Data: 3 a 10 de novembro de 2008Lisboa, Londres, Madri e Frankfurt
CONCESSIONS OF RAILROADS
CLEILSON QUEIROZCLEILSON QUEIROZVALEC-ENGENHARIA,CONSTRUÇÕES E FERROVIAS S.A.VALEC-ENGENHARIA,CONSTRUÇÕES E FERROVIAS S.A.
NORTH - SOUTH RAILROAD NORTH - SOUTH RAILROAD (EF 151)(EF 151)
THE SUB-CONCESSION OF THE SECTION THE SUB-CONCESSION OF THE SECTION PALMAS (TO) –PALMAS (TO) – ESTRELA D’OESTE (SP)ESTRELA D’OESTE (SP)
WEST - EAST INTEGRATION WEST - EAST INTEGRATION RAILROAD(EF 334)RAILROAD(EF 334)
THE SUB-CONCESSION OF THE SECTIONTHE SUB-CONCESSION OF THE SECTION
FIGUEIRÓPOLIS (TO) – ILHÉUS (BA)FIGUEIRÓPOLIS (TO) – ILHÉUS (BA)
• Public company of the Ministry of Transport .
• Purpose: construction and operation of Brazilian railway infrastructure .
VALEC - Engenharia, Construções e Ferrovias S.A.VALEC - Engenharia, Construções e Ferrovias S.A.
RAILWAY CONCESSIONS OF VALECRAILWAY CONCESSIONS OF VALEC
BELÉMBELÉM
PANORAMAPANORAMA
FIGUEIRÓPOLISFIGUEIRÓPOLIS
ILHÉUSILHÉUS
LITORAL DOLITORAL DO RIO DE JANEIRORIO DE JANEIRO
BOQUEIRÃO BOQUEIRÃO DA ESPERANÇADA ESPERANÇA
PORTO MURTINHOPORTO MURTINHO
EF 151EF 151
EF 334EF 334
EF 234EF 234EF 267EF 267
NORTH - SOUTH RAILROAD :NORTH - SOUTH RAILROAD :CURRENT STAGE OF CONSTRUCTION CURRENT STAGE OF CONSTRUCTION
BELEM
ACAILANDIAACAILANDIA
COLINAS DOCOLINAS DO TOCANTINSTOCANTINS
ANAPOLISANAPOLIS
ESTRELA D`OESTE
DESIGNED
CONCLUDED
UNDER CONSTRUCTION
DESIGNED
Belém
RIO DE JANEIRORIO DE JANEIRO
SANTOSSANTOS
Palmas
Estrela D’Oeste
ESTIMATED INVESTMENTR$ 3,5 bilhões
TOTAL EXTENSION OFTHE SECTION TO BEGRANTED2,600 MILES
NORTH - SOUTH RAILROAD :NORTH - SOUTH RAILROAD : SUB-CONCESSION SECTIONSUB-CONCESSION SECTION
SÃO LUIS
EF
151
FIGUEIRÓPOLISFIGUEIRÓPOLIS
ILHEUSILHEUS
Belém SÃO LUÍSSÃO LUÍS
EF
151
TOTAL EXTENSION OFTHE SECTION TO BEGRANTED2,384 MILES
ESTIMATED INVESTMENT R$ 3 BILHÕES
WEST- EAST INTEGRATION RAILROAD:WEST- EAST INTEGRATION RAILROAD:SUB-CONCESSION SECTIONSUB-CONCESSION SECTION
EF 334
EXTENSION OF SAVANA:1,8 milhão km2
AREA OF INFLUENCE OF THE NORTH - SOUTH RAILROAD: BRAZILIAN SAVANA
Soybeans and derivatives
Soybean meal
Soybean oil
Maize
Fertilizer
Sugar
Cotton
PRODUCTIVE POTENTIAL OF PRODUCTIVE POTENTIAL OF SUB-CONCESSIONS AREA OF INFLUENCE SUB-CONCESSIONS AREA OF INFLUENCE
FertilizerFertilizer
AlcoholAlcohol
Derived from petroleumDerived from petroleum
ContainersContainers
Iron oreIron ore
BauxiteBauxite
RAILROADGENERAL
CARGOORE TOTAL
EF 151 115 100 215
EF 334 20 50 70
ESTIMATED DEMAND FOR TRANSPORTESTIMATED DEMAND FOR TRANSPORT (TON.MIL)(TON.MIL)
Term of sub-concession: 30 years
Provides resources: fully paid for the VALEC, as stipulated in the contract schedule and the announcement of the sub-concession.
THE SUB-CONCESSION PROCESS THE SUB-CONCESSION PROCESS
Law nº 8.987 ( February 13, 1995)
Law nº. 9.074, (June 7, 1995 )
Article 175 of the Federal Constitution
Law nº 8.666 ( June 21, 1993)
Law nº 9.648 ( May 27, 1998)
Announcement of the sub-concession, and annex
THE LEGAL FRAMEWORK OF THE THE LEGAL FRAMEWORK OF THE SUB-CONCESSION PROCESSSUB-CONCESSION PROCESS
The participation of individual Brazilian and Foreign Companies is permitted.
The participation of consortiums between Brazilian and / or Foreign Companies in one Consortium is also permitted.
Acquisition of the Bidding Documents.
The presentation of a commitment to form a consortium indicating the participation of each member of the consortium and the leader.
REQUISITES FOR THE PARTICIPATIONREQUISITES FOR THE PARTICIPATION OF COMPANIESOF COMPANIES
FIRST STAGE OF THE BIDDING PROCESS – PRE-QUALIFICATION
(Special Bidding Committee of VALEC)
Legal Qualification
Technical Qualification
Economic and Financial Qualification
Clean Fiscal Standing
STAGES OF THE BIDDING PROCESSSTAGES OF THE BIDDING PROCESS
Delivery of the BOVESPA’s instructions
to the pre-qualified companies
STAGES OF THE BIDDING PROCESSSTAGES OF THE BIDDING PROCESS
SECOND STAGE OF THE BIDDING PROCESS – AUCTION IN THE BOVESPA
(The Sao Paulo Stock Exchange)
STAGES OF THE BIDDING PROCESSSTAGES OF THE BIDDING PROCESS
Deposit of the Bid Guarantee (two days prior to the Auction) Proceedings in accordance with the BOVESPA Manual Adjudication of the result based on the Highest Payment offered
for the grant of the Concession Disqualification of Proposals below the Minimum Value established
for the grant of the Concession Confirmation of the Winning Bid by the auctioneer Publication of the Result of the Auction indicating the winning company Creating a Specific Purpose Society for signing the contract
NORTH - SOUTH RAILROAD ( EF 151)
1st installment - 50% of the winning bid of the auction upon financial settlement - the signing of the sub concession - in conclusion of construction of the of the section Palmas (TO) – Anápolis (GO), scheduled for December 2010.
2nd installment - 25% of the winning bid in conclusion of construction of the Ouro Verde de Goias (GO) - Rio Verde (GO), scheduled for July 2011.
3rd installment - 25% of the winning bid in the auction in conclusion of construction of the section Rio Verde (GO) – Estrela D’Oeste (SP), scheduled for December 2011.
SUB CONCESSION PAYMENTSUB CONCESSION PAYMENT
WEST- EAST INTEGRATION RAILROAD WEST- EAST INTEGRATION RAILROAD ( EF 334)
1st installment - 40% of the winning bid of the auction upon financial settlement - the signing of the sub concession - in conclusion of construction of the section Ilhéus (BA) - Caetité (BA), scheduled for July 2011.
2nd Tranche - 30% of the winning bid in conclusion of construction of the section Caetité (BA) - Correntina / Barriers (BA), scheduled for July 2012.
3rd installment - 30% of the winning bid in the auction in conclusion of construction of the section Figueirópolis (TO) - Correntina / Barreiras (BA), scheduled for December 2012.
SUB CONCESSION PAYMENTSUB CONCESSION PAYMENT
VALEC – Engenharia, Construções e Ferrovias S.A.SAN – Quadra 3 – Sala 1100
Edifício Núcleo dos TransportesBrasília – DF
www.valec.gov.br
Data: 3 a 10 de novembro de 2008Lisboa, Londres, Madri e Frankfurt
THANKS !THANKS !