date: 07-14-2017. … · location restriction date contractor cost philadelphia passyunk ave....

25
LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru 5 AM Monday. DETOUR POSTED. 7/14/17-7/17/17 Buckley & Company, Inc. $33.5 million US 1 North (City Ave.) ramp to Ridge Ave. North Deck Repair: RAMP CLOSED & DETOURED. 6 AM - 3 PM. DETOUR POSTED. 7/15/17 & 7/22/17 Maintenance New State Rd. Roadway Construction: LANE CLOSURE between Levick Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM & 8 PM - 5 AM. 7/16/17-7/22/17 Walsh Construction Company $212.3 million *I-95 North Bridge Inspection: RIGHT LANE CLOSED between Enterprise Ave. & Broad St. 9 AM - 3 PM. 7/17/17-7/20/17 Pickering, Corts & Summerson *I-676 E & W Bridge Work: CLOSED & DETOURED between I-76 & Broad St. (PA 611). 11 PM - 5 AM. DETOUR POSTED. 7/17/17-7/20/17 Buckley & Company, Inc. $64.8 million *US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. 7/17/17-7/20/17 Maintenance *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. 7/17/17-7/20/17 Maintenance *I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. 7/17/17-7/20/17 Maintenance DATE: 07-14-2017 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways. 7/14/2017 Page 1 of 25

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

PHILADELPHIA

Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED

between 61st St. & 28th St. 7 PM Friday thru 5 AM

Monday. DETOUR POSTED.

7/14/17-7/17/17 Buckley & Company,

Inc.

$33.5 million

US 1 North (City Ave.) ramp to Ridge

Ave. North

Deck Repair: RAMP CLOSED & DETOURED. 6 AM -

3 PM. DETOUR POSTED.

7/15/17 & 7/22/17 Maintenance

New State Rd. Roadway Construction: LANE CLOSURE between

Levick Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM &

8 PM - 5 AM.

7/16/17-7/22/17 Walsh Construction

Company

$212.3 million

*I-95 North Bridge Inspection: RIGHT LANE CLOSED between

Enterprise Ave. & Broad St. 9 AM - 3 PM.

7/17/17-7/20/17 Pickering, Corts &

Summerson

*I-676 E & W Bridge Work: CLOSED & DETOURED between I-76 &

Broad St. (PA 611). 11 PM - 5 AM. DETOUR

POSTED.

7/17/17-7/20/17 Buckley & Company,

Inc.

$64.8 million

*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & 9th St. 9:30

AM - 2 PM.

7/17/17-7/20/17 Maintenance

*I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between I-76 & I-95. 9:30 AM -

2 PM.

7/17/17-7/20/17 Maintenance

*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT

LANE RESTRICTIONS between Phila. Int. Airport &

PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.

7/17/17-7/20/17 Maintenance

DATE: 07-14-2017

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

ENGINEERING DISTRICT 6-0

TRAFFIC RESTRICTION BULLETIN

(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)

(All restrictions 24 hours/day, 7 days/week unless otherwise noted)

PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD

Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.

7/14/2017 Page 1 of 25

Page 2: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 E & W Drain Cleaning/Debris Removal: LANE

RESTRICTIONS between US 1 (City Ave.) & 26th St.

9:30 AM - 2 PM.

7/17/17-7/20/17 Maintenance

*I-95 N & S Bridge Shielding Removal & Painting:

INTERMITTENT RIGHT & LEFT DOUBLE LANE

CLOSURES between Allegheny Ave. & Bridge St. 9

PM - 5 AM.

7/17/17-7/21/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

*US 1 South (Roosevelt Blvd.) Tree Removal: LEFT LANE CLOSURE between Ryan

Ave. & Faunce St. 9 AM - 3 PM.

7/17/17-7/21/17 Townscapes Inc.

Wilits Rd. Milling & Paving: PARKING & LANE RESTRICTIONS

between Academy Rd. & Welsh Rd. 7 PM - 6 AM & 9

AM - 3 PM.

7/17/17-7/21/17 Tony DePaul & Son $8.9 million

Girard Ave. Milling & Paving: PARKING & LANE RESTRICTIONS

between Lancaster Ave. & 34th St. 7 PM - 6 AM & 9

AM - 3 PM.

7/17/17-7/21/17 Tony DePaul & Son $8.9 million

Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon.

Robert C. Donatucci Memorial Bridge over Schuylkill

River. 9 AM - 3 PM.

7/17/17-7/21/17 Buckley & Company,

Inc.

$33.5 million

Walnut Lane Debris Removal & Concrete Repair: LANE

CLOSURES between Magdelena St. & Park Lane

Drive. Weekdays. 9 AM - 3 PM.

7/17/17-7/21/17 Buckley & Company,

Inc.

$14 million

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between

Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

7/17/17-7/21/17 James J. Anderson $869,700.00

Pennsylvania Ave. Milling: LANE RESTRICTIONS between Spring

Garden St. & 26th St. 7 PM - 6 AM.

7/17/17-7/21/17 James J. Anderson $7.1 million

Spring Garden St. Milling & Prep: LANE RESTRICTIONS between

Pennsylvania Ave. & Delaware Ave. 7 AM - 4 PM & 7

PM - 6 AM.

7/17/17-7/21/17 James J. Anderson $7.1 million

Ridge Ave. Roadwork: LANE RESTRICTIONS between 33rd St.

& Spring Garden St. 7 AM - 4 PM.

7/17/17-7/21/17 James J. Anderson $7.1 million

7/14/2017 Page 2 of 25

Page 3: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 East Bridge Inspection: RIGHT LANE CLOSED between

South St. & I-676. 12 AM - 5 AM.

7/22/17 Speciality

Engineering, Inc.

*I-95 South Barrier Installation & Line Painting: INTERMITTENT

RIGHT LANE CLOSURES at Aramingo Ave. 8 PM - 5

AM.

7/10/17-7/14/17 Driscoll Construction

Company,

Inc./Richard E.

Pierson Construction

Company, Inc.

$160.2 million

Cheltenham Ave. Milling & Paving: LANE RESTRICTIONS between Old

York Rd. & Tookany Creek Parkway. 9 AM - 3 PM & 7

PM - 6 AM.

7/10/17-7/14/17 Tony DePaul & Son $8.8 million

Willits St. Milling & Paving: LANE RESTRICTIONS between

Academy Rd. & Ashton Rd. 9 AM - 3 PM & 7 PM - 6

AM.

7/10/17-7/14/17 Tony DePaul & Son $8.8 million

Girard Ave. Milling & Paving: LANE RESTRICTIONS between

Lancaster Ave. & 34th St. 9 AM - 3 PM & 7 PM - 6

AM.

7/10/17-7/14/17 Tony DePaul & Son $8.8 million

Princeton Ave. Milling & Paving: LANE RESTRICTIONS between

Frankford Ave. & State Rd. 9 AM - 3 PM & 7 PM - 6

AM.

7/10/17-7/14/17 Tony DePaul & Son $8.8 million

Spring Garden St. Base Repair: LANES CLOSURE between

Pennsylvania Ave. & Delaware Ave. 7 PM - 6 AM.

7/11/17-7/14/17 James J. Anderson $7.1 million

Ridge Pk. Base Repair: LANES CLOSURE between 33rd St. &

Spring Garden St. 7 PM - 6 AM.

7/11/17-7/14/17 James J. Anderson $7.1 million

Chester Ave. Trolley Line Replacement: CLOSED & DETOURED

between Baltimore Ave. & S. 41st St. 24-HOUR

DETOUR. DETOUR POSTED.

7/7/17-7/17/17 SEPTA

Girard Ave. Trolly Track Replacement: CLOSED & DETOURED

between PA 611 (Broad St.) & 15th St. 24-HOUR

DETOUR. DETOUR POSTED.

6/19/17-7/16/17 SEPTA

Walnut St. Conduit Installation: LANE RESTRICTIONS between

32nd St. & 34th St. 7 PM - 3 AM.

6/19/17-9/1/17 Lightower Fiber

Networks

7/14/2017 Page 3 of 25

Page 4: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Torresdale Ave. Utility Operations: INTERMITTENT LANE CLOSURES

between Vandike St. & Adams Ave. Weekdays. 9 AM

- 3 PM. 24-HOUR TRAFFIC PATTERN SWITCH IN

PLACE.

6/19/17-9/19/17 A.P. Construction,

Inc.

$81,022,883.00

22nd Street on-ramp to I-676 West Construction: RAMP CLOSED & DETOURED. 24-

HOUR DETOUR. DETOUR POSTED.

6/12/17-8/18/17 Buckley & Company,

Inc.

$64.8 million

Palmer St. Overhead Bridge Construction: CLOSED &

DETOURED between Wildey St. & Delaware Ave. 24-

HOUR DETOUR. DETOUR POSTED.

6/15/16-5/1/18 James J. Anderson $211 million

Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between

Wildy St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/15/17-5/1/18 James J. Anderson $211 million

Richmond St. N & S Bridge Demolition: CLOSED & DETOURED between

Marlborough St. & Columbia Ave. 24-HOUR

DETOUR. DETOUR POSTED.

6/5/17-8/4/17 James J. Anderson $211 million

Columbia Ave. Bridge Demolition: CLOSED & DETOURED between

Wildey St. & Delaware Ave. 24-HOUR DETOUR.

DETOUR POSTED.

6/5/17-8/4/17 James J. Anderson $211 million

18th St. Roadwork: CLOSED & DETOURED between Vine St.

Local E/B & Vine St. Local W/B. 24-HOUR

CLOSURE. DETOUR POSTED.

5/15/17-10/27/17 Buckley & Company,

Inc.

$64.8 million

JFK Blvd. East Bridge Replacement: CLOSED & DETOURED

between Schuylkill Ave. & 20th St. 24-HOUR

DETOUR. DETOUR POSTED.

1/23/17-8/2/18 Abbonizio

Contractors, Inc.

$15.8 million

22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

21st St. Bridge Construction: TRAFFIC PATTERN CHANGE

on bridge over I-676 between Ben Franklin Parkway &

Race St.

11/7/16-11/30/18 Buckley & Company,

Inc.

$64.8 million

Berks St. Bridge Construction: CLOSED & DETOURED

between East Wildey St. & Delaware Ave. 24-HOUR

DETOUR. DETOUR POSTED.

7/25/16-7/14/17 James J. Anderson $211.7 million

7/14/2017 Page 4 of 25

Page 5: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St.

(PA 611) & Rising Sun Ave. 9 AM - 3 PM.

12/2/15-11/2017 Armour and Sons

Electric

$4.7 million

Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Somerset St. Bridge Work: CLOSED & DETOUR between Salmon

St. & Richmond St. 24-HOUR DETOUR. DETOUR

POSTED.

12/28/15-12/2018 James J. Anderson $211 million

Girard Ave. on-ramp to I-95 North Highway and Ramp Reconstruction: RAMP CLOSED

& DETOURED. 24-HOUR CLOSURE. DETOUR

POSTED.

12/16/15-10/20/17 James J. Anderson $211 million

Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between

Columbia Ave. & Aramingo Ave. 24-HOUR

RESTRICTIONS.

4/1/15-10/2018 James J. Anderson $211.7 million

BUCKS COUNTY

*I-95 South Milling & Bridge Deck Repairs: INTERMITTENT LANE

CLOSURES between Newtown Yardley & U.S. 1

interchanges. 8 PM - 5 AM.

7/16/17-7/20/17 James J. Anderson $29.6 million

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: CLOSED & DETOURED

between Plumbridge Drive & Bath Rd./Durham Rd. 8

PM - 5 AM. DETOUR POSTED.

7/16/17-8/5/17 Pennsylvania

Turnpike Commission

$142 million

PA 413 (New Rodgers Rd.), Bristol

Twp.

Bridge Rehabilitation: LANE RESTRICTIONS & 15-

MINUTE STOPPAGES between Plumbridge Drive &

Bath Rd./Durham Rd. 7 AM - 3 PM.

7/16/17-8/5/17 Pennsylvania

Turnpike Commission

$142 million

Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413

& New Falls Rd. 8 PM - 5 AM. DETOUR POSTED.

7/16/17-8/5/17 Pennsylvania

Turnpike Commission

$142 million

*I-95 South, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between NJ

state line & PA 332 (Yardley-Newtown Rd.) 12 AM - 2

PM.

7/17/17 Delaware River Joint

Toll Bridge

Commission

7/14/2017 Page 5 of 25

Page 6: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 North, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between PA

332 (Yardley-Newtown Rd. & NJ state line. 12 AM - 6

AM.

7/17/17 Delaware River Joint

Toll Bridge

Commission

PA 232 (Windy Bush Rd.), Solebury

Twp.

Tree Removal: LANE RESTRICTIONS at Piddock

Creek Rd. 9 AM - 3 PM.

7/17/17-7/18/17 Green Ridge

Landscaping

*I-95 South, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between NJ

state line & PA 332 (Yardley-Newtown Rd.) 8 PM - 2

PM.

7/17/17-7/21/17 Delaware River Joint

Toll Bridge

Commission

US 1 N & S, Falls, Middletown twps. Bridge Rehabilitation: LANE CLOSURES between I-95

& Stony Hill Rd. interchanges. 9 AM - 3 PM.

7/17/17-7/21/17 Loftus Construction,

Inc.

$11.7 million

PA 611 South, Doylestown Twp.,

Doylestown Bor.

Line Painting: RIGHT LANE CLOSED between N.

Broad St. & W. State St. 9 AM - 3 PM.

7/17/17-7/21/17 Rohm and Haas

Chemicals, LLC

PA 611 (Easton Rd.), Warrington

Twp.

Curb Ramp Installation: LANE CLOSURES at

Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison

Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol

Rd.; Kelly Rd.; Freedoms Way/Oxford Drive;

Doylestown Plaza. 9 AM - 3 PM.

7/17/17-7/21/17 James D. Morrissey $4.3 million

*I-95 North, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between PA

332 (Yardley-Newtown Rd. & NJ state line. 10 AM - 6

AM.

7/17/17-7/21/17 Delaware River Joint

Toll Bridge

Commission

PA 32 (River Rd.), Tinicum Twp. Tree Removal: LANE RESTRICTIONS between

Cafferty Rd. & Smithtown Rd. 9 AM - 3 PM.

7/17/17-7/21/17 Bustleton Services

*I-95 N & S High-Friction Resurfacing: RAMP CLOSED to

Woodhaven Rd. (PA 63). 8 PM - 5 AM. DETOUR

POSTED.

7/17/17-7/21/17 &

7/24/17-7/28/17

J.D. Eckman, Inc. $4.8 million

Woodhaven Rd. (PA 63) High-Friction Resurfacing: RAMP CLOSED to I-95 N

& S. 8 PM - 5 AM. DETOUR POSTED.

7/17/17-7/21/17 &

7/24/17-7/28/17

J.D. Eckman, Inc. $4.8 million

River Rd., Lower Makefield Twp. Survey Work: LANE RESTRICTIONS between I-95 &

Woodside Rd. 7 AM - 4 PM.

7/17/17-7/23/17 Delaware River Joint

Toll Bridge

Commission

Ridge Rd., West Rockhill Twp.,

Perkasie Bor.

Milling & Paving: LANE RESTRICTIONS between

County Line Rd. & Park Ave. 8 AM - 4 PM.

7/17/17-8/11/17 H&K Group, Inc. $3.7 million

7/14/2017 Page 6 of 25

Page 7: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 South, Bristol, Bensalem twps. Temporary Barrier Installation: LANE RESTRICTIONS

between PA 413 (Veterans Highway) & US 1 (Lincoln

Highway). 8 PM - 5 AM.

7/18/17-7/20/17 Pennsylvania

Turnpike Commission

$118.8 million

PA 132 East, (Street Rd.), Bensalem

Twp.

Bridge Inspection: RIGHT LANE CLOSED at US 1

Interchange. 9 AM - 12 PM.

7/19/17 AECOM

PA 132 West, (Street Rd.),

Bensalem Twp.

Bridge Inspection: RIGHT LANE CLOSED at US 1

Interchange. 12 PM - 3 PM.

7/19/17 AECOM

Sugar Bottom Rd./Pebble Hill Rd.,

Doylestown Twp.

Tree Removal: LANE RESTRICTIONS at Edison

Furlong Rd. 9 AM - 3 PM.

7/19/17-7/21/17 MKAY Enterprises

*I-95 North, Bensalem Twp. Bridge Inspection: LEFT LANE CLOSED between PA

63 (Woodhaven Rd.) & PA 132 (Street Rd.). 9 AM -

12 PM.

7/20/17 AECOM

*I-95 North, Bensalem Twp. Bridge Inspection: RIGHT LANE CLOSED between

PA 63 (Woodhaven Rd.) & PA 132 (Street Rd.). 12

PM - 3 PM.

7/20/17 AECOM

W. Bristol Rd., Warwick Twp. Utility Installation: LANE RESTRICTIONS between

Stover St. & Brookdale Rd. 9 AM - 3 PM.

7/20/17-7/21/17 PECO Energy

*I-95 South, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between NJ

state line & PA 332 (Yardley-Newtown Rd.) 8 PM - 10

AM.

7/21/17 Delaware River Joint

Toll Bridge

Commission

*I-95 North, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between PA

332 (Yardley-Newtown Rd. & NJ state line. 10 AM -

11 AM.

7/21/17-7/22/17 Delaware River Joint

Toll Bridge

Commission

*I-95 North, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between PA

332 (Yardley-Newtown Rd. & NJ state line. 6 PM - 12

PM.

7/22/17-7/23/17 Delaware River Joint

Toll Bridge

Commission

*I-95 South, Lower Makefield Twp. Barrier Installation: RIGHT LANE CLOSED between

NJ state line & PA 332 (Yardley-Newtown Rd.) 7 PM -

11 AM.

7/22/17-7/23/17 Delaware River Joint

Toll Bridge

Commission

*I-95 North, Lower Makefield Twp. Barrier Installation: LANE CLOSURES between PA

332 (Yardley-Newtown Rd. & NJ state line. 6 PM - 6

AM.

7/23/17 Delaware River Joint

Toll Bridge

Commission

7/14/2017 Page 7 of 25

Page 8: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 South, Lower Makefield Twp. Barrier Installation: RIGHT LANE CLOSED between

NJ state line & PA 332 (Yardley-Newtown Rd.) 6 PM -

2 PM.

7/23/17 Delaware River Joint

Toll Bridge

Commission

Buck Rd., Lower Southampton,

Northampton twps.

Milling & Paving: LANE RESTRICTIONS between

Bridgetown Pike/Jay St. & Rocksville Rd. 9 AM - 3 PM

& 7 PM - 5 AM.

7/10/17-7/14/17 James D. Morrissey,

Inc.

$3.2 million

Gibson Rd./Bristol Rd., Bensalem

Twp.

Milling & Paving: LANE RESTRICTIONS between

Overland Rd. & Bensalem Blvd. 9 AM - 3 PM & 7 PM -

5 AM.

7/10/17-7/14/17 James D. Morrissey,

Inc.

$3.2 million

*I-95 South, Lower Makefield Twp. Drain Installation: RIGHT LANE CLOSED between NJ

state line & PA 332 (Yardley-Newtown Rd.) 10 AM - 5

AM.

7/10/17-7/15/17 Delaware River Joint

Toll Bridge

Commission

*I-95 South, Lower Makefield Twp. Barrier Installation: RIGHT LANE CLOSED between

NJ state line & PA 332 (Yardley-Newtown Rd.) 8 PM -

2 PM.

7/10/17-7/15/17 Delaware River Joint

Toll Bridge

Commission

*I-95 North, Lower Makefield Twp. Drain Installation: RIGHT LANE CLOSED between PA

332 (Yardley-Newtown Rd. & NJ state line. 8 PM - 2

PM.

7/10/17-7/15/17 Delaware River Joint

Toll Bridge

Commission

PA 32 (River Rd.), Lower Makefield

Twp.

Driveway Installation: LANE RESTRICTIONS between

I-95 & Woodside Rd. 7 AM - 5 PM.

7/10/17-7/15/17 Delaware River Joint

Toll Bridge

Commission

US 13 N & S, (Bristol Pike), Bristol

Twp.

Storm Pipe Installation: LANE RESTRICTIONS

between Haunted Lane & Cedar Ave. Weekdays. 9

AM - 3 PM.

7/10/17-9/10/17 Bencardino

Excavating, Inc.

$634,265.00

*I-95 N & S, Bensalem Twp. Milling: INTERMITTENT LANE CLOSURES between

New Falls Rd. & Yardley Newtown Rd. Interchange. 8

PM - 5 AM.

7/12/17-7/14/17 James J. Anderson $29,633,134.00

*I-95 North, Middletown Twp. Bridge Deck Repair: LANE CLOSURES at US 1

Interchange. 8 PM - 5 AM.

7/12/17-7/14/17 James J. Anderson $29.6 million

Yardley Rd., Lower Makefield Twp. Utility Installation: LANE CLOSURE between

Maplewood Lane & Crown Terrace. Weekdays. 9 AM

- 3 PM.

7/13/17-7/20/17 PECO Energy

7/14/2017 Page 8 of 25

Page 9: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-95 North, Middletown Twp. Bridge Deck Repair: LANE CLOSURES at US 1

Interchange. 8 PM - 5 AM.

7/16/17-7/21/17 James J. Anderson $29.6 million

PA 63 (Woodhaven Rd.) N & S

ramps , Bensalem Twp.

High-Friction Resurfacing: CLOSED & DETOURED

between Bristol Pike & I-95. 8 PM - 5 AM.

7/17/17-7/21/17 J.D. Eckman, Inc. $4.8 million

River Rd., Lower Makefield Twp. Survey Work: LANE RESTRICTIONS between I-95 &

Woodside Rd. 7 AM - 4 PM.

7/17/17-7/23/17 Delaware River Joint

Toll Bridge

Commission

State Rd., Richland Twp. Base Repair: CLOSED & DETOURED between

Richlandtown Pike & PA 309. Weekdays. 7 AM - 5

PM. DETOUR POSTED.

7/5/17-7/14/17 Maintenance

PA 309 N & S, Hilltown, Rockhill

twps.

Land Surveying: LANE CLOSURES between Church

Rd. & Tollgate Rd. Weekdays. 9 AM - 3 PM.

6/26/17-7/28/17 AECOM

State Rd., Bristol Twp. Utility Installation: LANE RESTRICTIONS between

Wyoming Ave. & Bellevue Ave. Weekdays. 9 AM - 3

PM.

6/26/17-8/25/17 PECO Energy

Green Lane, Bristol Twp. Conduit Installation: LANE SHIFT between Airport Rd.

& Pacific Ave. 7 AM - 3 PM & 8 PM - 5 AM.

6/18/17-7/15/17 Pennsylvania

Turnpike Commission

$142 million

Carversville Rd., Solebury Twp. Culvert Rehabilitation: LANE RESTRICTIONS

between Aquetong Rd. & Stovers Mill Rd. Weekdays.

9 AM - 3 PM.

6/12/17-7/10/17 Loftus Construction,

Inc.

$6.8 million

PA 32 (River Rd.), Tinicum,

Bridgeton twps.

Milling & Paving: LANE RESTRICTIONS between

Dark Hollow Rd. & Trails End Lane. Weekdays. 8 PM

- 5 PM.

5/30/17-7/21/17 H&K Group, Inc. $3.7 million

N. Main St., Sellersville Bor. Culvert Replacement: CLOSED & DETOURED

between Longwood Ave. & Twelfth St. 24-HOUR

DETOUR. DETOUR POSTED.

5/30/17-9/1/17 Loftus Construction,

Inc.

$6.8 million

Lower State Rd., Doylestown Twp. Multi-Use Trail Installation: LANE RESTRICTIONS

between US 202 & Memorial Drive. Weekdays. 9 AM

- 3 PM.

5/30/17-10/17/17 James D. Morrissey,

Inc.

US 13 N & S, (Bristol Pike), Bristol,

Bensalem twps.

Milling & Paving: LANE RESTRICTIONS between

Newportville Rd. & PA 413 (Veterans Hwy.)

Weekdays. 7 PM - 5 AM.

3/23/17-8/31/17 James D. Morrissey,

Inc.

$3 million

7/14/2017 Page 9 of 25

Page 10: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Mill Rd., Bensalem Twp. Utility Installation: CLOSED & DETOURED between

US 13 (Bristol Pike) & State Rd. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

2/27/17-8/31/17 Aqua Pennsylvania

Steinsburg Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Hieter Rd. & Wentz Rd. 24-HOUR

DETOUR. DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

Trumbauersville Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED

between Canary Rd. & Esten Rd. 24-HOUR

DETOUR. DETOUR POSTED.

2/27/17-11/10/17 Pennsylvania

Turnpike Commission

PA 152 (Limekiln Pike), Warrington,

Twp.

Utility Installation & Paving: CLOSED & DETOURED

between Westminster Drive & County Line Rd. 24-

HOUR DETOUR. DETOUR POSTED.

12/13/16-10/12/17 James D. Morrissey,

Inc.

$14.8 million

Oxford Valley Rd., Falls, Lower

Makefield, Middletown twps.

Bridge Rehabilitation: LANE CLOSURES between Big

Oak Rd. & Cabot Blvd. 7 AM - 3:30 PM & 9 PM -

5AM.

11/14/16-7/2017 Loftus Construction,

Inc.

$11.7 million

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

East Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

*US 202 North, Buckingham Twp.,

Doylestown Bor.

Road Construction: LANE RESTRICTIONS between

PA 313 (Swamp Rd.) & Mechanicsville Rd. 9 AM - 3

PM.

4/13/15-11/9/18 James D. Morrissey $11 million

*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between

Bristol Rd. & Sugar Bottom Rd. 24-HOUR

RESTRICTIONS.

3/17/14-10/2017 J.D. Eckman, Inc. $31.6 million

Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between

Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.

3/2/11-Indef.

CHESTER COUNTY

*US 422 West, Tredyffrin Twp. Sign Structure Installation: RIGHT LANE CLOSURE

WITH PERIODIC 15-MINUTE TRAFFIC

STOPPAGES between PA Turnpike overpass & First

Ave. Interchange. 9 PM - 6 AM.

7/17/17 J.D. Eckman, Inc. $97.4 million

Coldstream Rd., East Pikeland Twp. Paving: LANE RESTRICTIONS between Hares Hill

Rd. & PA 113 (Kimberton Rd.) 8 AM - 4 PM.

7/17/17 Allan Myers, LP $2 million

7/14/2017 Page 10 of 25

Page 11: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

US 322 West (Brandywine

Ave./Downingtown Pike), East Caln,

East Bradford, West Bradford twps.

Base Repair: LANE RESTRICTIONS between Boot

Rd. & Sugars Bridge Rd. 9 AM - 2 PM.

7/17/17-7/18/17 Maintenance

PA 842 (Unionville Wawaset Rd.),

Pocopson, Newlin, East Marlborough

twps.

Milling & Paving: LANE RESTRICTIONS between Doe

Run Rd. & Brandywine Bridge. 6 PM - 6 AM.

7/17/17-7/20/17 Allan Myers, LP $3.7 million

*US 30 E & W, Valley, Caln twps. Median Stabilization: LANE RESTRICTIONS between

Airport Rd. & PA 340 (Kings Hwy.). 9 AM - 2 PM.

7/17/17-7/20/17 Maintenance

US 1 N & S (Baltimore Pike), London

Grove, Penn, Lower Oxford twps.

Shoulder Work: LANE RESTRICTIONS between PA

896 (Newark Rd.) & PA 41 (Gap Newport Pike). 9 AM

- 2 PM.

7/17/17-7/20/17 Maintenance

PA 401 E & W (Conestoga Rd.),

East Nantmeal, West Nantmeal

twps.

Crack Sealing: INTERMITTENT LANE CLOSURES

between PA 82 (Manor Rd.) & PA 345 (Bulltown Rd.).

9 AM - 2 PM.

7/17/17-7/21/17 Maintenance

US 1 (Baltimore Pk.) North,

Pocopson Twp.

Signal Work: LANE CLOSURE at PA 52 (Lenape Rd.)

9 AM - 3 PM.

7/17/17-7/21/17 Clearwater

Construction

$8.8 million

London Grove, East Marlborough,

West Marlborough, Londonderry,

Upper Oxford, Lower Oxford, West

Nottingham twps.

Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES. MOTORISTS ARE

ADVISED TO REMAIN AN AMPLE DISTANCE

BEHIND THE PAINTING TRUCK & STAY OFF

TRAFFIC LINES. 9:30 AM - 2:30 PM.

7/17/17-7/21/17 PennDOT

Newark Rd., New Garden Twp. Pipe Installation: LANE CLOSURE between PA 41

(Gap Newport Pk.) & Big Toe Rd. 9 AM - 3 PM.

7/17/17-7/22/17 Allan Myers, LP $1.4 million

Paoli Pike, Willistown Twp. Utility Installation: LANE RESTRICTIONS between

Warren Ave. & Pattison Lane. Weeknights. 8 PM - 6

AM.

7/17/17-8/21/17 PECO Energy

PA 842 (Unionville Wawaset Rd.),

Pocopson, Newlin, East Marlborough

twps.

Milling & Paving: LANE RESTRICTIONS between Doe

Run Rd. & Brandywine Bridge. 8 AM - 4 PM.

7/18/17-7/22/17 Allan Myers, LP $3.7 million

7/14/2017 Page 11 of 25

Page 12: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 352 (Sproul Rd.), East Whiteland

Twp.

High-Friction Resurfacing: LANE RESTRICTIONS

between King Rd. & US 30 (Lancaster Ave.). 7 PM - 5

AM.

7/9/17-7/14/17 J.D. Eckman, Inc. $4.8 million

Devon State Rd., Easttown Twp. High-Friction Resurfacing: LANE RESTRICTIONS at

Narcissa Rd.; Norristown Rd. & Stenton Ave.

Intersections. 7 PM - 5 AM.

7/9/17-7/14/17 J.D. Eckman, Inc. $4.8 million

Thirteenth Ave./Olive St./Caln Rd.,

Caln Twp., City of Coatesville

Paving: LANE RESTRICTIONS between Bus. US 30

& Bus. US 30. 6 PM - 6 AM.

7/10/17-7/11/17 Allen Myers, LP $2 million

Unionville Wawaset Rd., Pocopson,

Newlin, East Marlborough twps.

Milling & Paving: LANE RESTRICTIONS between Doe

Run Rd. & Brandywine Bridge. 6 AM - 6 PM.

7/10/17-7/14/17 Allen Myers, LP $3.7 million

Brandywine Creek Rd., Newlin Twp. Drilling/Subsurface Investigation: CLOSED &

DETOURED between Harveys Bridge Rd. &

Embreeville Rd. Weekdays. 7 AM - 4 PM. DETOUR

POSTED.

7/10/17-7/21/17 Maintenance

*US 422 West, Tredyffrin Twp. Sign Foundation Concrete Placement: LANE

CLOSURES between I-76 & First Ave. 11 AM - 1 PM.

7/11/17-7/14/17 J.D. Eckman, Inc. $97.4 million

PA 162 (Embreeville Rd.), Newlin

Twp.

Tree Removal: LANE RESTRICTIONS between

Stargazer Rd. & Cannery Rd.

7/12/17-7/14/17 Knight Brothers

Penn Green Rd., New Garden Twp. Utility Installation: LANE CLOSURE between Auburn

Rd. & Lauren Heights. Weekdays. 9 AM - 3 PM.

7/12/17-7/19/17 PECO Energy

PA 41 (Newport Gap Pike), New

Garden Twp.

Pipe Installation: LANE CLOSURE between Newark

Rd. & New Garden Rd. 9 AM - 3 PM.

7/14/17-7/17/17 Allan Myers, LP $1.4 million

Indian Run Rd., Wallace Twp. Bridge Replacement: CLOSED & DETOURED

between SpringtonRd. & Bassett Hunt Lane. Mon. thru

Sat. 6 AM - 6 PM. DETOUR POSTED.

7/17/17-9/30/17 Allen Myers, LP

Devon State Rd., Easttown Twp. Utility Installation: LANE CLOSURE between

Conestoga Rd. & Old Lancaster Rd. Weekdays. 9

AM - 3 PM.

7/19/17-7/26/17 PECO Energy

University Rd., Lower Oxford Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Baltimore Pk. & Pennsgrove Rd. 24-HOUR

CLOSURE. DETOUR POSTED.

7/31/17-9/1/17 Loftus Construction,

Inc.

$5.5 million

7/14/2017 Page 12 of 25

Page 13: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Sugartown Rd., Easttown Twp. Utility Installation: CLOSED & DETOURED between

Darby Paoli Rd. & Waterloo Lane. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

7/5/17-10/5/17 Aqua Pennsylvania

Howellville Rd., Tredyffrin Twp. Utility Installation: CLOSED & DETOURED between

Conestoga Rd. & US 30 (Lancaster Ave.).

Weekdays. 9 AM - 3 PM. DETOUR POSTED.

7/6/17-9/15/17 Luke Benedict

Church Rd., Avondale Bor. Bridge Rehabilitation: LANE RESTRICTIONS between

Sherwood Drive & Polo Rd. Weekdays. 9 AM - 3 PM.

7/6/17-10/6/17 Loftus Construction,

Inc.

$5.5 million

PA 724 (Schuylkill Rd.), North

Coventry Twp.

Utility Installation: LANE RESTRICTIONS at US 422.

Weekdays. 9 AM - 3 PM.

6/26/17-7/21/17 PECO Energy

Old Eagle School Rd., Tredyffrin

Twp.

Conduit Installation: LANE CLOSURE between

Swedesford Rd. & Devon Park Drive. Weekdays. 9

AM - 3 PM.

6/27/17-7/14/17 Zayo Fiber Solutions

Boot Rd., West Goshen Twp. Pipeline Maintenance: LANE CLOSURE between US

202 & Ship Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday

7 AM - 5 PM.

6/19/17-8/1/17 Sunoco Pipeline L.P.

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between Boot

Rd. & King Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday

7 AM - 5 PM.

6/19/17-8/1/17 Sunoco Pipeline L.P.

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between King

Rd. & Constitution Drive. Mon. thru Fri. 9 AM - 3 PM.

Saturday 7 AM - 5 PM.

6/19/17-8/1/17 Sunoco Pipeline L.P.

Price St., West Chester Bor. Utility Installation: LANE RESTRICTIONS between

South New St. & South Darlington St. Weekdays. 9

AM - 3 PM.

6/14/17-7/14/17 Aqua Pennsylvania

Little Conestoga Rd., Upper Uwchlan

Twp.

Road Widening: LANE RESTRICTIONS between

Milford Rd. & Park Rd. Weekdays. 9 AM - 3 PM.

5/30/17-7/28/17 Toll Brothers

PA 23 (Ridge Rd.), East Pikeland

Twp.

Utility Installation: CLOSED & DETOURED between

Hares Hill Rd. & PA 724 (Schuylkill Rd.). 24-HOUR

DETOUR. DETOUR POSTED.

5/15/17-11/15/17 Toll Brothers

PA 352 (Chester Rd.), East Goshen

Twp.

Pipe Installation: TRUCK DETOUR at Boot Rd. 24-

HOUR CLOSURE. DETOUR POSTED.

5/15/17-11/17/17 Sunoco Pipeline L.P.

7/14/2017 Page 13 of 25

Page 14: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green

Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.

3/3/17-Indef. Maintenance

*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

interchanges. 9 AM - 2 PM & 5 PM - 5 AM.

12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million

*US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 7 PM - 1 PM.

12/23/16-10/29/17 J.D. Eckman, Inc. $73.3 million

PA 926 (Street Rd.), Pocopson,

Birmingham twps.

Bridge Replacement: CLOSED & DETOURED

between Pocopson Rd. & Dorset Drive. 24-HOUR

DETOUR. DETOUR POSTED.

2/13/17-9/1/17 Clearwater

Construction

$8.6 million

Hollow Rd., West Vincent, East

Vincent twps.

Bridge Damage: CLOSED & DETOURED between

French Creek Rd. & Pughtown Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/20/16-Indef. PennDOT

Ross Fording Rd., West Fallowfield

Twp.

Bridge Damage: CLOSED & DETOURED between

Creek Rd. & Bryson Rd. 24-HOUR DETOUR.

DETOUR POSTED.

7/2/15-Indef. PennDOT

PA 724 ramp to US 422 East, East

Coventry Twp.

Ramp/Bridge Construction: RAMP CLOSED &

DETOURED. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, North Coventry

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

*US 422 E & W, North Coventry

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

DELAWARE COUNTY

*I-95 N & S, Various Municipalities Line Painting: SLOW MOVING OPERATION TO

PAINT TRAFFIC LINES BETWEEN DELAWARE

STATE LINE & PHILADELPHIA COUNTY LINE.

MOTORISTS ARE ADVISED TO REMAIN AN AMPLE

DISTANCE BEHIND THE PAINTING TRUCK & STAY

OFF TRAFFIC LINES. 6 AM - 12 PM.

7/15/17 PennDOT

7/14/2017 Page 14 of 25

Page 15: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. 7 PM - 5 AM.

7/16/17-7/21/17 J.D. Eckman, Inc. $62.7 million

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. 9 AM - 3 PM.

7/20/17-7/21/17 J.D. Eckman, Inc. $62.7 million

Providence Rd., Upper Providence,

Edgmont twps.

Milling: LANE RESTRICTIONS between PA 252

(Palmers Mill Rd. & Chester County line. 7 PM - 5

AM.

7/16/17-7/20/17 Allan Myers, LP $4.1 million

US 1 North, Upper Providence Twp. Base Repair: LEFT LANE CLOSURE between Ridley

Creek Rd. & PA 252 (Providence Rd.) 9 AM - 3 PM.

7/17/17-7/20/17 Maintenance

MacDade Blvd., Collingdale Bor. ADA Ramp Construction: LANE CLOSURE at Pine St.

& Hillside Ave. 9 AM - 3 PM.

7/17/17-7/21/17 Allan Myers, LP $7.2 million

*I-95 N & S, City of Chester Painting/Inspection & Repair: LANE CLOSURES

between I-476 & PA 352/320. 10 PM - 5 AM.

7/17/17-7/21/17 South State, Inc. $16.6 million

*US 30 E & W (Lancaster Ave.),

Radnor Twp.

Pedestrian Bridge Construction: RIGHT LANE

CLOSED between PA 320 (Spring Mill Rd.) & Ithan

Ave. 9 AM - 3 PM.

7/17/17-7/21/17 Neshaminy

Constructors, Inc.

$3.7 million

Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at

Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin

Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.

7/17/17-7/21/17 Lenni Electric $4.1 million

Baltimore Ave., Upper Darby Twp.,

Lansdowne Bor.

Traffic Signal Upgrade: LANE RESTRICTIONS

between Lansdowne Ave.; Penn Blvd./4th St.;

Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church

Lane. 9 AM - 3 PM.

7/17/17-7/21/17 Lenni Electric $4.1 million

Baltimore Ave., Clifton Heights Bor.,

Upper Darby Twp.

Road Widening: LANE RESTRICTIONS at Springfield

Rd.; Church Lane; Delmar Drive; Diamond St. &

Home Depot Drive. 9 AM - 3 PM.

7/17/17-7/21/17 Lenni Electric $4.1 million

Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Diamond St.; Madison St.; Woodlawn Ave.; Clifton

Ave. & Broadway Ave. 9 AM - 3 PM.

7/17/17-7/21/17 L.C. Costa

Contractors, Inc.

$4.1 million

7/14/2017 Page 15 of 25

Page 16: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

US 1 (Baltimore Ave.), Clifton

Heights Bor.

Curb Ramp Reconstruction: LANE CLOSURES at

Church St.; Marple Ave.; Jackson Ave.; Springfield

Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM.

7/17/17-7/21/17 L.C. Costa

Contractors, Inc.

$4.1 million

PA 3 (West Chester Pike),

Haverford, Upper Darby twps.

Curb Ramp Reconstruction: LANE CLOSURE at Brief

Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal

Square & Pennock Ave. 9 AM - 3 PM.

7/17/17-7/21/17 L.C. Costa

Contractors, Inc.

$5.9 million

PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at

Chatham Rd.; Forge Rd.; Copley Rd.; Terminal

Square & Millbourne Ave. 9 AM - 3 PM.

7/17/17-7/21/17 L.C. Costa

Contractors, Inc.

$5.9 million

Darby-Paoli Rd., Radnor Twp. Test Hole Excavating: LANE CLOSURE between

Sawmill Rd. & Brooke Rd. 9 AM - 3 PM.

7/17/17-7/21/17 So-Deep, Inc.

Oak Ave., Upper Darby Twp., Aldan

Bor.

Utility Installation: LANE RESTRICTIONS at Willow

Ave., Hawthorne Ave. & Jeffrey Rd. 9 AM -3 PM.

7/17/17-7/21/17 Aqua Pennsylvania

Glendale Rd., Haverford Twp. Utility Installation: CLOSED & DETOURED between

Colonial Rd. & PA 3 (West Chester Pike). Weekdays.

9 AM - 3 PM. DETOUR POSTED.

7/17/17-8/11/17 PECO Energy

US 202 South (Wilmington Pike),

Concord Twp.

Utility Installation: LEFT SHOULDER CLOSURE at

Smithbridge Rd. 9 AM - 3 PM.

7/17/17-8/30/17 Concord Township

Sewer Authority

*US 1 North, Middletown Twp. Tree Removal: RIGHT LANE CLOSED between

Baltimore Pike & Baltimore Pike overpass. 9 AM - 3

PM.

7/18/17 Maintenance

*US 1 North, Media Twp. Guide Rail Repair: RIGHT LANE CLOSED between

Baltimore Pike & North Providence Rd. 10 AM - 2 PM.

7/18/17 Long Fence

Company, Inc.

$2.2 million

*US 1 North, Upper Providence Twp. Guide Rail Repair: RIGHT LANE CLOSED between

North Providence Rd. & I-476. 10 AM - 2 PM.

7/18/17 Long Fence

Company, Inc.

$2.2 million

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. 9 AM - 3 PM.

7/20/17-7/21/17 J.D. Eckman, Inc. $62.7 million

7/14/2017 Page 16 of 25

Page 17: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Creek Rd., Middletown Twp. Pipe Installation: LANE CLOSURE between Duttons

Mill Rd. & W. Knowlton Rd. 24-HOUR

RESTRICTIONS.

8/1/17-9/30/17 Sunoco Pipeline L.P.

Goshen Rd., Newtown Twp. High-Friction Surface Treatment: LANE

RESTRICTIONS between Crum Creek Lane & Echo

Valley Lane. 7 PM - 5 AM.

7/9/17-7/14/17 J.D. Eckman, Inc. $3.8 million

US 1 N & S (Township Line Rd.),

Upper Darby Twp.

Utility Installation: LANE RESTRICTIONS between

Bella vista Rd. & Dermond Rd. 9 AM - 3 PM.

7/10/17-7/21/17 Aqua Pennsylvania

Springfield Rd., Springfield Twp. Utility Installation: LANE CLOSURE between Wornell

Drive & N. Norwinden Rd. Weekdays. 9 AM - 3 PM.

7/10/17-7/17/17 PECO Energy

*US 202 South (Wilmington West

Chester Pike), Concord Twp.

Utility Installation: LANE RESTRICTIONS between

Smithbridge Rd. & Beaver Valley Rd. Weekdays. 9

AM - 3 PM.

7/10/17-8/11/17 Concord Township

Sewer Authority

Powell Rd., Springfield Twp. Utility Installation: CLOSED & DETOURED between

Saxer Ave. & Woodland Ave. Weekdays. 9 AM - 3

PM. DETOUR POSTED.

7/12/17-7/28/17 Aqua Pennsylvania

Chester Creek Rd., Middletown

Twp., Brookhaven Bor.

Utility Installation: CLOSED & DETOURED between

Dutton Mill Rd. & Bridgewater Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

7/12/17-12/31/17 Middletown Township

Sewer Authority

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. 9 AM - 3 PM.

7/13/17-7/14/17 J.D. Eckman, Inc. $62.7 million

Glendale Rd., Haverford Twp. Utility Installation: CLOSED & DETOURED between

Colonial Rd. & PA 3 (West Chester Pike). Weekdays.

9 AM - 3 PM. DETOUR POSTED.

7/17/17-8/18/17 PECO Energy

Eagle Rd., Haverford Twp. Utility Installation: CLOSED & DETOURED between

Hathaway Lane & St. Denis Lane. Weeknights. 7 PM -

5 AM. DETOUR POSTED.

7/17/17-9/1/17 PECO Energy

Larken Rd., Upper Chichester Twp. Utility Installation: LANE RESTRICTIONS between

Chichester Ave. & Jennifer Way. Weekdays. 9 AM -

3 PM.

7/17/17-7/24/17 PECO Energy

7/14/2017 Page 17 of 25

Page 18: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Media Line Rd., Marple Twp. Utility Installation: LANE RESTRICTIONS between

Mulberry Lane & Mark Circle. Weekdays. 9 AM - 3

PM.

7/19/17-7/26/17 PECO Energy

Kirk Lane, Upper Providence twp. Utility Installation: LANE RESTRICTIONS between

Oakcrest Lane & Willowbrook Lane. 9 AM - 3 PM.

7/5/17-7/21/17 Aqua Pennsylvania

N. Providence Rd., Media Bor. Utility Installation: LANE RESTRICTIONS between N.

Monroe St. & Cherry St. Weeknights. 7 PM - 5 AM.

7/5/17-7/28/17 PECO Energy

E. Baltimore Ave., Media Bor. Utility Installation: LANE RESTRICTIONS between

Hirst Ave. & Melrose Ave. Weekdays. 9 AM - 3 PM.

7/5/17-7/21/17 PECO Energy

Upland St., City of Chester Bridge Deck Repair: CLOSED & DETOURED

between East 13th St. & East 12th St. 24-HOUR

DETOUR. DETOUR POSTED.

6/26/17-8/5/17 South State, Inc. $16.6 million

City Line Ave., Haverford twp. Utility Installation: LANE RESTRICTIONS between

Grove Place & Rolling Rd. Weekdays. 9 AM - 3 PM.

6/19/17-7/21/17 Aqua Pennsylvania

Madison St., City of Chester Bridge Deck Repair: CLOSED & DETOURED

between E. 12th St. & Providence Ave. 24-HOUR

DETOUR. DETOUR POSTED.

6/19/17-7/29/17 South State, Inc. $16.7 million

Goshen Rd., Newtown Twp. Utility Installation: CLOSED & DETOURED between

Newtown Street Rd. & Butler Drive. Weekdays. 9 AM

- 3 PM. DETOUR POSTED.

6/19/17-9/19/17 Aqua Pennsylvania

Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED

between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24-

HOUR DETOUR. DETOUR POSTED.

6/20/17-10/20/17 South State, Inc. $16.6 million

Baltimore Pike, Springfield Twp. Utility Installation: LANE RESTRICTIONS between

Thomson Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.

6/12/17-7/21/17 Aqua Pennsylvania

S. Bryn Mawr Ave., Radnor Twp. Bridge Reconstruction: LANE WIDTHS NARROWED

between PA 320 (Sproul Rd.) & S. Ithan Ave.

5/30/17-12/15/17 Loftus Construction,

Inc.

$7.5 million

Widner Way, Swarthmore Bor. Curb, Sidewalk & Driveway Aprons: LANE

CLOSURES between Swarthmore Ave. & Riverview

Rd. 7 AM - 3:30 PM.

5/22/17-9/12/17 Marino Corporation $480,821.00

7/14/2017 Page 18 of 25

Page 19: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Cresson Lane, Swarthmore Bor. Curb, Sidewalk & Driveway Aprons: LANE

CLOSURES between Dickenson St. & Columbia St. 7

AM - 3:30 PM.

5/22/17-9/12/17 Marino Corporation $480,821.00

Chestnut Ave., Swarthmore Bor. Curb, Sidewalk & Driveway Aprons: LANE

CLOSURES between College St. & Elm St. 7 AM -

3:30 PM.

5/22/17-9/12/17 Marino Corporation $480,821.00

South Wayne Ave., Radnor Twp. Utility Installation: CLOSED & DETOURED between

Lancaster Ave. & Conestoga Rd. Weekdays. 8:30

AM - 3 PM. DETOUR POSTED.

5/22/17-9/22/17 PECO Energy

Creek Rd., Middletown Twp.,

Brookhaven Bor.

Pipe Installation: CLOSED & DETOURED between

Bridgewater Rd. & Dutton Mill Rd. Weekdays. 7 AM -

5 PM. DETOUR POSTED.

5/15/17-12/31/17 Middletown Township

Sewer Authority

Crosby St., City of Chester Pedestrian Bridge Rehabilitation: Between 13th St. &

12th St.

3/27/17-9/19/17 South State, Inc. $16.6 million

*US 322 E & W (Conchester Hwy.),

Concord Twp.

Reconstruction & Road Widening: PERIODIC LANE

RESTRICTIONS between US 1 (Baltimore Pike) &

Clayton Park Drive. Weekdays. 9 AM - 3 PM & 7 PM -

6 AM.

3/20/17-10/20/17 J.D. Eckman, Inc. $62.7 million

Springfield Rd., Clifton Heights Bor. Utility Installation: CLOSED & DETOURED between

Providence Rd. & Oak Ave. Weekdays. 9 AM - 3 PM.

DETOUR POSTED.

3/15/17-7/21/17 Aqua Pennsylvania

Blueball Ave., Upper Chichester

Twp.

Bridge Repair: CLOSED & DETOURED between

Columbia Ave. & Scott Ave. 24-HOUR DETOUR.

DETOUR POSTED.

2/15/17-8/15/17 PennDOT

Conestoga Rd., Radnor Twp. Utility Installation: LANE RESTRICTIONS between US

30 (Lancaster Ave.) & Church Rd. Weekdays. 9 AM -

3 PM.

1/23/17-7/28/17 PECO Energy

College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED

between Spring Mill Rd. & Haverford Rd. 24-HOUR

DETOUR. DETOUR POSTED.

11/29/16-11/7/17 Road-Con, Inc. $5.2 million

MONTGOMERY COUNTY

*I-76 East, Lower Merion Twp. Tree Removal: RIGHT LANE CLOSURE from just

west of Gladwyne Interchange to Belmont Ave. 7 AM -

3 PM.

7/15/17 PennDOT

7/14/2017 Page 19 of 25

Page 20: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 E & W, West Conshohocken

Bor., Lower Merion Twp.

Milling & Concrete Patching: LANE CLOSURES

between I-476 & US 1 (City Ave.) 9 PM - 5 AM.

7/16/17-7/22/17 J.D. Eckman, Inc. $21.1 million

Flourtown Rd., Whitemarsh Twp. Base Repair: CLOSED & DETOURED between Butler

Pike & Joshua Rd. 7 PM - 5:30 AM. DETOUR

POSTED.

7/17/17 Maintenance

Johnson Rd., Plymouth Twp. Base Repair: CLOSED & DETOURED between

Belvoir Rd. & Plymouth Rd. 7 PM - 5:30 AM.

DETOUR POSTED.

7/17/17-7/18/17 Maintenance

Plymouth Rd., Plymouth Twp. Base Repair: CLOSED & DETOURED between

Johnson Rd. & Sandy Hill Rd. 7 PM - 5:30 AM.

DETOUR POSTED.

7/17/17-7/18/17 Maintenance

*US 422 E & W, Lower Providence,

Upper Providence, Limerick, Lower

Pottsgrove, North Coventry Twps.

Litter & Debris Removal: MOVING OPERATON

between PA 100 (Pottstown Pike) & PA 363 (Trooper

Rd.) 9 AM - 3 PM.

7/17/17-7/20/17 Maintenance

*I-476 N & S, Plymouth, Lower

Merion twps., West Conshohocken

Bor.

Litter & Debris Removal: MOVING OPERATON

WITH LANE CLOSURES between Turnpike/I-276

Interchange & County Line Rd. 9 AM - 3 PM.

7/17/17-7/20/17 Maintenance

*I-76 E & W, Upper Merion, Lower

Merion twps., West Conshohocken

Bor.

Litter & Debris Removal: MOVING OPERATION

WITH LANE CLOSURES between Turnpike/I-276 &

US 1 (City Ave.). 9 AM - 3 PM.

7/17/17-7/20/17 Maintenance

I-476 North, Plymouth Twp. Concrete Pavement Repairs: RIGHT LANE

CLOSURE between Ridge Pike & PA Turnpike

interchanges. 8 PM - 5 AM.

7/17/17-7/21/17 Pennsylvania

Turnpike Commission

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Wilson

St./Jackson St. 9 AM - 3 PM.

7/17/17-7/21/17 Road-Con, Inc. $13.3 million

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Roland

St./Park Blvd. & Keim St. 9 AM - 3 PM.

7/17/17-7/21/17 Road-Con, Inc. $13.3 million

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE between

Roland St. & Park Blvd. 9 AM - 3 PM.

7/17/17-7/21/17 Road-Con, Inc. $13.3 million

Wilson St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at N.

Hanover St. 9 AM - 3 PM.

7/17/17-7/21/17 Road-Con., Inc. $13.3 million

N. Wales Rd., Upper Gwynedd Twp. ADA Ramp Construction: LANE RESTRICTION at

Pennbrook Middle School Entrance. 9 AM - 3 PM.

7/17/17-7/21/17 Allan Myers, LP $6.4 million

7/14/2017 Page 20 of 25

Page 21: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Township Line Rd., Whitpain, East

Norriton twps.

Test Holes: LANE RESTRICTIONS between Kimberly

Drive & Oak Drive. 9 AM - 3 PM.

7/17/17-7/21/17 So-Deep, Inc.

*US 202 N & S (DeKalb Pike),

Whitpain Twp.

Test Holes: LANE RESTRICTIONS between PA

Turnpike & Township Line Rd. 9 AM - 3 PM.

7/17/17-7/21/17 So-Deep, Inc.

*US 202 N & S (DeKalb Pike),

Whitpain Twp.

Test Holes: LANE RESTRICTIONS between PA 73

(Skippack Pike) & Cherry Lane. 9 AM - 3 PM.

7/17/17-7/21/17 So-Deep, Inc.

Township Line Rd., Whitpain, East

Norriton twps.

Test Holes: LANE RESTRICTIONS between Swede

Rd. & DeKalb Pike. 9 AM - 3 PM.

7/17/17-7/21/17 So-Deep, Inc.

Norristown Rd., Lower Gwynedd

Twp.

ITS Installation: LANE CLOSURES between

Bethlehem Pike & Tennis Ave. 9 AM - 3 PM.

7/17/17-7/21/17 Carr & Duff, Inc. $3.6 million

Germantown Pike, East Norriton,

Plymouth twps.

ITS Installation: LANE CLOSURES between I-476 &

Swede Rd. 9 AM - 3 PM.

7/17/17-7/21/17 Carr & Duff, Inc. $3.6 million

PA 63 (Sumneytown Pike), Lower

Salford, Towamencin, Upper

Gwynedd, Lower Gwynedd,

Montgomery twps.; North Wales Bor.

ITS Installation: LANE CLOSURES between

Harleysville Pike & Bethlehem Pike. 9 AM - 3 PM.

7/17/17-7/21/17 Carr & Duff, Inc. $3.6 million

Bethlehem Pike, Montgomery,

Hatfield twps.

ITS Installation: LANE CLOSURES between

McLaughlin Rd. & Bergey Rd. 9 AM - 3 PM.

7/17/17-7/21/17 Carr & Duff, Inc. $3.6 million

Meyers Rd., Perkiomen Twp. Water Line & Storm Sewer Installation: LANE

RESTRICTIONS between Seitz Rd. & Miller Rd. 9 AM

- 3 PM.

7/17/17-7/21/17 H&K Group, Inc. $11.3 million

PA 73 (Skippack Pike), Skippack

Twp.

Paving: LANE RESTRICTIONS between Squirrel Hill

Rd. & Perkiomen Creek Rd. 9 AM - 3 PM.

7/17/17-7/21/17 H&K Group, Inc. $11.3 million

PA 29 (Gravel Pike), Perkiomen

Twp.

Pole Relocations & Storm Sewer Installation: LANE

RESTRICTIONS between Miller Rd. & Harrison Ave.

9 AM - 3 PM.

7/17/17-7/21/17 H&K Group, Inc. $11.3 million

US 202 North (DeKalb Pk.), East

Norriton Twp.

Pavement Cores: SHOULDER CLOSURE & TRAFFIC

SHIFT between Johnson Hwy. & Germantown Pk. 9

AM - 3 PM.

7/17/17-7/21/17 Applied Geoscience

& Engineering, Inc.

PA 611 (Old York Rd.), Abington

Twp.

Bridge Work: LANE RESTRICTIONS between Jericho

Rd. & Hamilton Ave. 9 AM - 3 PM.

7/17/17-7/21/17 J.D. Eckman, Inc. $3.6 million

7/14/2017 Page 21 of 25

Page 22: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

PA 63 East (Welsh Rd./Moreland

Rd.)

Pipe Replacement: LANE RESTRICTIONS between

PA 611 (Old York Rd.) & Easton Rd. 9 AM - 3 PM & 7

PM - 5 AM.

7/17/17-7/22/17 Glasgow, Inc. $4.6 million

North Charlotte St., Pottstown Bor. Utility Installation: LANE CLOSURE between Wilson

St. & Saint Johns St. Weekdays. 9 AM - 3 PM.

7/17/17-7/24/17 PECO Energy

PA 363 (Trooper Rd.), Lower

Providence Twp.

Road Widening & Utility Installation: LANE

RESTRICTIONS between Eisenhower Ave. &

Shannondell Blvd. Weeknights. 7 PM - 5 AM.

7/17/17-11/30/17 Forge 20 LLC

Washington Lane, Abington Twp. Utility Installation: LANE RESTRICTIONS between

Rydal Rd. & Cox Rd. 9 AM - 3 PM.

7/19/17-7/20/17 PECO Energy

Dreshertown Rd., Upper Dublin Twp. Utility Installation: LANE RESTRICTIONS at St.

Georges Rd. 9 AM -3 PM.

7/20/17-7/21/17 PECO Energy

County Line Rd., Warrington,

Horsham, Montgomery twps.

Excavating, Utility Work, Paving: LANE

RESTRICTIONS at Kenas Rd. 6 PM - 6 AM.

7/20/17-7/21/17 James D. Morrissey,

Inc.

$14.8 million

Lewis Rd., Upper Providence Twp. Utility Installation: LANE CLOSURE between Canci

Court & Bethel Rd. Weekdays. 9 AM - 3 PM.

7/21/17-7/28/17 PECO Energy

Walton Rd., Whitpain Twp. Base Repair: CLOSED & DETOURED between

Stenton Ave. & PA 73 (Skippack Pike). 7 PM - 5:30

AM. DETOUR POSTED.

7/19/17-7/20/17 Maintenance

Flint Hill Rd., Upper Merion Twp. Base Repair: CLOSED & DETOURED between

Swedeland Rd. & Jefferson St. 7 PM - 5:30 AM.

DETOUR POSTED.

7/20/17 Maintenance

PA 63 (Welsh Rd.), Abington, Lower

Moreland twps.

Milling & Paving: CLOSED AND DETOURED between

Edge Hill Rd. & Terwood Rd. 9 AM - 3 PM. DETOUR

POSTED.

7/24/17-8/2017 James D. Morrissey,

Inc.

$1.2 million

Orvilla Rd., Hatfield Twp. Utility Installation: CLOSED & DETOURED between

Cowpath Rd. & County Line Rd. Weeknights. 7 PM -

5 AM. DETOUR POSTED.

7/10/17-9/10/17 PECO Energy

Matsonford Rd., Upper Merion,

Lower Merion twps.

Bridge Repair: CLOSED & DETOURED between

Montgomery Ave. & Old Gulph Rd. Weekdays. 9 AM -

3 PM. DETOUR POSTED.

7/10/17-10/10/17 SEPTA

PA 23 ramp to US 422 East, Upper

Merion, West Norriton twps.

Ramp Reconstruction: RAMP CLOSED &

DETOURED. 24-HOUR DETOUR. DETOUR

POSTED.

7/10/17-11/2017 J.D. Eckman, Inc. $97.4 million

7/14/2017 Page 22 of 25

Page 23: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*I-76 E & W, Lower Merion Twp. Milling & Concrete Patching: LANE CLOSURES

between PA Turnpike Interchange & City Ave. 9 PM -

9 AM.

7/14/17-7/15/17 J.D. Eckman, Inc. $21 million

Terwood Rd., Upper Moreland Twp. Bridge Rehabilitation: CLOSED & DETOURED

between York Rd. & Davisville Rd. 24-HOUR

DETOUR. DETOUR POSTED.

7/5/17-8/4/17 Loftus Construction,

Inc.

$5.5 million

PA 63 (Welsh Rd.), Upper Dublin,

Upper Moreland twps.

Deck Rehabilitation: LANE CLOSURES between

Twining Rd. & Computer Ave. Weekdays. 9 AM - 3

PM.

7/6/17-9/30/17 Loftus Construction,

Inc.

$7.2 million

US 422 East, Upper Merion, West

Norriton twps.

Ramp Delineation: RIGHT LANE CLOSED between

PA 23 & Pennsylvania Turnpike. 7 PM - 5 AM.

6/29/17-6/30/17 J.D. Eckman, Inc. $97.4 million

PA 663 (Layfield Rd.), Upper

Hanover Twp.

Bridge Replacement: CLOSED & DETOURED

between Kutztown Rd. & Hill Rd. 24-HOUR DETOUR.

DETOUR POSTED.

6/19/17-8/31/17 Plenary Walsh

Keystone Partners

Wynnewood Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between

Williams Rd. & Wynnewood Ave. Mon. thru Sat. 8 AM

- 4 PM. 24-HOUR LANE RESTRICTIONS.

6/20/17-7/21/17 Lower Merion

Township Authority

New Second St., Cheltenham Twp. Bridge Reconstruction: CLOSED & DETOURED

between Ashbourne Rd. & Church Rd. 24-HOUR

DETOUR. DETOUR POSTED.

6/21/17-9/4/17 Loftus Construction,

Inc.

$7.5 million

PA 63 (Welsh Rd.)/Moreland Rd.,

Horsham, Abington, Upper Dublin,

Upper Moreland twps.

Milling & Paving: LANE RESTRICTIONS between

Village Rd./Jarrettown Rd. & Willow Brook Drive/Edge

Hill Rd. 7 PM - 5 AM.

6/13/17-7/28/17 Glasgow, Inc. $4.5 million

Broad St., Lansdale Bor. Milling & Paving: LANE RESTRICTIONS between PA

63 Main St. & PA 309 (Bethlehem Pike). Weeknights.

7 PM - 5 AM.

6/5/17-7/14/17 Glasgow, Inc. $4.5 million

Hollow Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between PA

23 (Conshohocken State Rd.) & Hagys Ford Rd.

Monday thru Saturday. 9 AM - 3 PM.

6/9/17-8/25/17 PECO Energy

Buchert Rd., Pottsgrove Twp. Curb Ramp Construction: LANE CLOSURE at

Pleasantview Rd.; N. Washington St. & Mervine St. 9

AM - 3 PM.

5/30/17-7/21/17 Highway Materials,

Inc.

$4.8 million

7/14/2017 Page 23 of 25

Page 24: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

Mervine St., Lower Pottsgrove Twp,

Pottstown Bor.

Curb Ramp Construction: LANE CLOSURE at N.

Franklin St. 9 AM - 3:30 PM.

5/30/17-7/21/17 Highway Materials,

Inc.

$4.8 million

Susquehanna Rd., Abington Twp. Utility Installation: CLOSED & DETOURED between

Washington Lane & Rydal Rd./Valley Rd. Weekdays.

9 AM - 3 PM. DETOUR POSTED.

5/23/17-8/28/17 Aqua Pennsylvania

South Lewis Rd., Upper Providence

Twp.

Utility Installation: CLOSED & DETOURED between

Borough Line Rd. & Bechtel Rd. 24-HOUR DETOUR.

DETOUR POSTED.

5/1/17-8/4/17 Upper Providence

Township Authority

Plank Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between PA 29 (Gravel Pike) & PA 73 (Skippack

Pike). 24-HOUR DETOUR. DETOUR POSTED.

5/2/17-10/2017 H&K Group, Inc. $11.3 million

Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED

between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR

DETOUR. DETOUR POSTED.

5/2/17-5/2019 H&K Group, Inc. $11.3 million

PA 152 (Limekiln Pike), Ambler Bor. Pipe Installation: LANE CLOSURE at Tennis Ave.

Weekdays. 9 AM - 3 PM.

4/28/17-7/31/17 Horsham Water &

Sewer Authority

PA 63 (Main St.), Lower Salford Twp. Roadway & Culvert Widening: LANE RESTRICTIONS

between PA 113 (Harleysville Pike) & Carrie Lane.

Weekdays. 9 AM - 3 PM.

3/15/17-11/1/17 Lower Salford

Township

Township Line Rd., Jenkintown Bor. Utility Installation: CLOSED & DETOURED between

Greenwood Ave. & Washington Lane. Weekdays. 8

AM - 3 PM. DETOUR POSTED.

2/28/17-7/26/17 Aqua Pennsylvania

Township Line Rd., Jenkintown Bor. Utility Installation: LANE RESTRICTIONS between

Washington Lane & PA 611 (Old York Rd.).

Weekdays. 8 AM - 3 PM.

2/28/17-7/26/17 Aqua Pennsylvania

*US 422 East, Lower Pottsgrove

Twp.

Road & Bridge Construction: LANE CLOSURES

between PA 724 (Schuylkill Rd.) & Sanatoga

Interchanges. 5 PM - 5 AM.

1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million

7/14/2017 Page 24 of 25

Page 25: DATE: 07-14-2017. … · LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Passyunk Ave. Bridge Rehabilitation: CLOSED & DETOURED between 61st St. & 28th St. 7 PM Friday thru

LOCATION RESTRICTION DATE CONTRACTOR COST

*US 422 West, Lower Pottsgrove

Twp.

Road & Bridge Construction: WEEKEND LANE

CLOSURES between Sanatoga & PA 724 (Schuylkill

Rd.) Interchanges. 7 PM - 1 PM.

1/23/17-10/29/17 J.D. Eckman, Inc. $73.3 million

Edge Hill Rd., Abington Twp. Bridge Rehabilitation: CLOSED & DETOURED

between Ferndale Ave. & Hamilton Ave. 24-HOUR

DETOUR. DETOUR POSTED.

1/9/17-11/1/17 J.D. Eckman, Inc. $3.6 million

East Walnut St., Hatfield Twp. Bridge Replacement: CLOSED & DETOURED

between PA 309 & County Line Rd. 24-HOUR

DETOUR. DETOUR POSTED.

10/24/16-9/28/17 Hatfield Township

County Line Rd., Warrington,

Horsham, Montgomery twps.

Utility Installation: LANE RESTRICTIONS between

Kulp Rd. & Stump Rd. 7 AM - 3 PM.

3/7/16-9/2018 James D. Morrissey,

Inc.

$14.8 million

Baligomingo Rd., West

Conshohocken Bor.

Slope Stabilization: CLOSED & DETOURED between

PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR.

DETOUR POSTED.

6/27/15-Indef.

PA 724 ramp to US 422 East, Lower

Pottsgrove Twp.

Roadwork: RAMP CLOSED & DETOURED. 24-

HOUR CLOSURE. DETOUR POSTED.

5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, Lower Pottsgrove

Twp.

Road Construction: TRAFFIC PATTERN SHIFT

between Sanatoga & PA 724 (Schuylkill Rd.)

Interchanges. 24-HOUR PATTERN.

2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million

*US 422 E & W, West Pottsgrove

Twp.

Bridge Construction: REDUCED TO ONE LANE

between Stowe & PA 100 Interchange. 24-HOUR

RESTRICTION.

11/27/14-9/2018 J.D. Eckman, Inc. $36 million

County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS

between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM

Fridays. 24-HOUR CLOSURE. DETOUR POSTED.

5/9/14-12/29/17 Valley Forge National

Historical Park

7/14/2017 Page 25 of 25