data center consolidation plan
TRANSCRIPT
-
8/9/2019 Data Center Consolidation Plan
1/39
Data Center Consolidation
Initiative
Agency Consolidation Plan Template
-
8/9/2019 Data Center Consolidation Plan
2/39
Data Center Consolidation Initiative
Contents
1 Introduction................................................................................................3
2 Program Goals and Obectives...................................................................!
2.1 Program Goals....................................................................................!
2.2 Data Center Consolidation "##roac$..................................................%
2.3 Four &ey Im#act "reas........................................................................'
2.! (trategic Obectives and )actical O##ortunities.................................'
2.% Government*+ide Data Center Consolidation )ime )able...................
3 "gency Consolidation Plan )em#late.......................................................10
3.1 Primary Focus "reas, Consolidation "##roac$es and Constraints... .103.2 "gency Consolidation Plan - tili/ation Im#rovement etrics.........12
3.3 "gency Consolidation Plan - Proected (avings etrics...................1!
! Data Center Consolidation P$ases...........................................................1'
!.1 P$ase 1 - I) "sset Inventory aseline uic4 5ins........................1'
!.1.1 Preliminary I) "sset Inventory "ssessment uic4 5ins.............1
!.1.2 I) (o6t+are "ssets and tili/ation )em#late Obectives.............20
! 1 3 I) 7 d " t d tili ti ) l t Ob ti 23
-
8/9/2019 Data Center Consolidation Plan
3/39
Data Center Consolidation Initiative
)$e Federal Data Center Consolidation initiative is targeted to reduce t$eoverall cost o6 data center o#erations and energy consum#tion by Federal
"gencies. Currently, t$ere are over 1,100 data centers in use across t$e
6ederal government +it$ little reuse or s$aring o6 resources +it$in or across
"gencies. In addition, data centers consume a gro+ing #ortion o6 t$e
>ation@s energyAelectricity su##ly due to gro+ing demand 6or t$e services
t$ey #rovide. Data centers used about '1 billion 45$ o6 electricity in 200',
re#resenting 1.%B o6 all .(. electricity consum#tion and double t$e amount
consumed in 2000. It is #roected t$at data center usage +ill e=ceed 100
billion 45$ by 2011, or 2.%B o6 total .(. electricity consum#tion. )$is very
e=tensive and continuously gro+ing consum#tion o6 energy by data centers
in t$e ( em#$asi/es t$e very real need to ac$ieve signicant im#rovements
in eciency o6 Federal data center o#erations.
)$is initiative is based on t$e O ndings 6rom udget Data :eEuest D:
>o. 0
-
8/9/2019 Data Center Consolidation Plan
4/39
Data Center Consolidation Initiative
)ier IH com#osed o6 a single #at$ 6or #o+er and cooling distribution,+it$out redundant com#onents, #roviding
-
8/9/2019 Data Center Consolidation Plan
5/39
Data Center Consolidation Initiative
Po+er sage A (Euare Foot
Po+er sage 8ciency P8
aintain cross*agency goals 6or $ig$ly available, scalable, and
redundant data center in6rastructure t$at +ill substantially reduce t$e
Government@s ris4 and #rovide 6or 6uture I) gro+t$.
2.2 Data Center Consolidation Approac
)$e Data Center Consolidation initiative is bro4en do+n into ' 4ey #$ases and
is designed to rst assess and inventory t$e current agency environment and
t$en establis$ a #lan 6or ac$ieving signicant reductions in data center build
t$roug$ t$e use o6 server virtuali/ation and Cloud Com#uting tec$nologies.
"dditionally, t$is initiative aims to reduce overall energy consum#tion by data
centers across t$e Federal Government, +$ile reducing t$e #$ysical real
estate and ot$er 4ey costs drivers associated +it$ data centers. )$e Data
Center Consolidation Initiative consists o6 t$e 6ollo+ing #$asesH
P$ase 1 - I) "sset Inventory aseline incl. Preliminary "ssessment
uic4 5ins
P$ase 2 - "##lication a##ing
P$ase 3 - "nalysis (trategic Decisions
P$ase ! - Consolidation Design )ransition Plan
P$ase % - Consolidation O#timi/ation 8=ecution
P$ase ' - Ongoing O#timi/ation (u##ort
-
8/9/2019 Data Center Consolidation Plan
6/39
Data Center Consolidation Initiative
)$e si= #$ases and related data collection tem#lates are discussed in detail
in Section 4 Data Center Consolidation Phases.
2.! "our #ey Impact Areas
)$ere are 6our distinct areas aecting data center o#timi/ation t$at need to
be considered in #arallel ty#ically by dierent teams * uilding Facilities, I)
Facilities, I) O#erations, I) Develo#mentH
Geograpic $ocation and %eal &state "ssess disasterAcost ris4
-
8/9/2019 Data Center Consolidation Plan
7/39
Data Center Consolidation Initiative
2. ,trategic Objectives and Tactical Opportunities
)$e #rimary goal o6 t$e Data Center Consolidation Initiative is to im#rove t$e
Federal Government@s data center eciencies and ca#abilities +$ile reducing
costs. )$e related strategic obectives are summari/ed belo+H
-
8/9/2019 Data Center Consolidation Plan
8/39
-
8/9/2019 Data Center Consolidation Plan
9/39
Data Center Consolidation Initiative
y !A30A2010 - "gencies s$all #artner +it$ O to develo# "gency*
+ide Data Center Consolidation PlansL y 'A30A2010 - O +ill #rovide a##roved data center consolidation
#lans to all "gencies, +$ic$ t$ey need to integrate in t$eir F?2012
budget submissions.
)$e timeline belo+ #rovides t$e $ig$*level guideline t$at "gencies must
6ollo+ 6or develo#ing "gency*s#ecic Data Center Consolidation Plans. It
includes 4ey Data Center Consolidation activities to be #er6ormed by t$e
"gencies and t$e su##ort #rovided by O and t$e PO team during eac$ o6
t$e critical #$ases.
Agency4driven Activities
Identi6y and em#o+er res#onsible #artiesAocesAsta #ositions to lead
t$e #roect teams, secure resources, re#ort #rogress
8stablis$ Data Center aseline by Conducting 7ard+are and (o6t+are
Inventory Develo# "gency Data Center Consolidation Plan and (c$edule
a#, "naly/e (ystems and a4e (trategic 9ong*term Investment
Decisions
Design, Im#lement and )est "gency*s#ecic Consolidation (olutions
8=ecute t$e "gency Data Center Consolidation Plan
O04driven Activities Identi6y (trategic Goals Dene Government*+ide etrics and )arget
Obectives
Collect "gency Data Derive Criteria and "nalytics 6or tili/ation
-
8/9/2019 Data Center Consolidation Plan
10/39
Data Center Consolidation Initiative
FO: OFFICI"9 (8 O>9? Page 10
-
8/9/2019 Data Center Consolidation Plan
11/39
Data Center Consolidation Initiative
! Agency Consolidation Plan Template
!.1 Primary "ocus Areas5 Consolidation Approaces and
Constraints
&ey "actors5 etrics and Objectives+ill be dened 6or eac$ o6 t$e 6our
6ocus areas described in section 2.3 and corres#onding Consolidation Plan
)em#lates +ill be s#ecied t$at +ould be com#leted ty#ically by dierentteams +it$in an agency i.e. uilding Facilities 6or location A6acility details,
including in6ormation on +$et$er t$e asset is leased or o+nedL I) Facilities 6or
Moor s#ace, rac4 utili/ation, #o+er, cooling, cable #lantL I) O#erations 6or
server, storage, net+or4 utili/ationL and I) Develo#ment 6or
"##lication #ort6olio ma##ing and #rioriti/ation.
)$e 4ey 6or t$ese detailed metrics is t$eir relevance 6or Data CenterConsolidation and 8nergy Cost :eduction, e.g.H
:ental cost #er sE. 6t. based on t$e Gross Floor "rea only +ould be amore in6ormative 9ocation A :eal 8state metric t$an )otal O#erationsCostL
Floor (#ace and :ac4 (#ace utili/ation ta4ing into account #o+er andcooling constraints in addition to CP utili/ation +ould #rovide better
visibility into actual data center utili/ationL " #rioriti/ed (5 #ort6olio, su##orted by a data center, +ould #rovide
insig$ts into availability, security, #er6ormance reEuirements and#otential 6or virtuali/ation and server consolidation.
-
8/9/2019 Data Center Consolidation Plan
12/39
-
8/9/2019 Data Center Consolidation Plan
13/39
Data Center Consolidation Initiative
O#timi/e energyAcooling utili/ation via eEui#ment location ro+Arac4cooling, im#lementing various Density Nones * $ig$, medium, lo+ at
dierent tiers +it$in e=isting data centers, etc.L
Conduct virtuali/ation and server consolidation analysis, design,#rioriti/ation and migrationL
Im#lement and manage on an on*going basis a##lication tiercategori/ation and alignment i.e. run $ig$*availability a##s only in a$ig$ tier data center or /oneA#od and t$e remaining a##s in a lo+ tierdata centerA/oneA#od.
Consider migration to Cloud Com#uting solutions, +$en a##ro#riatesecurity and o#erational reEuirements are met. (uc$ migration tostandard vendor su##orted enter#rise #lat6orms or services in t$ecloud i.e. In6rastructure, Plat6orm or (o6t+are as a (ervice can reduceo#erational ris4 +$ile lo+ering bot$ t$e )otal Cost o6 O+ners$i# )COand )otal Cost o6 (ervice Delivery )C(D.
-
8/9/2019 Data Center Consolidation Plan
14/39
Data Center Consolidation Initiative
6rom Jirtuali/ation and (erver A :ac4 (#ace tili/ation to Po+er sage
8ciency.
)$e )y#ical and )arget :esults listed in t$e table belo+ re#resent broad
industry ndings and s$all serve as overall utili/ation benc$mar4 guidance to
t$e "gencies. )$e actual "gency tili/ation etrics +ill be lled*out by t$e
"gencies via t$eir "sset Inventory aseline analysis, as described in detail in
section !.1.
Improving IT e8uipment utili+ation is te 9ey driver -or reducingenergy consumption per unit o- per-ormance. Tis can be acieved
primarily by6
(erver Jirtuali/ation increasing t$e number o6 virtual servers #er
$osts
(erver Consolidation decommissioning underutili/ed #$ysical servers
:ac4 (#ace Consolidation reallocating underutili/ed rac4s
Data Center Facilities Consolidation s$utting do+n underutili/ed
6acilities
)$e table belo+ oers standardi/ed average utili/ation metrics to su##ort
Data Center Consolidation decision ma4ing. (uc$ metrics +ill $el# also
identi6y e=isting 6acilities constraints s#ace, #o+er, cooling and augment
t$e aggregate usage metrics introduced in Section 4.1. IT Asset Inventory
Baseline. In #articular t$e "verage Po+er sage 8Euivalent metric is basedon t$e standard industry assum#tion o6 2% sE. 6t. #er rac4, and constitutes a
normali/ed metric 6or eEuivalent Po+er sage #er (Euare Foot. It is used also
in t$e I) Facilities )em#late and it is dened in "##endi= "
-
8/9/2019 Data Center Consolidation Plan
15/39
Data Center Consolidation Initiative
#roections t$erea6ter. In recognition o6 +or4*in*#rogress virtuali/ation and
consolidation #roects t$at are already under+ay in F?10, agencies may use
F?10 baseline data collected at t$e beginning o6 suc$ initiatives.
)$e #rocess and data tem#lates 6or collecting t$e asset inventory baseline
are described in section Section 4.1. IT Asset Inventory Baseline. )$e
rst ste# in t$is #rocess is t$e collection o6 a Preliminary Inventory
Assessment, +$ic$ agencies must submit by "#ril 30, 2010, in line +it$ t$e
O Passbac4 Considerations 6or F?2011. )$e nalAsset Inventory
Baselinemust be submitted by agencies by
-
8/9/2019 Data Center Consolidation Plan
16/39
Data Center Consolidation Initiative
)$e "gency*level Proected (avings etrics are a collection o6 best industry
#ractices in ca#turing various dimensions o6 Data Center Cost (avings - 6rom
Data Center Count and Gross Floor "rea :eduction to :ac4 and (erver Count
:eduction and nally to 8nergy sage and Cost :eduction.
)$e Planned Program Cost savings by !2012 s$all be lled out by agencies
based on t$eir "sset Inventory aseline analysis, as described in detail in
section !.1.
-
8/9/2019 Data Center Consolidation Plan
17/39
Data Center Consolidation Initiative
>umber o6 (ervers, "ggregate Data Center 8nergy se and "ggregate Data
Center 8nergy Costs. "gencies need to #rovide also incremental annual
target #roections 6or t$e same metrics +it$ a nal target date o6 !12.
Data Center Consolidation Pases
" i t d d i S ti 2 2 D t C t C lid ti A h t$
-
8/9/2019 Data Center Consolidation Plan
18/39
Data Center Consolidation Initiative
5it$in t$e rst #$ase o6 t$e data consolidation initiative agencies +ill #er6orm
metrics gat$ering across 6our #rimary areas in order to derive a baseline
state o6 t$eir current data center environment. )$is baseline set o6
measurements +ill 6ocus on t$e 6ollo+ing 6our 4ey im#act areas, illustrated in
t$e table belo+H
I) (o6t+are "ssets and tili/ation
I) 7ard+are "ssets and tili/ation
I) Facilities and 8nergy se
Geogra#$ic 9ocation and :eal 8state
-
8/9/2019 Data Center Consolidation Plan
19/39
Data Center Consolidation Initiative
)$e diagram belo+ illustrates t$e 6our areas o6 6ocus and t$e associated data
center metric com#onentsH
"6ter t$e initial baseline data collection 6or all 6our tem#lates is com#leted,
agencies +ill conduct ongoing #eriodic annual data u#dates 6or all 6our
tem#lates and +ill use t$em as t$e 6oundation 6or com#leting t$e agency*
-
8/9/2019 Data Center Consolidation Plan
20/39
Data Center Consolidation Initiative
-
8/9/2019 Data Center Consolidation Plan
21/39
Data Center Consolidation Initiative
.1.2 IT ,o-t*are Assets and (tili+ation Template ' Objectives
)$e #ur#ose o6 t$e (o6t+are "ssets )em#late is to document all aor
(ystems as dened in O Circular "*11, Part ;, 8=$ibit 300 $osted in a
data center, t$eir 4ey elements e.g. #lat6orm, server, etc. and to evaluate
t$e 6easibility o6 t$eir consolidation via one o6 t$e 6our a##roac$es discussed
in section 3.1 Decommission, Consolidation, Jirtuali/ation or Cloud
Com#uting.
For consistency +it$ ongoing O re#orting activities by t$e "gencies, t$e
-
8/9/2019 Data Center Consolidation Plan
22/39
Data Center Consolidation Initiative
FO: OFFICI"9 (8 O>9? Page 22
-
8/9/2019 Data Center Consolidation Plan
23/39
Data Center Consolidation Initiative
)$e s#ecic ): (ervice "rea used in t$is ma##ing is KService Plat(orm
and In(rastr)ct)re+, +$ic$ includes t$e 6ollo+ing ): (ervice CategoriesH
(u##ort Plat6orms e.g. 9inu=A288, 5indo+s (erver 200 A .>et etc.
(o6t+are 8ngineering e.g. Integrated Develo#ment 8nvironment - ID8,
etc.
Database A (torage e.g. :elational Data ase anagement (ystem -
:D(, etc.
Delivery (ervers e.g. "##lication (ervers, 5eb (ervers, etc.
7ard+are A In6rastructure e.g. 8nter#rise (ervers, ain6rames
"s described in t$e F8" Consolidated :e6erence odel, (ervice (tandards
dene t$e standards and tec$nologies t$at su##ort a (ervice Category and
many o6 t$e (ervice (tandards #rovide illustrative s#ecications or
tec$nologies as e=am#les. )$e actual (ervice (tandards #ertaining to t$e
K(ervice Plat6orm and In6rastructure@ (ervice "rea +it$ t$eir corres#onding
identiers Q'! - ;; and descri#tions can be 6ound in t$e F&A
Consolidated 'e(erence #odel mentioned earlier a re6erence +or4s$eet
is included also in t$e data collection 8=cel tem#late.
sing t$is F8"*based a##roac$, t$e (o6t+are "sset )em#late ca#tures all
critical tec$nical c$aracteristics 6or aor (ystems, starting 6rom (ervers and
O#erating (ystemsAPlat6orms t$roug$ so6t+are engineering and
databaseAstorage to delivery servers. )$e Pro#osed Consolidation "##roac$last column +ould become t$e leading driver 6or decommissioning,
consolidating, virtuali/ing or migrating to cloud com#uting o6 maor systems
li i $ b 6 ili i $ d i i $ d
-
8/9/2019 Data Center Consolidation Plan
24/39
Data Center Consolidation Initiative
Conduct (o6t+are "sset Inventory
Im#lement Denitive (o6t+are 9ibrary D(9
Im#lement (o6t+are 9icense anagement Com#liance
,o-t*are Development $i-ecycle ;,D$C? ' IT ,ervice anagement
;ITI$5 CI4Dev? Objectives6
O#timi/e t$e (o6t+are Develo#ment 9i6ecycle (D9C Processes
8stablis$A(trengt$en t$e :elease C$ange anagement 6unctions
associated +it$ (D9C O#timi/e t$e :elease anagement Processes +$ic$ s$ould be closely
integrated +it$ C$ange anagement
O#timi/e t$e Incident and Problem anagement Processes
.1.! IT )ard*are Assets and (tili+ation Template ' Objectives
)$e #ur#ose o6 t$e I) 7ard+are "ssets and tili/ation )em#late is to
document all #$ysical servers and main6rames $osted in a data center, t$eir
count, CP and #o+er ca#acity and utili/ation, t$e availableAused storage and
nally t$e degree to +$ic$ server utili/ation $as been im#lemented +it$in a
data center. )$e degree o6 virtuali/ation is measured by t+o metricsH
Jirtuali/ation B R Jirtual 7ost Count A )otal server Count BL and
"verage >umber o6 J O( #er Jirtual 7ost Q.
)$ese serverAmain6rame utili/ation metrics are included in t$e agency*level
-
8/9/2019 Data Center Consolidation Plan
25/39
Data Center Consolidation Initiative
>IS (ervers
Ot$er (ervers
)$e only dierentiator bet+een t$e main6rame categories and t$e server
categories is t$e +ay eac$ o6 t$e t+o grou#s account 6or "verage CP
Ca#acity, i.e. in IP( 6or all main6rames and in 7/ 6or all servers.
-
8/9/2019 Data Center Consolidation Plan
26/39
Data Center Consolidation Initiative
FO: OFFICI"9 (8 O>9? Page 2'
-
8/9/2019 Data Center Consolidation Plan
27/39
Data Center Consolidation Initiative
Program Objectives -or IT )ard*are Assets and (tili+ation6
IT )ard*are Asset ' Con:guration anagement Objectives6
8stablis$A(trengt$en t$e 7ard+are "sset anagement Function
Conduct #eriodic "sset Inventory - an initial baseline and subseEuent
annual Inventory :e#orts
Im#lement Conguration anagement Data ase CD
Im#lement "sset Conguration anagement Processes
IT ,ervice anagement ;ITI$5 CI4,vc? Objectives6
8stablis$A(trengt$en t$e C$ange anagement 6unction and t$e
C$ange Control :evie+ oard CC:
O#timi/e t$e C$ange anagement #rocesses
O#timi/e t$e Incident and Problem anagement #rocesses
.1. IT "acilities5 &nergy5 ,torage and Telecom Template 'Objectives
)$e #ur#ose o6 t$e I) Facilities, 8nergy and )elecom )em#late is to document
electricity usage and cost, #o+er ca#acity, rac4 count utili/ation, total
storage ca#acity and utili/ation and telecom connectivity as designed,
im#lemented and used +it$in a data center. )$e tem#late is designed to
enable consistent I) Facilities data collection across data centers and across"gencies. It also aims to leverage only a 6e+ 4ey 6oundational data elements
e.g. )otal Data Center I) Po+er Ca#acity and Po+er sage, :ac4 Count and
:ac4 tili/ation in order to derive automatically more in6ormative data
-
8/9/2019 Data Center Consolidation Plan
28/39
Data Center Consolidation Initiative
:egarding I) Po+er metering, t$e 8P" recommendations 6rom t$e >ovember
12, 200< 5eb Con6erence are as 6ollo+sH
easurements o6 I) Po+er s$ould be made at t$e out#ut o6 t$e P(
meterL
I6 a data center does not $ave a P( meter, t$en I) Po+er s$ould be
measured at t$e PD meter or at a location closer to t$e rac4sL
I6 a data center $as more t$an 10B non*I) load on a P( meter it
s$ould measure I) Po+er at t$e PD meter or a location closer to t$e
rac4s, or it can sub*meter t$e non*I) loadL
I6 a data center #re6ers to measure I) Po+er at t$e PD meter, 8P"
allo+s trac4ing o6 I) Po+er at bot$ t$e P( and PD meters, but
re#orting #re6erence is given to t$e P( data.
"s I) Po+er metering tec$nology evolves and reac$es +ider ado#tion over
time, measurements at t$e rac4 or even at t$e server level +ill become more
6easible and routine, oering t$e best visibility into I) #o+er usage #atterns
and savings o##ortunities.
-
8/9/2019 Data Center Consolidation Plan
29/39
Data Center Consolidation Initiative
Program Objectives -or IT "acilities5 &nergy5 ,torage and Telecom6
Cooling Optimi+ation Objectives6
8ective use o6 air andAor liEuid economi/ers use outdoor air, +ater
+$ere #ossible
O#timal data center airMo+ conguration rac4 conguration A server
density
se o6 $ig$*eciency Com#uter :oom "ir Conditioning C:"C units,
variable s#eed c$illers, air*$andler 6ans, c$illed +ater #um#s
Po*er (sage Optimi+ation Objectives6
De#loy $ig$*eciency #o+er distribution and P( units
Im#lement digital control o6 #o+er su##lies including DC *DC
conversion
8nable #o+er management on all I) $ard+are eEui#ment
.1.3 Geograpic $ocation and %eal &state Template ' Objectives
)$e #ur#ose o6 t$e Geogra#$ic 9ocation and :eal 8state )em#late is to
c$aracteri/e t$e geogra#$ic location according to #o#ulation density citytier, geogra#$y climate and seismic /ones and energy sources eG:ID sub*
region, as +ell as t$e ty#e o6 real estate - by data center tier, o+ners$i#
model gross Moor area and cost
-
8/9/2019 Data Center Consolidation Plan
30/39
Data Center Consolidation Initiative
Program Objectives -or Geograpic $ocation and %eal &state6Geograpic $ocation Optimi+ation Objectives6
:educed ris4 o6 disasters natural or man*made
-
8/9/2019 Data Center Consolidation Plan
31/39
-
8/9/2019 Data Center Consolidation Plan
32/39
Data Center Consolidation Initiative
consolidation andAor t$roug$ t$e use o6 cloud com#uting services to ac$ieve
t$e tili/ation and Cost (avings targets outlined in sections 3.2 and 3.3.
During t$e analysis and strategic decision ma4ing "gencies s$ould alsoassess t$e security #role o6 systems and a##lications to ensure t$at securityreEuirements can be maintained +it$ alternative virtuali/ation andAor CloudCom#uting solutions. )$is analysis s$ould include t$e a##lication o6 NIST
-
8/9/2019 Data Center Consolidation Plan
33/39
-
8/9/2019 Data Center Consolidation Plan
34/39
Data Center Consolidation Initiative
Geograpic $ocation and %eal &state Decisions
Geograpic $ocation ' %eal &state Optimi+ation6
(elect consolidation locations based on reduced ris4, moderate
climate, energy cooling source #ro=imity, abundant net+or4 access
(elect real estate o#tions based on lo+ #o#ulation density resulting in
lo+er real estate acEuisition or leasing costs and in reduced
o#erational costs
Determine t$e o#timal use o6 gross sEuare 6ootage area to leverage
economies o6 scale and consider t$e available e=#ansion #otential 6or
accommodating long*term gro+t$ in demand data center li6es#an
could be +ell over 20*30 years
. Pase 7 Consolidation Design ' Transition Plan
)$e Consolidation Design +ill 6ocus on develo#ing tec$nical standards andarc$itectures as +ell as identi6ying o##ortunities 6or leveraging s$ared Cloud
Com#uting solutions +it$in "gencies and across "gencies. )$e Cloud
Com#uting solutions s$ould 6ocus on systems +it$ FI(" A >I() 00*%3 lo+
and moderate security reEuirements. (ystems +it$ lo+ and moderate
security reEuirements s$ould be strongly considered 6or Cloud Com#uting
eit$er via (o6t+are as a (ervice (aa(, Plat6orm as a (ervice Paa( or
In6rastructure as a (ervice Iaa( solutions.
)$e "gency )ransition Plan +ill dene t$e ste#s t$at t$e "gency +ill ta4e to
migrate a##lications consolidate servers t$roug$ virtuali/ation de#loy
-
8/9/2019 Data Center Consolidation Plan
35/39
Data Center Consolidation Initiative
Detailed )imetable, ilestones and 5or4 rea4do+n (tructure 5( 6or
"gency Consolidation 8=ecution
.3 Pase 3 7 Consolidation ' Optimi+ation &ecution
P$ase % Consolidation and O#timi/ation 8=ecution is t$e actual 6ulllment o6
t$e "gency Data Center Consolidation Plan and t$e e=ecution o6 t$e "gency
)ransition Plan. )$is #$ase +ill 6ocus on im#lementing t$e designed
arc$itecture solutions 6or t$e virtuali/ation o6 servers, migration o6 a##licationto a virtual environment, moving a##lications and in6rastructure to cloud
com#uting alternatives Iaa(, Paa( or (aa(, as +ell as on t$e
im#lementation o6 any #lanned I) Facilities o#timi/ation activities or site
migration eorts, e.g. rac4 s#ace consolidation, air Mo+ o#timi/ation, coolingA
#o+er system redesign, site consolidationArelocation, etc.
During t$is #$ase "gencies are reEuired to re#ort annually t$eir #rogress ont$e Data center Consolidation Plan as outlined in (ections .2 !tili"ation
Improvement #etricsand . Pro$ected Savin%s #etrics. )$is includes
t$e number o6 data centers t$at $ave been consolidated, t$e reduction in
data center Moor s#ace, energy consum#tion and t$e ado#tion o6
virtuali/ation andAor cloud tec$nology solutions to oToad t$e data center
s#ace and ca#acity +it$in "gency data centers.
-
8/9/2019 Data Center Consolidation Plan
36/39
-
8/9/2019 Data Center Consolidation Plan
37/39
Data Center Consolidation Initiative
Appendi A 7 Data Center Consolidation etrics Descriptions
FO: OFFICI"9 (8 O>9? Page 3;
-
8/9/2019 Data Center Consolidation Plan
38/39
Data Center Consolidation Initiative
FO: OFFICI"9 (8 O>9? Page 3
-
8/9/2019 Data Center Consolidation Plan
39/39
Data Center Consolidation Initiative
FO: OFFICI"9 (8 O>9? Page 3