Our mission is to add value to the projects entrusted to us. We work side by side with the client from briefing up to the testing phase finishing with the end product.

We help the client to define his objectives, with options and alternative scenarios.We do not settle for second best and we like working with demanding clients.

CONTENTS

• Company Background

About us The three brands Strengths

• Insightful Solutions

Approach Sustainability Structure Services Clients

• Activities for Data Center

Proposed Activities for Data Center New Constructions - Site Selections New Constructions - Permits New Constructions - Design & Works Direction Existing Site

• Data Center Experience

Page 3: Data Center EN 2016 LQ
Page 4: Data Center EN 2016 LQ

ABOUT US

Lombardini22 is a leading architecture and engineering company,

a dynamic laboratory, a space open to contamination and the

territory, which generates curiosity and energy around it. It is

an international and multidisciplinary group of professionals,

addressing the real estate market with an approach based on

the full involvement of the client in leadership and control of the

project and the inspired interaction of diverse skills.

Lombardini22 operates with three brands: L22, DEGW and FUD.

Page 5: Data Center EN 2016 LQ

THE THREE BRANDS

L22 is dedicated to architectural design and engineering for major

international clients on major projects in the Retail, Office and Hotel -

Residential markets. A company that has earned a prominent place in the

panorama of Italian designers and today is also active abroad, especially

in the Mediterranean area.

DEGW Italia helps large companies design workspaces. It is a leader in

the strategic consulting on ways of working and the interaction between

physical space and business performance. Thanks to its experience,

DEGW Italia provides a valuable contribution to understanding the

relationship between people, work processes and designing spaces to

improve business results: People, Place, Performance.

FUD Brand Making Factory completes the offer by L22 and DEGW Italia

in the field of Physical Branding and Communication Design from 2014.

FUD was born in 2010 developing communication and brand design

projects in a very distinctive style: thinking horizontally in partnership with

the client, niftily moving vertically towards the right branding solution. FUD

covered everything from the initial business project and concept to the

communication strategy, production phase and final product.

Page 6: Data Center EN 2016 LQ
Page 7: Data Center EN 2016 LQ

People and expertise

• Lombardini22 is a group with more than 140 architects, engineers,

consultants, graphic designers and staff. Professionals specialized in the

corporate, retail and hospitality sectors.

• Reliability of the project management and 360° service (a single consultant

for architecture, interior design, M&E and cost control) are the strengths

of Lombardini22.Multicultural team with strong service orientation and international knowledge

• The secret is the presence of different disciplines, working in synergy on

integrated design to achieve the goal.360° Service - One consultant for

architecture, interior design, M&E, cost contro

• A multicultural, service oriented team with international experience combined with knowledge and mutual respect are the driving force of the company’s development.

140

11785

32

ARCHITECTS

STAFF

P E O P L E

E N G I N E E R S6 GRAPHIC DESIGNERS

PA R T N E R S

+

Page 8: Data Center EN 2016 LQ
Page 9: Data Center EN 2016 LQ

APPROACH

Lombardini22 make complex issues simple. We help clients to

capitalize on a vital dynamic: the relationship between people and

the design of physical place, to enhance performance.

Lombardini22 values an integrated and multidisciplinary approach

to projects thanks to an international team of professionals and a

rich variety of skills and expertise.

Lombardini22 helps to deliver tangible and sustainable business

value, through rigorous and clearly structured evidence and

through an ability to really listen to the aspirations, strategic needs

and practical commercial concerns of our clients.

Page 10: Data Center EN 2016 LQ

sistema "edificio—impianti"

best practice

carbon footprint

brief

ingegneria impiantisticacertificazione

protocolli

Green Building Council ItaliaProgettazioneintegrativa

LEED

SUSTAINABILITY

• Lombardini22 has designed the first building certified LEED Platinum in Italy and is designing more than 500.000 sqm of buildings that will obtain a LEED certification.

• Lombardini22 is a member of the GBC Italia and of US GBC and has 3 LEED AP.

• Lombardini22 develops energy modelling of buildings through Equest, IES-VE, EPLUS software certified by ASHRAE / LEED.

• Lombardini22 is specialized in design of Data Center and its professionals have obtained the ATD qualification (Accredited Tier Disegner) certified by Uptime Institute.

• “We are designers and we develop templates with cognition: it’s our profession”

Page 11: Data Center EN 2016 LQ
Page 12: Data Center EN 2016 LQ

STRUCTURE

Quality

Paolo Facchini - Chairman

Franco Guidi - Managing Director

Adolfo Suarez Marco Amosso Alessandro Adamo Roberto Cereda Paolo Facchini

Administration

ARCHITECTURE

Retail and Hospitality

ARCHITECTURE

Urban & Building Design

WORKPLACE

Consultancy and Design

ENGINEERING

M&E service - Sustainability

HEALTH & SAFETY SERVICES

Permission Requirements

Human Resources

D’Alessio - Ferrara

BRANDING

Communication Design

Page 13: Data Center EN 2016 LQ

SERVICES MARKETS

Architecture

Building DesignInterior Design

Education

Hospitality

Residential

Retail & Leisure

Retail ParkShopping Center

Outlet

Commercial

Business ParkMixed Use

Office Building

Healthcare

Consulting

Graphic Design & CommunicationHealth & Safety

UrbanismEngineering

MEPEnvironmentalSustainability

SERVICES

Page 14: Data Center EN 2016 LQ

CLIENTS

Page 15: Data Center EN 2016 LQ
Page 16: Data Center EN 2016 LQ
Page 17: Data Center EN 2016 LQ

PROPOSED ACTIVITIES FOR DATA CENTER

Lombardini22 works in cooperation with the customer. All

activities that are carried out are based on the acquisition of

requirements and information necessary for the exchange of

experiences and the sharing of knowledge. Goals and strategy

to achieve them are established together with the customer.

Lombardini22 is specialized in Data Center design and its

professionals have obtained the ATD qualification (Accredited Tier

Designer) certified by Uptime Institute.

Lombardini22 provides specific services dedicated to Data Center

for:

· new construction

· existing site

Page 18: Data Center EN 2016 LQ

NEW CONSTRUCTIONS - SITE SELECTION

• Administrative existing condition analisys & preliminary contact with local Authorities

• Site compatibility analisys (risk analisys: seismic, flood, acoustic, geological, environmental, electromagnetic, airport adjacence and/or sensible target, etc.)

• Site accessibility analisys, roads and services Provider (power & communication).

• Preliminary Feasibility Study & Budget Plan

Page 19: Data Center EN 2016 LQ

NEW CONSTRUCTIONS - PERMITS

• Building permits

• Preliminary M&E Design and Italian Law 10/91

• Fire prevention Design and submission to Fire Brigade

• Forecasted acoustic impact analisys

• Italian Tax practise for energy production, diesel storage, etc.

• Sanitary authorization

• Plumbing connection and other services practise

• Environmental pollution practise

• Land & Building cadastral practise

Page 20: Data Center EN 2016 LQ

NEW CONSTRUCTIONS - DESIGN & WORKS DIRECTION

• Feasibility Study & Budget Plan

• Energy model & CFD

• Site topographic survey

• Landscape / structural / civil / architectural / MEP Design, from

preliminary to detail accuracy level

• Health & Safety Coordinator during Design and Construction phases

• Tender Documents

• Works Direction with weekly report

• Cost Control, Quantity Surveyoir & Works Progression control

• Test & Commissioning & IST

• LEED & BREEAM Certifications

NEW CONSTRUCTIONS -

Page 21: Data Center EN 2016 LQ

EXISTING SITES

• Site analisys to evaluate possible critical systems

• Possible existing permit issues solution

• Energy audit

• Refurbishment Designs for energy efficiency improvement and/or expansion

• Health & Safety Coordinator during Design and Construction phases

• Tender Documents

• Works Direction with weekly report

• Cost Control, Quantity Surveyoir & Works Progression control

• Test & Commissioning & IST

Page 22: Data Center EN 2016 LQ
Page 23: Data Center EN 2016 LQ

HP ENTERPRISE SERVICES

Lombardini22 is designing for HP one of the more sophisticated

versions of Data Center, and among the largest in Europe, it is

a fortress of prefabricated reinforced concrete organized into

quadrants of 500 square meters each, for an expansion of up to

2,000 square meters. The flexibility and scalability of activation

of the quadrants, which is essential for the modulation of

investments in timely response to market demand, make this an

innovative Data Center.

Client: HP Enterprise Services

Location: Inverno PV – Italy

Area: 2.000 sqm

End of works: On going

Services: M&E, Civil and Structural Design, Integrated Fire Prevention

Page 24: Data Center EN 2016 LQ
Page 25: Data Center EN 2016 LQ

THE FLEXIBLE DATA CENTER

• Four quadrants 2000 sqm total available space

• Independently fitted out by Quadrant from Cold Shell

• Each quadrant redundancy N+1 Tier 3

Page 26: Data Center EN 2016 LQ

THE FLEXIBLE DATA CENTER KEY FACTS

• Data Hall Size expandable to a total of 2000 sqm

• Two independent MV supplies available

• Tier Level 3

• Mechanical Configuration N+1

• Electrical Configuration N+1

• Server racks would be dual feed @ 100% rating of power supplies

• Room IT load = 1500 W/sqm

• Mechanical & Electrical system provision for each quadrant would be standalone

Page 27: Data Center EN 2016 LQ

20 km

30 km

Cooling units # 1 to 3 Power Generators # 1

PCM – UPS module # 1

Quadrant 1

Core building + tech rooms

PCM – UPS module # 2

Power Generators # 2

SINGLE QUADRANT SYSTEMS N+1 REDUNDANCY

Page 28: Data Center EN 2016 LQ

THE FLEXIBLE DATA CENTER – SINGLE QUADRANT SYSTEMS AND FUNCTIONS LAYOUT

Page 29: Data Center EN 2016 LQ

HP INVERNO REFURBISHMENT

Energy improvement and plant engineering for the data center

Winter overall. Coordination for the replacement of the unit

Hydronic and development of transformation from Tier 2 to Tier 3

Site.

Client: HP Enterprise Services

Location: Inverno PV – Italy

IT room area: 1.400 smq

Power: 3MW

Services: Reconstruction air conditioning plant and fire suppression plant, Interventions to improve energy efficiency, M&E, Works Management

Page 30: Data Center EN 2016 LQ
Page 31: Data Center EN 2016 LQ
Page 32: Data Center EN 2016 LQ

HP CERNOVA NEW DATA CENTER

Client: HP Enterprise Services

Location: Milan – Italy

Area: 1.000 sqm

End of works: 2012

Services: M&E, Engineering Design

Page 33: Data Center EN 2016 LQ
Page 34: Data Center EN 2016 LQ
Page 35: Data Center EN 2016 LQ
Page 36: Data Center EN 2016 LQ

ALCATEL–LUCENT LAB

L22 designed the complete M&E Services for the new Alcatel

Lucent Headquarter. Specific attention to the 4500 sqm of Labs

and Research Areas with a Power Load requirement of 1.5 kW /

sqm.

Client: Alcatel–Lucent

Location: Vimercate MB – Italy

Area: 33.000 sqm

End of Works: On going

Services: Mechanical and Electrical Design, Brief, Space Planning, Interior Design, Workplace Change Management, Artistic Director

Page 37: Data Center EN 2016 LQ
Page 38: Data Center EN 2016 LQ
Page 39: Data Center EN 2016 LQ
Page 40: Data Center EN 2016 LQ

BCC SOLUTION

Identify, analyze, optimize. These are the steps that have made

energy efficiency upgrading for the BCC Solution head office a

successful case study. The objective of Lombardini22 and BCC is

to analyze the energy consumption of the data center and office

spaces. Based on the data collected, Lombardini22 develops the

best plant design for reducing consumption and costs, enabling

significant savings in resources.

Client: BCC Solution Spa

Location: Rome – Italy

Area: 5.000 sqm

Estimated costs: 120.000 €

Estimated savings: 140.000 € per year

Services: Energy analysis and mechanical and electrical design

Page 41: Data Center EN 2016 LQ
Page 42: Data Center EN 2016 LQ

VERIZON

Italian IDC. 10 MW power load.

Initial installation 2001 per phases up to 2011.

Client: Verizon

Location: Pero, MI – Italy

Area: 10.000 smq

End of Works: 2011

Classification: TIER 3

Services: Civil, M&E, Work Supervision

Page 43: Data Center EN 2016 LQ
Page 44: Data Center EN 2016 LQ
Page 45: Data Center EN 2016 LQ

COST MODEL

• Costs based on tenders received May 2012

• Initial construction 500sqm Nett Technical + 500sqm Cold shell only + Administration core

• Final Construction 2000sqm Nett technical + Administration Core

COAST INITIAL CONSTRUCTION FINAL CONSTRUCTION Cost/sqm Nett Tech Cost/MW Cost/sqm Nett Tech Cost/MW

Civil and Strctural 1.500€/sqm

MEP 2.800€/sqm

Plant & Equipment (Procured directly by client) 3.200€/sqm

Site Upgrades - Power 800.000€

Page 46: Data Center EN 2016 LQ

NESTLÉ

Design of the new Nestle headquarters CED under construction in

Milano Fiori, Milan.

Client: Nestlè

Location: Milan – Italy

IT room area: 140 smq

Power: 2x250kVA

L22 Service: CED Design, IT System, Coordination

DEGW Service: Execution planning, General Construction Supervision

Page 47: Data Center EN 2016 LQ
Page 48: Data Center EN 2016 LQ
Page 49: Data Center EN 2016 LQ

STATE STREET BANK

Plant design construction of the new headquarters in Milan and

general coordination site offices, MER and SER.

Client: State Street Bank

Location: Milan – Italy

IT Room area: 100 smq

Power: 2x120kVA

L22 Service: New Construction

DEGW Service: Construction Design, Works Management

Page 50: Data Center EN 2016 LQ
Page 51: Data Center EN 2016 LQ
Page 52: Data Center EN 2016 LQ

NOKIA SIEMENS NETWORKS

L22 develops the M&E design as part of the NSN HQ

Refurbishment, including laboratories CED. DEGW Italia is

developing the consolidation project and moving of the different

locations to the Head quarters of Cassina Plaza of approximately

1,000 people. DEGW Italia has adapted the international

guidelines to the Italian reality. The NSN Modern Office provides

a concept of sharing, more common in the world than in Italy and

should be coordinated. Therefore three ways of working has been

introduced and explained, defined by the mobility of the persons:

Mobile, Campus Mobile, Desk-Based. DEGW Italia is dealing

with the whole Change Management project, which in addition

to classic interviews with persons responsible for functions and

customer departments, provides the preparation of a series of

communication tools to spread the new concept of using space

to the entire staff.

Page 53: Data Center EN 2016 LQ

Client: Nokia Siemens Network

Location: Cassina De’Pecchi MI – Italy

Area: 14.000 sqm

L22 Services: M&E Design

DEGW Services: Brief Space Planning, Interior Design, Workplace Change Management, Construction Management

Page 54: Data Center EN 2016 LQ

LIVELLO COPERTURA

PIANO/FLOOR 3

PIANO/FLOOR 2

PIANO/FLOOR 1

PIANO/FLOOR 0

CD_3CD_2CD_1

LIVELLO COPERTURA

PIANO/FLOOR 3

PIANO/FLOOR 2

PIANO/FLOOR 1

PIANO/FLOOR 0

CD_3CD_2CD_1

LIVELLO COPERTURA

PIANO/FLOOR 3

PIANO/FLOOR 2

PIANO/FLOOR 1

PIANO/FLOOR 0

CD_3CD_2CD_1

LIVELLO COPERTURA

PIANO/FLOOR 3

PIANO/FLOOR 2

PIANO/FLOOR 1

PIANO/FLOOR 0

CD_3CD_2CD_1

Armadio - 42 HE

TIPICO ARMADIO IT ROOM

Dorsale OtticaDa LAN Room

Armadio - 42 HE

Apparati attivi 48 porte (Esclusi dalla fornitura)

Passacavi

Passacavi

PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Passacavi

Passacavi

Passacavi

Passacavi

Passacavi

Passacavi

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPermutatore rame dorsale fonia (25 coppie)

Dorsale Fonia a PABXad armadi di semipiano

PARTE PASSIVA

Bretelle Ottiche SC-SC

Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

TIPICO ARMADIO IT ROOMPARTE ATTIVA

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Apparati attivi 48 porte (Esclusi dalla fornitura)

8 coppie 25 coppie telefonico

ALLESTIMENTO VALIDO PER LOCALI IT: PIANO SECONDO CD01, CD02, CD03 E PIANO TERZO CD02

Armadio - 42 HE

TIPICO ARMADIO IT ROOM

Dorsale OtticaDa LAN Room

Armadio - 42 HE

Passacavi

PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Passacavi

Passacavi

Passacavi

Passacavi

Passacavi

Passacavi

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPermutatore rame dorsale fonia (25 coppie)

Dorsale Fonia a PABXad armadi di semipiano

PARTE PASSIVA

Bretelle Ottiche SC-SC

Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

TIPICO ARMADIO IT ROOMPARTE ATTIVA

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Apparati attivi 48 porte (Esclusi dalla fornitura)

4 coppie 25 coppie telefonico

ALLESTIMENTO VALIDO PER LOCALI IT: PIANO PRIMO CD01, CD02 E TERZO CD03

AlimentazioneElettrica daQ.E. UPS

AlimentazioneElettrica daQ.E. UPS

Armadio - 42 HE

TIPICO ARMADIO IT ROOM

Dorsale OtticaDa LAN Room

Armadio - 42 HE

PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi

Passacavi

Passacavi

Passacavi

Passacavi

Passacavi

Passacavi

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPermutatore rame dorsale fonia (25 coppie)

Dorsale Fonia a PABXad armadi di semipiano

PARTE PASSIVA

Bretelle Ottiche SC-SC

Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

TIPICO ARMADIO IT ROOMPARTE ATTIVA

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Apparati attivi 48 porte (Esclusi dalla fornitura)

4 coppie 25 coppie telefonico

ALLESTIMENTO VALIDO PER LOCALI IT: PIANO PRIMO CD03 E TERZO CD01

AlimentazioneElettrica daQ.E. UPS

Passacavi

Armadio - 42 HE

TIPICO ARMADIO IT ROOM

Dorsale OtticaDa LAN Room

Armadio - 42 HE

PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi

Passacavi

Passacavi

Passacavi

Passacavi

PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano

PassacaviPermutatore rame dorsale fonia (25 coppie)

Dorsale Fonia a PABXad armadi di semipiano

PARTE PASSIVA

Bretelle Ottiche SC-SC

Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

Patch panel 24 prese RJ45 cat.6 utenze dati di piano

TIPICO ARMADIO IT ROOMPARTE ATTIVA

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Passacavi

Apparati attivi 48 porte (Esclusi dalla fornitura)

Apparati attivi 48 porte (Esclusi dalla fornitura)

2 coppie 25 coppie telefonico

ALLESTIMENTO VALIDO PER LOCALI IT: PIANO TERRA CD01

AlimentazioneElettrica daQ.E. UPS

Passacavi

(*) I CAVI E LE INFRASTRUTTURE PER LA RETE FONIASONO DA CONSIDERARSI OPZIONALI.NSN SI RISERVA DI VALUTARE L'ESATTO NUMERO DIUTENZE TELEFONICHE DA PREDISPORRE NELL'INTEROEDIFICIO E PERTANTO DI ADEGUARE DI CONSEGUENZAIL PRESENTE SCHEMA.

(**) LE PATCH CORD (IN RAME ED OTTICHE)LATO PERMUTATORE E LATO UTENZA SONO A CARICODELL'APPALTATORE.

(***) SONO DA CONSIDERARSI INCLUSE TUTTE LESTRUTTURE DI ATTESTAZIONE DELLE LINEE IN RAME EDOTTICHE, IN PARTICOLARE CASSETTI OTTICI, PANNELLIDI PERMUTAZIONE DATI/FONIA. E' PREVISTA LACERTIFICAZIONE DELLE LINEE IN RAME EDELLE CONNESSIONI OTTICHE REALIZZATE.

(****) GLI ACCESS POINT SARANNO DEL TIPO POWEROVER ETHERNET E SARANNO DOTATI DI ALIMENTATORESINGOLO COLLEGATO ALLA STRISCIA DI ALIMENTAZIONEDI RACK.

(*****) I PUNTI RETE DEDICATI AI SISTEMI DI SICUREZZA DOVRANNO ESSERE COLLEGATI DIRETTAMENTEALL'ARMADIO SERVER ROOM IN POSIZIONECHIARAMENTE IDENTIFICABILE

RevisioneDataN°

TAVOLA/DRAW:

NOME FILE/FILE NAME:

TITOLO/DESCRIPTION:

COMMITTENTE/CLIENT:

PROGETTO/PROJECT:

PROGETTISTA/DESIGNER:

OGGETTO/OBJECT:

SCALA/SCALE:

DISEGNATO DA:

DATA/DATE:

DRAWING BY:CONTR. DACHECKED BY:

REV.DATA REV.

COMMESSA/JOB:

LOMBARDINI22 S.r.l. (L.663/41 Art.2575)

Nokia Siemens Network S.p.A.Via Roma 108 Cassina de' Pecchi (Mi)

Cassina Plaza - Building CDVia Roma 108 Cassina de' Pecchi (Mi)

Roberto CeredaIscrizione Ordine Ingg Bs 2609

Progetto esecutivo

Riqualificazione Architettonicaed Impiantistica Building CDImpianti di SicurezzaFunzionale Impianto Rete LAN/Fonia

MC+CDV RC

20/04/2011 -

0402_EECDF01a

0402

EE CD F0118/05/2011 a

1 18/05/2011 Revisione per appalto

2

3

4

5

Page 55: Data Center EN 2016 LQ

TELECITY GROUP SPA

L22 develops the design of the new ID3 IT room, in addition to

the two existing ones. L22 oversaw the design of all phase of

the process, from the practices to the civil, architectural and

engineering design, including fire prevention and acoustics

consultancy. The new room is about 250 square meters, the air

conditioning system is constituted by direct free-cooling. The

power draw of the site is approximately 2.5 MVA, the site is

classified TIER II.

Client: Telecity Group Spa

Location: Milan – Italy

IT Room Area: 250 sqm

Power: 2.5 MVA

Classification: TIER 2

Service: Civil, Architectural and Engineering Design, Fire Prevention, Acoustic Consultancy