data origination, management and wgs 84 3... · 2013. 9. 19. · 4 icao pbn manual seminar data...

6
1 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 1 Data Origination, Management and WGS 84 Data Origination, Management and WGS 84 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 2 Overview Overview Learning Objectives Understand the implication of publishing incorrect navigational data in the State’s AIP Identify why it is essential to use a common reference system Understand the impact of using different ellipsoids Recognise why late publication of data should not take place. ICAO PBN Manual Seminar Data Origination & Management, WGS-84 3 Content Content The Challenge The Data Chain Achieving data quality Reference systems • Surveying Publishing the data ICAO PBN Manual Seminar Data Origination & Management, WGS-84 4 The Problem Identified The Problem Identified ANSP (AIS) DB Providers Aircraft Operators Aircraft fly different tracks AIP ADB/DB If unclear or ambiguous procedure description Lack of Integrity ICAO PBN Manual Seminar Data Origination & Management, WGS-84 5 Impact of AIP Errors Impact of AIP Errors Conventional: Automatic: Coordinates required . 0 9 18 2 7 . 0 9 18 2 7 Coordinates required RNAV: Coordinates required Coordinates required . 0 9 18 2 7 . 0 9 18 2 7 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 6 Sample Chart Error Sample Chart Error ? 50º 31’.0 .1 .2 .3 .4 .5 .0 .1 .2 .3 .4 .5

Upload: others

Post on 03-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Data Origination, Management and WGS 84 3... · 2013. 9. 19. · 4 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 19 Solid Earth Reference Ellipsoid Normal p P The

1

ICAO PBN Manual SeminarData Origination & Management, WGS-84 11

Data Origination, Management and WGS 84

Data Origination, Management and WGS 84

ICAO PBN Manual SeminarData Origination & Management, WGS-84 22

OverviewOverviewLearning Objectives• Understand the implication of publishing

incorrect navigational data in the State’s AIP

• Identify why it is essential to use a common reference system

• Understand the impact of using different ellipsoids

• Recognise why late publication of data should not take place.

ICAO PBN Manual SeminarData Origination & Management, WGS-84 33

ContentContent

• The Challenge

• The Data Chain

• Achieving data quality

• Reference systems

• Surveying

• Publishing the dataICAO PBN Manual Seminar

Data Origination & Management, WGS-84 44

The Problem IdentifiedThe Problem Identified

ANSP(AIS)

DBProviders

AircraftOperators

Aircraft fly

different tracks

AIP ADB/DB

If unclear or ambiguousprocedure description

Lack of Integrity

ICAO PBN Manual SeminarData Origination & Management, WGS-84 55

Impact of AIP ErrorsImpact of AIP Errors

Conventional:

Automatic:

Coordinates required

.0

9

18

27.0

9

18

27

Coordinates required

RNAV:

Coordinates required

Coordinates required

.0

9

18

27

.0

9

18

27

ICAO PBN Manual SeminarData Origination & Management, WGS-84 66

Sample Chart ErrorSample Chart Error

??

50º 31’.0

.1

.2

.3

.4

.5

.0

.1

.2

.3

.4

.5

Page 2: Data Origination, Management and WGS 84 3... · 2013. 9. 19. · 4 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 19 Solid Earth Reference Ellipsoid Normal p P The

2

ICAO PBN Manual SeminarData Origination & Management, WGS-84 77

CommunicationsServiceProvider

AerodromeAir TrafficServiceProvider

Procedure& AirspaceDesigner

AeronauticalInformation

Service

End UsersNOTAM

AIP

FMSData

ApplicationsProvider

Flight PlanningData

ApplicationsProvider

EndUsers

SimulatorData

ApplicationsProvider

Navigation DataTailoring Requirements

NavigationData

Processor

Who is Involved?Who is Involved?

OtherGovernment

Sources

ICAO PBN Manual SeminarData Origination & Management, WGS-84 88

BasicData

Sources

• Collect• Process• Publish• Distribute

Users

Every player must establish a Navigation Data Process in order to ensure the quality of data delivered to the users

Navigation Data ProcessNavigation Data Process

Role of Regulator(s) approve process to ensure correct data

ICAO PBN Manual SeminarData Origination & Management, WGS-84 99

Data Chain Processes and Standards

Data Chain Processes and Standards

OriginationDerive and

Publisheg States’ AIPs

Application Integration (Packing)

Link to target equipment in

required format

End UseLoad and Maintain

current cycle

Preparation by Data Service

Provider (Coding)

ReceiveAssembleTranslate

SelectFormat

Distribute

DO-201A/ED-77

DO-200A/ED-76DO-178B/ED-12B

DO-200A/ED-76

JARs/FARs

StateState’’s Responsibilitys Responsibility

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1010

Data Exchange after Publication in AIC

Data Exchange after Publication in AIC

FMS Packed Data

Compiled Data

Jeppesen - US

Data Houses

Jeppesen - DE

EAG - UK

Lufthansa Flight Nav - CH

Data Packers

CMC Canada

Rockwell

Garmin

Smiths

Honeywell

Universal

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1111

What is Data Quality?What is Data Quality?

• Quality is ability to meet requirements

• Characterised by:

– Accuracy– Resolution– Assurance Level– Traceability– Timeliness– Completeness– Format

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1212

Managing DataWhat is Data Integrity?

Managing DataWhat is Data Integrity?

• The assurance that a data item retrieved from a storage system has not been changed since the original data entry or latest authorised amendment

Data

Data

Exchange

Same?

Page 3: Data Origination, Management and WGS 84 3... · 2013. 9. 19. · 4 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 19 Solid Earth Reference Ellipsoid Normal p P The

3

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1313

INPUT

OUTPUT

RECEIVE ASSEMBLE TRANSLATE

DISTRIBUTEFORMATSELECT

C C C

CCC

FAILPASS

FAILPASS

FAIL

FAILFAIL

PASS

PASSPASSPASS

FAIL

C CHECK

RNVREQ_1103

Navigation Data Processing Model

Navigation Data Processing Model

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1414

ICAO RequirementsICAO Requirements

User requirements in ICAO Annex 15

Critical (10-8)Essential (10-5) DataRoutine (10-3)

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1515

RTCA Do 200AEUROCAE ED 76RTCA Do 200A

EUROCAE ED 76

These documents are submitted to the aviation community as a collection of disciplines necessary to provide assurance that the production of aeronautical databases meets the high integrity required for safe flight.

From the executive summary:

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1616

Processing RequirementsProcessing Requirements

• Each supplier of data in the chain assures:– The data meets quality requirements– The source of any data can be traced– All detected data discrepancies addressed– All reported errors resolved in a timely manner– Delivery of data is made at the agreed time– Data is applicable to the intended period of use– Any unresolved errors or anomalies known to

remain are made available to the client

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1717

Issues to be AddressedIssues to be Addressed• Survey

– Not meeting accuracy and integrity requirements

• No real data integrity – No guarantee that data not corrupted

• RNAV coding – Has the data house correctly interpreted the

design • No real Traceability

– Cannot validate to confirm whether process working

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1818

The Earth as a GeoidThe Earth as a Geoid

• Geoid– The equipotential

surface of the earth's gravity field which would coincide with the ocean surface, if the earth were undisturbed and without topography

Geoid

Perpendicular togeoid (plumbline)

Ocean

Mean seasurface (geoid)

Page 4: Data Origination, Management and WGS 84 3... · 2013. 9. 19. · 4 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 19 Solid Earth Reference Ellipsoid Normal p P The

4

ICAO PBN Manual SeminarData Origination & Management, WGS-84 1919

Solid Earth

Reference Ellipsoid

Normal

p

P

The Earth as an EllipsoidThe Earth as an Ellipsoid

ReferenceEllipsoid

Zoom

Zoom

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2020

WGS 84 WGS 84 Global Geodetic System - accurate to 1-2 Metres

Realisation• International Terrestrial Reference System (ITRS)

– Precise geodetic system -1-3 cm over 5,000 km– Maintained by the International Earth Rotation Service – Plate Tectonic movements – therefore position changes– ITRF – globally distributed network with defined epoch

(date), position and velocity – In Europe original surveys done to ETRF 89 network –

move to ITRF 2000 – accepted realisation of WGS 84– Use transformations to update:

IF DATA INTEGRITY SUFFICIENT

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2121

Deviation of the Vertical and Undulation

Deviation of the Vertical and Undulation

GeoidGeoidEllipsoidEllipsoid

Deviation ofthe vertical

Perpendicular to ellipsoidPerpendicular togeoid (plumbline)

Ocean

Mean sea surface (geoid)Geoid undulation

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2222

AA

BB

What is a Height?

• Implicit question in what direction water is flowing

• Water is in rest on an equipotentialgravity surface (⇒heights are equal)

• Definition of such a height cannot be geometrical ⇒ "Point A is higher than point B"

⇒ "Point B has the same heightas point C"

Stretchof water

CC

Question

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2323

-- 100 m100 m + 100 m+ 100 m+ 50 m+ 50 m0 m0 m-- 50 m50 m

WGS 84 vs. GeoidWGS 84 vs. Geoid

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2424

Solid Earth

p

Impact of Different EllipsoidsImpact of Different Ellipsoids

L ≠ LEllipsoid

Equatorial Plane

Ellipsoid

Equatorial Plane

P

L

P

L

Page 5: Data Origination, Management and WGS 84 3... · 2013. 9. 19. · 4 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 19 Solid Earth Reference Ellipsoid Normal p P The

5

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2525

Effect of Geodetic SystemsEffect of Geodetic Systems

Diekirch Nav-Aid (Luxembourg)

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2626

How to SurveyHow to Survey

GPS Survey Consideration– GPS Observation Techniques – Connection to the geodetic reference frame– Stations with defined ITRF coordinates– Control Stations

Clear line of sight away from reflecting surfacesEnsure no interferenceRedundancy of data collection to allow validationHardware selection – NB take care if mixed receiver network – antenna phase centre differences

– Survey Execution and Marking

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2727

20

SurveysSurveysWhat to Survey

20

SurveySurvey

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2828

SurveysSurveys

How to mark (Monumentation)

Steel or Alloy tube

O ptional concrete co llar

Fine mark crossG round surface

Length to be agreed accord ing to ground cond itions.The illustration is d iagrammatic on ly and is not intended to refer to any particular proprietary type.

SV coverBevelled top withcentre punchnail at top

Concrete500x500 mmon plan

Compressiblefiller 25 mmthick minimum

20 mm diameterstainless steelrod 600 mm. long.

trial pitback filledwith concrete

10 mm. diameter stainless steelrod 100 mm. long fitted throughpre-drilled hole in 20 mm. dia (vertical) rod.

ICAO PBN Manual SeminarData Origination & Management, WGS-84 2929

ICAO Annex 15ICAO Annex 15

RS56869_1000

6.1.1 Information ..., shall be disseminated under the regulated system (AIRAC), i.e. basing establishment, withdrawal or significant changes upon a series of common effective dates at intervals of 28 days, including 10 January 1991.

Note:10 January 1991 is the starting point for counting the 28days

AIRAC Process started long before 1991

ICAO PBN Manual SeminarData Origination & Management, WGS-84 3030

AIRAC Cycle: TimelinessAIRAC Cycle: Timeliness• Annex 15, Chapter 6, Paragraph 2:

– Information published on paper and distributed 42 days in advance of the effective date

– Recommendation – Major changes minimum 56 days

RS56869_1001

AIRAC

Effective Date

ReceptionPublication

28 days for system updating

14 days for postal delivery

56 days for major updates14 days

Page 6: Data Origination, Management and WGS 84 3... · 2013. 9. 19. · 4 ICAO PBN Manual Seminar Data Origination & Management, WGS-84 19 Solid Earth Reference Ellipsoid Normal p P The

6

ICAO PBN Manual SeminarData Origination & Management, WGS-84 3131

Why 28 DaysWhy 28 Days

Commercial Data ProvidersAirline operators

ChartsFlight Management SystemsAircraft Performance DBFlight PlanningSimulators

ATC CentresFlight planningSimulatorsATC screens

OTHERSSimulatorsFlight Planning

To update a wide range of systems!

Varying freeze dates!

28 days for system updating14 days for postal delivery

Publication Reception

AIRACEffective date

ICAO PBN Manual SeminarData Origination & Management, WGS-84 3232

PBN Consideration: Operational Implementation Date

PBN Consideration: Operational Implementation Date

• Experience has shown that an additional 3 to 10 days after publication effective date should be allocated before operational implementation (“turn-on”) in the air traffic system

• Additional period provides time to ensure ground and aircraft system data is correctly validated and loaded in data bases

ICAO PBN Manual SeminarData Origination & Management, WGS-84 3333

Data Origination Data Origination EUROCONTROL Guidance Material• Integrity of Aeronautical Information

- Aeronautical Data OriginationAFN/NAV/DAT/ORG/DOC001-150404

Survey and procedure Design RequirementsFAA Guidance Material• FAA Specification 405 Standards for Aeronautical Surveys

and Related Products• FAA Order 8260.19 Flight Procedures and AirspaceICAO • Doc 9674 -WGS 84 Manual

ICAO PBN Manual SeminarData Origination & Management, WGS-84 3434

Summary Summary

• AIP Issues

• Data Chain

• Aeronautical Data Processes

• WGS 84

– Geoid

– Impact of different ellipsoids

• Surveying Issues

• Timeliness

ICAO PBN Manual SeminarData Origination & Management, WGS-84 3535

Audience Response SystemQuestions

Audience Response SystemQuestions