date: 08.02.2009 ‘paryavaran bhavan’...appendix i form 1 (i) basic information name of the...
TRANSCRIPT
Date: 08.02.2009
To,
The Director,
Ministry of Environment & Forests,
‘PARYAVARAN BHAVAN’
CGO Complex, Lodhi Road,
New Delhi 110 033
Sub: Application for environmental clearance for our proposed expansion plant
of Chlorinated paraffin wax & sulpha chlorinated paraffin wax at our existing
plant located at Plot. No. 57/D/B, 1st phase, Industrial estate, GIDC Vapi 396 195.
Di: Valsad. Gujarat.
Respected Sir,
With reference to the above subject, we would like to state that, at present, we are
engaged in the manufacturing of Chlorinated Paraffin wax with capacity of
250TPM at our unit located at Plot. No. 57/D/B, 1st phase, Industrial estate,
GIDC Vapi 396 195. Di: Valsad. Gujarat.
Now we wish to expand our production capacity of Chlorinated Paraffin wax &
also introduce new product i.e. Sulpha Chlorinated Paraffin Wax at our existing
plant located in notified industrial area, GIDC Vapi, Di: Valsad, State: Gujarat.
We are submitting herewith the following details
1. Form No.1 along with Details.
2. Draft Terms of Reference (TOR
3. Project Feasibility Report
We request you to kindly consider our case in B2 category & issue us
Environmental Clearance for our proposed plant.
Please do the needful & oblige.
Thanking You,
Yours Faithfully
FOR MAWELL PLASTISIZERS PVT. LIMITED
DIRECTOR
APPENDIX I
FORM 1
(I) Basic Information
Name of the Project: M/s. Makwell Plastisizers Pvt. Ltd.
Location / site alternatives under consideration: Plot No. 57/D/B, 1st
Phase, GIDC Vapi,
Dist. Valsad, State: Gujarat, India.
Phone: +91-260- 2423495
Fax: +91-260- 2423496
Email: [email protected]
Size of the Project: * Organic chemicals
Existing: 250 TPM
Proposed: 2000 TPM
TOTAL : 2250 TPM
Expected cost of the project: Total : Rs. 432 Lacs
Existing : Rs. 207 Lacs
Proposed : Rs. 225 Lacs
Contact Information: Mr. Hiren Thakkar (Director)
Mobile No. : +91-98922 27171
Screening Category: Category B, 5(f), as the unit is
Located in notified area.
• Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining
lease area and production capacity for mineral production, area for mineral exploration, length for
linear transport infrastructure, generation capacity for power generation etc.,}
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical
changes in the locality (topography, land use, changes in water bodies, etc.)
Sr.
No.
Information/Checklist confirmation Yes/No? Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
1.1 Permanent or temporary change in land
use, land cover or topography including
increase in intensity of land use (with respect to local
land use plan)
No The plant is located in Notified
Industrial zone of GIDC Vapi.
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil
testing? No
1.5 Construction works? No Existing buildings shall be utilized for
the Proposed plant. No new civil
construction is required. Suitable
modification in MS structure shall be
carried out. Layout Plan is Attached as
Annexure 1
1.6 Demolition works? No Suitable modification in MS structure
shall be carried out.
1.7
Temporary sites used for construction workers or
housing of construction workers? No
Not required as local laborers shall be
employed.
1.8 Above ground buildings, structures or Earthworks
including linear structures, cut and fill or excavations Yes
As per GIDC approved Plan in existing
shed, Attached as Annexure 1
1.9
Underground works including mining or tunneling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing Yes
As per List of Product attached as
Annexure 2.
1.14 Facilities for storage of goods or materials? Yes As per Table attached as Annexure 3
1.15
Facilities for treatment or disposal of solid waste or
liquid effluents?
Yes Effluent treatment plant shall be
modified for the proposed quantity of
industrial effluent. The treated effluent
shall be sent to CETP for further
treatment and disposal. And
solid/hazardous waste shall be disposed
into approved TSDF site of M/s.
VWEMCL, GIDC Vapi.
1.16
Facilities for long term housing of operational
workers?
No Local people will be employed as
workers.
1.17 New road, rail or sea traffic during construction or
operation?
No Developed Industrial Area with
infrastructure facilities.
1.18 New road, rail, air waterborne or other airports etc? No Developed Industrial Area with
infrastructure facilities.
1.19 Closure or diversion of existing transport routes or
infrastructure leading to changes in traffic
movements?
No Developed Industrial Area with
infrastructure facilities.
1.20 New or diverted transmission lines or pipelines? No Developed Industrial Area with
infrastructure facilities.
1.21
Impoundment, damming, converting, realignment or
other changes to the hydrology of watercourses or
aquifers?
No Developed Industrial Area with
infrastructure facilities.
1.22 Stream crossings? No Developed Industrial Area with
infrastructure facilities.
1.23
Abstraction or transfers or the water form ground or
surface waters? Yes
No ground water shall be used. The
water shall be supplied by GIDC.
1.24
Changes in water bodies or the land surface affecting
drainage or run-off?
No No ground water shall be used. The
water shall be supplied by GIDC.
Separate rain water drains have been
provided. Treated effluent is sent to
CETP through underground pipeline.
1.25
Transport of personnel or materials for construction,
operation or decommissioning?
No Not applicable.
1.26 Long-term dismantling or decommissioning or
restoration works?
No Not applicable. No dismantling or
decommissioning is required for the
project.
1.27 Ongoing activity during decommissioning which could
have an impact on the environment?
No Not applicable.
1.28
Influx of people to an area in either temporarily or
permanently?
No Existing 25 numbers of locally
employed will be utilized.
1.29 Introduction of alien species? No
1.30 Loss of native species of genetic diversity? No
1.31 Any other actions? No
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or
energy, especially any resources which are non-renewable or in short supply):
Sr.
No
Information/checklist confirmation Yes/
No?
Details there of (with approximate
quantities/rates, wherever possible)
with source of information data
2.1 Land especially undeveloped or agriculture land (ha) No Site located in notified Industrial area of
GIDC Vapi.
2.2 Water (expected source & competing users) unit: KLD Yes Notified area authority will supply total
water 111 KL/day. Notified area takes its
water from the weir storage constructed
on the river Damanganga.
2.3 Minerals (MT) No
2.4
Construction material -stone, aggregates, sand / soil
(expected source MT)
Yes Existing buildings shall be utilized for
proposed plant. Necessary modification in
MS structure shall be carried out.
2.5 Forests and timber (source - MT) No No forest resource or timber will be used
in the project.
2.6
Energy including electricity and fuels )source,
competing users) Unit: fuel (MT), energy (MW)
Yes Power requirement : Existing : 120 KW
HP+ Proposed : 50 KW= TOTAL : 170 KW
power is required for Proposed Expansion
plant)
Coal : 30 TPM
HSD : 8 KG/HR
2.7 Any other natural resources (use appropriates
standard units)
No
3. Use, storage, transport, handling or production of substances or materials, which could be harmful to
human health or the environment or raise concerns about actual or perceived risks to human health.
Sr. No. Information / Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates wherever possible)
with source of information data
3.1 Use of substances or materials, which are hazardous
(as per MSIHC rules) to human health or the
environment (flora, fauna, and water supplies)
Yes
List hazardous raw material is attached at
Annexure 3.
3.2 Changes in occurrence of disease or affect disease
vectors (e.g. insect or water borne diseases)
No Not applicable.
3.3 Affect the welfare of people e.g. by changing living
conditions?
No The site is in notified industrial area of
GIDC Vapi, thus there will not be change
in living condition of the people in the
nearby vicinity. The expansion will
generate employment opportunity for
local people.
3.4
Vulnerable groups of people who could be affected
by the project e.g. hospital patients, children, the
elderly etc.,
No The site is in notified industrial area of
GIDC Vapi, The nearest town is 3.0 km
having population of about 1.25 lacs
people.
3.5 Any other causes No
4. Production of solid wastes during construction or operation or decommissioning MT/month)
Sr. No. Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable.
4.2
Municipal waste (domestic and or commercial
wastes) No Not applicable.
4.3
Hazardous wastes (as per Hazardous Waste
Management Rules)
Yes The list of hazardous waste is attached as
Annexure 4. The company has a
membership of approved TSDF facility of
M/s VWEMCL, GIDC Vapi for disposal of
their waste.
4.4 Other industrial process wastes Yes The list of other hazardous waste
generated is attached as Annexure 4. The
company has a membership of approved
TSDF facility of M/s VWEMCL, GIDC Vapi,
for disposal of their waste.
4.5 Surplus product Yes Annexure : 2 attached
4.6
Sewage sludge or other sludge from effluent
treatment
Yes Attached Annexure as 4
4.7 Construction or demolition wastes No No new construction or demolition
required. Existing buildings shall be
utilized for proposed plant. Necessary
modification in MS structure shall be
carried out.
4.8 Redundant machinery or equipment
No
Small reactors shall be partly utilized and
remaining unusable reactors shall be sold
to scrap dealers after thorough cleaning.
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sr. No. Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
5.1 Emissions from combustion of fossil fuels From
stationary or mobile sources
Yes Emission from steam boiler & D G set
from coal & HSD firing in the form of PM,
RSPM, SOx, NOx, but they will be well
within GPCB norms. Attached as
Annexure 5. Suitable chimney height shall
be provided.
5.2 Emissions from production processes No Process gas emission in the form of HCl &
Cl2 from chlorinator, which will be
scrubbed in three stage scrubbing system
& recovered hydro chloric acid as a by
product. Adequate height of vent
provided. Attached as Annexure 5.
5.3 Emissions from materials handling including storage or
transport
Yes All mitigation measures as proposed in
the Risk assessment report shall be
appropriately taken. There is no used of
solvent.
5.4 Emissions from construction activities including plant
and equipment
No No construction is required.
5.5
Dust or odours from handling of materials including
construction materials, sewage and waste
No No construction is required.
All the waste shall be stored in designated
place and shall be transported to TSDF
site in approved closed vehicles owned by
the TSDF authority.
5.6 Emissions from incineration of waste No Not applicable.
5.7 Emissions from burning of waste in open air (e.g. slash
materials, construction debris)
No No open burning of waste is permitted.
5.8 Emissions from any other sources No
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Sr. No. Information/Checklist confirmation Yes/
No?
Details there of (with approximate
Quantities /rates, wherever possible)
With source of source of information
data
6.1
From operation of equipment e.g. engines, ventilation
plant, crushers
Yes Expected Noise monitoring results are
shown in table attached as Annexure 6.
All precautionary measures like acoustic
enclosure, anti vibrating pad/foundation
for equipments etc shall be taken.
6.2 From industrial or similar processes Yes Expected Noise monitoring results are
shown in table attached as Annexure 6.
All precautionary measures like acoustic
enclosure, anti vibrating pad/foundation
for equipments etc shall be taken.
6.3 From construction or demolition No
No new construction or demolition
required. Existing buildings shall be
utilized for proposed plant. Small reactors
shall be replaced by bigger size reactors
and necessary modification in MS
structure shall be carried out.
6.4 From blasting or piling No
6.5 From construction or operational traffic No
6.6 From lighting or cooling systems No
6.7 From any other sources No
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,
surface waters, groundwater, coastal waters or the sea:
Sr. No Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
7.1
From handling, storage, use or spillage of hazardous
materials
No Hazardous material shall be stored in
designated storage area with bund walls
for tanks. Other material will be stored in
bags/drums on pallets with concrete
flooring and no spillage is likely to occur.
All liquid raw materials shall be
transported through pumps and closed
pipelines and no manual handling shall be
involved.
7.2
From discharge of sewage or other effluents to water
or the land (expected mode and place of discharge)
No Treated effluent shall be discharged into
under ground drainage line to CETP, Vapi
for further treatment and disposal to
estuary of River Damanganga, finally
meeting Arabian sea.
7.3
By deposition of pollutants emitted to air into the
land or into water
No The factory is located in notified
industrial area of GIDC, Vapi. The
emissions shall conform the GPCB / CPCB
norms. The effluent shall be treated and
shall be sent to CETP for further
treatment through under ground
drainage line and finally the treated
effluent shall be discharged into tidal
zone of river Damanganga meeting
Arabian sea.
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollution in the
environment from these sources?
No
Full- fledged Environmental Management
System (EMS) will be installed. I.e. ETP,
Air Pollution Control systems, Solid
Hazardous Waste Handling and
Management as per norms, etc which will
eliminates the possibility of building up of
pollution.
8. Risks of accident during construction or operation of the Project, which could affect human health or the
environment:
Sr. No Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
8.1 From explosions, spillages, fires etc from storage,
handling, use or production of hazardous substances
Yes Summary of The risk assessment reports
is attached. Mitigations measures shall be
taken as per the report. Annexure 7.
8.2 From any other causes No
8.3 Could the project be affected by natural disasters
causing environmental damage (e.g. floods,
earthquakes, landslides, cloudburst etc)?
No There is no history of flood in GIDC Vapi.
The buildings are designed considering
seismic zone III which is not earthquake
prone area.
The land is plain terrain – no scope of
landslide.
This area is having moderate rainfall and
there is no history of cloudburst.
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned activities in
the locality
Sr.
No.
Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
9.1 Lead to development of supporting. laities, ancillary
development or development stimulated by the
project which could have impact on the environment
e.g.:
* Supporting infrastructure (roads, power supply,
waste or waste water treatment, etc.)
• housing development
• extractive industries
• supply industries
• other
No Site is located in Notified Industrial area
of GIDC Vapi.
This industrial zone is having existing road
infrastructure, power supply, CETP, and
Common TSDF which are to be utilized.
Local people will be employed.
9.2
Lead to after-use of the site, which could have an
impact on the environment
No The treated effluent shall be sent to CETP
for further treatment and final disposal to
tidal zone of river Damanganga. The
hazardous waste shall be disposed to
common TSDF site of VWEMCL.
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to Other
existing or planned projects with similar effects
No The proposed ETP shall be designed in
such a way that the treated effluent
conforms to the statutory requirements.
The treated effluent shall be discharged
to CETP for further treatment and
disposal. The load of 7 kl/day of the
project will be taken by the ETP.
Adequate measures taken for scrubbing
of process gas.
The common TSDF site of VWEMCL, Vapi
is also adequate to take the additional
load of the project.
The CETP capacity is suitably expanded by
the CETP authority.
The common TSDF site of VWEMCL is also
adequate to take the additional load of
the project.
(III) Environmental Sensitivity
Sr. No Information/Checklist confirmation Name /
Identity
Aerial distance (within 25 km). Proposed
Project Location Boundary.
1 Areas protected under international conventions
national or local legislation for their ecological,
landscape, cultural or other related value
Nil Site is located in Notified Industrial Area
of GIDC Vapi.
2 Areas which are important or sensitive for Ecological
reasons - Wetlands, watercourses or other water
bodies, coastal zone, biospheres, mountains, forests
Nil - do -
3 Areas used by protected, important or sensitive
species of flora or fauna for breeding, nesting,
foraging, resting, over wintering, migration
Nil - do -
4 Inland, coastal, marine or underground waters Yes Arabian Sea – 12.0 km
Damanganga River – 3.5 km
5 State, National boundaries Yes Maharashtra State Boundary – 15 km
Dadra & Nagar Haveli (UT) – 10 km
6 Routes or facilities used by the public for to recreation
or other tourist, pilgrim areas.
Nil
7 Defense installations Nil Daman Coast Guard Station is 12 km
away.
8 Densely populated or built-up area Yes Vapi GIDC and Vapi Town – 1.25 Lakhs
population at 1.0 km
9 Areas occupied by sensitive man-made land
community facilities)
Nil The site is located in notified industrial
area of GIDC Vapi.
10 Areas containing important, high quality or scarce
resources (ground water resources, surface
resources, forestry, agriculture, fisheries, tourism,
tourism, minerals)
Yes
The project shall not use any ground
water.
The nearest surface resource is river
Damanganga where the treated effluent
conforming GPCB standard, from CETP is
discharged.
The project being in notified industrial
area does not affect agricultural land.
Daman Port is 12 km which is having
fisheries and tourism activities.
11 Areas already subjected to pollution or
environmental damage. (those where existing legal
environmental standards are exceeded)
Nil Site is located in Notified Industrial Area
of GIDC Vapi.
12
Areas susceptible to natural hazard which could
cause the project to present environmental problems
(earthquakes, subsidence, landslides, erosion,
flooding or extreme or adverse climatic conditions)
Nil
The area falls under seismic zone III
which is non earthquake prone area.
The area is plain terrain with sandy loam
soil.
There is no heavy rain in the area and it is
away from coastal area. So erosion of
land is very little.
The area has no history of flooding in
GIDC Vapi area.
The climate of area is moderate. There is
no history of cloud burst.
ANNEXURE: 2
LIST OF PRODUCTS AT EXISTING & PROPOSED SCENERIO WITH
MONTHLY CAPACITY
Sr. No. Product Existing Proposed Total After
Expansion
1 Chlorinated Paraffin wax 250 1500 1750
2 Sulpha Chlorinated
Paraffin wax
0 500 500
3 30% HCl from CPW 452.75 2716.5 3169.25
4 30% HCl from SCPW 0 644.0 644.0
ANNEXURE: 3
LIST OF RAW MATERIALS CONSUMPTION PER TONNE & PER MONTH OF
PRODUCT AFTER PROPOSED EXPANSION
Sr. No. Raw Materials Quantity in MT
Tone Per tone Tone per month
[A] For Chlorinated Paraffin Wax
1.0 Heavy Normal Paraffin/Paraffin
wax
0.48309 845.40
2.0 Chlorine gas 1.063 1859.9
3.0 Hydrated lime for tail scrubber 0.004 7.0
[B] For Sulpha Chlorinated Paraffin
Wax
1.0 HNP/Paraffin wax 0.650 325.0
2.0 Chlorine gas 0.650 325.0
3.0 SO2 Gas 0.1 50.0
4.0 Hydrated lime for tail scrubber 0.004 2.0
ANNEXURE: 3
DETAILS OF SAFE STORAGE & HANDLING OF HAZARDOUS CHEMICAL
No. Name of Finish Products
Quantity stored (MT) Place of Storage Standard operating
Pressure & temperature
Possible Type of Hazards
Control Measures Provided
Max. Actual
1 Heavy normal paraffin/Paraffin
wax
20 10 MS Storage tank Normal at ambient Repeated contact may cause
irritation
Avoid inhalation, wash with water
2 Chlorine gas 10 5 MS cylinders Stable under normal condition, non combustable
Poison gas, corrosive,
irritation of eyes & mucous
membranes
Avoid inhalation of vapour, cooled water sprayer & Provided
PPEs
3 Sulphur dioxide gas 10 5 Cylinders Stable at normal condition
Non- corrosive when dry. Toxic-corrosive at high concentration are
fatal
Safety glasses or face shield; rubber gloves. Suitable ventilation
4 Hydro chloric acid 200 100 Storage tank Stable. Avoid heat, flames
Extremely corrosive.
Inhalation of vapour can cause
serious injury. Ingestion may be fatal. Liquid can cause severe
damage to skin and eyes
Safety glasses or face mask, gloves. Effective
ventilation
ANNEXURE:2 A
MANUFACTURING PROCESS IN BRIEF
1. CHLORINATED PARRAFIN WAX:
Heavy normal paraffin wax or paraffin wax as the case may heated/melted in
heating tank. About 80-85oC, the mass is charged in a lead lined chlorinator.
Chlorine from toner is passed in chlorinator till required % of concentration is
achieved. This is checked by specific gravity of the materials. After completion of
chlorination, the mass is discharged in another lead lined vessel, where air is passed
to get rid of traces of HCl & Cl2. This is an aeration process.
While the chlorination is in process, HCl gas & traces of unreacted chlorine is
librated, which is scrubbed in water to get HCl as 27- 30% & excess HCl & Cl2 gas
further scrubbed in alkali scrubber.
After aeration is over, the chlorinated paraffin wax is transferred to storage tank as
final product.
2. SULPHA CHLORINATED PARAFIN WAX:
Heavy normal paraffin wax or paraffin wax as the case may heated/melted in
heating tank. About 80-85 0C, the mass is charged in a lead lined chlorinator.
Chlorine & sulphur dioxide gas from toner/cylinder is passed in chlorinator till
required % of concentration is achieved. This is checked by specific gravity of the
materials. After completion of chlorination, the mass is discharged in another lead
lined vessel, where air is passed to get rid of traces of HCl & Cl2. This is an
aeration process.
While the chlorination is in process, HCl gas & traces of unreacted chlorine is
librated, which is scrubbed in water to get HCl as 27- 30% & excess HCl & Cl2 gas
further scrubbed in alkali scrubber.
After aeration is over, the sulpha chlorinated paraffin wax is transferred to storage
tank as final product.
ANNEXURE:8
WATER CONSUMPTION & EFFLUENT GENERATION IN M3/DAY AT
EXISTING & AFTER PROPOSED EXPANSION
Sr.
No.
Particulars Water Consumption Effluent Generation
Existing After
expansion
Existing After
expansion
1 Domestic 1.0 2.0 1.0 2.0
2 Processing
(Main Scrubber)
13.0 89.0 4.0 0
3 Boiler 1.0 12.92 0 1.5
4 Cooling 1.0 1.5 0 0.5
5 Product Washing 0 0 0 0
6 Floor/container
washing
1.0 2.0 1.0 2.0
Tail scrubber 1.0 3.0 1.0 3.0
7 Gardening 0 0.5 0 0
8 Total 18.0 110.92 7.0 9.0
Total Industrial 17.0 108.42 6.0 7.0
Note:
• There is no use of water in the process. Water is used for scrubbing of excess
chlorine to convert hydro chloric acid.
• Boiler condensate is recycled. Boiler blow down comes out as effluent.
• Floor washing/container washing comes out as effluent.
ANNEXURE: 9
CHARACTERISTICS OF EFFLUENT
• Characteristics of Untreated Effluent:
No Effluent
parameters
Domestic Tail
scrubber
Boiler
+
cooling
Equip +
floor +
cont. wash
Combined
Industrial
Effluent
1 pH 6.8 8.7 8.1 6.5 8.3
2 Color 80 150 60 100 275
3 TDS 800 4300 2400 2100 3850
4 S/S 255 564 121 456 306
5 Oil/grease 12.5 11.2 13.6 14.8 9.78
6 BOD - 32 10 150 80
7 COD - 256 124 603 440
8 Ammonical
nitrogen
25 ND 8 ND 9
9 Phenolic
compound
ND ND ND ND ND
Chloride 120 1800 560 510 1600
Sulphate 180 125 240 180 280
10 Hydraulic
load, lit/day
2000 3000 2000 2000 7000
• Characteristic of Treated Effluent:
No. Parameter Results
1. pH 7.0
2. Colour 60 unit
3. S/S 56 mg/l
4 BOD 20-30 mgl
4. COD 200-250 mg/l
5 Ammonical nitrogen 10 mgl
• Mode of Disposal of Treated Effluent:
GIDC Vapi Effluent Drainage Line for further treatment in the CETP, for ultimate
disposal into tidal zone of river Damanganga.
ANNEXURE: 10
DETAILS OF EFFLUENT TREATMENT PLANT
Average hydraulic load m3/day : 7
Design hydraulic load, m3/day : 10
Average BOD, mgl : 80
Average COD, mgl : 440
No Name of the unit Dimensions
in meters
Capacity
in m3
MOC Detention time in hrs Adequacy
Reqd Prov.
1 Oil/grease trap 1x1.2x1.2 1.0 RCC 10 mts 3 hrs Adequate
2 Collection Tank 2 x 2.5 x 2.5 10 RCC 24 hrs 33 hrs Adequate
3 Neutralization
Tank
1.2 dia x 2.4 2.7 RCC 1 hr 9 hrs Adequate
4 Dil. Acid dosing
tank
- 200 lits HDPE - - Adequate
5 Flocculator 0.8 dia x 1.25 0.6 RCC 15 mt 2 hrs Adequate
6 Primary Lamella
Clarifier
1.25 x 1.25 x
2.5
3 MS/
epoxy
2 hr 3.6 Adequate
7 PE tank 0.5 HDPE Adequate
8 Sludge Drying
Bed
5 x 5 x1.2 25 Brick Adequate
9 Holding tank 2 m3 HDPE Adequate
10 Filter pump 1.0 m3/hr CI Adequate
11 Sand filter 0.6 dia x 1.2 3.5 MS 3.2
m3/m2/hr
4.2
m3/m2
/hr
Adequate
12 Act. Carbon filter 0.6 dia x 1.2 3.5 MS 3.2
m3/m2/hr
4.2
m3/m2
/hr
Adequate
ANNEXURE:5
DETAILS OF AIR POLLUTION CONTROL MEASURES AT EXISTING &
PROPOSED SECENERIO
[1] Flue Gas Emission:
Sr.
No.
Particulars Existing Proposed After
expansion
Remarks
1 Capacity of steam
boiler
400 kgs/hr 1000 kgs/hr 1000 kgs/hr
400 kgs/hr will be
discontinued
2 Fuel consumption LDO: 5
kl/M
Coal: 30
TPM
Coal: 30 TPM -
3 Height of Chimney
with SMF
11 meter 15 meters 15 meters
chimney
Multi cyclone
separator will be
provided
4 Flue gas emission PM: <150
SOx: < 100
NOX :< 50
PM: <150
SOx: < 100
NOX: < 50
PM: <150
SOx: < 100
NOX :< 50
5 D G Set 0 125 KVA 125 KVA Standby
6 Fuel (HSD) 0 8 lits/hr, 8 lits/hr,
7 Chimney with SMF 0 11 meters 11 meters
8 Flue gas emission PM: <150
SOx: < 100
NOX :< 50
PM: <150
SOx: < 100
NOX: < 50
PM: <150
SOx: < 100
NOX :< 50
[2] Process Gas Emission:
Sr.
No.
Particulars Existing Proposed After expansion
1 Stack attached
to chlorinator
Graphite/FRP/HDPE
water scrubber
followed by alkali
scrubber
Graphite/FRP/HDPE
water scrubber
followed by alkali
scrubber 3 nos.
Graphite/FRP/HDPE
water scrubber
followed by alkali
scrubber 6 nos.
2 Chimney
provided
19 meters x 2 nos 19 meters x 1 nos 19 meters x 3 nos
3 Process gas
emission
HCl: < 10 mg/nm3
Cl2: < 5 mg/Nm3
HCl: < 10 mg/nm3
Cl2: < 5 mg/Nm3
HCl: < 10 mg/nm3
Cl2: < 5 mg/Nm3
DETAILS OF MULTI CYCLONE SEPARATOR FOR COAL FIRED BOILER
SR.
NO.
PARTICULARS BOILER
1 Capacity 1000 kgs/hr
2 Fuel Used Coal
3 Fuel Consumption 1 MT/day
4 Calorific Value 4200 kcal/kg
5 Inlet to dust collector 250 oC
6 Stack Temperature 160 oC
7 Diameter of chimney 800 mm
8 Flue gas Value 10500 m3/hr
9 I D Fan 10900 cfm
10 Efficiency 65 %
11 Stack height 30 meters
12 APC Multi Cyclone
Separator
13 Overall dimensions 1.2m x 1.2 m x 2.0 m
14 No. of clones 9
15 Size of clone 125 mm
ANNEXURE:4
DETAILS OF HAZARDOUS WASTE GENERATION, STORAGE & DISPOSAL
AFTER PROPOSED EXPANSION
No Type of
waste
Category Quantity per year Storage
area in
m2
Disposal
Existing Proposed Total
1 ETP
waste, MT
34.3 3.6 1.0 4.6 10 TSDF, Vapi
2 Spent oil,
kgs
5.1 24 6 30 2 Sold to
Registered
recyclers
3 Discarded
containers,
nos.
33.3 80 100 180 10 Sold to
authorized
recycler
4 Lime
sludge
from tail
(wet)
scrubber
,MT
36.1 1.92 11.28 13.20 10 TSDF, Vapi
Note:
• Memebrship of TSDF of Vapi Waste and Effluent Management Co Ltd
obtained for disposal of waste.
• Designated storage area provided as per the category of the waste with
leachate collection and disposal to ETP.
ANNEXURE:6
EXPECTED NOISE LEVEL
Sr.
NO.
Source Location Noise Level dB(A) Measures
taken
Day
Time
Night
time
1 Pumps Near ETP 68.0 67.2 Regular
maintenance
2 D.G Set Inside D.G set room 68.2 62.4 Acoustic
enclosure
3 Boiler, Blower In boiler house 73.8 75.3 Separate room
& regular
maintenance
4 Vehicles &
other
Out side factory
premises
60.2 58.2 -
5 Process
machineries
Inside production
plant
70.3 69.2 Regular
maintenance
Note:
• Earplugs provided to the D.G set operators. Regular maintenance of blowers,
pumps are carried out. Closed room & acoustic enclosure for D.G set is provided.
LIST OF DIRECTORS WITH ADDRESS
Sr. No. Name Address
1 Mr. Shashikant N Thakkar A-506, Bhaveshwar Plaza, Opp:
Shreyas Plaza, LBS marg, Ghatkopar
(West) Mumbai 4000086
2 Mr. Amrish K Thakkar A-506, Bhaveshwar Plaza, Opp:
Shreyas Plaza, LBS marg, Ghatkopar
(West) Mumbai 4000086
3 Mr. Hiren S Thakkar A-506, Bhaveshwar Plaza, Opp:
Shreyas Plaza, LBS marg, Ghatkopar
(West) Mumbai 4000086
4 Mr. Vishal S Thakkar A-506, Bhaveshwar Plaza, Opp:
Shreyas Plaza, LBS marg, Ghatkopar
(West) Mumbai 4000086
5 Mr. Kishore N Thakkar A-506, Bhaveshwar Plaza, Opp:
Shreyas Plaza, LBS marg, Ghatkopar
(West) Mumbai 4000086
6 Mr. Zubin K Thakkar A-506, Bhaveshwar Plaza, Opp:
Shreyas Plaza, LBS marg, Ghatkopar
(West) Mumbai 4000086
DETAILS OF SCRUBBING SYSTEM
Sr. No. Particulars Details
1.0 Size of primary Absorber 2ø x 5 m ht 1.1 MOC MS powder coated body with Graphite
tubes
1.2 No. of tubes 85
2.0 Size of secondary Absorber 1ø x 4 m ht 2.1 MOC Graphite tubes FRP body
2.2 No. of tubes 25
3.0 Size of Tail scrubber 1ø x 4 m ht 3.1 MOC PP/FRP
3.2 Packing 2” intalax saddles
4.3 Packing height 2 m 5.0 Size of alkali scrubber 1ø x 4 m ht 5.1 MOC PP/FRP
5.2 Packing 2” intalax saddles
5.3 Packing height 2 m 6.0 Water circulation tank PP/FRP, 5000 lit
7.0 Blower 5 HP