dallas conty constrction projects connec y...

1
TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT 0939_080620 DALLAS COUNTY CONSTRUCTION PROJECTS 2020 HIGHWAY PROJECTS: Connecting You With Texas SUMMER • Q3 2020 Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 CONTACT INFORMATION Laura Weaver – Public Information Officer (214) 320-4404 [email protected] TxDOT graphic SOURCE: Texas Department of Transportation. DALLAS COUNTY PROJECTS UNDER CONSTRUCTION (SUMMER Q3 2020) # CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete 1 0197-02-122 US 175 I-45 to E of Bexar St. Extend US 175; recon SM Wright/SH 310 Feb-2016 Jun-2016/ Sep-2020 Webber, LLC $103.9 M 90% 2 0092-14-096 I-45/I-20 I-45 at I-20 Bridge and deck repair Jun-2019 Aug-2019/Mar-2020 Gibson & Associates $8.3 M 100% 3 2374-01-137 I-635 US 75 to south of IH 30; east and west on IH 30 Reconstr./widen existing facility (2/3FR+5GPL+5GPL+2/3FR); Interchange Improv. Aug-2019 Aug-2019/Jan-2025 Pegasus Link Constructors $1.7 B 11% 4 0009-02-069 SH 78 Garland Rd. from S of Tranquilla to SP 244 (NW Hwy.) 9 Intersection Improvements Jan-2019 Aug-2019/Sep-2021 Ragle Constru., Inc. $8.7 M 40% 5 0261-02-074 US 67 Belt Line Rd. to I-20 Widen frwy. from 4-lanes to 6-lanes May-2017 Sep-2017/Oct-2020 Flatiron Contr., Inc. $59 M 80% 6 0196-03-268 I-35E I-30 to N of Oak Lawn Ave. Reconstruct 2-lane FR and interchanges Jun-2017 Oct-2017/Mar-2021 Balfour Beatty Infrastructure, Inc. $78.8 M 82% 7 2374-04-049 I-20 W of Carrier Pkwy. to FM 1382 (Belt Line Rd.) Construct 6-lane frontage roads/ramp mods Jun-2017 Jan-2018/Aug-2021 Fluor Heavy Civil, LLC $54.2 M 70% 8 0353-06-057 SH 114 At Texas Plaza in the City of Irving Construct 0 to 4-lane signature bridge Jun-2017 Mar-2018/Nov-2020 Webber, LLC $39.5 M 90% 9 0092-14-092 I-345 North Good Latimer Expy. to SS 366 Full depth concrete repair on frontage roads Jun-2019 Mar-2020/Aug-2020 Ragle Constru., Inc. $4.0 M 95% 10 0196-03-278 I-35E I-35E from N of Oak Lawn to N of Harry Hines Full depth repair; frontage road construction Jul-2019 Sep-2019/Aug-2020 O. Trevino Construction $4.3 M 90% 11 2374-01-180 I-635 East of Abrams Rd. to west of Plano Rd. Construct noise walls at various locations Nov-2017 May-2018/Apr-2020 Austin Bridge & Road Services, LP $11.8 M 100% 12 0581-01-137 SL 12 At Mockingbird/Peavy Replace bridge & approaches Jan-2019 Jul-2019/Aug-2020 Ragle Constru., Inc. $6.1 M 80% 13 0197-02-121 US 175 Seagoville Road to Malloy Bridge Road Slope failure repair Jun-2018 Oct-2018/Aug-2020 Austin Bridge & Road, LP $11.4 M 95% 14 0918-47-176 CS On Belt Line Rd. from Dry Branch to Bear Creek Drainage improvements May-2018 Jul-2018/Mar-2020 T. K. West Group LLC $3 M 100% 15 0197-02-126 US 175 I-20 to Kaufman CL Full depth pavement repair Jun-2019 Aug-2019/May-2020 O. Trevino Construction $3 M 100% 16 1068-04-119 I-30 SH 161 to NW 7th St. in Grand Prairie Construct 0 to 4 frontage roads Jun-2018 Oct-2018/Jun-2021 Sema Constr., Inc. $37.8 M 75% 17 2964-01-048 SH 161 S of SH 183 to N of Belt Line Rd. Widen & constru. 4 to 8 GPL (6-lns peak travel) Jun-2018 Oct-2018/Aug-2020 J. D. Abrams, L.P. $20.1 M 93% 18 2374-02-147 I-635 At Seagoville Rd. Replace bridge deck Jul-2018 Mar-2020/Oct-2020 Sema Constr., Inc. $9.2 M 20% 19 0442-02-088 I-35E/ US 67 (TSG) 8th St. to US 67; US 67 from I-35E to I-20 Widen highway and add reversible non- tolled express lanes Spring 2018/ Summer 2022 2022 Pegasus Link Constructors, LLC $666 M 55% 20 2374-04-060 I-20 N of Main Street to Camp Wisdom Road Construct 0 to 4 lane frontage roads Dec-2018 Aug-2019/Jan-2021 Fluor Heavy Civil, LLC $11.9 M 45% 21 2374-07-063 I-635 Royal Lane to West of Belt Line Road Construct 0 to 2 lane wb frontage road and ramp modifications Aug-2023 Spring 2020/TBD ------- $19.3 M 0% 22 0009-02-040 SH 78 In Garland from I-635 to Forest Ln. Traffic signals and intersection improvement Apr-2019 Sep-2019/Sep-2021 Gibson & Associates $4.6 M 25% 23 0092-01-052 US 175 South of Budd St. to I-45 Construct freeway to 6 lane divided arterial Dec-2019 Jul-2020/Sep-2023 Johnson Bros Corp $46.2 M 0% 24 0092-01-059 SH 310 Pennsylvania Ave. to N of Al Lipscomb Way Reconstruct I-45 and SM Wright Interchange Dec-2019 Jul-2020/Sep-2023 Johnson Bros Corp $11.2 M 0% 25 0092-14-088 I-45 Lenway St. to Good Latimer Reconstruct I-45 and SM Wright Interchange Dec-2019 Jul-2020/Sep-2023 Johnson Bros Corp $30.5 M 0% 26 0430-01-057 SH 352 North of Kearney St. to US 80 EB frontage road Reconstruct 4 lane undivided rural to 4 lane divided urban roadway Mar-2020 TBD/TBD Ed Bell Construction Co. $12.4 M 0% 27 0581-02-124 Irving IC SL 12 at SH 183 and Spur 482 at SH 114 and SH 183 Reconstruct Interchanges May-2020 Fall 2020/TBD Webber, LLC $301M 0% ESTIMATED TOTAL $3.29 B TxDOT graphic NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of SUMMER Q3 2020. 4 1 5 2 3 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 8 35E 35E 35E 35E DNT DNT 635 635 635 20 20 45 45 45 20 20 30 121 114 114 161 161 180 180 342 342 342 352 183 356 121 121 121 121 190 289 289 190 190 1382 1382 N 5 miles 75 75 75 67 80 80 67 77 35E 77 67 78 66 78 78 12 12 12 12 12 12 COLLIN CO. DALLAS CO. DENTON CO. COLLIN CO. DALLAS CO. ROCKWALL CO. DALLAS CO. ELLIS CO. DALLAS CO. ELLIS CO. KAUFMAN CO. DALLAS CO. TARRANT CO. 544 408 175 2377 660 983 664 664 Garland Rd. Mesquite Garland Richardson Irving Grand Prairie Las Colinas Farmers Branch Coppell Carrollton Addison Duncanville Desoto Hutchins Seagoville Wilmer Lancaster Lawson Combine Mesquite Garland Richardson Hebron The Colony Irving Grand Prairie Las Colinas Farmers Branch Coppell Carrollton Addison Duncanville Desoto Hutchins Seagoville Wilmer Lancaster Lawson Combine Rowlett Rowlett North Lake Lewisville Lake Dallas Executive Airport Joe Pool Lake W Belt Line Rd. S Belt Line Rd. University Park Highland Park Cockrell Hill Cockrell Hill Red Oak Ovilla Ferris Red Oak Ovilla Ferris Pecan Hill E Belt Line Rd. Malloy Bridge Rd. Lancaster Regional Airport Mesquite Metro Airport S B e l t L i n e R d. 77 30 30 Balch Springs Balch Springs 287 University Park Highland Park DFW Int’l. Airport Lancaster Regional Airport DALLAS Mountain Creek Lake Plano Lewisville Sachse Murphy Wylie Saint Paul MIDLOTHIAN MIDLOTHIAN Lake Ray Hubbard Sunnyvale Projects Under Construction

Upload: others

Post on 15-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DALLAS CONTY CONSTRCTION PROJECTS Connec Y Texasftp.dot.state.tx.us/.../construction/dallas-cst.pdf · DALLAS COUNTY PROJECTS UNDER CONSTRUCTION (SPRING Q2 2020) # CSJ Hwy Project

TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0939

_080

620

DALLAS COUNTY CONSTRUCTION PROJECTS2020 HIGHWAY PROJECTS:

Connecting You With Texas

SUMMER • Q3 2020

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONLaura Weaver – Public Information Officer (214) 320-4404 • [email protected] TxDOT graphicSOURCE: Texas Department of Transportation.

DALLAS COUNTY PROJECTS UNDER CONSTRUCTION (SUMMER Q3 2020)

# CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0197-02-122 US 175 I-45 to E of Bexar St. Extend US 175; recon SM Wright/SH 310 Feb-2016 Jun-2016/ Sep-2020 Webber, LLC $103.9 M 90%

2 0092-14-096 I-45/I-20 I-45 at I-20 Bridge and deck repair Jun-2019 Aug-2019/Mar-2020 Gibson & Associates $8.3 M 100%

3 2374-01-137 I-635 US 75 to south of IH 30; east and west on IH 30Reconstr./widen existing facility(2/3FR+5GPL+5GPL+2/3FR); Interchange Improv. Aug-2019 Aug-2019/Jan-2025 Pegasus Link Constructors $1.7 B 11%

4 0009-02-069 SH 78 Garland Rd. from S of Tranquilla to SP 244 (NW Hwy.) 9 Intersection Improvements Jan-2019 Aug-2019/Sep-2021 Ragle Constru., Inc. $8.7 M 40%

5 0261-02-074 US 67 Belt Line Rd. to I-20 Widen frwy. from 4-lanes to 6-lanes May-2017 Sep-2017/Oct-2020 Flatiron Contr., Inc. $59 M 80%

6 0196-03-268 I-35E I-30 to N of Oak Lawn Ave. Reconstruct 2-lane FR and interchanges Jun-2017 Oct-2017/Mar-2021Balfour Beatty Infrastructure, Inc.

$78.8 M 82%

7 2374-04-049 I-20 W of Carrier Pkwy. to FM 1382 (Belt Line Rd.) Construct 6-lane frontage roads/ramp mods Jun-2017 Jan-2018/Aug-2021 Fluor Heavy Civil, LLC $54.2 M 70%

8 0353-06-057 SH 114 At Texas Plaza in the City of Irving Construct 0 to 4-lane signature bridge Jun-2017 Mar-2018/Nov-2020 Webber, LLC $39.5 M 90%

9 0092-14-092 I-345 North Good Latimer Expy. to SS 366 Full depth concrete repair on frontage roads Jun-2019 Mar-2020/Aug-2020 Ragle Constru., Inc. $4.0 M 95%

10 0196-03-278 I-35E I-35E from N of Oak Lawn to N of Harry Hines Full depth repair; frontage road construction Jul-2019 Sep-2019/Aug-2020 O. Trevino Construction $4.3 M 90%

11 2374-01-180 I-635 East of Abrams Rd. to west of Plano Rd. Construct noise walls at various locations Nov-2017 May-2018/Apr-2020Austin Bridge & Road Services, LP

$11.8 M 100%

12 0581-01-137 SL 12 At Mockingbird/Peavy Replace bridge & approaches Jan-2019 Jul-2019/Aug-2020 Ragle Constru., Inc. $6.1 M 80%

13 0197-02-121 US 175 Seagoville Road to Malloy Bridge Road Slope failure repair Jun-2018 Oct-2018/Aug-2020 Austin Bridge & Road, LP $11.4 M 95%

14 0918-47-176 CS On Belt Line Rd. from Dry Branch to Bear Creek Drainage improvements May-2018 Jul-2018/Mar-2020 T. K. West Group LLC $3 M 100%

15 0197-02-126 US 175 I-20 to Kaufman CL Full depth pavement repair Jun-2019 Aug-2019/May-2020 O. Trevino Construction $3 M 100%

16 1068-04-119 I-30 SH 161 to NW 7th St. in Grand Prairie Construct 0 to 4 frontage roads Jun-2018 Oct-2018/Jun-2021 Sema Constr., Inc. $37.8 M 75%

17 2964-01-048 SH 161 S of SH 183 to N of Belt Line Rd. Widen & constru. 4 to 8 GPL (6-lns peak travel) Jun-2018 Oct-2018/Aug-2020 J. D. Abrams, L.P. $20.1 M 93%

18 2374-02-147 I-635 At Seagoville Rd. Replace bridge deck Jul-2018 Mar-2020/Oct-2020 Sema Constr., Inc. $9.2 M 20%

19 0442-02-088I-35E/US 67 (TSG)

8th St. to US 67; US 67 from I-35E to I-20Widen highway and add reversible non-tolled express lanes

Spring 2018/ Summer 2022

2022Pegasus Link Constructors, LLC

$666 M 55%

20 2374-04-060 I-20 N of Main Street to Camp Wisdom Road Construct 0 to 4 lane frontage roads Dec-2018 Aug-2019/Jan-2021 Fluor Heavy Civil, LLC $11.9 M 45%

21 2374-07-063 I-635 Royal Lane to West of Belt Line RoadConstruct 0 to 2 lane wb frontage road and ramp modifications

Aug-2023 Spring 2020/TBD ------- $19.3 M 0%

22 0009-02-040 SH 78 In Garland from I-635 to Forest Ln. Traffic signals and intersection improvement Apr-2019 Sep-2019/Sep-2021 Gibson & Associates $4.6 M 25%

23 0092-01-052 US 175 South of Budd St. to I-45 Construct freeway to 6 lane divided arterial Dec-2019 Jul-2020/Sep-2023 Johnson Bros Corp $46.2 M 0%

24 0092-01-059 SH 310 Pennsylvania Ave. to N of Al Lipscomb Way Reconstruct I-45 and SM Wright Interchange Dec-2019 Jul-2020/Sep-2023 Johnson Bros Corp $11.2 M 0%

25 0092-14-088 I-45 Lenway St. to Good Latimer Reconstruct I-45 and SM Wright Interchange Dec-2019 Jul-2020/Sep-2023 Johnson Bros Corp $30.5 M 0%

26 0430-01-057 SH 352 North of Kearney St. to US 80 EB frontage roadReconstruct 4 lane undivided rural to 4 lane divided urban roadway

Mar-2020 TBD/TBD Ed Bell Construction Co. $12.4 M 0%

27 0581-02-124 Irving IC SL 12 at SH 183 and Spur 482 at SH 114 and SH 183 Reconstruct Interchanges May-2020 Fall 2020/TBD Webber, LLC $301M 0%

ESTIMATED TOTAL $3.29 B

TxDOT graphicNOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of SUMMER Q3 2020.

4

1

5

2

3

6

7

9

10

11

12

13

14

15

16

17

1819

20

21

22

23

24

2526

278

35E

35E

35E

35E

DNT

DNT635

635

635

20

20

45

45

45

20

20

30

121

114

114161

161

360

360

180

180

342

342

342

352

183

356

183

121

121

121

121

190

289

289

190

190

205

1382

1382

N

5 miles

75

75

75

67

8080

6777

35E

77

77

67

67

78

66

78

78

1212

12

12

12

12

COLLIN CO.

DALLAS CO.

DENTON CO. COLLIN CO.

DALLAS CO.

ROCK

WALL

CO.

DALLAS CO.

ELLIS CO.

DALLAS CO.

ELLIS CO.

KAUF

MAN

CO.

DALL

AS CO

.

TARR

ANT C

O.

1171

544

740

408

175

3039

2377

660

983

813813

664664

663

664

Garland Rd.

Mesquite

Garland

Richardson

Irving

Grand Prairie

Las Colinas

FarmersBranch

Coppell Carrollton

Addison

Duncanville

Desoto

Hutchins Seagoville

WilmerLancaster

Forney

Crandall

Lawson

Combine

Mesquite

Garland

Richardson

Hebron

TheColony

Irving

Grand Prairie

Las Colinas

FarmersBranch

Coppell Carrollton

Addison

Duncanville

Desoto

Hutchins Seagoville

WilmerLancaster

Forney

Crandall

Lawson

Combine

Rowlett

Lavon

Rowlett

Lavon

ROCKWALLNorthLake

LewisvilleLake

Dallas ExecutiveAirport

Joe PoolLake

W Belt Line Rd.

S B

elt Li

ne Rd

.

University Park

Highland Park

Cockrell Hill

Cockrell Hill

HeathHeath

Red OakOvilla FerrisRed OakOvilla Ferris

Palmer

Pecan Hill

E Belt Line Rd.

Malloy Bridge Rd.

LancasterRegionalAirport

MesquiteMetro

Airport

S Be

l t Lin

e Rd.

77

30

30

Balch SpringsBalch Springs

287

287

University Park

Highland Park

DFW Int’l.Airport

LancasterRegionalAirport

DALLAS

Mountain CreekLake

Plano

Lewisville

Sachse

MurphyWylieSaint

Paul

MIDLOTHIAN

WAXAHACHIE

MIDLOTHIAN

WAXAHACHIE

Lake RayHubbard

Sunnyvale

Projects Under Construction