danny broad - australasian railway association - strategic direction for australian rail

23
www.ara.net.au ABN 64 217 302 489 Strategic Direction for Australia Rail Danny Broad, CEO, ARA New Zealand Rail Conference 2016

Upload: informa-australia

Post on 16-Apr-2017

135 views

Category:

Business


1 download

TRANSCRIPT

www.ara.net.au

ABN 64 217 302 489

Strategic Direction for

Australia Rail

Danny Broad, CEO, ARA

New Zealand Rail Conference 2016

www.ara.net.au

Rail is Critical for a Better Future

• For economic growth and productivity

• For international competitiveness

• For social enhancement and environmental sustainability

• A prominent employer in Australia with close to 200,000 people working in the industry

• Close to $45 billion in committed investment in the next 5 years.

www.ara.net.au

6th Largest Rail Network in the World (44,262km)

www.ara.net.au

OUR ANNUAL CUSTOMERS...

1.3 billion tonnes

of freight

627 million heavy

rail

journeys

810 million customer journeys

183 million

light rail

journeys

www.ara.net.au

Challenges

• Capital city population increases

• Freight volume to double

• Industry needs certainty

• Long-term strategic planning

• Integrated transport solutions

• Investment

• Social and Economic Benefits

www.ara.net.au

The Rail Industry Vision

The rail industry sees four key platforms going

forward to address the challenges:

• Longer term planning

• Smarter investment

• Enhanced productivity

• Practical innovation

www.ara.net.au

PASSENGER COVERPAGE

Passenger Rail

www.ara.net.au

Unprecedented Investment…

Sydney - $22.4 billion committed

(light rail and metro style heavy rail, rollingstock, regional rail)

Melbourne - $21 billion committed

(new rollingstock, RLX removal, metro

new line)

Brisbane - $5.8 billion committed(rollingstock, light rail, new line,

duplication)

But gaps exist…

www.ara.net.au

Source: Orion Advisory, The Future of Australian Passenger Rollingstock (2012)

www.ara.net.au

Passenger Rail Solutions

• Long-term planning independent of political cycles

• State and Federal governments to work together

• Harmonisation of standards

• Producing a steady, long-term pipeline

• Integration of transport modes

• Alternative investment approaches

www.ara.net.au

RAIL FREIGHT

RAIL FREIGHT

www.ara.net.au

Freight rail moves…

Bulk movements

account for 97% of the

overall freight task.

www.ara.net.au

Freight rail moves…

Containerised goods moved on

rail have increased by 65% since

2009-10, to 27 million tonnes.

www.ara.net.au

Rail’s market share of

interstate freight movements

www.ara.net.au

• National freight rail long-term supply chain

• More freight on to rail

• Road/Rail pricing – separate

regulator

• Rail to ports

• Inland Rail

Freight Solutions

www.ara.net.au

• 1700km route

• Melbourne to Brisbane,

bypassing Sydney

• $10 billion

• < 24 hours transit time

• Removing thousands of

trucks from roads

• Boosting regional

development

Inland Rail

www.ara.net.au

Perspective On Inland Rail

www.ara.net.au

RAIL MANUFACTURING

Challenges and SolutionsRAIL MANUFACTURING

www.ara.net.au

Rail Manufacturing Sector

www.ara.net.au

Current Challenges – Rail Manufacturing

Sector

• Volatile procurement cycle

• Variations relating to rollingstock specifications

• Matching rail capabilities with future opportunities

• Supply chain inefficiencies

• Maximising international opportunities

www.ara.net.au

Addressing the Challenges

• Invest in productive and efficient rail infrastructure including rollingstock

• Continue supply chain development activities

• Harness innovation

• Ensure continuity of critical skills development and training

• Pursue harmonisation of specifications issues through the development of harmonisation principles and harmonised rolling stock standards

www.ara.net.au

• Rail is doing well but there is much more to do

• There are many rail projects in place and into the future particularly

significant light and heavy passenger rail projects

• This is good for the industry and growing the economy

• Rolling stock procurement needs co-ordination and harmonisation

• Inland Rail needs to be built and freight and passenger lines

untangled in capital cities

• Port shuttles need serious attention

Summary

www.ara.net.au

Rail today