRICTIONS between Compass Rd.

& Lincoln Hwy. 7 PM - 5 AM & 9 AM - 3 PM

10/15/17-10/20/17 Allan Myers $6.3 million

PA 162 S (Embreeville Rd.), Newlin

Twp.

Tree Removal: LANE RESTRICTION between

Brandywine Creek Rd. & Scott Rd. 9 AM - 3 PM

10/16/17 Knight Brothers

Boot Rd., East Caln Twp. Soil Borings: LANE CLOSURE between Quarry Rd. &

Southwind Lane. 9 AM - 3 PM.

10/16/17-10/18/17 Navarro & Wright

Bulltown Rd., West Nantmeal Twp. Core Boring: LANE RESTRICTIONS between Yoder

Rd. & Hedge Rd. 9 AM - 3 PM.

10/16/17-10/20/17 Pennsylvania

Turnpike Commission

Strasburg Rd., West Sadsbury Twp. Milling: LANE RESTRICTION between Limestone Rd.

& Lancaster County Line 9 AM - 3 PM

10/16/17-10/20/17 Allan Meyers $5.5 million

PA 100 N (Pottstown Pike), West

Whiteland Twp.

Utility Installation: LANE RESTRICTIONS between

Warerloo Rd. & Town Center Mall 9 AM - 3 PM

10/16/17- 10/20/17 PECO Energy

U.S. 202 N & S, Tredyffrin Twp. Large Sign Maintenance: ROAD CLOSURES between

Chesterbrook Blvd. & Allendale Rd. 8 PM - 5 AM

10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million

U.S. 422 N & S, Tredyffrin Twp. Large Sign Maintenance: ROAD CLOSURES between

U.S. 202 & PA 23 Valley Forge Rd). 8 PM - 5 AM

10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million

Business U.S. 30 W (Lincoln

Highway), Coatesville City

Utility Installation: LANE RESTRICTIONS between

First Ave & Church St. 9 AM - 3 PM

10/16/17-12/15/17 Pennslyvania

American Water Co.

10/18/2017 Page 10 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 422 West, Lower Pottsgrove

Twp.

Bridge Construction: LANE CLOSURES between

Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7

AM - 1 PM.

10/17/17-10/18/17 J.D. Eckman, Inc. $73.3 million

PA 724 (West Scuykill Rd.) North

Coventry Twp.

Tree Removal: LANE RESTRICTIONS between Berks

County Line & Catfish Ln. 9 AM - 3 PM

10/17/17-10/20/17 Knight Brothers

PA 724 (Sckuylkill Rd), North

Coventry Twp.

Utility Installation: LANE CLOSURE between Park Ave

& Vaughn Rd. 9 AM - 3 PM

10/17/17-10/24/17 PECO Energy

Lochwood Ln, East Goshen Twp Uitility Installation: LANE CLOSURE between

Lochwood Ln. & Strasburg Ln. Weekdays. 9 AM - 3

PM

10/19/17-10/26/17 PECO Energy

Leopard Rd. Easttown Twp. Utility Installation: LANE CLOSURE between Potter

Ave & Sheffield Dr. 9 AM - 3 PM

10/27/17-11/3/17 PECO Energy

Newtown Rd., Easttown Twp. Utility Installation: CLOSED & DETOURED between

Sugartown Rd. & Waterloo Rd. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

10/26/17-11/16/17 PECO Energy

Newark Rd., New Garden Twp. Widening: LANE RESTRICTIONS between New

Garden Rd. & PA 41 (Gap Newport Pike). 9 AM - 3

PM.

9/25/17-10/30/17 Allan Myers, LP $1.4 million

Woodview Rd., London Grove Twp. Bridge Replacement: CLOSED & DETOURED

between Ewing Rd. & W. Woodview Rd. 24-HOUR

DETOUR. DETOUR POSTED.

9/25/17-12/2/17 Walsh Construction

Company

$29.2 million

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between Boot

Rd. & Kind Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday

7 AM - 5 PM.

10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between King

Rd. & Constitution Drive. Mon. thru Fri. 9 AM - 3 PM.

Saturday 7 AM - 5 PM.

10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million

Boot Rd., West Goshen Twp. Pipeline Maintenance: LANE CLOSURE between US

202 & Ship Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday

7 AM - 5 PM.

10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million

PA 29 (Morehall Rd.), East

Whiteland Twp.

Widening: LANE RESTRICTIONS at Great Valley

Parkway. Weekdays. 9 AM - 3 PM.

10/2/17-11/3/17 Liberty Property, LLC $29.3 million

10/18/2017 Page 11 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Conestoga Rd., West Pikeland Twp. Utility Installation: LANE CLOSURE between Byers

Rd. & Walnut Lane. Weekdays. 9 AM - 3 PM.

10/4/17-10/11/17 PECO Energy

PA 724 (Schuylkill Rd.), East

Pikeland Twp.

Utility Installation: LANE RESTRICTIONS at Ridge Rd.

Weekdays. 9 AM - 3 PM.

10/9/17-10/24/17 PECO Energy

East Nottingham, West Nottingham,

Upper Oxford, Lower Oxford, New

London, Londonderry twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 2:30 PM.

10/10/17-10/20/17 PennDOT $29.6 million

West Evergreen St., West Grove

Bor.

Sidewalk Replacement: LANE RESTRICTIONS

between Oakland Ave. & Prospect Ave. Weekdays 9

AM - 3 PM.

10/10/17-10/24/17 Flyway Excavating

Business US 30 West, City of

Coatesville

Utility Installation: LANE RESTRICTIONS between

First Ave. & Church St. Weekdays. 9 AM - 3 PM.

10/10/17-12/15/17 Pennsylvania

American Water

Company

PA 100 South (Pottstown Pike),

West Whiteland Twp.

Adjust Manhole Covers: LANE CLOSURES between

Commerce Drive & Lincoln Hwy. Weekdays. 9 AM -

3 PM.

10/11/17-10/19/17 Verizon

PA 282 (Wallace Ave.),

Downingtown Bor.

Sidewalk Installation: LANE SHIFT between

Pennsylvania Ave. & US 30 (Lancaster Ave.).

Weekdays. 9 AM - 3 PM.

9/11/17-11/30/17 Downingtown

Borough

US 1 North, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between PA

41 (Gap Newport Pike) & Newark Rd. 24-HOUR

RESTRICTIONS.

9/6/17-11/7/17 Loftus Construction,

Inc.

$5.5 million

US 1 South, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between

Newark Rd. & PA 41 (Gap Newport Pike). 24-HOUR

RESTRICTIONS.

8/7/17-11/7/17 Loftus Construction,

Inc.

$5.5 million

West Baltimore Pike, Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Penns Manor Rd. & Mill St. Weekdays. 8 AM - 4 PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.50

10/18/2017 Page 12 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

West Cypress St., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Scarlett Rd. & Mill St. Weekdays. 8 AM - 4 PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.50

Rosedale Rd., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between

Walnut St. & MacFarlan Rd. Weekdays. 8 AM - 4

PM.

7/31/17-12/31/17 Ply-Mar Construction

Co., Inc.

$830,403.00

PA 23 (Ridge Rd.), East Pikeland

Twp.

Utility Installation: CLOSED & DETOURED between

Hares Hill Rd. & PA 724 (Schuylkill Rd.). 24-HOUR

DETOUR. DETOUR POSTED.

5/15/17-11/15/17 Toll Brothers $29.15 million

PA 352 (Chester Rd.), East Goshen

Twp.

Pipe Installation: TRUCK DETOUR at Boot Rd. 24-

HOUR CLOSURE. DETOUR POSTED.

5/15/17-11/17/17 Sunoco Pipeline L.P. $29.17 million

Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green

Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.

3/3/17-Indef. Maintenance $29.3 million

*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

interchanges. 9 AM - 2 PM & 5 PM - 5 AM.

12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million

*US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 7 PM - 1 PM.

12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million

Hollow Rd., West Vincent, East

Vincent twps.

Bridge Damage: CLOSED & DETOURED between

French Creek Rd. & Pughtown Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/20/16-Indef. PennDOT

Ross Fording Rd., West Fallowfield

Twp.

Bridge Damage: CLOSED & DETOURED between

Creek Rd. & Bryson Rd. 24-HOUR DETOUR.

DETOUR POSTED.

7/2/15-Indef. PennDOT $29.2 million

PA 724 ramp to US 422 East, East

Coventry Twp.

Ramp/Bridge Construction: RAMP CLOSED &

DETOURED. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, North Coventry

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

10/18/2017 Page 13 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 422 E & W, North Coventry

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

DELAWARE COUNTY

Springfield Rd., Upper Darby,

Springfield twps.; Collingdale, Aldan

Clifton Heights bors.

Milling & Paving: LANE RESTRICTIONS between

MacDade Blvd. & Netherwood Drive. 7 PM - 5 AM

and 9 AM - 3 PM

10/15/17-10/20/17 Highway Materials,

Inc.

$2.5 million

Upland Ave/22nd St. Upland Boro.

Chester City

Asphalt Paving Adjustments: LANE RESTRICTIONS

between Upland St. & Melrose St. 9 AM - 3 PM.

10/16/17-10/20/17 Allan Myers $7.2 million

*I-476 N & S, Radnor, Haverford,

twps.

ITS Fiber Installation & Splicing: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

10/16/17-10/20/17 Wampole-Miller, Inc. $15 million

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -

3 PM

10/16/17-10/21/17 Neshaminy

Constructors, Inc.

$3.7 million

*I-95 N & S, Lower Chichester,

Upper Chichester, Chester, Upland,

Ridley, Tinicum twps. Chester City

Large Sign Maintenance: LANE CLOSURES between

PA 491 (Naamans Rd.) & Bartram Ave. 8 PM - 5 AM

10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million

Sweetwater Rd., Thornbury,

Edgemont twps.

Mill & Base Repair: LANE RESTRICTIONS between

Valley Rd. & Creek Rd. 6 PM - 6 AM

10/19/17 Allan Myers $4,098,777.00

*I-95 S on ramp from Edgmont Ave Painting/Inspection: CLOSE I-95 SB ON RAMP

between Edgemont Ave & I-95 9 AM to 3 PM

10/23/17-10/27/17 South State, Inc. $16.6 million

Bryn Mawr Ave., Radnor Twp. Utility Installation: LANE RESTRICTIONS at Wootton

Rd. 9 AM - 3 PM.

10/25/17-10/27/17 Aqua Pennsylvania

*I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER

CLOSURES between I-476 & PA 352/320. 10 PM - 5

AM.

10/9/17-10/20/17 South State, Inc. $16.6 million

10/18/2017 Page 14 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-476 N & S, Radnor, Haverford,

Marple twps.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

10/9/17-10/20/17 Wampole-Miller, Inc. $15 million

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: LANE CLOSURES

between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM -

3 PM

10/9/17-10/13/17 Neshaminy

Constructors, Inc.

$3.7 million

PA 3 (West Chester Pike),

Haverford, Upper Darby twps.

Curb Ramp Reconstruction: LANE CLOSURE at Brief

Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal

Square & Pennock Ave. 9 AM - 3 PM.

10/9/17-10/20/17 L.C. Costa

Contractors, Inc.

$5.9 million

PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Chatham Rd.; Forge Rd.; Copley Rd.; Terminal

Square & Millbourne Ave. 9 AM - 3 PM.

10/9/17-10/20/17 L.C. Costa

Contractors, Inc.

$5.9 million

E. Baltimore Ave., Lansdowne Bor. ADA Curb Ramp Replacement: LANE CLOSURE at

1st St.; 2nd St.; Baltimore St. & E. Baltimore St.;

Rigby St.; Lexington Ave.; Wildwood Ave.; Melrose

Ave.; Hirst Ave.; Maple Ave.; Legion Ter.; Lewis Ave.

& Third St. 9 AM - 3 PM.

10/9/17-10/20/17 L.C. Costa

Contractors, Inc.

$7.2 million

Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Diamond St.; Madison St.; Woodlawn Ave.; Clifton

Ave. & Broadway Ave. 9 AM - 3 PM.

10/9/17-10/20/17 L.C. Costa

Contractors, Inc.

$4.1 million

US 1 (Baltimore Ave.), Clifton

Heights Bor.

Curb Ramp Reconstruction: LANE CLOSURES at

Church St.; Marple Ave.; Jackson Ave.; Springfield

Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM.

10/9/17-10/20/17 L.C. Costa

Contractors, Inc.

$4.1 million

Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at

Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin

Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.

10/9/17-10/20/17 Lenni Electric $4.1 million

Baltimore Ave., Upper Darby Twp.,

Lansdowne Bor.

Traffic Signal Upgrade: LANE RESTRICTIONS

between Lansdowne Ave.; Penn Blvd./4th St.;

Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church

Lane. 9 AM - 3 PM.

10/9/17-10/20/17 Lenni Electric $4.1 million

10/18/2017 Page 15 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Baltimore Ave., Clifton Heights Bor.,

Upper Darby Twp.

Road Widening: LANE RESTRICTIONS at Springfield

Rd.; Church Lane; Delmar Drive; Diamond St. & Home

Depot Drive. 9 AM - 3 PM.

10/9/17-10/20/17 Lenni Electric $4.1 million

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) & PA

261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM

Saturday

10/9/17-10/14/17 J.D. Eckman, Inc. $62.7 million

U.S. 1, Middletown, Upper

Providence, Marple twps.

Large Sign Maintenance: LANE CLOSURES between

PA 352 (Middletown Rd.) & PA 320 (Sproul Rd.). 8

PM - 5 AM

10/9/17-10/14/17 Carr & Duff, Inc. $2.1 million

Radnor, Haverford, Upper Darby,

Springfield, Marple, Newtown twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 2:30 PM.

10/10/17-10/20/17 PennDOT

County Line Rd., Radnor Twp. Utility Installation: LANE RESTRICTIONS at

Glenbrook Ave. Weekdays. 9 AM - 3 PM.

10/11/17-10/16/17 Aqua Pennsylvania

Barren Rd. Middletown Twp. Utility Installation: LANE CLOSURES between Devon

Lane & County Village Way. Weekdays. 9 AM - 3

PM.

10/11/17-10/20/17 PECO Energy

Naamans Creek Rd., Concord Twp. Utility Installation: LANE CLOSURES between Pyle

Rd. & Shavertown Rd. Weekdays. 9 AM - 3 PM.

10/13/17-10/20/17 PECO Energy

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: SIDEWALK CLOSED

between PA 320 (Spring Mill Rd.) & Ithan Ave. 24 hour

Closure

10/2/17-12/6/17 Neshaminy

Constructors, Inc.

$3.7 million

Goshen Rd., Newton Twp. Utility Installation: ROAD CLOSURE WITH DETOUR

between Newton Street Rd. & Butler Dr. 9 AM - 3 PM.

DETOUR POSTED.

10/4/17-10/20/17 Aqua Pennsylvania

Bethel Rd., Concord Twp. Curb Installation: LANE RESTRICTIONS between

Smithbridge Rd. & Featherbed Lane. Weekdays. 9

AM - 3 PM.

10/5/17-11/17/17 Valley Point Church

10/18/2017 Page 16 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Sugartown Rd., Radnor Twp. Utility Installation: LANE RESTRICTIONS between

Poplar Ave. & Longwood Drive. Weekdays. 9 AM - 3

PM.

9/25/17-10/27/17 Aqua Pennsylvania $29.27 million

Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between S.

Devon Ave. & Lenoir Ave. 8:30 AM - 3 PM. DETOUR

POSTED.

9/25/17-10/31/17 PECO Energy $29.31 million

Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED

between 12th St. & 13th. DETOURED POSTED.

9/25/17-1/11/18 South State, Inc. $16.8 million

Baltimore Pike, Springfield Twp. Conduit Repair: LANE RESTRICTIONS between East

Woodland Ave. & Thomson Ave. Weekdays. 9 AM -

3 PM.

9/18/17-10/13/17 Verizon $29.13 million

Kirk Lane, Upper Providence Twp. Utility Installation: LANE RESTRICTIONS at Oakcrest

Lane, Willowbrook Lane & W. 3rd St. Weekdays. 9

AM - 3 PM.

9/5/17-10/13/17 Aqua Pennsylvania

Burmont Rd., Haverford Twp. Utility Installation: LANE RESTRICTIOMS between

Glendale Rd. & Township Line 9 AM - 3 PM

Weekdays

9/5/17-10/27/17 Aqua Pennsylvania

S. Oak Ave., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between

Baltimore Pike & Providence Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

9/11/17-11/17/17 Aqua Pennsylvania

Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between

Lansdowne Ave. & PA 3 (West Chester Pike).

Weekdays. 9 AM - 3 PM. DETOUR POSTED.

9/11/17-11/17/17 Aqua Pennsylvania

Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between

MacDade Blvd. & PA 13 (Chester Pike). Weekdays.

9 AM - 3 PM. DETOUR POSTED.

8/22/17-11/24/17 Aqua Pennsylvania

Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between

13th St. & 12th St. 24-HOUR DETOUR. DETOUR

POSTED.

8/14/17-2/14/18 South State, Inc. $16.6 million

Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between

Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR

DETOUR. DETOUR POSTED.

8/7/17-10/20/18 Road-Con, Inc. $29.20 million

10/18/2017 Page 17 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Creek Rd., Middletown Twp. Pipe Installation: LANE CLOSURE between Duttons

Mill Rd. & W. Knowlton Rd. 24-HOUR

RESTRICTIONS.

8/1/17-10/15/17 Sunoco Pipeline L.P. $29.15 million

Chester Creek Rd., Middletown

Twp., Brookhaven Bor.

Utility Installation: CLOSED & DETOURED between

Dutton Mill Rd. & Bridgewater Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

7/12/17-12/31/17 Middletown Township

Sewer Authority

$29.31 million

Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED

between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-

HOUR DETOUR. DETOUR POSTED.

6/20/17-10/20/17 South State, Inc. $16.6 million

Baltimore Pike, Springfield Twp. Utility Installation: LANE RESTRICTIONS between

Thomson Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.

6/12/17-11/3/17 Aqua Pennsylvania

S. Bryn Mawr Ave., Radnor Twp. Bridge Reconstruction: LANE WIDTHS NARROWED

between PA 320 (Sproul Rd.) & S. Ithan Ave.

5/30/17-12/15/17 Loftus Construction,

Inc.

$7.5 million

Creek Rd., Middletown Twp.,

Brookhaven Bor.

Pipe Installation: CLOSED & DETOURED between

Bridgewater Rd. & Dutton Mill Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

5/15/17-12/31/17 Middletown Township

Sewer Authority

Crosby St., City of Chester Pedestrian Bridge Rehabilitation: Between 13th St. &

12th St.

3/27/17-11/29/17 South State, Inc. $16.6 million

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. Weekdays. 9 AM - 3 PM & 7 PM -

6 AM.

3/20/17-10/20/17 J.D. Eckman, Inc. $62.7 million

College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED

between Spring Mill Rd. & Haverford Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/29/16-5/2018 Road-Con, Inc. $5.2 million

MONTGOMERY COUNTY

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 9 AM.

10/13/17-10/14/17 J.D. Eckman, Inc. $21.1 million

*I-76 E & W, West Conshohocken

Bor., Upper Merion, Lower Merion

twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 9 AM.

10/13/17-10/14/17 J.D. Eckman, Inc. $21.1 million

10/18/2017 Page 18 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Linfield Trappe Rd, Limerick Twp Base Repair: CLOSED between Township Line Rd &

Lewis Rd, Red Arrow Detour

8 PM to 5 AM

10/15/17 Maintenance

PA 611 (Old York Rd.), Abington

Twp.

Bridge Work: LANE RESTRICTIONS between Jericho

Rd. & Hamilton Ave. 9 AM - 3 PM. & 9 PM - 5 AM

10/15/17-10/20/17 J.D. Eckman, Inc. $3.6 million

US 422 East, Upper Merion, West

Norriton twps.

Bridge Steel Erection & Bridge Demolition: SINGLE

LEFT/RIGHT LANE CLOSURES & 15-MINUTE

STOPPAGES between US 202 & Trooper Rd.

Interchanges. 7 PM - 5 AM.

10/15/17-10/20/17 J.D. Eckman, Inc. $97.4 million

US 422 West, Upper Merion, West

Norriton twps.

Bridge Steel Erection & Bridge Demolition: SINGLE

LEFT/RIGHT LANE COSURES & 15-MINUTE

STOPPAGES between US 202 & Trooper Rd.

Interchanges. 9 PM - 6 AM.

10/15/17-10/20/17 J.D. Eckman, Inc. $97.4 million

*I-76 E & W, Upper Merion, Lower

Merion twps.

Milling & Concrete Patching: LANE CLOSURES

between US 202 & US 1 (City Ave.) 9 PM - 5 AM & 9

PM - 9 AM (weekends)

10/15/17-10/21/17 J.D. Eckman, Inc. $21.1 million

*I-76 E & W, Lower Merion Twp. Surveying: RIGHT LANE AND SHOULDER

CLOSURE between Belmont Ave/Green Lane & City

Ave. exits 9 AM - 11 AM

10/16/17 Dawood Engineering

U.S. 422 W, Limerick Twp. Concrete Patching: RIGHT LANE CLOSURES

between Township Line Rd & Lewis Rd. 9 AM - 3 PM.

10/16/17-10/17/17 Maintenance

Eagleville Rd, Lower Providence Twp Base Repair: CLOSED between Ridge Pike & South

Park Ave, Red Arrow Detour

8 PM to 5 AM

10/16/17-10/17/17 Maintenance

Main St. Royersford Boro Curb, Sidewalk Installation: LANE CLOSURE between

3rd Ave & 4th Ave. 6 AM - 4 PM

10/16/17- 10/20/17 Borough of

Royersford

PA 73 (Skippack Pike), Whitpain

Twp.

Pavement Cores and Roadway Borings: LANE

CLOSURES between Crestline Drive & Cathcart Rd.

9 AM - 3 PM.

10/16/17-10/20/17 Applied Geoscience

& Engineering, Inc.

10/18/2017 Page 19 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Meyers Rd., Perkiomen Twp. Grading and Subbase: LANE RESTRICTIONS

between Seitz Rd. & Miller Rd. 9 AM - 3 PM.

10/16/17-10/20/17 H&K Group, Inc. $11.3 million

PA 29 (Gravel Pike), Perkiomen

Twp.

Pole Relocations: LANE RESTRICTIONS between

Miller Rd. & Harrison Ave. 9 AM - 3 PM.

10/16/17-10/20/17 H&K Group, Inc. $11.3 million

*I-476 N & S, West Conshohocken

Bor.

ITS Fiber Installation & Splicing: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

10/16/17-10/20/17 Wampole-Miller, Inc. $15 million

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams

St.;Franklin St.; Madison St.& Washington St. 9 AM -

3 PM.

10/16/17-10/20/17 Road-Con, Inc. $13.3 million

PA 320 S (Gulp Rd) Survey Operation: LANE CLOSURE between Trinity

Rd., I-76, Upper Gulph Rd. interchanges 9 AM - 3 PM

10/16/17- 10/20/17 Susquehanna Civil

Inc.

*I-76 E & W, Upper Merion Twp. Large Sign Maintenance: LANE CLOSURES between

PA 320 (Swedeland Rd.) & PA Turnpike 8 PM - 5 AM

10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million

Layfayette Ave., Whitemarsh Twp. Utility Installation: LANE RESTRICTIONS between

Layfayette Ave. Connector & PA 73 (Skippack Pike).

Weekdays. 9 AM - 3 PM.

10/16/17-11/30/17 Ambler Borough

Water Department

U.S. 202 N & S, Upper Merion Twp. Large Sign Maintenance: LANE CLOSURES between

Chesterbrook Blvd. & Allendale Rd. 8 PM - 5 AM

10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million

*I-76 W, Lower Merion Twp. Surveying: LANE CLOSURE between Belmont

Ave/Green Lane & City Ave. exits 9:45 AM - 2 PM

10/17/17 Dawood Engineering

*I-76 E & W, Lower Merion Twp. Surveying: RIGHT LANE AND SHOULDER

CLOSURE between Belmont Ave/Green Lane & City

Ave. exits 10 AM - 2 PM

10/18/17 Dawood Engineering

U.S. 422 E, Lower Providence Twp. Concrete Patching: LEFT LANE CLOSURES between

Egypt Rd. & Trooper Rd. 9 AM - 3 PM.

10/18/17-10/19/17 Maintenance

Gravel Pike (PA 29), Perkiomen Twp Base Repair: CLOSED between Skippack Pike (PA

73) & Bridge Rd, Red Arrow Detour

8 PM to 5 AM

10/18/17-10/19/17 Maintenance

10/18/2017 Page 20 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

S. Trooper Rd., West Norriton Twp. Trench Restoration: LANE RESTRICTIONS between

Blvd. of the Generals & William Penn Drive. 7 PM - 2

AM.

10/19/17 Sunesys, LLP

PA 663 (King St.), Pottstown Bor, Railroad Crossing Replacement: CLOSED AND

DETOURED between PA 100 (Pottstown Pike) &

Manatawny St. 24 HOUR CLOSURE

10/20/17-10/23/17 Colebrookdale

Railroad

PA 309 (Bethlehem Pike), Colmar

Twp.

Curb & Inlet Work: RIGHT LANE CLOSED between

Hilltown Pike & Triwigtown Rd. Weekdays. 9 AM - 3

PM.

10/20/17-10/27/17 A. Amsterdam

Conshocken State Rd., Lower

Merion Twp.

Bridge work: LANE RESTRICTION at Mill Creek Rd. 9

AM - 3 PM

10/23/17-10/25/17 Montgomery County

Evansburg Rd., Skippack Twp. Utility Installation: LANE RESTRICTIONS between

Township Line Rd. & Reagan Drive. 9 AM - 3 PM.

10/23/17-10/27/17 North Penn Water

Authority

PA 113 (Harleysville Pike), Lower

Salford Twp.

Utility Installation: LANE RESTRICTIONS between PA

63 (Sumneytown Pike) & Oak Drive. Weekdays. 9

AM - 3 PM.

10/23/17-11/30/17 PECO Energy

Old Forty Foot Rd., Lower Salford

Twp.

Bridge Rehabilitation: CLOSED AND DETOURED

between Township Line Road & Kober Road

WEEKDAYS 7 AM - 4 PM

10/30/17-6/2/18 J.D. Eckman, Inc. $7.4 million

Washington Lane, Lower Moreland

Twp.

Utility Installation: LANE CLOSURE between Welsh

Rd. & Holcomb Rd. 9 AM - 3 PM. Weekdays. 9 AM -

3 PM.

10/11/17-10/18/17 PECO Energy

Norristown, Upper Providence,

Lower Providence, Limerick,

Whitemarsh twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9 AM - 3 PM.

10/10/17-10/20/17 PennDOT $29.6 million

Kepler Rd., Pottsgrove Twp. Utility Installation: LANE CLOSURE between Doe Run

Lane & Wooded Way. Weekdays. 9 AM - 3 PM.

10/10/17-10/17/17 PECO Energy

*I-476 N & S, Lower Merion Twp.,

West Conshohocken Bor.

ITS Conduit & Fiber Installation: RIGHT SHOULDER

CLOSED between I-76 & I-95. 9 AM - 3 PM.

10/9/17-10/20/17 Wampole-Miller, Inc. $15 million

10/18/2017 Page 21 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams

St.;Franklin St.; Madison St.& Washington St. 9 AM -

3 PM.

10/9/17-10/20/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at

Washington St. 9 AM - 3 PM.

10/9/17-10/20/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at

Madison St. 9 AM - 3 PM.

10/9/17-10/20/17 Road-Con, Inc. $13.3 million

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Franklin

St. 9 AM - 3 PM.

10/9/17-10/20/17 Road-Con, Inc. $13.3 million

Flint Hill Rd., Upper Merion Twp. Sidewalk Installation: LANE CLOSURE between

Brentwood Court & Hertzog Blvd. 9 AM - 3 PM.

10/9/017-10/20/17 GEI Enterprises Inc. $29.29 million

Bethlehem Pike, Springfield Twp. Utility & Sidewalk Installation: LANE RESTRICTIONS

between Windsor Rd. & Rich Ave. Weekdays. 9 AM -

3 PM.

10/9/17-10/20/17 Springfield Township

Authority

West Main St., West Norriton Twp. Curb Removal: LANE RESTRICTIONS at Schuylkill

Ave. Weekdays. 9 AM - 3 PM.

10/2/17-10/20/17 L.F.T. Realty $29.20 million

Sandy Hill Rd., Plymouth Twp. Milling and Paving: LANE RESTRICTIONS between

Fairfield Rd. & Rollin Hill Dr. Weekdays 7 PM - 5 AM

10/2/17- 10/27/17 Glasgow, Inc. $4.5 million

Edge Hill Rd., Upper Moreland Twp. Utility Installation: LANE CLSOURE between Quigley

Ave & Moreland Rd. 9 AM - 3 PM Weekdays

10/3/17-10/10/17 PECO Energy

Joshua Rd., White Marsh Twp. Pipeline Repair: LANE CLOSURE between Flower

Town Rd & Stenton Ave. 6 PM - 6 AM

10/3/17-10/14/17 Sunoco Pipeline L.P.

Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between

Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3

PM.

10/2/17-11/16/17 Pennsylvania

American Water

Company

10/18/2017 Page 22 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Gypsy Lane, Upper Merion Twp. Bridge Deck Reconstruction: CLOSED & DETOURED

between South Gulph Rd. & Hughes Rd. Weekdays.

24-HOUR DETOUR. DETOUR POSTED.

10/2/17-11/15/17 Loftus Construction,

Inc.

$5.5 million

Cowpath Rd., Telford Bor. Bridge Rehabilitation: CLOSED & DETOURED

between Hollow Rd. & Barndt Rd. 24-HOUR

CLOSURE. DETOUR POSTED.

10/4/17-11/3/17 Loftus Construction,

Inc.

$5.5 million

N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between

Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3

PM.

9/27/17-11/15/17 Bencardino

Excavating, Inc.

$155,000.00

Argyle Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between

Chatham Rd. & Wynnewood Rd. Weekdays. 9 AM - 3

PM.

9/26/17-11/30/17 Aqua Pennsylvania

PA-113 (3rd Ave./Rahns Rd), Trappe

Borough, Perkiomen Twp.

Milling and Paving: LANE RESTRICTIONS between

Boro Line Road and PA-29 (Gravel Pike). 7 PM - 5

AM.

9/18/17-10/13/17 Glasgow, Inc. ECMS 107861

Bleim Rd., Lower Pottsgrove Twp. Utility Installation: LANE RESTRICTIONS between

New Hanover Square Rd. & Pleasantview Rd. 9 AM -

3 PM. Saturdays. 7 AM - 7 PM.

9/22/17-10/20/17 Borough of Pottstown

Church Rd., Upper Merion Twp. Utility Installation: CLOSED & DETOURED between

Gulph Ridge Rd. & Henderson Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

9/11/17-10/31/17 Aqua Pennsylvania

Cheltenham Ave., Cheltenham Twp. Utility Installation: LANE RESTRICTIONS between

Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.

8/30/17-11/2/17 PECO Energy

Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between

Washington Lane & York Rd. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

8/24/17-12/29/17 Aqua Pennsylvania

PA 363 (Trooper Rd.), Lower

Providence Twp.

Road Widening & Utility Installation: LANE

RESTRICTIONS between Eisenhower Ave. &

Shannondell Blvd. Weeknights. 7 PM - 5 AM.

7/17/17-11/30/17 Forge 20 LLC

10/18/2017 Page 23 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

Matsonford Rd., Upper Merion,

Lower Merion twps.

Bridge Repair: CLOSED & DETOURED between

Montgomery Ave. & Old Gulph Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

7/10/17-10/27/17 SEPTA

PA 23 ramp to US 422 East, Upper

Merion, West Norriton twps.

Ramp Reconstruction: RAMP CLOSED &

DETOURED. 24-HOUR DETOUR. DETOUR

POSTED.

7/10/17-11/2017 J.D. Eckman, Inc. $97.4 million

W. Wynnewood Rd, Lower Merion

Twp.

Utility Installation: LANE RESTRICTIONS between E.

County Line Rd. & Ballytore Rd. Weekdays. 9 AM - 3

PM.

6/5/17-10/27/17 Aqua Pennsylvania

Buchert Rd., Pottsgrove Twp. Curb Ramp Construction: LANE CLOSURE at

Pleasantview Rd.; N. Washington St. & Mervine St. 9

AM - 3 PM.

5/30/17-10/20/17 Highway Materials,

Inc.

$4.8 million

Mervine St., Lower Pottsgrove Twp,

Pottstown Bor.

Curb Ramp Construction: LANE CLOSURE at N.

Franklin St. 9 AM - 3:30 PM.

5/30/1710/20/17 Highway Materials,

Inc.

$4.8 million

Plank Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between PA 29 (Gravel Pike) & PA 73 (Skippack

Pike). 24-HOUR DETOUR. DETOUR POSTED.

5/2/17-10/2017 H&K Group, Inc. $11.3 million

Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR

DETOUR. DETOUR POSTED.

5/2/17-5/2019 H&K Group, Inc. $11.3 million

PA 63 (Main St.), Lower Salford Twp. Roadway & Culvert Widening: LANE RESTRICTIONS

between PA 113 (Harleysville Pike) & Carrie Lane.

Weekdays. 9 AM - 3 PM.

3/15/17-11/1/17 Lower Salford

Township

$29.1 million

*US 422 East, Lower Pottsgrove

Twp.

Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

Interchanges. 5 PM - 5 AM.

1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million

*US 422 West, Lower Pottsgrove

Twp.

Road & Bridge Construction: WEEKEND LANE

CLOSURES between Sanatoga & PA 724 (Schuylkill

Rd.) Interchanges. 7 PM - 1 PM.

1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million

Edge Hill Rd., Abington Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Ferndale Ave. & Hamilton Ave. 24-HOUR

DETOUR. DETOUR POSTED.

1/9/17-11/1/17 J.D. Eckman, Inc. $3.6 million

10/18/2017 Page 24 of 25

LOCATION RESTRICTION DATE CONTRACTOR COST

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

Baligomingo Rd., West

Conshohocken Bor.

Slope Stabilization: CLOSED & DETOURED between

PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.

DETOUR POSTED.

6/27/15-Indef. $29.27 million

PA 724 ramp to US 422 East, Lower

Pottsgrove Twp.

Roadwork: RAMP CLOSED & DETOURED. 24-

HOUR CLOSURE. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, Lower Pottsgrove

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

Interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, West Pottsgrove

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS

between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM

Fridays. 24-HOUR CLOSURE. DETOUR POSTED.

5/9/14-12/29/17 Valley Forge National

Historical Park

$29.29 million

10/18/2017 Page 25 of 25