Data Intensive Engineering
Xosé Manuel Carreira Rodríguezhttp://www.linkedin.com/in/carreira
13th December 2012
![Page 2: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/2.jpg)
BRIEF
• In this presentation the possible use of the big
data technologies in the civil engineering is
overviewed.
![Page 3: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/3.jpg)
![Page 4: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/4.jpg)
![Page 5: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/5.jpg)
![Page 6: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/6.jpg)
“…probably indicates that these sectors face
strong systemic barriers to increasing
productivity”
![Page 7: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/7.jpg)
We collect enough data.
We need to focus on
1- connecting
2 – identifying patterns
3- giving confidence level
Multiple data sources:
BooksExperts in the fieldInformation systemsTests and surveyingData repositoriesReal time sensors
![Page 8: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/8.jpg)
Data quality
• Processing is cheap and access is easy, the big problem is data quality.
• Considerable research but highly fragmented
![Page 9: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/9.jpg)
Classic definition of Data Quality
• Accuracy
– The data was recorded correctly.
• Completeness
– All relevant data was recorded.
• Uniqueness
– Entities are recorded once.
• Timeliness
– The data is kept up to date.
• Special problems in federated data: time consistency.
• Consistency
– The data agrees with itself.
![Page 10: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/10.jpg)
Finding a modern definition
• Data quality must
– Reflect the use of the data
– Lead to improvements in processes
– Be measurable
• No silver bullets: Use several data quality
metrics.
![Page 11: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/11.jpg)
What is the problem to solve?
• Do you have a bunch of data and want to:– Estimate an unknown parameter from it?
• True rainfall based on radar observations?
• Amount of liquid content from in-situ measurements of temperature, pressure, etc?
• Regression
– Classify what the data correspond to?
• A water surge?
• A temperature inversion?
• A boundary?
• Classification
• Regression and classification aren’t that different
11
![Page 12: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/12.jpg)
Case 1: Neural networks for flood
• Neural networks modelling of the rainfall-runoff relationship
• No physical model, just data driven model.
• Result: flow forecasting
![Page 13: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/13.jpg)
Case 1: Neural networks for flood
• Input: several past rain gauges and flow gauges
• Result: Flow model
![Page 14: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/14.jpg)
Case 1: Neural networks for flood
Training with 1st (larger) set of data
![Page 15: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/15.jpg)
Case 1: Neural networks for flood
Verification with 2nd (smaller) set of data
![Page 16: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/16.jpg)
Simulation
sample
![Page 17: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/17.jpg)
How can IT help in maintenance ?
• Information Technology has also found applications in post commission period of the project.
• IT can provide easy access to various statistics, drawing & various other data concerning the project.
• Self check tools can identify the problems in various systems like fire fighting, air conditioning & can automatically inform concerned service provider.
• IT can also help in prompt reporting of problem & its rectification.
![Page 18: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/18.jpg)
Case 2: Bridge Management Systems
• Double click on the
icon on your desktop
– Introductory screen is
displayed
– Click OK button to
continue to the Data
collection form
Page 18
![Page 19: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/19.jpg)
Connecting Bridge Management Systemsto Asset Management
U.S. Department of Transportation
Federal Highway Administration
![Page 20: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/20.jpg)
Bridges in the U.S.
25% are structurally or functionally deficient according to ASCE
0
20000
40000
60000
80000
100000
120000
140000
Pre
-1909
10s
20s
30s
40s
50s
60s
70s
80s
90s
Bridge Construction by Decade
![Page 21: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/21.jpg)
Typical BMS Expectations
A tool to evaluate:
• Bridge condition and serviceability
• Implications of project decisions
• Priorities and schedules
• Expected budget
• Cost of alternative standards
• Value of preventive maintenance
Case 2: Bridge Management Systems
![Page 22: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/22.jpg)
You can run a company from a coffee shop
![Page 23: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/23.jpg)
Why not a lab or a civil infraestructure?
![Page 24: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/24.jpg)
Desktop PCs are idle half the day
24
Desktop PCs tend to be active
during the workday.
But at night, during most of
the year, they’re idle. So
we’re only getting half their
value (or less).
![Page 25: Data Intensive Engineering](https://reader033.vdocuments.site/reader033/viewer/2022042602/559e49651a28abf5728b4766/html5/thumbnails/25.jpg)
Finally ,
it is argued that IT can readily be
used by civil engineers given the low
capital investment levels required.
The “only” requirement is investment in
education among the civil engineers &
recognition of the enormous potential
lying beneath.