Dams and Hydraulic Structures F���� N�, I�. (FNI) ���’ water resources firms since 1894. Our naonally recognized firm is the region’s most experienced engineering consultant for water supply projects, designing more than 150 major dams and reservoirs during our history. Our experience with dams and reservoirs includes both new and rehabilitaon projects. We are familiar with all aspects of dam maintenance and operaons, as well as inspecon, monitoring, evaluaon and rehabilitaon of dams. In addion, our professionals provide full-service capabilies for your water resources projects. We provide soluons from beginning to end for all dam and hydraulic structure needs, including perming and planning, hydrologic and hydraulic analysis, geotechnical and structural design, construcon document preparaon, and construcon management. Innovave approaches Praccal results Outstanding service Lake Houston Dam Evaluation COASTAL WATER AUTHORITY FNI performed a comprehensive evaluaon of Lake Houston Dam, including a Probable Maximum Flood update, breach analysis and Emergency Acon Plan (EAP). Lake Brazos Labyrinth Weir Dam Rehabilitation CITY OF WACO FNI provided innovave soluons for this award-winning dam rehabilitaon project. The team combined reuse of the exisng dam site with an uncovenonal spillway configuraon, yielding construcon me and cost savings. Richland Chambers Reservoir and Dam Design TARRANT REGIONAL WATER DISTRICT FNI provided all planning, perming, design and construcon phase services for this 45,000-acre reservoir with a six- mile long dam. Toledo Bend Dam Gate Inspection and Analysis TOLEDO BEND PROJECT JOINT OPERATION FNI performed inspecons of 11 tainter gates, hoists, and associated mechanical and electrical systems. Following the inspecon, FNI developed a structural model reflecng field condions to evaluate structural capacity of the gates.

Upload: duonghanh

Post on 08-Mar-2018

304 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Dams and Hydraulic Structures - Freese and Nichols, Inc. and Hydraulic... · Dams and Hydraulic Structures ... Hydraulic Modeling Geological and Geotechnical ... dams, spillways and

Dams and Hydraulic Structures

F����� ��� N������, I��. (FNI) ��� ���� ��� �� ��� ������’� ������� water resources fi rms since 1894. Our nati onally recognized fi rm is the region’s most experienced engineering consultant for water supply projects, designing more than 150 major dams and reservoirs during our history.

Our experience with dams and reservoirs includes both new and rehabilitati on projects. We are familiar with all aspects of dam maintenance and operati ons, as well as inspecti on, monitoring, evaluati on and rehabilitati on of dams.

In additi on, our professionals provide full-service capabiliti es for your water resources projects. We provide soluti ons from beginning to end for all dam and hydraulic structure needs, including permitti ng and planning, hydrologic and hydraulic analysis, geotechnical and structural design, constructi on document preparati on, and constructi on management.

Innovati ve approachesPracti cal resultsOutstanding service

Lake Houston Dam EvaluationCOASTAL WATER AUTHORITYFNI performed a comprehensive evaluati on of Lake Houston Dam, including a Probable Maximum Flood update, breach analysis and Emergency Acti on Plan (EAP).

Lake Brazos Labyrinth Weir Dam RehabilitationCITY OF WACOFNI provided innovati ve soluti ons for this award-winning dam rehabilitati on project. The team combined reuse of the existi ng dam site with an uncoventi onal spillway confi gurati on, yielding constructi on ti me and cost savings.

Richland Chambers Reservoir and Dam DesignTARRANT REGIONAL WATER DISTRICTFNI provided all planning, permitti ng, design and constructi on phase services for this 45,000-acre reservoir with a six-mile long dam.

Toledo Bend Dam Gate Inspection and AnalysisTOLEDO BEND PROJECT JOINT OPERATIONFNI performed inspecti ons of 11 tainter gates, hoists, and associated mechanical and electrical systems. Following the inspecti on, FNI developed a structural model refl ecti ng fi eld conditi ons to evaluate structural capacity of the gates.

Page 2: Dams and Hydraulic Structures - Freese and Nichols, Inc. and Hydraulic... · Dams and Hydraulic Structures ... Hydraulic Modeling Geological and Geotechnical ... dams, spillways and

www.freese.com

Dam Modernization ProgramUPPER BRUSHY CREEK WATER CONTROL IMPROVEMENT DISTRICT (WCID)FNI completed evaluati on and modernizati on of 23 dams, including 21 high-hazard dams. This project required close coordinati on with the community at both local and state levels for successful constructi on implementati on.

Award-Winning ProjectsFNI’� ������ ������� �� �����-������� ��� �������� ��������:

Wesley Seale Dam 2001 Nati onal Rehabilitati on

Project of the Year, Associati on of State Dam Safety Offi cials

Best of 2001 Award of Excellence, Texas Constructi on

2002 Nati onal Finalist, American Council of Engineering Companies

2002 Engineering Excellence Award, Texas Council of Engineering Companies

Upper Brushy Creek Dam Modernizati on Program

2007 Award of Merit, Associati on of State Dam Safety Offi cials

Lake Brazos Dam 2007 Gold Medal for

Engineering Excellence, Texas Council of Engineering Companies

2008 Environmental Project of the Year, Texas Public Works Associati on

2008 Excellence in Constructed Project Award, United States Society of Dams

2008 Engineering Excellence Honor Award, American Council of Engineering Companies

Hydrologic and Hydraulic Guidelines for Dams in Texas

2009 Eminent Conceptor Top Engineering Project, Texas Council of Engineering Companies

Lake Delton Dam Repair 2009 Engineering Achievement

Award, American Society of Civil Engineers (Wisconsin Secti on)

2010 Engineering Excellence Honor Award, American Council of Engineering Companies

�������� ��� ���������� Water Supply Planning

and Feasibility Assessment

Federal and State Environmental Permitti ng

State Dam Safety Coordinati on

Funding

������� ��� ��������

Hydrologic and Hydraulic Modeling

Geological and Geotechnical Investi gati ons

Seepage Modeling Sett lement and Bearing

Capacity Modeling Embankment and

Foundati on Stability Analysis

Gravity Dam Stability Analysis

Advanced Structural Numerical Modeling

Physical Model Studies Hydropower Feasibility

Studies

Risk Management and Risk-Based Prioriti zati on

Emergency Acti on Plans and Security Assessments

Potenti al Failure Mode Analysis

������ ��� ��������������

Embankment Dams Gravity Dams Slab and Butt ress Dams Spillways Foundati on

Improvements Cut-off Walls Dam Rehabilitati on and

Dam Raises Dewatering Systems Post-Tensioned Anchors Gates and Hoists

��������������� ��� ����������

Dam Safety Instrumentati on Design

Instrumentati on Monitoring Programs

SCADA and Other Control Hardware and Soft ware

������������ ���������� ��� ������� Constructability Review Engineering Support Contract Administrati on

and Document Control On-site Inspecti on and

Quality Assurance

�������� ������� ��� ����������

Dam Safety Inspecti ons and Training

Operati on and Maintenance Plans

Gate Inspecti ons Gate Operati ng Plans Part 12D Safety

Inspecti ons Comprehensive Facility

Review Security Plans

SERVICESFNI has a rich history of planning, designing, rehabilitati ng, inspecti ng, monitoring and evaluati ng dams, spillways and hydraulic structures. We off er comprehensive engineering and consulti ng services for dams and reservoirs in the following areas:

Freese and Nichols is a full service professional consulti ng fi rm and the fi rst engineering/architecture fi rm to receive the Malcolm Baldrige Nati onal Quality Award. With offi ces in Texas and North Carolina, Freese and Nichols provides services in engineering, architecture, environmental science, planning, constructi on services, energy and program management.

FNI’s Dam and Hydraulic Structure Experience Includes: More than 600 dam

evaluati ons in the past 10 years

12 Federal Energy Regulatory Commission Part 12 inspecti ons

More than 150 major dam and reservoir designs

More than 110 Probable Maximum Flood studies

More than 200 Breach Analyses

More than 100 Emergency Acti on Plans