Data Communications Network Task Force Report 1

Upload: shanon-anderson

Post on 18-Jan-2018

220 views

Category:

Documents


0 download

DESCRIPTION

TASK FORCE PRODUCT COMMITMENT CREATE A COORDINATING COMMITTEE CREATE A STEERING COMMITTEE DEFINE THE TASK FORCE PURPOSE DEFINE TASK FORCE PRODUCT S 3

TRANSCRIPT

Page 1: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

Data

Communications

Network

Task Force Report

1

Page 2: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

PRESENTATION OUTLINE

I. TASK FORCE PRODUCT COMMITMENT

II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL ARCHITECTURE AND DEPLOYMENT STRATEGY

III. IMPLEMENTATION ANALYSIS

IV. ECONOMIC ASSESSMENT

V. RECOMMENDATIONS

2

Page 3: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

TASK FORCE PRODUCT COMMITMENT

• CREATE A COORDINATING COMMITTEE

• CREATE A STEERING COMMITTEE• DEFINE THE TASK FORCE PURPOSE • DEFINE TASK FORCE PRODUCT S

3

Page 4: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

COMMITTEE MEMBERSHIP

COORDINATING COMMITTEE MEMBERSHIP: • PLANNING AND SUPPORT STAFFS • SPECIFICALLY DESIGNATED TECHNICAL REPRESENTATIVES

STEERING COMMITTEE MEMBERSHIP • TASK FORCE MANAGER • NETWORK ENGINEERING AND PLANNING • AOS FUNDAMENTAL PLANNING • AOS IMPLEMENTATION - • FUTURE TECHNOLOGY - • COMPUTER OPERATIONS • DATA COMMUNICATIONS PLANNING V • CURRENT PLANNING & TECHNICAL SUPPORT • TECHNICAL CONSULTANTS, COOPERS & LYBRAND

4

Page 5: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

TASK FORCE PURPOSE THE TASK FORCE HAS BEEN ESTABLISHED TO:

• COMPLETE TECHNICAL AND ECONOMIC EVALUATIONS OF THE ADVANCED OFFICE SYSTEMS (AOS) AND LOCAL AREA NETWORK (LAN) SERVING ARRANGEMENT WITHIN 60 DAYS

• COMPARE THE S SERVING ARRANGEMENT WITH INDUSTRY AND TECHNOLOGY TRENDS

• IDENTIFY EARLY IMPLEMENTATION TECHNICAL PROBLEMS AND ISSUES TO BE ADDRESSED COORDINATE RESOLUTION ACTIVITIES

• COMMUNICATE DATA COMMUNICATIONS NETWORK PERFORMANCE IMPROVEMENT ACTIVITIES AND PROBLEM STATUS

• PROMOTE TEAM EFFECTIVENESS • IDENTIFY A SINGLE POINT OF CONTACT FOR DATA

COMMUNICATIONS NETWORK SERVICES 5

Page 6: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

THE TASK FORCE WILL PROVIDE:

• CAPITAL AND EXPENSE COST DATA, ONE-TIMEAND RECURRING FOR EACH COMPONENT AND FACILITY PROVIDED, PER USER AND IN TOTAL

• A TECHNICAL ASSESSMENT OF THE ISC AND LAN SERVING ARRANGEMENT AND ITS SUITABILITY FOR CURRENT APPLICATION AND COMPATIBILITY WITH FUTURE TECHNOLOGY

DEPLOYMENT STRATEGY FOR THE DATA COMMUNICATIONS NETWORK:

• STOP NOW, • CAP AT SOME FUTURE (IDENTIFIED) POINT, OR • DEPLOY FOR ALL OF COMPANY

6

Page 7: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

TASK FORCE PRODUCT (Con’t) • A PLAN FOR A SINGLE POINT OF CONTACT FOR THE

USER FOR ALL DCN “SYSTEM’ NEEDS - FOR INITIAL MOVE-IN AND ONGOING OCCUPANCY

• VERIFICATION THAT THE ISC AND THE LAN SERVING ARRANGEMENT ALIGN WITH TECHNOLOGY TRENDS

• AN INDUSTRY SCAN OF TECHNOLOGY USED BY OTHER MAJOR CORPORATIONS

• INSIGHT INTO THE NEXT STEPS NECESSARY IN THE CREATION OF A FUNDAMENTAL PLAN FOR ADVANCED OFFICE SYSTEMS

7

Page 8: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL ARCHITECTURE & DEPLOYMENT STRATEGY

• INITIAL SERVING ARRANGEMENT • 9-85 NETWORK SERVING ARRANGEMENT • RECOMMENDED NETWORK SERVING

ARRANGEMENT • RECOMMENDED USER SERVICES

ARRANGEMENT • PROPOSED AOS DEPLOYMENT

ARRANGEMENT

8

Page 9: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

INITIAL SERVING ARRANGEMENT

9

DG

D C AEmulation Term ina ls

N ative Term inals

LAN D C A

D C A

Page 10: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

DG

D C A

Em ulation Term ina ls

N ative Term ina ls

LAN

D C A

T1M UX M U X

O ther Services

9-85 NETWORK SERVING ARRANGEMENT

• GENERAL ARCHITECTURE APPROACH IS WORKABLE • NEEDS TUNING

DATA CENTER

10

Page 11: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

Recommended Network Serving Arrangement

• BETTER PERFORMANCE FOR NATIVE TERMINALS • LOWER COST FOR: NETWORK ($1,360.000) 11

DG

D C A

Em ulation Term inals10%

N ative Term inals90%

LAN

D C A

1 0 %

T1s

DG

LANLAN

LANLAN

90 %

O ther Services

100 M5M/channel

DATA CENTER

DGDG s

BuildingBroadband Netw ork

Page 12: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

Recommended User Services Arrangement

• IMPROVED LAN PERFORMANCE & REDUCED USER RESPONSE TIME• FUTURE REDUCTION IN COST OF SUPPORTING PRODUCTION WORD PROCESSING ($800.000)

12

D ataC en te r

LAN

T1s

LANLAN

LANLAN

W ide Area Netw ork

F ileS e rve rs

O ther SevicesO ther Locations

9 .6 K

9 .6 K

9 .6 K

19 .2 K

D um b A syn Term ina ls

P C 's w itho u t d isks

5 MP C 's

P C 's w ithou t d isks

S yn Te rm ina lsO ther Sevices

DCA

Echo p le xM o d e

19.2 K

19.2 K

19.2 K

10 M

Pro du ctio nT yp ists(T e m p)

P ro du ctio nT yp is ts &PC U se rs

C asua l A O SU se rs

Page 13: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

Proposed AOS Deployment Arrangement

13

HPAOS

DECAOS

VM/PROFS*

DGCEO

UNIXAOS

SperryAOS

TandemAOS

AOSHUB

(future)

X .25 W AN

Affiliated Users

Unaffiliated Users(emphasizing email usage)

C u rre n t* Info CenterUsers

Page 14: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

OTHER TASK FORCE PRODUCTS

• ANALYZE CAPACITY AND PERFORMANCE OF LAN AND AOS -- JOINT DG

JOINT DG/DCA/UB PRELIMINARY STUDY JUST COMPLETED • DEFINE SINGLE POINT OF CONTACT FOR USERS

SERVICE QUALITY --NORTH • COMPARE RECOMMENDED ARCHITECTURE TO INDUSTRY TRENDS

RECOMMENDED ARCHITECTURE IS COMPATIBLE • OBTAIN INSIGHT INTO STRATEGY FOR COMPANY-WIDE AOS AND

NETWORK -- INTER-BUILDING ECHOPLEXING NOT ECONOMICAL -- NUMBER OF MINICOMPUTERS A MAJOR CONCERN -- X.400 VS. IBM DIA/DCA FOR AOS INTERCOMMUNICATIONS

14

Page 15: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

ECONOMIC ANALYSIS

CAPITAL COSTSExpenditures as of 7/20/85 $Projected completion using:

“Initial Serving Arrangement” $Projected completion using:

“Recommended Serving Arrangement” $

Savings due to implementation of Recommendations $ 2,200,000

15

Page 16: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

ECONOMIC ANALYSISCOST PER USER

One Time Capital $5,900Recurring Annual Expenditures:

LAN 836*ISC 427

$1,263BEP: 1.3 years

* Includes $510 per user for DNTC

16

Page 17: Data Communications Network Task Force Report 1. PRESENTATION OUTLINE I. TASK FORCE PRODUCT COMMITMENT II. ASSESSMENT OF TECHNICAL SUITABILITY OF INITIAL

ARCHITECTURE • USE LAN IN FOR GENERAL DATA COMMUNICATION

CONNECTIVITY • LIMIT DCA DEPLOYMENT TO EMULATION • EMPLOY MORE THAN ONE AOS

-- AFFILIATED: OPERATIONAL SYSTEM -- UNAFFILIATED: PROFS OR CEO -- PROVIDE INTER-SYSTEM COMMUNICATION

• MOVE TOWARD LOCAL INTELLIGENCE -- DEPLOY MICROS FOR PRODUCTION TYPING -- LIMIT CHARACTER ECHOING OVER NETWORK

• LIMIT DEVICE TYPES SUPPORTED BY USERS• LIMIT SOFTWARE DEPLOYED ON DATA GENERAL

17