dalradian presentation october 20 2016 final
TRANSCRIPT
October 25, 2016
Patrick F.N. Anderson
High-Grade Gold in Northern Ireland
President & CEO
2
FORWARD-LOOKING INFORMATION AND QUALIFIED PERSON
2
This presentation contains “forward looking information” which may include, but is not limited to, statements with respect to the future financial or operating performance ofthe Company and its subsidiaries (collectively, “Dalradian”) and its mineral projects, the future price of metals, the estimation of mineral resources, the realization of mineralresource estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and timing of thedevelopment of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations, environmental risks,reclamation expenses, title disputes or claims, limitations of insurance coverage and the timing and possible outcome of pending regulatory matters. Often, but not always,forward looking statements can be identified by the use of words and phrases such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,“intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”,“would”, “might” or “will” be taken, occur or be achieved.
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions such asthe continued political stability in Northern Ireland, that permits required for Dalradian’s operations will be obtained on a timely basis in order to permit Dalradian to proceed onschedule with its planned exploration and development programs, that skilled personnel and contractors will be available as Dalradian’s operations continue to grow, that theprice of gold will be at levels that render Dalradian’s mineral projects economic, that the Company will be able to continue raising the necessary capital to finance its operationsand realize on mineral resource estimates and current mine plans and that the assumptions contained in the Company’s PEA (as defined herein) are accurate and complete.
Forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Dalradian tobe materially different from any future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others,general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; the actual results of reclamationactivities; conclusions of economic evaluations; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possiblevariations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents,labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development orconstruction activities, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Annual Information Form for the year ended December 31, 2014dated March 24, 2015 (the “AIF”) .
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward lookingstatements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward looking statements containedherein are made as of the date of this presentation and the Company disclaims any obligation to update any forward looking statements, whether as a result of newinformation, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward looking statements will prove to beaccurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forwardlooking statements.
Certain technical data in this presentation was taken from the NI 43-101 technical report entitled, “Technical Report for the Northern Ireland Gold Project, Northern Ireland”,dated June 17, 2016 and prepared by Dr. Jean-Francois Couture, PGeo (APGO#0197) and Dr. Oy Leuangthong, PEng (PEO#90563867), both of SRK Consulting (Canada) Inc. andStacy Freudigmann, PEng (APEGBC #33972) of JDS Energy & Mining Inc., all of whom are independent Qualified Persons as defined by National Instrument 43-101, and is subjectto all of the assumptions, qualifications and procedures described therein. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Eric Tremblay, P.Eng., Chief Operating Officer, and Greg Hope, M.Sc., MAIG, Exploration and Geology Manager with Dalradian Resources Inc., are the Qualified Persons whoreviewed and approved the technical information in this presentation. The exploration data was based on the procedures described in the Company’s PEA and is subject to all ofthe assumptions, qualifications and procedures described therein.
3
PREMIUM ASSET IN A SCARCITY MARKET
High grade gold in the OECD
Feasibility Study on schedule for Q4
Planning application process has begun
4
Industry
557244960
300
130,000
leading safety record
days working undergroundblastsm of developmenttest stopeslost-time accidentsnon-compliancem of drilling
CORPORATE
6
THE BOARD:TRACK RECORD OF FINDING, FUNDING AND BUILDING MINES
PATRICK F. N. ANDERSONPRESIDENT & CEO
Founder & Former CEO of Aurelian Resources 2008 – PDAC International Mineral Discovery 2008 – Northern Miner Man of the Year Director of Osisko Mining Inc.
RONALD GAGEL
CFO of TMAC Resources Former CFO of FNX Mining and Aur Resources 2013 – PDAC Distinguished Service Award Director of Adriana Resources and Stonegate Agricom
THOMAS OBRADOVICH
Director of Barkerville Gold Mines Founder & Former CEO of Young-Davidson Mines Former Director of Aurelian Resources
SEAN ROOSEN
Founder & CEO of Osisko Mining Corporation and Osisko Royalty Corporation
‘06 – Prospector of the Year - Quebec ‘08 – Prospector of the Year - Canada ‘09 – Northern Miner Man of the Year
JONATHAN RUBENSTEIN
Director of Eldorado Gold, Detour Gold, MAG Silver, Roxgold Former Director of Aurelian Resources, Sutton Resources, Canico
Resource and Cumberland Resources
PATRICK “PADDY” DOWNEY
Director of Orezone and Pan Global Resources Former CEO of Elgin Mining, Aura Minerals and Viceroy Exploration Native of Northern Ireland
JIM RUTHERFORDCHAIRMAN
Director of Anglo American plc Former senior vice president of Capital International Investors,
responsible for mining investments Native of Northern Ireland
DR. NICOLE ADSHEAD-BELL
Director of Pretium, Lithium Americas, and Beadell Resources Former Director of Mining Research at Sun Valley Gold
7
STOCK PRICE PERFORMANCE
$0.50
$0.75
$1.00
$1.25
$1.50
$1.75
$2.00
$2.25
$2.50
$2.75
Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16
Michael Curran$2.15
Tyron Breytenbach$2.70
$2.00 Andrew Breichmanas
Adam Melnyk$2.00
$2.25 Eric Zaunscherb
Jamie Spratt$1.50
$2.25 Ron Stewart
$2.50 Stephen Walker
140p Jonathan Guy
Ryan Walker$1.80
Analyst targets range from
$1.50-$2.70
0
2
4
6
8
10
12
Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16
Vo
lum
e (M
illio
ns)
$1.35October 19, 2016
SHARE CAPITALIZATION AND CASH POSITION
Shares outstanding of 241 million and fully diluted of 298 million as of September 2016
Cash position of $23 million*as of June 30, 2016
All dollars quoted in $ CAD*Not including $24.5 million from proceeds of exercised warrants announced September 15th, 2016
CURRAGHINALT DEPOSIT
9
MINERAL PROJECTS IN IRELAND AND THE UK
Our flagship asset: Curraghinalt, orogenic high-grade gold deposit
Excellent regional infrastructure
Over 120,000 hectares under license
Gold
Base Metals
Other
Gortin
Omagh
Curraghinalt
BELFAST
N O R T H E R NI R E L A N D
Galantas Gold
ConroyDiamonds& Gold
Lonmin
Irish SaltMining
Irish Salt (Kilroot)UG Mine
Curraghinalt GoldDeposit
Galantas (Cavanacaw)Permitted UG mine
Scotgold (Cononish)Permitted
Vedanta (Lisheen)Previous producer
Boliden (Tara)In production
Lundin (Galmoy)Previous producer
Conroy (Clontibret)Gold exploration
Xstrata (Pallas Green)Feasibility
Wolf (Hemerdon)Tungsten producer
Cleveland Potash (Boulby)In production
Sirius (York Potash)In development
Croagh PatrickGold deposit
IMC Exploration (Avoca)Exploration
Gold Mines of Wales(Gwynfynydd/Clogau) Exploration/former mines
Calliacher-Urlar BurnExploration
10
CURRAGHINALT RESOURCE
Since 2010, we have grown the resource more than 7-fold over 4 updates Based on more than 130,000 m of drilling and ~1,700 m of underground development
May 2016 resource update more than doubled M&I ounces in support of FS
High-grade gold resource open in all directions1
Measured: 0.03 MT grading 26.99 g/t Au for 25,000 contained ounces Indicated: 5.58 MT grading 11.53 g/t Au for 2.07 million contained ounces Inferred: 7.13 MT grading 10.06 g/t Au for 2.31 million contained ounces
1 Refer to technical report dated June 17, 2016
11
Orogenic deposit; analogous to prolific Abitibi (Canada) and Lachlan Gold Belt (Australia)
High grade increases with conversion from Inferred to Indicated to Measured
16 veins included in the 2016 resource (5 more than previously reported)
Gold is non-refractory, amenable to off-the-shelf processing
DEPOSIT CHARACTERISTICSM
etre
sB
elo
w S
urf
ace
High ounces per vertical metre
Ounces per Vertical Metre – Current ResourceOunces per Vertical Metre – Previous Resource
12
CURRAGHINALT VEIN SYSTEM
Abundance, spacing and orientation of veins advantageous for underground mining
13
RESOURCE EXPANSION
1 Refer to Technical Report dated June 17, 2016
2 2a 12-CT-173 drilled at 150/-60; 2b and 2c 12-CT-162 drilled at 180/-55; 2b from 186.00m - 188.22m, 2c from 229.08m - 230.55m; true width undetermined
3 11-CT-99 drilled from 471.14-474.34m4 12-CT-167 drilled from 201.93-204.40m5 12-CT-154
Vein and Vein Intersections
Curraghinalt
Deposit
Curraghinalt DepositResource effective as of May 2016
1–
Measured: 0.03 Moz Au (0.03 MT @ 26.99 g/t)
Indicated: 2.07 Moz Au (5.58 MT @ 11.53 g/t)
Inferred: 2.31 Moz Au (7.13 MT @ 10.06 g/t)
Attagh Burn2.47m @ 18.99 g/t Au
4
Alwories Discovery Holes2
4.72m @ 14.82 g/t Au2a
2.22m @ 14.10 g/t Au2b
1.47m @ 23.60 g/t Au2c
900 m Step-out 0.65m @ 15.04 g/t Au5
400 m Step-out
3.2m @ 5.34 g/t Au3
Proposed
mill site
Curraghinalt
Deposit
12km
Curraghinalt
Trend
Rylagh
14
Curraghinalt
Deposit
Attagh Burn2.47m @ 18.99 g/t Au
3
Golan Burn0.6m @ 61.43 g/t Au
Gold Anomalies
1
kilometres
0 2
Scotch TownPeak of 10.52 g/t Au
In mineralized boulders
400 m Step-out
3.2m @ 5.34 g/t Au2
1 1a 12-CT-173 drilled at 150/-60; 1b and 1c 12-CT-162 drilled at 180/-55; 1b from 186.00m - 188.22m, 1c from 229.08m - 230.55m; true width undetermined
2 11-CT-99 drilled at 200/-60, from 471.14-474.34 m3 12-CT-167 drilled from 201.93-204.40 m
Vein and Vein Intersections
Glaciated Terrain with Minimal Outcrop
Alwories Discovery Holes1
4.72m @ 14.82 g/t Au1a
2.22m @ 14.10 g/t Au1b
1.47m @ 23.60 g/t Au1c
12KM GOLD TREND IS MOSTLY UNEXPLORED
Proposed
mill site
Curraghinalt
Deposit
12km
Curraghinalt
Trend
Rylagh
15
HIGH GRADE REGIONAL DISCOVERIES
Fallagh
Rylagh
1
kilometres
0 2
1
kilometres
0 2kilometres
0 5
SAMPLES - New Discovery 50cm @ 139.5 g/t Au (F11601)
10-15cm @ 1.37 g/t Au (F11627)
50cm @ 168 g/t Au (F36011)
50cm @ 42.4 g/t Au (F36011)
SAMPLES30.30 g/t Au (B0641)
29.20 g/t Au (B0633)
17.25 g/t Au (B0625)
11.65 g/t Au (B0627)
Curraghinalt
Deposit
Curraghinalt
Deposit
12km
Curraghinalt
Trend
Rylagh
16
New licence areas DG5/DG6 added in June 2016
DG5 and DG6 anomalies are the largest on our licences outside of Curraghinalt
Soil sampling, panning and stream sediment sampling on all six licences
REGIONAL EXPLORATION
FEASIBILITY STUDY
18
FEASIBILITY STUDY
FS supported by:
UG program, including 960 m of new development with test stoping and
130,000 m of drilling (including 51,479 m of new infill drilling)
FS proceeding on the basis of:
Mining primarily by longhole but with additional methods as required to minimize dilution;
Processing incorporating a flotation circuit (recovery of 94%-plus);
Dry stack tailings; and
~ 50% of waste rock to be returned underground as paste backfill
19
SITE OVERVIEW
Crow
106-16
No. 1
T-17
Mullan
Sheep Dip
Road
Water treatment plant
Waste pad
Ore storage
Explosives magazine
Elevator and ventilation
Veins
Previous Development
Development completed by DNA
V-75
Adit
Test stopes
Planning decision
TEST STOPE LOCATION
Prepare ESIA
Test stopesPrevious developmentDNA development metres
0 12.5 25
Planning decision
TEST STOPE RESULTS
Prepare ESIA
2.8 metres
1.4 metreson average
Overall, recovered 54% more gold than predicted in resource model
Validates long-hole open stoping as the primary mining method
Shows that narrow mining widths can be achieved using mechanized methods
Stope 1: average width of 1.40 m; dilution of 29% to the designed stope
Stope 2: average width of 1.33 m; dilution of 10% to the designed stope
PERMITTING
23
NI GOVERNMENT FOCUSED ON JOBS
Top priority of government is jobs & investment
DUP returned as largest party with the most seats in the Assembly and first minister role
Numerous government officials have visited our project, including the First Minister
Invest NI grant to Dalradian for $590,000 to support jobs and training during UG Program
Aug 2014 site visit by Arlene Foster, MLA, then Minister for Enterprise, Trade and Investment, now First Minister
Planning decision
PERMITTING PROCESS
Draft Project Description(pre-consultation with stakeholders via PAD)
Prepare ESIASubmit Planning Application
H2 2016
Planning NI Review
Permission to construct a mine will be based
on a Planning Application, which will consist
of a Project Description and an Environmental
and Social Impact Assessment (ESIA)
Review and approval is
estimated to take 1-2 years
Curraghinalt has been designated a project
of “regional significance”, which allows
ministerial involvement in the planning decision
Pre-engage with DfI
via a Pre-Application
Discussion (PAD)
Granted
Refused
Referred to Public Local Inquiry
25
ESTIMATED TIMELINE
Jan2016 Feb Mar Apr May June July Aug Sept Oct Nov Dec
UG development Test stoping
Infill drilling
Resource update
1st round of 2nd round of Submission of Stakeholder consultations consultations Planning Application
Feasibility study
Preparation of ESIA
SUMMARY
DNA HIGHLIGHTS
Team of mine builders, explorers, financiers and local expertise
Business-friendly jurisdiction with transparent permitting
Dual-listed in Toronto & London
Large, high-grade vein system
Proven narrow-vein mining methods
Non-refractory gold
28
Patrick F.N. Anderson
President & CEO
416.583.5622
Trading Symbol:
DNA on TSX
DALR on AIM
Corporate Office:
Dalradian Resources Inc.
Queen’s Quay Terminal
207 Queen’s Quay West
Suite 416
Toronto, Ontario
Canada M5J 1A7
www.dalradian.com