danube - black sea task force for cooperation on water protection in the wider black sea region 1...

19
Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Upload: abigail-torres

Post on 27-Mar-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Danube - Black Sea Task Force for cooperation on water protection in

the wider Black Sea Region

1

Philip WellerICPDR Executive Secretary

Page 2: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Platform for cooperation for the protection of water and water related ecosystems of the wider Black Sea Region through developing:

Project database and indicators for prioritisation of investment projects

Financing mechanisms and facilitating cooperation between IFIs, bilateral donors and recipient countries

2

Purpose of the DABLAS Task Force

Page 3: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Prioritisation of Water SectorInvestment Projects

in the Danube River Basin

Page 4: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

© MicpLFU

InvestmentInvestmentss:: 3.6138 billion EUR 3.6138 billion EUR

4

Results:Results: 197 municipal wastewater 197 municipal wastewater treatment plants in operation treatment plants in operation

Page 5: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary
Page 6: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Emission reduction in municipal wastewater treatment plants

 

Country Total Projects

Total Investments(Mio. EUR)

Reduction BOD (t/a)

Reduction COD (t/a)

Reduction Tot-N (t/a)

Reduction Tot-P (t/a)

Czech Republic

14 156.0 170 106 856 47

Hungary 9 142.3 9,231 20,126 1,802 442

Slovak Republic

7 41.6 1,143 1,650 295 61

Slovenia 15 282.7 25,265 42,461 4,293 709

Sum 45 622.6 35,809 64,343 7,246 1,259 

Page 7: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

7

DABLAS II Project

• Evaluation of Policies, Regulations, and Investment Projects implemented in the last five years in Danube River Basin Countries in line with EU Directives and Regulations

Page 8: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Project Objective

Assist the ICPDR in evaluating the accomplishments realised in the DRB, in terms of policies, legislation, regulations, and investment projects, implemented in line with the ICPDR JAP and taking into account EU water related directives, in particular the EU WFD.

Page 9: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Expected project results 1. Provide clear picture on:

- the policy and legal reforms under preparation,- the gaps to be filled, and- the investment projects, which need further

technical and financial support.

2. Represent the baseline for evaluating subsequent progress, the costs and the benefits at the national and regional levels in implementing EU Directives.

Page 10: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Scope of the project (1)

1) Developing methodology, guidelines and formats for the collection and analysis of data and information on:

– implementation of policies, legal reforms and measures in line with EU water related directives and the ICPDR JAP

– implementation of investment projects taking into account the operations performed under the DABLAS Prioritisation Project

Page 11: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Scope of the project (2)

2) Developing/revising formats of questionnaires to include municipal, industrial, agro-industrial, wetland restoration, and agricultural & land use projects)

3) Analysing and preparing summary reports and tables

4) Developing indicators

5) Revising ICPDR DABLAS Project Database

6) Test-running of database and presenting of results

Page 12: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Implementation steps (1)

Analyse progress, identify gaps and propose priority actions to reinforce national capacities to facilitate the development of policies, legal and institutional mechanisms

Revision of project list at national level (JAP):analyse results, identify bottle necks in technical and financial terms and propose necessary measures to facilitate implementation of investment projects

Page 13: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Implementation steps (2)

Participation of national consultant in a one-day workshop instructions on the use of project fact sheets and templates

Completion of templates for policy component

Completion of a project fact sheet for each of the project by national consultant

Compilation of all completed project fact sheets and templates by the international consultant

Drafting of final report

Page 14: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Policy Component (JAP tasks)

Reduction of pollution from point and diffuse sources

Wetland and floodplain restoration

Monitoring water quality and water quality standards

Reduction and control of priority substances

Prevention of accidental pollution events

Product control, i.e. phosphate free detergents

Minimising the impacts of floods

Performing the domestic national water balance

River Basin Management

Page 15: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

National report on policy component

Monitoring/enforcement of the JAP tasksBarriers to water-related policy and legal

reformSchedule and implementation steps for the

approximation of national water policies and legislation to relevant EU Directives

Cost estimates concerning institutional and legal measures and direct investments that have been carried out to respond to new water related regulations

Page 16: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Investments Component

projects implemented in the past 5 years taking into account type of project (technical description), investment cost, financing modalities and achieved results in terms of compliance with EU directives and pollution reduction (BOD, COD, N and P)

projects under implementation or in pipeline, which are well prepared and do not need any further technical or financial support, indicating expected results

projects in preparation, which need further technical and financial support

Page 17: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Project Fact Sheets Recommended Editions to the Municipal Sector

17

Preconditions, Preparedness, Financeability

Feasibility study ready

Guarantee provided for investment

Share of household and industrial tariffs and expected Cost recovery from household/industrial tariffs

Financing secured (Y/N): If No, Financing Gap %

Sustainability

Affordability of tariffs

Achieve environmental targets: EU, Local

Page 18: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

Project Fact Sheets Industrial Sector: selected fields

Project Identification and Setting: Location Name, Recipient Body, TNMN Station, Downstream Users

Industry Profile Ownership: Public, Private, Public-Private (%/%) Industry Viability Project Description Project Effects and Interactions Estimated Project Procurement and Cost Funding Scheme Summary of Project Financing Preconditions, Preparedness Sustainability: BAT, Achieve Environmental Targets

Page 19: Danube - Black Sea Task Force for cooperation on water protection in the wider Black Sea Region 1 Philip Weller ICPDR Executive Secretary

WW

F

Further informationwww.icpdr.org