darwin green primary school & children's centre
TRANSCRIPT
Facts and FiguresgIntroduction
The school is located on the Dar in Green One de elopment one of three majorThe school is located on the Darwin Green One development, one of three majorwhich form the Northwest Fringe. Each of the three sites, Darwin Green One (1,5Green Two (around 1,100 dwellings) and Northwest Cambridge (3,000 dwellings)( g ) g ( g )school to serve the community. A new secondary school is planned to meet the the three development sites.
The Darwin Green One school will be a 420 place (2 forms of entry (FE)) primary school and an out-of-hours school club which will be accessible during the day focommunity groups and Children’s Centre service provision.
The sponsor of the school will be determined following a statutory search procesThe sponsor of the school will be determined following a statutory search procestake place in the Autumn term, following which the Council will identify a preferredfinal decision being taken by the Department for Education. As a result, it has no
ith th i th d l t f th d i f th h l Iengage with the sponsor in the development of the designs for the new school. Ihas been informed through detailed engagement with education specialists at thensure that the facilities are able to support a range of education pedagogies. Inpp g p g gexperience and lessons from the large number of new schools which have been County in recent years has been critical.
The school will be one of the first civic buildings to be completed on the Darwin Ghas been sited within the wider development to have a strong relationship with thas provide a strong visual presence on one of the main accesses to the developm
Project Team DetailsKey Dates Project Team Details
ClientP j t M
Key Dates
Planning application submittedPl i d i i
CamF it
Aug 2014N Project Manager
CDM Co-ordinatorContractor
Planning decisionPhase 1 construction startPhase 1 construction complete
FaitFaitKier
Nov 2014Aug 2015Jun 2016
ArchitectServices EngineerStructural Engineer
Phase 1 construction completeFraCouPete
Jun 2016
Structural EngineerLandscape Architect
PeteHan
DARWIN GREEN PRIMARY SCHOOL DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE
r de elopment sitesr development sites 596 dwellings), Darwin ) will have a primary ) p ydemands arising from
school, 52 place pre-or use by
s This is anticipated tos. This is anticipated to d sponsor prior to the ot been possible to I t d th hInstead, the scheme e County Council to
n achieving this, the g ,opened across the
Green development. It he Local Centre as well ment site.
mbridgeshire County Councilthf l + G ldthful + Gouldthful + Gouldr Constructionnk Shaw Associatesuch Perry Wilkeser Danner Dannnnah Brown Landscapes
Connectivity
DARWIN GREEN PRIMARY SCHOOL
Connectivity
DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE
Site InfluencesSite Influences
Responses to Site Influences
DARWIN GREEN PRIMARY SCHOOL
Responses to Site Influences
DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE
Building ConceptBuilding Concept
View 1 from southern corner of site
View 3 from Town Square
Site Context
View 4 from public open space
DARWIN GREEN PRIMARY SCHOOL
Site Context
DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE
View 2 School Squareq
Ground Floor Plan
DARWIN GREEN PRIMARY SCHOOL
Ground Floor Plan
DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE
First Floor PlanFirst Floor Plan
Classroom Section Hall Section
View from Town Square
South West Elevation South East E
Sections and ElevationsSouth East Elevation North West E
DARWIN GREEN PRIMARY SCHOOL
Sections and Elevations
DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE
Standing seam roof
Cambridge buff brick
Rainscreen cladding -plank
Meteon NA06 Patina
Translucent wall panels
Elevation
Curtain walling and louvres
Elevation
School Square
Landscape Proposals
DARWIN GREEN PRIMARY SCHOOL
Landscape Proposals
DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE
DARWIN GREEN PRIMARY SCHOOL DARWIN GREEN PRIMARY SCHOOL & CHILDREN’S CENTRE