dallas us 75 corridor...teas department of transportation fall • 2015 “wor ith others to proide...

1
TEXAS DEPARTMENT OF TRANSPORTATION FALL • 2015 “Work with others to provide safe and reliable transportation solutions for Texas.” DALLAS DISTRICT 0461_072815 US 75 CORRIDOR SOURCE: Texas Department of Transportation. NOTE: Highlighted areas are not drawn to scale. TxDOT graphic PROJECT DETAILS 1. CSJs: 0047-06-145; 0047-07-219 Location: From I-635 to SH 121/Spur 399 Description: Perform a corridor study Existing HOV: 2 (HOV-C) from I-635 to Bethany Future Managed HOV: TBD Length: 18 miles Cost: $2.5 billion Next Steps: Anticipate public meeting, Fall 2015 Letting: TBD (unfunded and not in Mobility 2035 Plan) Existing HOV: Concurrent flow HOV lane 2. CSJs: 0047-06-156; 0047-07-225 Location: From I-635 to McDermott Description: Implement express lanes in existing HOVs Cost: $11 million Letting: TBD 3. CSJ: 047-06-133 Location: From PGBT to Park Blvd Description: Widen DC from PGBT to NB US 75 & SB US 75 to PGBT; Widen DART RR & Plano Pkwy underpasses; Auxiliary lane NB to Park exit ramp Cost: $37 million Letting: November 2015 4. CSJ: 0047-06-139 Location: Spring Creek Pkwy. to Sam Rayburn Tollway Description: Widen 6-lane freeway to 8-lane freeway; Improve frontage roads and ramps Cost: $48 million Letting: December 2013 Status: Under construction ECD: May 2017 Contractor: MCM Construction Start: April 2014 5. CSJ: 0047-06-108 Location: From Spur 399 (SH 121 south) to U.S. 380 Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $106.6 million Contractor: Webber, LLC Construction Start: January 2012 ECD: November 2015 Approximate % Complete: 80% 6.CSJ: 0047-14-063 Status: Completed September 2011 Description: Reconstruct interchange Estimated Cost: $25.7 million 7. CSJ: 0047-14-067 Location: From south of Bloomdale Rd. to CR 275 Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $68.1 million Contractor: Zachry Construction Corp. ECD: August 2015 Approximate % Complete: 95% Construction Start: November 2012 8. CSJ: 0047-14-068 Location: From Telephone Rd. to Melissa Rd. Description: Widen 4-lanes to 6-lanes and 2-lane front- age roads in each direction Estimated Cost: $67 million Construction Start: November 2012 Approximate % Complete: 50% Estimated Completion Date: November 2016 9. CSJ: 0047-14-069 Location: North of Melissa Rd. to south of FM 455 Description: Reconstruct and widen 4-lane to 6-lanes and 2-lane frontage roads in each direction Estimated Cost: $56.5 million Estimated Letting: December 2015 10. CSJ: 0047-14-074 Location: At FM 455 interchange in Anna Description: Construct interchange Estimated Cost: $30 million Estimated Letting: December 2015 11. CSJ: 0047-14-053 Location: From north of FM 455 to CR 375 (Grayson County Line) Description: Widen and reconstruct from 4-lane to 6-lane highway and reconstruct existing 4-lane frontage road Estimated Construction Cost: $65 million Estimated Letting: September 2017 PROGRAMMING STATUS CSJ: 0047-14-053 MTP (2035 Metropolitan Transportation Plan, 2014 Amendment) YES UTP (2015 Unified Transportation Program); Authority - Plan YES STIP (Statewide Transportation Implementa- tion Program) YES* * Phase-Engineering (07/2014 Revision: Approved 12/02/2014). CSJs: 0047-14-069; 0047-14-074 MTP (2035 Metropolitan Transportation Plan, 2014 Amendment) YES UTP (2015 Unified Transportation Program); 2015 Authority - Develop YES STIP (Statewide Transportation Implementa- tion Program) YES** ** Phase-Engineering, Right-of-Way, Construction (07/2014 Revision: Approved 12/02/2014). CONTACT INFORMATION Suja Mathew, P.E. TxDOT Transportation Engineer Supervisor (214) 320-6184 [email protected] Barry Heard, P.E. TxDOT Area Engineer (972) 542-2345 [email protected] Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 78 78 78 75 289 DNT DNT DNT 289 121 121 121 121 982 205 190 190 544 546 543 543 380 380 380 380 5 2478 2478 3537 2862 1377 1827 3356 35E 635 635 30 Melissa Anna New Hope Princeton Lavon Lake Lake Ray Hubbard Lavon Wylie Lucas Parker Richardson St. Paul 66 289 Rowlett Addison 66 Rockwall Hebron Frisco ROCKWALL CO. McKINNEY Garland DENTON CO. COLLIN CO. McKinney Municipal Airport DALLAS CO. COLLIN CO. DALLAS CO. COLLIN CO. 5 miles N 75 75 78 190 5 5 5 COLLIN CO. GRAYSON CO. Concurrent Flow This project is not in Mobility 2035 Plan KEY 2 3 1 4 5 8 6 7 10 11 9 Dallas McKinney 20 35E Detail 121 121 78 75 75 80 380 377 635 35E 30 30

Upload: others

Post on 25-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DALLAS US 75 CORRIDOR...TEAS DEPARTMENT OF TRANSPORTATION FALL • 2015 “Wor ith others to proide sae and reliale transportation solutions or Texas.” DALLAS DISTRICT US 75 CORRIDOR

TEXAS DEPARTMENT OF TRANSPORTATION FALL • 2015

“Work with others to provide safe and reliable transportation solutions for Texas.”

DA L L A S D I S T R I C T

0461

_072

815US 75 CORRIDOR

SOURCE: Texas Department of Transportation. NOTE: Highlighted areas are not drawn to scale. TxDOT graphic

PROJECT DETAILS 1. CSJs: 0047-06-145; 0047-07-219Location: From I-635 to SH 121/Spur 399

Description: Perform a corridor study

Existing HOV: 2 (HOV-C) from I-635 to Bethany

Future Managed HOV: TBD

Length: 18 miles

Cost: $2.5 billion

Next Steps: Anticipate public meeting, Fall 2015

Letting: TBD (unfunded and not in Mobility 2035 Plan)

Existing HOV: Concurrent flow HOV lane

2. CSJs: 0047-06-156; 0047-07-225Location: From I-635 to McDermott

Description: Implement express lanes in existing HOVs

Cost: $11 million

Letting: TBD

3. CSJ: 047-06-133Location: From PGBT to Park Blvd

Description: Widen DC from PGBT to NB US 75 & SB US 75 to PGBT; Widen DART RR & Plano Pkwy underpasses; Auxiliary lane NB to Park exit ramp

Cost: $37 million

Letting: November 2015

4. CSJ: 0047-06-139Location: Spring Creek Pkwy. to Sam Rayburn Tollway

Description: Widen 6-lane freeway to 8-lane freeway; Improve frontage roads and ramps

Cost: $48 million

Letting: December 2013

Status: Under construction

ECD: May 2017

Contractor: MCM

Construction Start: April 2014

5. CSJ: 0047-06-108Location: From Spur 399 (SH 121 south) to U.S. 380

Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads

Estimated Cost: $106.6 million

Contractor: Webber, LLC

Construction Start: January 2012

ECD: November 2015

Approximate % Complete: 80%

6.CSJ: 0047-14-063 Status: Completed September 2011

Description: Reconstruct interchange

Estimated Cost: $25.7 million

7. CSJ: 0047-14-067Location: From south of Bloomdale Rd. to CR 275

Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads

Estimated Cost: $68.1 million

Contractor: Zachry Construction Corp.

ECD: August 2015

Approximate % Complete: 95%

Construction Start: November 2012

8. CSJ: 0047-14-068Location: From Telephone Rd. to Melissa Rd.

Description: Widen 4-lanes to 6-lanes and 2-lane front-age roads in each direction

Estimated Cost: $67 million

Construction Start: November 2012

Approximate % Complete: 50%

Estimated Completion Date: November 2016

9. CSJ: 0047-14-069Location: North of Melissa Rd. to south of FM 455

Description: Reconstruct and widen 4-lane to 6-lanes and 2-lane frontage roads in each direction

Estimated Cost: $56.5 million

Estimated Letting: December 2015

10. CSJ: 0047-14-074Location: At FM 455 interchange in Anna

Description: Construct interchange

Estimated Cost: $30 million

Estimated Letting: December 2015

11. CSJ: 0047-14-053Location: From north of FM 455 to CR 375 (Grayson County Line)

Description: Widen and reconstruct from 4-lane to 6-lane highway and reconstruct existing 4-lane frontage road

Estimated Construction Cost: $65 million

Estimated Letting: September 2017

PROGRAMMING STATUSCSJ: 0047-14-053MTP (2035 Metropolitan Transportation Plan, 2014 Amendment)

YES

UTP (2015 Unified Transportation Program); Authority - Plan YES

STIP (Statewide Transportation Implementa-tion Program)

YES*

*Phase-Engineering (07/2014 Revision: Approved 12/02/2014).

CSJs: 0047-14-069; 0047-14-074MTP (2035 Metropolitan Transportation Plan, 2014 Amendment)

YES

UTP (2015 Unified Transportation Program); 2015 Authority - Develop

YES

STIP (Statewide Transportation Implementa-tion Program)

YES**

**Phase-Engineering, Right-of-Way, Construction (07/2014 Revision: Approved 12/02/2014).

CONTACT INFORMATIONSuja Mathew, P.E.

TxDOT Transportation Engineer Supervisor (214) 320-6184 • [email protected]

Barry Heard, P.E.TxDOT Area Engineer

(972) 542-2345 [email protected]

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

DENTONCOUNTY

COLLINCOUNTY

78

78

78

75

289

DNT

DNT

DNT

289

121

121

121

121

982

205190

190

544

546

543

543

380

380

380380

5

2478

2478

3537

2862

1377

1827

3356

35E

635635 30

Melissa

Anna

NewHope

Princeton

LavonLake

LakeRay

Hubbard

LavonWylie

Lucas

Parker

Richardson

St. Paul

66289Rowlett

Addison

66Rockwall

Hebron

Frisco

ROCKWALL CO.

McKINNEY

Garland

DEN

TON

CO

.

COLL

IN C

O.

McKinneyMunicipalAirport

DALLAS CO.

COLLIN CO.

DALLAS CO.

COLLIN CO.

5 miles

N

75

75 78

190

5

5

5

COLLIN CO.

GRAYSON CO.

Concurrent Flow

This project is not in Mobility 2035 Plan

KEY

2

3

1

4

5

8

6

7

10

11

9

Dallas

McKinney

2035E

Detail

121

121

7875

75

80

380

377

635

35E

30

30