Page 1: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur
Page 2: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

DAITARI IRON ORE MINING PROJECTAt Village Talapada, Tehsil Harichandanpur of Keonjhar &

Sukida Tehsil of Jajpur district

ENVIRONMENTAL IMPLICATION OF ROADTRANSPORTATION ALONG

WITH PROPOSED MITIGATION MEASURES

Environmental Consultant

MECON LIMITED(A Govt. of India Enterprise)

Vivekananda PathPO. Doranda, Dist – Ranchi,

Jharkhand – 834002

(Sl.No. in the list of NABETAccredited Consultant Organization: 103

ENVIRONMENTAL IMPLICATION OF ROADTRANSPORTATION ALONG

WITH PROPOSED MITIGATION MEASURES

Project Proponent

Post Box No.34,Bhubaneswar-751001, Odisha

(A Govt. of Odisha undertaking)

May, 2016MEC/11/16/Q7B4/PP/2247/R0

Page 3: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

© 2016 MECON Limited, All rights reserved

ContentPage i

CONTENTS

1.0 Background 1

2.0 Physiography 5

3.0 Climate 6

4.0 Present Environmental Status 7

4.1 Meteorology 9

4.2 Ambient Air Quality 11

5.0 Traffic Density 13

5.1 Traffic Survey 135.2 Possibility of increasing truck traffic from Daitari mines 18

6.0 Environmental implications of transportation on air quality 20

6.1 Impact on air quality due to transportation of ore through

ghat road

20

6.2 Mitigation measures to minimize impact on air quality due to

transportation of ore through ghat road

24

8.0 Results and Discussions 24

Page 4: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

© 2016 MECON Limited, All rights reserved

ContentPage ii

TABLES

Table 1 Ambient Air Quality Monitoring StationsTable 2 Summarised Ambient Air Quality Monitoring ResultsTable 3 Traffic Survey locationsTable 4 Summarized Traffic Density DataTable 5 Meteorological data used for GLC predictionTable 6 Predicted Resultant Air Quality

FIGURES

Fig.1 Location of Daitari ML.Fig.2 Despatch routesFig.3 Monthly variation of daily avg. max. and min. temperatureFig.4 Monthly variation of Rainfall vis-à-vis Potential evapo-transpirationFig.5 Locations of monitoring stationsFig.6.1 Wind Rose at Daitari (24 hours overall)Fig.6.2 Wind Rose at Daitari (Day)Fig.6.3 Wind Rose at Daitari (Night)Fig.7.1 Photograph showing a stretch of Ghat roadFig.7.2 Photograph showing a stretch of Daitari-Paradip expresswayFig.8.1 Graph showing Existing traffic density of ghat roadFig.8.2 Graph showing existing traffic density on Daitari-Paradip Expressway near zero pointFig.8.3 Graph showing existing traffic density on Daitari-Paradip Expressway near Daitari

police stationFig.9.1 Graph showing possible increase in traffic density on ghat roadFig.9.2 Graph showing possible increase in traffic density on daitari-paradip expresswayFig.10.0 Isopleths representing the maximum ground-level concentrations

APPENDIX

Appendix 1 Baseline monitoring data report of the study period (01.03.2016 to 15.05.2016)

Page 5: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 1

1.0 BACKGROUND

Odisha Mining Corporation Limited (OMC) was jointly established by the Union andState Governments in 1956 as the first state Public Sector Unit (PSU) in mining sector inthe country for exploration, exploitation and marketing of minerals. In the year 1962,OMC became wholly owned by the State Government. Odisha Mining Corporation Ltd.has been classified as a “Gold” Category State PSU.

OMC holds / operates 35 mining leases consisting of 11 iron ore leases, 3 manganeseore leases, 5 iron & manganese ore leases, 11 chromite leases, 1 limestone lease and 4gemstone (semi-precious ruby / corundum) leases only in Odisha state. The majorminerals mined by OMC are chrome, iron and manganese ore which cater to therequirement of mineral based industries such as steel, sponge iron, pig iron, ferro-manganese, ferro-chrome etc. At the present rate, OMC is producing about 10% of totaliron ore production and about 30% of the total chrome ore production of the state.

Daitari iron ore lease is spread over Talpada village, Rebana Reserve Forest and DaitariProtected Forest between latitudes 21005’33.1”N & 21007’08.8’’N and longitudes85046’01.9”E & 85049’17.0’'E. The area is covered under Survey of India toposheet no.73 G/16. Location of Daitari ML is shown in Fig 1.

Daitari iron ore lease deed for total area of 1812.99 ha was executed on 27.01.1966 fora period of 30 years, which expired on 26.01.1996. Application for further renewal of thelease for a period of 20 years w.e.f. 27.01.1996 was made on 21.01.1995 for a leasearea of 1812.99 ha. In the meantime OMC decided to retain only 190.20 ha area andsurrender balance part of the mining lease area, and accordingly a revised renewalapplication was filed by OMC on 22.05.1997 for an area over 190.20 ha. Mining planunder Rule 22 (1) of MCR 1960 for a lease area of 190.20 ha was approved by IBM videletter No. 314(3)/97/MCCM(C)/MP-10, dated 14.09.1998. Subsequently, the Scheme ofmining along with Progressive Mine Closure Plan (PMCP) for the period from 2003-2008over 190.20 ha area was submitted by the lessee and approved by Indian Bureau ofMines vide letter No 314(3)/97/MCCM(C)/S-22/2003, dated 11.07.2006.

Later on OMC management again decided to retain the original lease area of 1812.99 hawithout surrendering any part of the lease and requested Principal Secretary to Govt. ofOdisha, Department of Steel & Mines Bhubaneswar to grant 1st renewal of the mininglease over an area of 1812.99 ha vide letter no. 3156/OMC/G&S/2006 dated 09.02.2006.OMC also wrote similar letter to Director of Mines (Odisha) on 15.02.2012 to grant 1st

renewal of lease over an area of 1812.99 ha. Scheme of mining along-with PMCP for theperiod 2008-2013 and for an area of 1812.99 ha was approved by IBM vide letter No314(3)/2008/MCCM(CZ)/MS-12, dated 06.10.2008. Approved Mining Plan for an area of190.20 ha was modified for the revised lease area of 1812.99 ha. The same was

Page 6: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 2

Balsingha

Kahneipal Kanshargorha

OstapalOdisha Kuhika Sukinda

LakhindarpurBirasal

BadhakathiaKaduabandi

Bhimatangar

Chirigunia

Pimpudia

Baulapal

BandhaganDuburi

Santarpur

Kanjiapal Jamupashi

KaliapaniSaruabil

Daitari

Baliparbat

Nuagan

TurkipadaBalisahi

Nardangipenth

ROAD

RAILWAY

MAJOR SETTLEMENTS

WATER BODIES

MINE LEASE AREA

PARADEEP EXPRESS HIGHWAY

DISTRICT BOUNDARY

DaitariML Daitari

Rly.Siding

ParadeepExpresswayJ A J P U R

K E O N J H A R

GhatRoad

Balsingha

Kahneipal Kanshargorha

OstapalOdisha

Kumursingha

Kuhika Sukinda

LakhindarpurBirasal

BadhakathiaKaduabandi

Bhimatangar

Chirigunia

Pimpudia

Baulapal

BandhaganDuburi

Santarpur

Kanjiapal Jamupashi

KaliapaniSaruabil

DaitariBaliparbat

Nuagan

TurkipadaBalisahi

Nardangipenth

Fig 1: Location of Daitari ML

Page 7: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 3

approved by Indian Bureau of Mines vide letter no. 314(3)/2008/MCCM (CZ)/MP-16dated 06.10.2008. Last scheme of mining of Daitari iron ore lease for a period of 2013-2016 over an area of 1812.99 ha has been approved by IBM vide letter no.314(3)/2012-MCCM(CZ)/MS-52/223 dated 12.07.2013.

The Environment Clearance of the mine has been accorded by MoEFCC vide letter no. J-11015/1003/2007-IA.II(M) dated 22.09.2010 for a production capacity of 3.0 milliontonnes per annum. The stage-II Forestry Clearance of the mine has been accorded foran area of 95.60 ha by MoEFCC (FC Division) vide letter no. 8-164/97-FC dated 25th

/27th January 2005. Consent to operate have also been granted by the State PollutionControl Board, Odisha under the Air & Water (Prevent & Control of Pollution) Act videletter no. 5917/IND-I-CON-246 dated 05.04.2011, which is valid upto 31.3.2016.Consent to establish have also been granted by the State Pollution Control Board,Odisha under the Air & Water (Prevent & Control of Pollution) Act vide letter no.504/IND/-II-CON-47666 dated 12.01.2009. The lessee also has surface right over anarea of 520.30 ha.

Later it was again proposed by OMC to retain 1018.3085 ha and surrender theremaining area (794.6815 ha) to the state government. Permission from the stategovernment for obtaining renewal of the lease area over 1018.3085 ha. Accordingly,OMC prepared the Final Mine Closure Plan (FMCP) for the proposed area to besurrendered i.e. 794.6815 ha and the same was approved by IBM vide letter no.314(3)/2012-MCCM(CZ)/FMCP-6/453 dated 15.03.2013. Certificate under rule 29A ofMCR 1960 has been issued by Regional Controller of Mines, Bhubaneswar vide letter no.FMCP/FM/05-ORI/BHU-2012-13 dated 25.06.2013. Precise area plan for the balanceretained area of 1018.3085 ha was approved by the Directorate of Mines, Odisha videletter no. MIV(B)-59/04-12897/DM dated 23/02/2013. The present lease area comprisesof forest Land, agricultural land, settlements, waste land, grazing land and roads.

The targeted production capacity of the mine at present is 3 million tonnes per year(MTPA) i.e. 10,000 TPD of iron ore. Out of 3 MTPA (till 16.03.2016), transportation ofabout 2 MTPA ore used to be done through 3.8 km long distance belt [closed] conveyor(LDBC) up to the stock pile at Baliparbat and the sized ore from Baliparbat used to bedispatched through rail. However, transportation of remaining 1 MTPA of ore used to beevacuated through ghat road (22 km), about half of which (i.e. 0.5 MTPA) send to therailway siding and remaining half send through expressway (Daitari-Paradip: 45 km) tolong-term consumers viz. NINL, TISCO, MESCO etc. at Kalinga nagar industrial area.The above despatch routes is illustrated in Fig 2.

IBM raised objection on transportation of mineral by ghat road at Daitari by OMC videletter ORI/IRON/KJR/MCDR-16/BBS/1870 dated 09.09.2015. OMC vide letter no.3511/OMC/OMC/2015 dated 05.10.2015 had provided to IBM the necessity for utilizationof road for mineral transportation at Daitari.

Page 8: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 4

Fig 2: Despatch routes

Ghat Road

Daitari Rly.Siding

ConveyorGallery

BaliparbatStockyard

Daitari-Paradip

Expressway

CrushingPlant

Daitari ML

Page 9: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 5

IBM reported violation of EC by OMC vide their letter no. ORI/IRON/KJR/MCDR-16/BBS/3241 dated 20.01.2016 as a portion of the mineral was being transportedthrough road instead of closed conveyor belt. Transportation of mineral by road wasthen discontinued from 16.03.2016 in view of IBM’s objection to road transport. OMCsought clarification vide letter no. 4436/OMC/F&E/2016 dated 26.03.2016 fromMOEF&CC regarding utilization of road for transportation of mineral from Daitari ML asstipulated in EC order J-11015/1003/2007-IA.II(M) dated 22.9.2010. MOEF&CC videletter J-11015/1003/2007-IA.II(M) (pt.) dated 07-04-2016 intimated OMC that thematter shall be referred to the EAC.

The proposal was considered during 5th meeting of the reconstituted committeeof the Expert Appraisal Committee for Environmental Appraisal of MiningProjects constituted under EIA notification, 2006 during April 25-26, 2016. EACdeferred consideration of the proposal till submission of "A detail report onenvironmental implication of road transportation along with proposed mitigationmeasures." Accordingly OMC engaged M/s MECON Limited, Ranchi – 834002(Sl.No. in the list of NABET Accredited Consultant Organization: 111 as on May09, 2016) to carry the aforesaid study and submit a report.

2.0 PHYSIOGRAPHY

The mine lease is located on the top of a steep hill range, the Daitari Range. The DaitariRange rises sharply from about 140m above mean sea level (AMSL) to more than 800mAMSL. There are peaks exceeding 800 m AMSL in the Daitari hill range. At places Daitarihill ranges are marked by very steep slopes including some bare rocky cliffs on the south.Further south, part of Sukinda valley is another hill range, the Mahagiri hill range, whichtoo is very steep and rises to more than 600 m AMSL. In the Mahagiri hill range also thereare a few bare rocky cliffs. On the northern side, the Daitari hills slope down to about 180m AMSL. The northern area is hilly with several hillocks having gullies between them.North of the hills are densely forested. The mine lease is located on top of a steep ridge.The top of the ridge is at more than 840 m AMSL (on the N – S axis of the lease on thewestern side), whereas the lowest point of the lease is at 420 m AMSL (towards theeastern boundary).

The area has dendritic pattern of drainage. The south-eastern part of the lease area isdrained by a number of seasonal channels which drain into Talangi Nala which in turndrains into the Damsal Nala, which is the principal drainage channel of Sukinda valley. Thesouth-western part of the lease area is drained by seasonal channels draining into PatnaNala – another tributary of Damsal Nala. The Damsal Nala, flows from east to west alongthe length of Sukinda valley. The northern half of the lease area is drained by severalseasonal channels, which drain into a water reservoir about a km north of the lease area.A perennial stream, Kukurangi Nala emerges from this reservoir and flows initially towards

Page 10: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 6

the north-east but subsequently turns towards the south-east and joins another perennialriver, Kusai Nadi. Kusai Nadi receives drainage channels from the western, northern(including a perennial stream Bagai Nadi from the north) and eastern parts of the studyarea. It flows initially from the north-west to south-east but turns towards the east.

3.0 CLIMATE

The study area lies in the tropical region where climate is characterized by veryhot summers and cool winters. Summer is typically from March to June whenmonthly temperature ranges from a maximum of 39°C during daytime to aminimum of 22°C at night. Winter is from November to February when themaximum temperature during day goes up to 32°C and minimum temperatureat night becomes as low as 15°C. Monthly Variation in daily average maximumand minimum temperature as recorded at India Meteorological Department’s(IMD) observatory at Cuttack is illustrated as Fig.3.

The average annual rainfall as recorded at IMD observatory at Cuttack is 1475.3mm. The Southwest monsoon lasts from mid June to mid September and thearea gets more than 75% of the annual rainfall during this period. MonthlyVariation in rainfall vis-à-vis potential evapotranspiration as recorded at IMD’sobservatory at Cuttack is illustrated as Fig.4.

Source: Climatological Tables and Observations in India, IMD, Cuttack.

Page 11: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 7

Fig.3: Monthly variation of daily avg. max. and min. temperature

Source : Climatological Tables and Observations in India, IMD, Cuttack

Fig. 4: Monthly variation of Rainfall vis-à-vis Potential evapo-transpiration

4.0 PRESENT ENVIRONMENTAL STATUS

OMCL has engaged M/s Ecological Development Consultancy Pvt. Ltd. (EDCPL),Bhubaneswar, Odisha for carrying out regular environmental monitoring for theirdifferent mining leases in the district of Jajpur, Keonjhar and Sundergarh.Environmental monitoring includes monitoring of various environmentalattributes such as Meteorology, Ambient Air Quality, Work Zone Air Quality,Noise Level, Water Quality, Waste Water Quality, Vehicular Emission and SoilQuality, Traffic density survey. This report has been prepared on the basis ofbaseline environmental data monitored by EDCPL from 01-03-2016 to 15-05-2016. Hereinafter shall be referred as the study period. Location of themeteorological station, AAQ monitoring stations and Traffic survey points are marked inFig 5. Detailed monitoring results (Meteorological data, date-wise detailed AAQmonitored data and AAQ monitoring stations and date-wise detailed hourly trafficdensity data are given in Appendix 1.

Page 12: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 8

Traffic Survey Location Ghat Road

AAQ Monitoring Station Daitari-Paradip Expressway

MET Station

Fig 5: Location of monitoring stations

Page 13: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 9

4.1 METEOROLOGY

Prevailing micro-meteorological conditions at site regulate the dispersion (andhence dilution) of air pollutants in the atmosphere. Therefore study ofmeteorological conditions is an integral part of environmental impactassessment studies.

Micro-meteorological data is continuously being monitored at site through anAutomatic Weather Monitoring Station installed at the rooftop of OMC office(21°06’40.44”N; 85°50’22.86”E) of Daitari Iron Ore Mine to collect the meteorologicaldata on hourly basis continuously. The parameters monitored at the meteorologicalstation are Temperature, Relative Humidity, Wind Speed, Wind Direction and Rainfall.Location of the meteorological station is marked in Fig 5 and the detailedmeteorological data is given as Appendix:1

During the study period the temperature varied from 16.16 ºC to 44.82 ºC & RelativeHumidity varied from 11.34 % to 97.54 %. The maximum wind speed recorded duringthe month was 13.9 m/s and overall average wind speed is calculated to be 2.98 m/s.12.66 % of the time the wind remained calm (≤0.5 m/s). The total rainfall was 16.8 mmand 21 days out 76 days were rainy days. The predominant wind direction as observedto be from WSW quadrant during the study period. Figs. 6.1, 6.2 and 6.3 give thewind-rose diagrams during the study period at Daitari separately for 24 hours overall,day and night time respectively, based on the monitored data.

Fig. 6.1: Wind Rose at Daitari (24 hours overall)

Page 14: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 10

Fig. 6.2: Wind Rose at Daitari (Day)

Fig. 6.3: Wind Rose at Daitari (Night)

Page 15: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 11

4.2 AMBIENT AIR QUALITY

M/s EDCPL has been engaged by M/s OMCL for regular monitoring of ambientair quality is monitored at six (6) locations. Monitoring is carried out forParticulate Matter (PM10), Particulate Matter (PM2.5), Sulphur Dioxide (SO2),Oxides of Nitrogen (NOX) and Carbon Monoxide (CO). The PM10 & PM2.5 wasmonitored for 24 hourly, while SO2 and NOX were monitored on 4 hourly basesfor 24 hours at each sampling location and CO was monitored using the COMonitor for 1 hr in a day in each monitoring station twice in a week for a month.Details about Air Quality Monitoring locations are given in Table 1. Location ofthe AAQ monitoring stations are marked in Fig 5. The summarised results ofambient air quality monitoring is given in Table 2 and date-wise detailed AAQmonitored data is given as Appendix:1.

Table 1: Ambient Air Quality Monitoring Stations:

Sl.No. Location Station

CodeCoordinates

Latitude Longitude1 Hilltop near mine canteen A1 21°05’38.70”N 85°48’42.84”E2 Daitari Guest House A2 21°06’34.10”N 85°49’29.40”E3 OMC Office A3 21°06’40.44”N 85°50’22.86”E4 Baliparbat Township A4 21°06’30.72”N 85°51’35.70”E5 Water Reservoir Pump House A5 21°07’39.06”N 85°48’43.44”E6 Near Hospital Daitari A6 21°06’43.14”N 85°49’25.20”E

Results and discussion:

Particulate Matter (PM10): The Value of PM10 ranges between 42 μg/m3 to 94 μg/m3.However, the C98 value of PM10 ranges between 76.4 μg/m3 to 93μg/m3. The results arewell within the prescribed norms of CPCB.Particulate Matter (PM2.5): The Value of PM2.5 ranges between 14 μg/m3 to 40μg/m3. However, the C98 value of PM2.5 ranges between 33.6 μg/m3 to 38.6 μg/m3.Theresults are well within the prescribed norms of CPCB.Sulphur Dioxide (SO2): The Value of SO2 ranges between <4.0 μg/m3 to 8.4 μg/m3.However, the C98 value of SO2 ranges between 6.45 μg/m3 to 8.32 μg/m3. The resultsare well within the prescribed norms of CPCB.Oxides of Nitrogen (NOX): The Value of NOX ranges between <10.0 μg/m3 to 17.6μg/m3. However, the C98 value of NOX ranges between 13.3 μg/m3 to 17.4 μg/m3. Theresults are well within the prescribed norms of CPCB.Carbon Monoxide (CO): The Value of CO is less than 0.11 mg/m3. Results are wellwithin the prescribed norms of CPCB.

Page 16: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 12

Table 2: Summarized Ambient Air Quality Monitoring Results:

Parameters PM10 PM2.5 SO2 NOX CO

Name of monitoringequipment used

Respirable DustSampler (RDS)

Respirable DustSampler (RDS)

RDS &Spectrophoto-

Meter/Colorimeter

RDS &Spectrophoto-

meter/ColorimeterCO analyzer

Method of measurement Gravimetric Gravimetric Improved West andGaeke method

Jacob andHochheise NDIR

Equipment sensitivity Detection Limit:1 µg/m3

Detection Limit:5 µg/m3

Detection Limit:4 µg/m3

Detection Limit:9 µg/m3

Detection Limit:0.11 mg/m3

Sl.No.

StationCode Co-ordinate Max. Min. C98 Max. Min. C98 Max. Min. C98 Max. Min. C98 Max. Min. C98

1. A1 21°05’38.70”N85°48’42.84”E 77 45 76.4 34 16 33.6 7.2 4.7 7.15 14.5 9.7 14.4 <0.11 <0.11 <0.11

2. A2 21°07’34.10”N85°49’29.40”E 85 44 84.2 38 15 37.5 7.8 4.4 7.73 16.4 9.7 16.3 <0.11 <0.11 <0.11

3. A3 21°07’40.44”N85°50’22.86”E 91 47 90.1 37 18 36.6 8.2 5.2 8.14 16.8 10.6 16.7 <0.11 <0.11 <0.11

4. A4 21°07’30.72”N85°51’35.70”E 94 46 93.0 40 17 39.5 8.4 4.5 8.32 17.6 9.9 17.4 <0.11 <0.11 <0.11

5. A5 21°07’39.07”N85°48’43.44”E 79 42 78.3 37 14 36.5 6.5 <4.0 6.45 13.4 <9.0 13.3 <0.11 <0.11 <0.11

6. A6 21°07’43.14”N85°49’25.20”E 85 54 84.4 39 19 38.6 7.6 4.9 7.54 15.8 9.9 15.7 <0.11 <0.11 <0.11

Page 17: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 13

5.0 TRAFFIC DENISTY

In order the assess the existing traffic load on evacuation corridor mainly on ghat road,traffic survey on 24 hourly basis for 4 days during the study period was conducted at 3locations. Details of traffic survey locations are given in Table 3. Traffic surveylocations are marked in Fig 5. The summarised results of traffic density data is givenin Table 4 and date-wise detailed traffic density data is given as Appendix:1.

5.1 TRAFFIC SURVEY

Table 3: Traffic survey locations:

Sl.No. Location Road Stretch Station

CodeCoordinates

Latitude Longitude

1. Near Daitari Guesthouse(just outside the MLarea)

Ghat Road TD1 21°06’36.06”N 85°49’33.42”E

2. Near Zero point(100 m away fromDaitari welcome gatetowards Tomka)

Daitari-Paradip

Expressway

TD2 21°06’22.72”N 85°52’19.08”E

3. Near Daitari Policestation(0.5 km away fromdaitari railway sidingtowards Tomka)

Daitari-Paradip

Expressway

TD3 21°07’18.84”N 85°54’52.18”E

Significance of traffic survey locations are as follows:

TD1: Classified volume count of all vechicles either entering the Daitari ML area orexiting from the Daitari ML area.

TD2: Classified volume count of vehicles either (i) coming from/going towards ghatroad (Daitari ML/township area) or (ii) coming from/going towards stock pile(Baliparbat area).

TD3: Classified volume count of vechicles coming from/going towards Tomka/Kalinga Nagar Industrial area (excluding the vehicles plying only till daitari railwaysiding).

Page 18: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 14

Table 4: Summarized Traffic Density data:

(a) TD1: Near Daitari Guest house

Readings DateTWO WHELLER LMV HMV Total

VehiclesTraffic inPCU/DayTo Fro To Fro To Fro

1 03.05.2016 47 44 50 30 13 14 198 2072 06.05.2016 27 25 47 65 12 18 194 2283 10.05.2016 43 36 36 34 22 19 190 2334 13.05.2016 31 28 32 30 13 12 146 167

Average 37 33 41 40 15 16 182 208

(b) TD2: Near Zero point

Readings Date TWO WHELLER LMV HMV TotalVehicles

Traffic inPCU/DayTo Fro To Fro To Fro

1 03.05.2016 204 157 71 79 1001 886 2398 59922 06.05.2016 162 169 74 74 624 768 1871 44903 10.05.2016 178 158 78 77 399 384 1274 26724 13.05.2016 184 188 68 70 1138 1102 2750 7044

Average 182 168 73 75 791 785 2073 5049

(c) TD3: Near Police Station

Readings Date TWO WHELLER LMV HMV TotalVehicles

Traffic inPCU/DayTo Fro To Fro To Fro

1 03.05.2016 346 313 82 74 536 574 1925 38162 06.05.2016 308 325 57 75 337 445 1550 27953 10.05.2016 380 333 87 104 126 96 1126 12144 13.05.2016 384 382 93 100 737 690 2386 4857

Average 355 338 80 88 434 451 1747 3170

Page 19: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 15

Fig. 7.1: Photograph showing a stretch of Ghat Road

Fig. 7.2: Photograph showing a stretch of Daitari-Paradip Expressway

Page 20: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 16

Result & Discussion:

It has been observed from the above data that the existing average traffic density inGhat road is only 208 PCU/day. The traffic load appears less due to suspension of mineraltransport through this road. However, the traffic density near zero point on Daitari-Paradip expressway increases to 5049 PCU/day due to additional traffic load of heavyvehicles coming from Baliparbat area. Also, traffic density at a point near Daitari policestation on the Daitari-Paradip expressway comes down to 3170 PCU because some of theheavy vehicles coming from Baliparbat area transport mineral only upto the the railwaysiding and remaining heavy vehicles goes upto Kalinga nagar industrial area/ other partsof the state. Graphical representation of the traffic survey data are shown in the followingfigures.

2080

1000

2000

3000

4000

5000

6000

1 2 3 4

TrafficdensityinPCU/day

Readings

Traffic density in PCU/Day Average PCU/day

Fig. 8.1: Graph showing existing traffic density of ghat road

Page 21: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 17

5049

0

1000

2000

3000

4000

5000

6000

1 2 3 4

TrafficdensityinPCU/day

Readings

Traffic density in PCU/Day Average PCU/day

Fig. 8.2: Graph showing existing traffic density on Daitari-Paradip Expressway nearzero point

3170

0

1000

2000

3000

4000

5000

6000

1 2 3 4

TrafficdensityinPCU/day

Readings

Traffic density in PCU/Day Average PCU/day

Fig. 8.3: Graph showing existing traffic density on Daitari-Paradip Expressway nearDaitari police station

Page 22: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 18

5.2 POSSIBLITY OF INCREASING TRUCK TRAFFIC FROM DAITARI MINES

Ghat Road: As per IRC:64 ”Guidelines for Capacity of Roads in Rural Areas, therecommended design service volume for two lane roads on hilly terrain is 7000 PassengerCar Units (PCUs) per day and the reduction factor for shoulder width of 1.2 m is 0.92.Accordingly, the recommended design service volume comes down to 6440 PCUs/day.

The existing average traffic density on ghat road is only 208 PCU/day. Even consideringthe maximum existing traffic density of 233 PCU/day (on 10-05-2016), the road hasaddtional capacity of more than 6207 PCUs/day i.e. 2069 trucks/day can ply on the road.Therefore another 1034 trucks can be despatched daily.

For transporting 1 million tonnes per annum ore from daitari mines through ghat road,additional about 1248 PCU [416 truck trips (both ways i.e. loaded and unloaded)] per dayshall be made. Even after putting this additional load, ghat road shall remain withanother 4959 PCU/day capacity.

6440

0

2000

4000

6000

8000

1 2 3 4

TrafficdensityinPCU/day

Readings

Traffic density in PCU/Day Additional Traffic in PCU/Day

Maximum Capacity

Fig.9.1: Graph showing possible increase in traffic density on ghat road

Daitari-Paradip Expressway: As per IRC:64 ”Guidelines for Capacity of Roads in RuralAreas, the recommended design service volume for two lane roads on plain terrain is15000 Passenger Car Units (PCUs) per day and the reduction factor for shoulder width of1.2 m is 0.92. Accordingly, the recommended design service volume comes down to13800 PCUs/day.

Page 23: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 19

The existing average traffic density on daitari-paradip expressway is 5049 PCU/day (nearzero point) and 3170 PCU/day (near daitari police station). Even considering themaximum existing traffic density of 5992 PCU/day (on 03-05-2016), the road hasaddtional capacity of more than 7808 PCUs/day i.e. 2602 trucks/day can ply on the road.Therefore another 1300 trucks can be despatched daily.

For transporting 1 million tonnes per annum ore from daitari mines through this road,additional about 1248 PCU [416 truck trips (both ways i.e. loaded and unloaded)] per dayshall be made. Even after putting this additional load, daitari-paradip expressway shallremain with another 6560 PCU/day capacity.

13800

0

4000

8000

12000

16000

1 2 3 4

TrafficdensityinPCU/day

Readings

Traffic density in PCU/Day Additional Traffic in PCU/Day

Maximum Capacity

Fig.9.2: Graph showing possible increase in traffic density on Daitari-Paradipexpressway

Page 24: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 20

6.0 ENVIRONMENTAL IMPLICATIONS OF TRANSPORTATION ON AIR QUALITYALONGWITH ITS MITIGATION MEASURES

6.1 IMPACT ON AIR QUALITY DUE TO TRANSPORTATION OF ORE THROUGH GHATROAD

Prediction of Changes in Air Quality

The fugitive dust emissions due to transport of iron ore through Ghat road viatrucks have been estimated using the methodologies outlined in the AP-42(USEPA) and National Pollutant Inventory (NPI) Emission Estimation TechniqueManual (EET) for Mining Version 3.1 (Jan. 2012) (Australia).

Baseline ambient air quality data was collected during Summer 2016. During thisperiod the mining activities was going on e.g. mining of iron ore, loading,transportation by truck through haul roads, transportation by conveyor systemand subsequent transportation by railway siding. Air quality modeling withchange scenario i.e. transportation of 1 Mt/y iron ore via Ghat road by truck (25t) has been considered.

Dust estimate summary

For air quality modeling was carried out considering only transportation of orethrough roads as line source. A dust emission rate for source identified i.e. roadtransportation of ore through trucks is estimated to be 0.026g/s/m.

Modeling Methodology

Air quality impacts from the proposed changed scenario have been assessedusing the ISC3 computer dispersion model, developed by US EPA. Using themodel, maximum 24-hour ground-level PM10 concentrations at the nearestsensitive receiver to the site has been predicted.

ISC3 model is designed to predict ground-level concentrations or dry depositionof pollutants emitted from one or more sources, which may be stacks, areasources, volume sources, open pits or any combination of these. ISC3 isessentially a statistical Gaussian plume model that requires a time series of bothmeteorological and source emission data.

For the present study ore transportation route have been modeled using linearea option of ISC3.

Page 25: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 21

Grid System

ISC3 can calculate concentrations both on a set grid (typically Cartesian) or atspecified locations. In the present study the model was configured to predict theground-level concentrations on discrete receptors (which were considered at AAQmonitoring station). This grid approach was chosen to restrict the duration ofmodel runs.

Meteorological Data

So that comparison of the proposed altered transportation scenario becomespossible, the meteorological data generated at Daitari during the study period ofAmbient Air Quality monitoring has been carried out based on meteorologicaldata collected during Summer 2016. During the study period, predominant winddirection was from West-South-western (WSW). During day time predominant winddirection was also found to be WSW followed by SW. Calm conditions prevailed for8.89% of the time. During night time wind direction was found to be WSW followed bySW. Calm condition prevailed for 16.34% of the time. Overall (24 hours) also thepredominant wind direction was SSW, followed by SW and W. Calm condition prevailedfor 12.66% of the time.

A time series air quality meteorological data file, containing hourly averaged values of (i)Wind speed and direction; (ii) Ambient air temperature (iii) Pasquill-Gifford stability class;and (iv) Atmospheric mixing height were required for the for the modeling studies. Thewind speed, direction and temperature data were obtained from meteorologicalmeasurements recorded at site by OMC. Atmospheric stability categories weredetermined using the net radiation index method, or Turner’s method as described inUSEPA (1998). This method estimates stability from solar altitude, wind speed and cloudobservations. Mixing heights were collected from the CPCB publication on “spatialvariations of mixing heights over India”. Stability, wind speeds, and mixing heights on theday when maximum GLC occurred is given below in Table 5.

Table 5 : Meteorological data used for GLC predictionHour Wind dir.

(degree)Wind speed

(m/s)Temp.(◦o K)

Stabilityclass

Mixingheight (m)

01 245 1.1 299.0 6 10002 271 0.5 298.4 6 10003 263 0.3 298.0 6 10004 244 0.8 298.1 6 5005 252 0.9 297.4 5 5006 256 00 296.0 4 5007 235 0.2 296.6 3 11008 220 00 296.3 3 350

Page 26: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 22

Hour Wind dir.(degree)

Wind speed(m/s)

Temp.(◦o K)

Stabilityclass

Mixingheight (m)

09 196 0.8 300.3 2 61510 93 2.2 306.2 2 93511 106 3.0 310.2 2 130012 28 4.2 313.1 1 175013 85 5.8 314.5 1 180014 209 4.0 315.0 1 205015 30 2.9 315.3 2 215016 62 2.2 315.5 3 170017 199 2.0 315.3 4 160018 264 2.7 313.6 5 120019 284 1.0 309.6 5 90020 68 1.4 305.0 5 72521 312 0.9 303.5 6 60022 37 1.0 303.0 6 40023 25 0.6 303.0 6 30024 267 1.4 301.6 6 207

Predicted Futuristic Ground-level Dust Concentrations

The results represent the maximum GLC that are predicted due to mineraltransportation by Ghat road in the surrounding areas. Isopleths have presented inFig 10.

Page 27: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 23

Fig. 10: Isopleths representing the maximum ground-level concentrations

The incremental concentrations of PM10 values (μg/m3) due to the alteredtransportation arrangement is given in the following Table 6. It can beseen that the resultant data are well within the norms.

Table 6: Predicted Resultant Air QualitySl.No.

Location Coordinates MonitoredPM10 (max)

(μg/m3)

Contribution asdue to the

proposed alteration(μg/m3)

Resultantvalues *(μg/m3)

1. Pump housenear colony

21°05’38.70”N85°48’42.84”E 77 <1 78

2. Daitari GuestHouse

21°07’34.10”N85°49’29.40”E 85 7.11 92

3. OMC Office21°07’40.44”N85°50’22.86”E 91 7.21 98

4. BaliparbatTownship

21°07’30.72”N85°51’35.70”E 94 1.74 96

5.WaterReservoir PumpHouse

21°07’39.07”N85°48’43.44”E 79 <1 80

6. Near HospitalDaitari

21°07’43.14”N85°49’25.20”E 85 1.07 86

* without any control measures

Page 28: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Daitari Iron Ore Mining Project : Environmental Implication of Road Transportation along with Proposed Mitigation Measures

©, 2016 MECON LIMITED, All rights reserved

Page 24

MITIGATIUON MEASURES TO MINIMIZE IMPACT ON AIR QUALITY DUE TOTRANSPORTATION OF ORE THROUGH GHAT ROAD

The ghat road will be properly maintained and potholes shall be filled-inregularly to reduce generation of fugitive dusts and emissions from vehicles.

Transportation of mineral shall be made through trucks covered withTarpaulin also overloading shall be prevented in order to stop spillage.

Speed restrictions will be imposed on loaded trucks in order to ensure safetyand avoid spillage of ore on the transportation route.

Sufficient time lag between movement of two consecutive trucks shall beensured to allow settling of dust.

Vehicular emissions shall be kept under control and shall be regularlymonitored.

Rigorous maintenance of vehicles for transportation of mineral shall be done.Vehicles will be replaced when condition and/or performance deteriorates toan unacceptable level and where appropriate, idling of engines will beavoided.

All transportation will be undertaken along pre-designated routes.

Water spraying shall be done at transfer points.

No transportation of mineral outside the mine lease area shall be carried outafter the sunset.

7.0 RESULTS AND DISCUSSION

The following conclusion can be drawn from the study:

The local road transport infrastructure is capable of handling the increasedtraffic load due to transportation of (1 MTPA) mineral through ghat road.

The predicted PM10 level shows that the additional contribution due to thealtered transportation scenario shall be very less with no appreciablerepercussions. The values may further be minimized with propermanagement measures.

No populated area falls on the stretch of ghat road through which (1 MTPA)mineral transportation is envisaged.

--- XXX ---

Page 29: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

ODISHA MINING CORPORATION LIMITED

DAITARI IRON ORE MINING PROJECT

ENVIRONMENTAL MONITORING REPORT

FOR THE PERIOD

OF

1st MARCH TO 15th MAY

M/s ECOLOGICAL DEVELOPMENT CONSULTANCY PVT. LTD.

BHUBANESWAR, ODISHA

Appendix 1

Page 1 of 30

Page 30: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

1

Ecological Development Consultancy Pvt. Ltd.

Appendix 1

Page 2 of 30

Page 31: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

2

Ecological Development Consultancy Pvt. Ltd.

1.1 Present Report

The present report presents the Environmental related data in respect of Ambient Air Quality,

Meteorology, and Traffic Density Survey in around Daitari Iron Ore Mine in Keonjhar district of Odisha

during the month of ‘March, April, May 2016’.

Table No. 1.1: Work within the Mine Lease Area

Environmental Attributes No. of Locations

Ambient Air Quality 6 locations

Traffic Density Survey 3 Location

Meteorological Information

1.2 Ambient Air Quality

The ambient air quality Monitoring was carried out for Particulate Matter (PM10), Particulate Matter

(PM2.5), Sulphur Dioxide (SO2), Oxides of Nitrogen (NOX) and Carbon Monoxide (CO). The PM10 & PM2.5

was monitored for 24 hourly, while SO2 and NOX were monitored on 4 hourly basis for 24 hours at each

sampling location and CO was monitored using the CO Monitor for 1 hr in a day in each monitoring station,

for a month. Details about Air Quality Monitoring locations are given below.

Ambient Air Quality Monitoring Stations

Sl. No. Location Station Code Coordinates

Latitude Longitude

1 Pump house near colony A1 21°05’38.7”N 85°48’42.84”E

2 Daitari Guest House A2 21°06’34.10”N 85°49’29.4”E

3 OMC Office A3 21°06’40.44”N 85°50’22.86”E

4 Baliparbat Township A4 21°06’30.72”N 85°51’35.7”E

5 Water Reservoir Pump House A5 21°07’39.06”N 85°48’43.44”E

6 Near Hospital Daitari A6 21°06’43.14”N 85°49’25.2”E

1.2 Traffic Density Survey

Sl. No. Location Station Code Coordinates

Latitude Longitude

1 Near Guest House TD1 21°06’30.02”N 85°49’38.07”E

2 Near Zero Point TD2 21°06’26.04”N 85°5302.04”E

3 Near Police Station TD3 21°07’18.06”N 85°55’06.01”E

Appendix 1

Page 3 of 30

Page 32: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Ambient Air Quality Monitoring

Summarized Results of Ambient Air Qualities During The Month Of ‘March 2016’

Sl.

No. Locations Co-ordinate

Station

Code

PM10

PM2.5

SO2

NOX

CO

Max. Min. Avg. Max. Min Avg. Max. Min. Avg. Max. Min. Avg. Max Min. Avg.

1. Pump house

Inside colony

21°05’38.7”N

85°48’42.84”E A1 77 58 67 30 24 27 7.1 5.4 6.3 13.5 11.0 12.2 0.09 0.02 0.05

2. Daitari Guest

House

21°07’34.10”N

85°49’29.4”E A2 85 69 77 34 26 30 7.8 6.3 7.1 15.1 12.3 13.8 0.10 0.01 0.05

3. OMC Office 21°07’40.44”N

85°50’22.86”E A3 91 67 80 37 25 32 8.2 6.3 7.2 16.3 13.5 14.8 0.10 0.02 0.05

4. Baliparbat

Township

21°07’30.72”N

85°51’35.7”E A4 94 68 79 36 26 30 8.4 6.9 7.5 17.0 13.7 15.4 0.09 0.03 0.06

5.

Water

Reservoir

pump house

21°07’39.07”N

85°48’43.44”E A5 70 53 62 29 21 24 6.0 3.5 5.1 12.4 3.7 10.7 0.10 0.01 0.04

6.

Near

Hospital

Daitari

21°07’43.14”N

85°49’25.2”E A6 80 59 71 33 24 28 7.3 5.9 6.7 15.2 12.3 13.8 0.09 0.01 0.05

CPCB Standard

100 µg/m3

60 µg/m3

80 µg/m3

80 µg/m3

4.0 mg/m3

Appendix 1

Page 4 of 30

Page 33: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Details of AAQ Monitoring during the Month of ‘March 2016’

Station Name Station

Code Date

PM10 (µg/ m3)

PM2.5 (µg/ m3)

SO2

(µg/ m3)

NOx (µg/ m3)

CO

(mg/m3)

Pump House

Inside Colony A1

02.03.2016 68 27 6.0 11.3 0.05

05.03.2016 63 24 5.8 11.8 0.08

09.03.2016 72 29 6.5 12.6 0.04

12.03.2016 69 27 6.8 13.2 0.09

16.03.2016 58 24 5.4 11.0 0.02

19.03.2016 60 25 6.0 11.4 0.08

23.03.2016 77 30 7.1 13.5 0.07

28.03.2016 65 26 6.2 12.0 0.02

31.03.2016 70 29 6.7 13.1 0.09

Daitari Guest

House A2

02.03.2016 76 31 6.3 12.4 0.03

05.03.2016 82 33 7.3 13.9 0.07

09.03.2016 85 34 7.7 14.6 0.01

12.03.2016 74 29 7.0 13.7 0.05

16.03.2016 69 26 6.8 12.3 0.08

19.03.2016 72 28 6.7 13.3 0.09

23.03.2016 78 31 7.6 15.1 0.10

28.03.2016 75 28 7.2 14.4 0.06

31.03.2016 80 31 7.8 15.0 0.05

OMC Office A3

03.03.2016 78 32 6.9 14.6 0.04

07.03.2016 83 34 7.3 15.4 0.03

10.03.2016 91 37 8.2 16.3 0.05

14.03.2016 Monitoring has not been done due to rain

17.03.2016 67 25 6.3 13.5 0.02

21.03.2016 82 34 7.5 15.1 0.09

25.03.2016 73 27 6.7 13.8 0.10

29.03.2016 88 35 7.8 15.3 0.06

Baliparbat

Township A4

03.03.2016 85 33 8.0 16.5 0.03

07.03.2016 94 36 8.4 17.0 0.06

10.03.2016 87 33 7.9 16.2 0.09

14.03.2016 Monitoring has not been done due to rain

17.03.2016 68 26 7.0 15.2 0.05

21.03.2016 73 28 6.9 13.7 0.03

25.03.2016 79 30 7.7 15.3 0.06

29.03.2016 81 32 7.6 16.0 0.10

Water Reservoir

Pump House

A5

01.03.2016 65 23 5.5 11.4 0.04

04.03.2016 69 25 5.8 12.0 0.01

08.03.2016 70 29 6.0 12.4 0.05

11.03.2016 59 23 5.4 10.8 0.06

15.03.2016 Monitoring has not been done due to rain

18.03.2016 61 24 5.7 11.0 0.09

22.03.2016 53 21 3.8 8.4 0.04

26.03.2016 56 23 3.6 8.3 0.03

30.03.2016 Monitoring has not been done due to rain0.09

Near Hospital

Daitari

A6

01.03.2016 78 27 6.5 13.8 0.08

04.03.2016 80 33 7.1 14.5 0.06

08.03.2016 69 28 6.9 13.5 0.09

11.03.2016 59 24 5.9 12.3 0.04

15.03.2016 Monitoring has not been done due to rain

18.03.2016 72 30 6.9 14.0 0.06

22.03.2016 76 32 7.3 15.2 0.01

26.03.2016 64 25 6.5 13.8 0.05

30.03.2016 Monitoring has not been done due to rain

CPCB Standards 100µg/ m3 60µg/m3 80µg/m3 80µg/m3 4mg/m3

Appendix 1

Page 5 of 30

Page 34: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Summarized Results of Ambient Air Qualities During The Month Of ‘April 2016’

Sl.

No. Locations Co-ordinate

Station

Code

PM10

PM2.5

SO2

NOX

CO

Max. Min. Avg. Max. Min Avg. Max. Min. Avg. Max. Min. Avg. Max Min. Avg.

1. Pump house

Inside colony

21°05’38.7”N

85°48’42.84”E A1 76 45 62 34 16 25 7.2 4.7 6.0 14.5 9.8 12.0 0.07 0.02 0.04

2. Daitari Guest

House

21°07’34.10”N

85°49’29.4”E A2 83 44 65 38 15 27 7.8 4.4 6.3 16.4 9.7 13.0 0.10 0.02 0.06

3. OMC Office 21°07’40.44”N

85°50’22.86”E A3 82 47 63 35 18 26 7.9 5.2 6.1 16.8 10.6 13.1 0.09 0.01 0.05

4. Baliparbat

Township

21°07’30.72”N

85°51’35.7”E A4 87 46 72 40 17 31 8.3 4.5 6.7 17.6 9.9 14.3 0.07 0.02 0.04

5.

Water

Reservoir

pump house

21°07’39.07”N

85°48’43.44”E A5 79 42 61 37 14 26 6.5 3.8 5.1 13.4 3.6 10.9 0.09 0.02 0.05

6.

Near

Hospital

Daitari

21°07’43.14”N

85°49’25.2”E A6 85 54 68 39 19 30 7.6 4.9 6.3 15.8 10.6 13.2 0.10 0.02 0.06

CPCB Standard

100 µg/m3

60 µg/m3

80 µg/m3

80 µg/m3

4.0 mg/m3

Appendix 1

Page 6 of 30

Page 35: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

The details of AAQ Monitoring during the Month of ‘April 2016’

Station Name Station

Code Date

PM10 (µg/ m3)

PM2.5 (µg/ m3)

SO2 (µg/ m3)

NOx (µg/ m3)

CO

(mg/m3)

Pump House

Inside Colony A1

04.04.2016 48 17 4.7 9.8 0.07

07.04.2016 59 24 5.2 10.6 0.04

11.04.2016 70 30 6.8 12.7 0.03

14.04.2016 74 33 7.2 13.6 0.02

18.04.2016 Monitoring has not been done due to rain

21.04.2016 45 16 5.3 10.4 0.06

25.04.2016 68 28 6.5 12.3 0.07

28.04.2016 76 34 7.0 14.5 0.03

Daitari Guest

House A2

04.04.2016 44 15 4.4 9.7 0.02

07.04.2016 63 27 5.8 11.9 0.05

11.04.2016 72 31 7.1 14.8 0.06

14.04.2016 80 36 7.7 15.6 0.09

18.04.2016 Monitoring has not been done due to rain

21.04.2016 49 20 5.7 10.7 0.09

25.04.2016 67 29 6.2 12.5 0.08

28.04.2016 83 38 7.8 16.4 0.10

OMC Office A3

01.04.2016 50 22 5.2 10.6 0.04

05.04.2016 53 23 5.4 10.8 0.05

08.04.2016 58 25 5.7 12.4 0.08

12.04.2016 71 32 6.6 14.2 0.03

15.04.2016 82 35 7.9 16.8 0.09

19.04.2016 47 18 5.2 11.7 0.07

22.04.2016 64 26 5.8 12.3 0.01

26.04.2016 61 24 6.0 13.6 0.03

29.04.2016 75 31 6.8 14.2 0.06

Baliparbat

Township A4

01.04.2016 46 17 4.5 9.9 0.03

05.04.2016 60 27 5.6 12.3 0.05

08.04.2016 73 30 7.2 14.5 0.07

12.04.2016 86 39 8.2 17.6 0.02

15.04.2016 80 37 7.8 15.9 0.05

19.04.2016 63 22 5.7 12.1 0.06

22.04.2016 77 31 6.6 13.8 0.07

26.04.2016 84 37 8.0 16.9 0.03

29.04.2016 87 40 8.3 17.3 0.06

Water Reservoir

Pump House

A5

02.04.2016 42 14 3.6 8.8 0.09

06.04.2016 52 21 4.8 9.5 0.04

09.04.2016 69 34 6.2 13.1 0.07

13.04.2016 79 37 6.5 13.4 0.09

16.04.2016 70 28 5.6 11.2 0.07

20.04.2016 43 16 3.8 8.2 0.02

23.04.2016 55 24 4.2 9.7 0.05

27.04.2016 66 29 5.4 10.4 0.03

30.04.2016 78 35 6.3 12.6 0.04

Near Hospital

Daitari

A6

02.04.2016 54 20 4.9 10.6 0.10

06.04.2016 62 26 5.7 11.3 0.08

09.04.2016 56 19 5.1 10.8 0.05

13.04.2016 75 35 7.2 15.6 0.06

16.04.2016 85 39 7.5 15.8 0.07

20.04.2016 60 29 6.0 12.4 0.08

23.04.2016 74 36 6.8 14.2 0.04

27.04.2016 81 38 7.6 15.7 0.02

30.04.2016 68 30 6.4 13.2 0.09

CPCB Standards 100µg/ m3 60µg/m3 80µg/m3 80µg/m3 4mg/m3

Appendix 1

Page 7 of 30

Page 36: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Summarized Results of Ambient Air Qualities During The Month Of ‘May 2016’

Sl.

No. Locations Co-ordinate

Station

Code

PM10

PM2.5

SO2

NOX

CO

Max. Min. Avg. Max. Min Avg. Max. Min. Avg. Max. Min. Avg. Max Min. Avg.

1. Pump house

Inside colony

21°05’38.7”N

85°48’42.84”E A1 66 58 62 29 20 23 7.0 5.6 6.2 13.0 9.7 11.4 0.09 0.05 0.06

2. Daitari Guest

House

21°07’34.10”N

85°49’29.4”E A2 70 61 65 29 19 23 7.0 6.2 6.6 12.4 9.9 11.0 0.09 0.02 0.05

3. OMC Office 21°07’40.44”N

85°50’22.86”E A3 78 59 68 32 20 26 7.2 6.6 6.9 13.5 10.9 12.2 0.08 0.02 0.05

4. Baliparbat

Township

21°07’30.72”N

85°51’35.7”E A4 81 68 74 34 25 29 8.0 6.3 7.3 16.1 12.9 14.4 0.01 0.04 0.03

5.

Water

Reservoir

pump house

21°07’39.07”N

85°48’43.44”E A5 63 52 57 22 16 19 5.5 4.2 4.8 10.5 9.0 9.5 0.09 0.04 0.06

6.

Near

Hospital

Daitari

21°07’43.14”N

85°49’25.2”E A6 74 61 67 30 21 25 7.0 5.2 6.0 13.8 9.9 11.8 0.08 0.03 0.06

CPCB Standard

100 µg/m3

60 µg/m3

80 µg/m3

80 µg/m3

4.0 mg/m3

Appendix 1

Page 8 of 30

Page 37: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

The details of AAQ Monitoring during the Month of ‘May 2016’

Station Name Station

Code Date

PM10 (µg/ m3)

PM2.5 (µg/ m3)

SO2 (µg/ m3)

NOx (µg/ m3)

CO

(mg/m3)

Pump House

Inside Colony A1

02.05.2016 62 23 5.6 9.7 0.05

05.05.2016 58 20 6.3 11.4 0.09

09.05.2016 66 29 5.9 11.9 0.08

12.05.2016 63 22 7.0 13.0 0.05

Daitari Guest

House A2

02.05.2016 70 29 6.5 11.7 0.07

05.05.2016 64 21 6.2 9.9 0.02

09.05.2016 69 26 7.0 10.2 0.09

12.05.2016 61 19 6.9 12.4 0.04

OMC Office A3

03.05.2016 72 30 7.2 12.6 0.07

06.05.2016 65 22 6.6 10.9 0.06

10.05.2016 59 20 7.0 12.1 0.08

13.05.2016 78 32 6.9 13.5 0.02

Baliparbat

Township A4

03.05.2016 81 34 6.3 14.5 0.05

06.05.2016 72 29 7.6 12.9 0.10

10.05.2016 68 25 7.9 14.0 0.04

13.05.2016 77 31 8.0 16.1 0.06

Water Reservoir

Pump House

A5

04.05.2016 56 18 4.4 9.1 0.06

07.05.2016 63 20 4.2 10.5 0.04

11.05.2016 52 16 5.1 9.0 0.07

14.05.2016 61 22 5.5 9.4 0.09

Near Hospital

Daitari

A6

04.05.2016 66 23 5.2 11.2 0.08

07.05.2016 71 28 6.1 12.3 0.03

11.05.2016 61 21 5.6 9.9 0.06

14.05.2016 74 30 7.0 13.8 0.08

CPCB Standards 100µg/ m3 60µg/m3 80µg/m3 80µg/m3 4mg/m3

Appendix 1

Page 9 of 30

Page 38: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

1

Ecological Development Consultancy Pvt. Ltd.

Location : Near Police Station

Date : 03.05.2016

TIME TWO WHEELER LMV HMV

Total TO For TO For TO For

00:00 – 01:00 0 0 0 0 0 0 0

01:00 – 02:00 0 0 0 0 1 0 1

02:00 – 03:00 0 0 0 0 1 0 1

03:00 – 04:00 0 0 0 0 0 1 1

04:00 – 05:00 2 0 0 0 4 0 6

05:00 – 06:00 9 6 0 0 11 4 30

06:00 – 07:00 13 15 0 3 25 3 59

07:00 – 08:00 10 13 2 2 61 6 94

08:00 – 09:00 29 40 1 5 39 10 124

09:00 – 10:00 34 31 3 4 73 41 186

10:00 – 11:00 38 24 4 5 59 50 180

11:00 – 12:00 32 25 11 10 116 70 264

12:00 – 13:00 18 24 5 4 55 33 139

13:00 – 14:00 15 12 6 4 41 65 143

14:00 – 15:00 23 15 7 5 24 3 77

15:00 – 16:00 12 11 4 4 8 37 76

16:00 – 17:00 9 14 9 5 7 57 101

17:00 – 18:00 36 38 3 8 0 40 125

18:00 – 19:00 18 17 4 5 5 56 105

19:00 – 20:00 22 20 6 6 2 74 130

20:00 – 21:00 10 7 4 2 0 19 42

21:00 – 22:00 15 1 10 0 2 5 33

22:00 – 23:00 0 0 3 1 2 0 6

23:00 – 24:00 1 0 0 1 0 0 2

TOTAL 346 313 82 74 536 574 1925

Appendix 1

Page 10 of 30

Page 39: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

2

Ecological Development Consultancy Pvt. Ltd.

Location : Near Zero Point

Date : 03.05.15

TIME TWO WHEELER LMV HMV

Total TO For TO For TO For

00:00 – 01:00 0 0 0 0 0 0 0

01:00 – 02:00 1 1 0 1 23 11 37

02:00 – 03:00 0 0 0 1 31 34 66

03:00 – 04:00 O 0 1 0 34 31 66

04:00 – 05:00 1 5 1 0 25 27 59

05:00 – 06:00 3 4 0 0 19 14 40

06:00 – 07:00 10 15 0 3 1 2 31

07:00 – 08:00 11 6 1 5 14 12 49

08:00 – 09:00 32 18 1 4 108 2 165

09:00 – 10:00 25 20 4 9 164 21 243

10:00 – 11:00 22 15 2 4 92 63 198

11:00 – 12:00 17 8 4 7 82 59 177

12:00 – 13:00 15 18 12 8 114 72 239

13:00 – 14:00 9 4 6 5 47 43 114

14:00 – 15:00 6 3 2 0 25 2 38

15:00 – 16:00 4 5 2 4 6 45 66

16:00 – 17:00 8 8 7 7 7 48 85

17:00 – 18:00 12 11 3 6 2 45 79

18:00 – 19:00 11 8 8 4 7 72 110

19:00 – 20:00 9 6 5 7 46 116 189

20:00 – 21:00 3 1 4 0 32 40 80

21:00 – 22:00 5 0 2 3 45 45 100

22:00 – 23:00 0 1 4 1 38 37 81

23:00 – 24:00 0 0 2 0 39 45 86

TOTAL 204 157 71 79 1001 886 2398

Appendix 1

Page 11 of 30

Page 40: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

3

Ecological Development Consultancy Pvt. Ltd.

Location : Near Guest House

Date : 03.05.15

TIME TWO WHEELER LMV HMV

Total TO For TO For TO For

00:00 – 01:00 0 0 0 2 0 0 2

01:00 – 02:00 0 0 0 0 0 0 0

02:00 – 03:00 0 0 0 0 0 0 0

03:00 – 04:00 0 0 1 1 0 0 2

04:00 – 05:00 2 2 0 0 1 1 6

05:00 – 06:00 3 2 1 1 2 2 9

06:00 – 07:00 1 0 1 0 2 0 4

07:00 – 08:00 1 1 2 0 1 2 7

08:00 – 09:00 2 0 2 3 0 1 8

09:00 – 10:00 0 1 3 1 0 0 5

10:00 – 11:00 2 2 3 3 1 0 11

11:00 – 12:00 2 1 1 1 0 1 6

12:00 – 13:00 0 0 2 1 0 0 3

13:00 – 14:00 4 3 4 2 1 0 14

14:00 – 15:00 0 11 5 1 1 1 19

15:00-16:00 2 0 3 0 0 0 5

16:00 – 17:00 4 2 6 2 1 0 15

17:00 – 18:00 6 8 2 2 0 3 21

18:00 – 19:00 5 4 1 2 0 0 12

19:00 – 20:00 5 4 3 2 2 1 17

20:00 – 21:00 6 3 5 1 1 1 17

21:00 – 22:00 2 0 3 2 0 1 8

22:00 – 23:00 0 0 1 2 0 0 3

23:00 – 24:00 0 0 1 1 0 0 2

TOTAL 47 44 50 30 13 14 198

Appendix 1

Page 12 of 30

Page 41: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

4

Ecological Development Consultancy Pvt. Ltd.

Location : Near Police Station

Date : 06.05.16

TIME TWO WHEELER LMV HMV

Total TO For TO For TO For

00:00 – 01:00 0 0 3 0 1 0 4

01:00 – 02:00 0 0 0 0 0 0 0

02:00 – 03:00 0 0 0 0 0 0 0

03:00 – 04:00 0 0 1 0 3 0 4

04:00 – 05:00 3 1 0 0 2 0 6

05:00 – 06:00 11 7 0 1 15 6 40

06:00 – 07:00 12 17 0 5 30 2 66

07:00 – 08:00 15 22 2 3 85 3 130

08:00 – 09:00 35 38 2 4 63 15 157

09:00 – 10:00 28 35 4 3 44 37 151

10:00 – 11:00 33 29 4 4 31 50 151

11:00 – 12:00 11 18 4 6 17 37 93

12:00 – 13:00 11 22 4 2 8 6 53

13:00 – 14:00 19 13 6 7 5 60 110

14:00 – 15:00 10 18 3 0 8 74 113

15:00 – 16:00 30 20 4 4 10 45 113

16:00 – 17:00 26 23 4 10 4 60 127

17:00 – 18:00 26 24 6 7 1 32 96

18:00 – 19:00 22 22 1 5 4 11 65

19:00 – 20:00 10 7 3 6 6 7 39

20:00 – 21:00 3 7 3 4 0 0 17

21:00 – 22:00 0 1 5 1 0 0 7

22:00 – 23:00 3 1 0 2 0 0 6

23:00 – 24:00 0 0 1 1 0 0 2

TOTAL 308 325 60 75 337 445 1550

Appendix 1

Page 13 of 30

Page 42: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

5

Ecological Development Consultancy Pvt. Ltd.

Location : Near Zero Point

Date : 06.05.2016

TIME TWO WHEELER LMV HMV

Total TO For TO For TO For

00:00 – 01:00 0 0 3 0 41 43 87

01:00 – 02:00 0 0 1 0 40 41 82

02:00 – 03:00 0 1 0 1 29 22 53

03:00 – 04:00 0 0 2 1 3 0 6

04:00 – 05:00 0 3 1 0 3 0 7

05:00 – 06:00 2 11 0 1 12 4 30

06:00 – 07:00 7 10 0 5 21 4 47

07:00 – 08:00 11 14 1 3 94 3 126

08:00 – 09:00 22 18 2 7 61 19 129

09:00 – 10:00 19 15 7 5 43 37 126

10:00 – 11:00 7 7 4 7 32 48 105

11:00 – 12:00 5 8 6 4 12 45 80

12:00 – 13:00 10 9 5 3 11 61 99

13:00 – 14:00 8 11 6 7 5 64 101

14:00 – 15:00 3 9 3 0 7 63 85

15:00 – 16:00 12 10 6 2 8 44 82

16:00 – 17:00 14 14 5 8 4 61 106

17:00 – 18:00 16 12 4 3 3 41 79

18:00 – 19:00 14 9 4 4 16 4 51

19:00 – 20:00 9 3 5 4 36 27 84

20:00 – 21:00 2 3 3 4 30 29 71

21:00 – 22:00 0 1 5 1 40 32 79

22:00 – 23:00 1 1 0 3 35 46 86

23:00 – 24:00 0 0 1 1 38 30 70

TOTAL 162 169 74 74 624 768 1871

Appendix 1

Page 14 of 30

Page 43: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

6

Ecological Development Consultancy Pvt. Ltd.

Location : Near Guest House

Date : 06.05.2016

TIME TWO WHEELER LMV HMV

Total TO For TO For TO For

00:00 – 01:00 0 0 1 3 0 0 4

01:00 – 02:00 0 0 0 1 0 0 1

02:00 – 03:00 0 0 0 0 0 0 0

03:00 – 04:00 1 0 1 1 0 0 3

04:00 – 05:00 3 2 1 0 2 1 9

05:00 – 06:00 3 2 1 0 2 1 9

06:00 – 07:00 0 1 0 1 2 0 4

07:00 – 08:00 2 1 7 7 1 2 20

08:00 – 09:00 4 2 7 7 1 2 23

09:00 – 10:00 0 0 0 1 0 0 1

10:00 – 11:00 2 3 2 3 0 0 10

11:00 – 12:00 2 2 2 5 0 0 11

12:00 – 13:00 0 0 4 2 0 0 6

13:00 – 14:00 1 1 3 6 0 0 11

14:00 – 15:00 0 0 4 1 0 2 7

15:00 – 16:00 0 0 1 1 1 2 5

16:00 – 17:00 1 1 2 4 0 1 9

17:00 – 18:00 0 1 1 2 1 1 6

18:00 – 19:00 3 2 1 5 1 2 14

19:00 – 20:00 2 2 1 1 1 1 8

20:00 – 21:00 3 5 3 5 0 2 18

21:00 – 22:00 0 0 2 3 0 0 5

22:00 – 23:00 0 0 2 3 0 0 5

23:00 – 24:00 0 0 1 3 0 1 5

TOTAL 27 25 47 65 12 18 194

Appendix 1

Page 15 of 30

Page 44: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

7

Ecological Development Consultancy Pvt. Ltd.

Location : Near Zero Point

Date : 10.05.2016

TIME TWO WHEELER LMV HMV

Total TO Fro TO Fro TO Fro

00:00 – 01:00 0 0 1 0 38 38 77

01:00 – 02:00 0 0 0 0 40 35 75

02:00 – 03:00 0 0 0 0 37 36 73

03:00 – 04:00 2 3 0 1 43 40 89

04:00 – 05:00 2 0 1 0 42 43 88

05:00 – 06:00 2 3 1 3 18 22 49

06:00 – 07:00 9 7 0 3 35 5 59

07:00 – 08:00 18 12 1 7 20 2 60

08:00 – 09:00 9 14 4 8 15 3 53

09:00 – 10:00 18 21 6 6 2 0 53

10:00 – 11:00 20 14 7 5 3 4 53

11:00 – 12:00 10 14 5 5 7 2 43

12:00 – 13:00 13 15 6 3 0 13 50

13:00 – 14:00 12 7 7 5 2 6 39

14:00 – 15:00 14 7 7 4 3 1 36

15:00 – 16:00 10 10 5 8 4 7 44

16:00 – 17:00 7 16 3 11 0 21 58

17:00 – 18:00 3 8 2 3 2 11 29

18:00 – 19:00 12 5 3 4 3 3 30

19:00 – 20:00 7 2 11 1 2 2 25

20:00 – 21:00 6 0 4 0 2 8 20

21:00 – 22:00 2 0 2 0 16 22 42

22:00 – 23:00 2 0 0 0 27 22 51

23:00 – 24:00 0 0 2 0 38 38 78

TOTAL 178 158 78 77 399 384 1274

Appendix 1

Page 16 of 30

Page 45: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

8

Ecological Development Consultancy Pvt. Ltd.

Location : Near Police Station

Date : 10.05.2016

TIME TWO WHEELER LMV HMV

Total TO Fro TO Fro TO Fro

00:00 – 01:00 0 0 4 0 1 1 6

01:00 – 02:00 0 0 0 0 0 0 0

02:00 – 03:00 0 0 0 0 1 0 1

03:00 – 04:00 0 1 2 1 1 0 5

04:00 – 05:00 3 0 0 0 2 0 5

05:00 – 06:00 9 15 2 3 6 5 40

06:00 – 07:00 26 23 0 4 36 4 93

07:00 – 08:00 60 31 3 8 19 4 125

08:00 – 09:00 61 36 7 9 18 1 132

09:00 – 10:00 30 29 4 4 5 3 75

10:00 – 11:00 29 32 7 6 4 3 81

11:00 – 12:00 23 26 9 7 5 2 72

12:00 – 13:00 16 27 6 4 4 13 70

13:00 – 14:00 18 15 7 4 4 7 55

14:00 – 15:00 20 15 8 11 7 2 63

15:00 – 16:00 14 10 5 8 1 6 44

16:00 – 17:00 15 25 5 15 0 10 70

17:00 – 18:00 8 7 3 1 3 15 37

18:00 – 19:00 21 22 7 8 8 12 78

19:00 – 20:00 10 7 2 2 0 2 23

20:00 – 21:00 10 8 2 4 1 2 27

21:00 – 22:00 5 4 3 5 0 4 21

22:00 – 23:00 2 0 1 0 0 0 3

23:00 – 24:00 0 0 0 0 0 0 0

TOTAL 380 333 87 104 126 96 1126

Appendix 1

Page 17 of 30

Page 46: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

9

Ecological Development Consultancy Pvt. Ltd.

Location : Near Guest House

Date : 10.05.2016

TIME TWO WHEELER LMV HMV

TOTAL TO Fro TO Fro TO Fro

00:00 – 01:00 0 0 0 0 0 0 0

01:00 – 02:00 0 0 0 0 0 0 0

02:00 – 03:00 0 0 0 0 0 0 0

03:00 – 04:00 0 0 0 0 0 0 0

04:00 – 05:00 0 0 1 1 1 1 4

05:00 – 06:00 3 3 0 0 1 0 7

06:00 – 07:00 3 3 1 1 2 1 11

07:00 – 08:00 6 2 3 2 2 1 16

08:00 – 09:00 4 3 3 2 2 1 15

09:00 – 10:00 1 2 0 1 3 1 8

10:00 – 11:00 2 1 3 0 0 0 6

11:00 – 12:00 2 3 3 3 1 3 15

12:00 – 13:00 2 3 4 5 1 0 15

13:00 – 14:00 0 1 0 1 1 2 5

14:00 – 15:00 1 1 3 0 1 1 7

15:00 – 16:00 2 2 1 1 0 1 7

16:00 – 17:00 0 1 1 2 0 1 5

17:00 – 18:00 3 3 0 0 1 0 7

18:00 – 19:00 3 3 1 1 2 1 11

19:00 – 20:00 6 2 3 2 2 1 16

20:00 – 21:00 4 3 3 5 2 2 19

21:00 – 22:00 1 0 4 2 0 1 8

22:00 – 23:00 0 0 2 4 0 1 7

23:00 – 24:00 0 0 0 1 0 0 1

TOTAL 43 36 36 34 22 19 190

Appendix 1

Page 18 of 30

Page 47: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

10

Ecological Development Consultancy Pvt. Ltd.

Location : Near Guest House

Date : 13.05.2016

TIME TWO WHEELER LMV HMV

TOTAL TO Fro TO Fro TO Fro

00:00 – 01:00 0 1 1 0 0 0 1

01:00 – 02:00 0 0 0 0 0 0 0

02:00 – 03:00 0 0 0 0 0 1 1

03:00 – 04:00 0 0 0 0 0 0 0

04:00 – 05:00 2 0 1 2 0 0 5

05:00 – 06:00 0 1 2 1 1 0 5

06:00 – 07:00 2 2 2 2 0 1 9

07:00 – 08:00 4 3 3 0 2 0 12

08:00 – 09:00 3 1 2 0 1 1 8

09:00 – 10:00 1 2 2 1 1 0 7

10:00 – 11:00 3 2 1 0 1 1 8

11:00 – 12:00 2 3 0 3 1 1 10

12:00 – 13:00 1 0 2 1 0 1 5

13:00 – 14:00 1 2 0 2 2 1 8

14:00 – 15:00 1 0 2 3 2 1 9

15:00 – 16:00 1 2 2 2 0 0 7

16:00 – 17:00 1 2 1 2 1 0 7

17:00 – 18:00 1 0 2 2 0 1 6

18:00 – 19:00 1 2 4 2 0 1 10

19:00 – 20:00 3 4 2 1 1 0 11

20:00 – 21:00 2 1 1 3 0 2 9

21:00 – 22:00 2 0 2 1 0 0 5

22:00 – 23:00 0 0 1 2 0 0 3

23:00 – 24:00 0 0 0 0 0 0 0

TOTAL 31 28 32 30 13 12 146

Appendix 1

Page 19 of 30

Page 48: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

11

Ecological Development Consultancy Pvt. Ltd.

Location : Near Police Station

Date : 13.05.2016

TIME TWO WHEELER LMV HMV

TOTAL TO Fro TO Fro TO Fro

00:00 – 01:00 0 1 2 0 2 0 5

01:00 – 02:00 0 0 0 0 2 0 2

02:00 – 03:00 1 0 0 2 1 1 5

03:00 – 04:00 1 0 0 0 0 0 1

04:00 – 05:00 5 0 0 0 0 1 6

05:00 – 06:00 30 12 2 1 3 0 48

06:00 – 07:00 21 23 0 11 24 1 80

07:00 – 08:00 31 38 1 6 99 4 179

08:00 – 09:00 34 30 1 1 96 28 190

09:00 – 10:00 20 22 5 5 80 43 175

10:00 – 11:00 32 47 5 11 112 50 257

11:00 – 12:00 17 20 7 13 81 80 218

12:00 – 13:00 23 26 10 1 41 52 153

13:00 – 14:00 14 13 7 4 100 71 209

14:00 – 15:00 19 14 10 9 35 53 140

15:00 – 16:00 20 12 4 3 32 58 129

16:00 – 17:00 15 17 3 6 10 40 91

17:00 – 18:00 31 32 9 6 9 71 158

18:00 – 19:00 21 26 6 6 3 59 121

19:00 – 20:00 15 29 5 5 3 67 124

20:00 – 21:00 24 19 7 6 1 9 66

21:00 – 22:00 2 0 2 0 1 1 6

22:00 – 23:00 6 1 5 1 1 1 15

23:00 – 24:00 2 0 2 3 1 0 8

TOTAL 384 382 93 100 737 690 2386

Appendix 1

Page 20 of 30

Page 49: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

12

Ecological Development Consultancy Pvt. Ltd.

Location : Near Zero Point

Date : 13.05.2016

TIME TWO WHEELER LMV HMV

TOTAL TO Fro TO Fro TO Fro

00:00 – 01:00 2 0 1 1 38 32 74

01:00 – 02:00 0 0 1 0 49 46 96

02:00 – 03:00 0 0 1 0 43 43 87

03:00 – 04:00 0 0 1 2 37 34 74

04:00 – 05:00 2 3 1 0 38 41 85

05:00 – 06:00 8 10 1 1 33 32 85

06:00 – 07:00 13 14 1 10 29 19 86

07:00 – 08:00 12 14 0 3 99 3 131

08:00 – 09:00 17 17 2 1 95 30 162

09:00 – 10:00 13 13 2 5 86 41 160

10:00 – 11:00 13 21 3 3 125 62 227

11:00 – 12:00 11 17 4 8 67 85 192

12:00 – 13:00 13 15 8 1 55 63 155

13:00 – 14:00 4 8 6 3 110 75 206

14:00 – 15:00 3 8 7 7 40 58 123

15:00 – 16:00 4 4 4 3 35 52 102

16:00 – 17:00 8 13 3 4 12 52 92

17:00 – 18:00 21 10 3 3 5 61 103

18:00 – 19:00 15 9 4 5 6 66 105

19:00 – 20:00 8 6 3 3 7 83 110

20:00 – 21:00 6 3 4 5 44 30 92

21:00 – 22:00 5 3 2 0 19 25 54

22:00 – 23:00 4 0 3 1 27 33 68

23:00 – 24:00 2 0 3 1 39 36 81

TOTAL 184 188 68 70 1138 1102 2750

Appendix 1

Page 21 of 30

Page 50: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

13

Ecological Development Consultancy Pvt. Ltd.

Meteorology

Results of Site Specific Meteorological Data Month Of ‘March 2016’

Sl.

No. Parameters Month of ‘March 2016’

1 Temperature (0C)

Maximum 39.62

Minimum 17.66

Average 29.11

2 Relative Humidity (%)

Maximum 98.78

Minimum 17.16

Average 59.74

3 Wind speed(m/s) Maximum 6.7

Average 1.23

4 Wind Direction (%)

N 2.41

NNE 2.82

NE 5.10

ENE 4.57

E 4.57

ESE 2.56

SE 2.16

SSE 2.01

S 3.77

SSW 5.52

SW 10.22

WSW 15.33

W 10.22

WNW 3.63

NW 4.17

NNW 2.96

CALM 18.01

5 Rainfall(mm) Monthly Total 23.7

No. of rainy days 04

Appendix 1

Page 22 of 30

Page 51: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

14

Ecological Development Consultancy Pvt. Ltd.

Details Of Meteorological Data During the month Of ‘March 2016’

Date Temperature Relative Wind Speed (m/s) Rainfall

(mm) Humidity (%)

Max. Min. Max. Min. Max. Min.

01.03.2016 34.36 19.47 87.56 32.54 4.7 0 0

02.03.2016 33.95 20.78 96.45 41.25 4.0 0 0

03.03.2016 32.58 21.45 93.12 42.36 3.8 0 0

04.03.2016 33.12 20.85 82.14 34.15 4.6 0 0

05.03.2016 35.63 22.47 86.23 30.12 4.1 0 0

06.03.2016 35.16 21.45 90.14 26.89 4.5 0 0

07.03.2016 36.23 23.14 80.21 25.60 5.6 0 0

08.03.2016 34.97 22.52 78.46 24.13 5.8 0 0

09.03.2016 34.24 23.56 75.46 25.61 4.4 0 0

10.03.2016 36.33 23.39 81.13 27.94 3.9 0 0

11.03.2016 36.51 24.74 83.15 26.16 3.2 0 0

12.03.2016 36.94 22.69 86.21 35.18 3.0 0 0

13.03.2016 37.36 21.22 85.27 30.97 4.7 0 0

14.03.2016 35.78 23.56 80.13 28.13 5.2 0.2 12.4

15.03.2016 33.92 21.14 95.15 50.89 6.2 0.4 1.6

16.03.2016 33.62 22.35 97.31 49.76 4.2 0.2 0

17.03.2016 35.03 22.41 92.13 38.12 3.6 0 0

18.03.2016 34.23 23.65 95.10 34.21 2.9 0 0

19.03.2016 36.89 24.45 87.13 28.24 1.8 0 0

20.03.2016 38.41 23.25 93.10 42.21 2.5 0 0

21.03.2016 38.85 21.53 74.38 23.41 3.4 0 0

22.03.2016 39.03 22.89 72.02 20.40 3.3 0 0

23.03.2016 38.21 21.46 75.96 18.98 4.2 0 0

24.03.2016 36.95 24.63 90.41 17.16 4.0 0 0

25.03.2016 37.75 20.14 75.06 21.42 3.1 0 0

26.03.2016 36.87 23.98 83.98 32.78 3.7 0 0

27.03.2016 38.91 24.72 84.23 27.6 4.2 0 0

28.03.2016 35.45 18.14 98.78 48.44 6.7 0 0.8

29.03.2016 34.26 17.66 96.41 38.42 4.0 0 0

30.03.2016 36.53 24.38 92.12 45.98 5.8 0.4 8.9

31.03.2016 39.62 19.42 90.10 56.31 5.1 0.6 0

Appendix 1

Page 23 of 30

Page 52: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

15

Ecological Development Consultancy Pvt. Ltd.

Wind rose (24hrly) for the month of ‘March 2016’

Appendix 1

Page 24 of 30

Page 53: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

16

Ecological Development Consultancy Pvt. Ltd.

Results of Site Specific Meteorological Data Month Of ‘April 2016’

Sl.

No. Parameters Month of ‘April 2016’

1 Temperature (0C)

Maximum 45.22

Minimum 20.42

Average 31.54

2 Relative Humidity (%)

Maximum 95.68

Minimum 16.12

Average 51.21

3 Wind speed(m/s) Maximum 15.8

Average 3.59

4 Wind Direction (%)

N 2.22

NNE 5.41

NE 3.33

ENE 3.05

E 3.89

ESE 2.78

SE 2.37

SSE 3.48

S 7.37

SSW 6.39

SW 13.89

WSW 15.56

W 8.89

WNW 4.44

NW 4.30

NNW 1.80

CALM 10.83

5 Rainfall(mm) Monthly Total 6.8

No. of rainy days 01

Appendix 1

Page 25 of 30

Page 54: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

17

Ecological Development Consultancy Pvt. Ltd.

Details Of Meteorological Data During the month Of ‘April 2016’ Date Temperature Relative Wind Speed (m/s) Rainfall

(mm) Humidity (%)

Max. Min. Max. Min. Max. Min.

01.04.2016 36.80 25.6 95.68 40.26 5.7 2.4 0

02.04.2016 38.79 28.14 90.10 38.90 6.2 1.7 0

03.04.2016 38.98 27.40 88.26 39.41 6.6 0.4 0

04.04.2016 39.86 29.12 92.16 32.14 6.8 0.2 0

05.04.2016 40.10 28.18 86.47 29.26 5.9 0 0

06.04.2016 38.91 26.17 78.09 26.92 6.0 0 0

07.04.2016 41.42 25.91 73.42 22.19 6.7 0.8 0

08.04.2016 41.98 26.84 70.17 24.98 7.1 0 0

09.04.2016 40.17 26.10 76.88 25.60 7.7 0 0

10.04.2016 42.01 24.97 78.77 27.16 8.8 0.2 0

11.04.2016 42.98 25.41 80.21 24.14 10.6 1.9 0

12.04.2016 43.29 22.18 75.32 22.46 12.7 2.1 0

13.04.2016 43.87 20.42 77.16 20.10 10.9 1.6 0

14.04.2016 44.22 24.16 72.23 18.96 6.2 0.2 0

15.04.2016 44.30 21.40 70.17 19.20 4.4 0 0

16.04.2016 44.60 24.68 78.26 18.16 3.8 0 0

17.04.2016 44.70 28.25 80.16 22.24 8.6 0.4 0

18.04.2016 45.22 28.40 77.16 22.10 15.8 1.2 6.8

19.04.2016 44.10 25.26 95.25 30.18 10.16 0.4 0

20.04.2016 43.86 24.68 86.70 33.24 7.3 0.2 0

21.04.2016 44.02 25.58 89.16 34.26 8.2 0 0

22.04.2016 44.15 26.96 85.17 24.18 9.7 0.6 0

23.04.2016 44.96 25.42 91.16 16.12 3.6 0 0

24.04.2016 43.72 23.90 84.51 17.60 5.5 0 0

25.04.2016 42.28 24.34 80.18 20.15 6.9 0 0

26.04.2016 42.48 26.16 84.76 23.97 4.9 0 0

27.04.2016 40.21 25.07 86.42 38.42 5.0 0 0

28.04.2016 43.14 26.76 81.16 25.24 8.9 0.2 0

29.04.2016 42.96 25.84 79.38 21.40 10.2 1.2 0

30.04.2016 43.38 24.54 76.42 22.20 12.4 0.6 0

Appendix 1

Page 26 of 30

Page 55: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

18

Ecological Development Consultancy Pvt. Ltd.

Wind rose (24hrly) for the month of ‘April 2016’

Appendix 1

Page 27 of 30

Page 56: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

19

Ecological Development Consultancy Pvt. Ltd.

Results of Site Specific Meteorological Data Month Of ‘May 2016’

Sl.

No. Parameters Month of ‘May 2016’

1 Temperature (0C)

Maximum 40.43

Minimum 19.22

Average 29.82

2 Relative Humidity (%)

Maximum 96.58

Minimum 21.63

Average 59.10

3 Wind speed(m/s) Maximum 12.70

Average 03.46

4 Wind Direction (%)

N 2.29

NNE 2.69

NE 3.22

ENE 5.78

E 5.23

ESE 2.82

SE 1.69

SSE 2.42

S 7.52

SSW 7.67

SW 15.59

WSW 17.64

W 8.34

WNW 3.5

NW 4.42

NNW 3.9

CALM 5.28

5 Rainfall(mm) Monthly Total 3.0

No. of rainy days 3

Appendix 1

Page 28 of 30

Page 57: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

20

Ecological Development Consultancy Pvt. Ltd.

Details Of Meteorological Data During the month Of ‘May 2016’ Date Temperature Relative Wind Speed (m/s) Rainfall

(mm) Humidity (%)

Max. Min. Max. Min. Max. Min.

01.05.2016 33.19 19.22 94.9 44.77 6.4 0 0

02.05.2016 33.99 19.7 95 41.69 8.8 0 0

03.05.2016 40.43 19.52 95.66 21.97 7.9 0 0.2

04.05.2016 38.76 23.35 86.89 21.63 7.8 0.7 0.2

05.05.2016 39.14 23.67 87.78 24.38 7.1 0.4 0

06.05.2016 38.4 23.64 90.45 28.65 5.7 0 0

07.05.2016 38.58 25.63 86.74 23.52 7.4 0 0

08.05.2016 35.44 24.68 89.9 40.3 12.7 1.3 0

09.05.2016 36.83 24.28 78.09 37.81 6.3 1.1 0

10.05.2016 38.22 21.83 96.54 34.66 9.2 0 2.6

11.05.2016 34.78 21.54 96.58 51.34 4.9 0.2 0

12.05.2016 37.07 22.81 89.99 40.78 5.4 0 0

13.05.2016 39.79 26.33 82.89 27.28 6.1 0 0

14.05.2016 37.85 25.9 80.89 35.96 7.3 0 0

15.05.2016 39.2 26.3 82.54 30.19 8.8 1.7 0

Appendix 1

Page 29 of 30

Page 58: DAITARI IRON ORE MINING PROJECTenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0... · 2016-05-20 · DAITARI IRON ORE MINING PROJECT At Village Talapada, Tehsil Harichandanpur

Environmental Monitoring Report for the period of “1st March to 15th May”

21

Ecological Development Consultancy Pvt. Ltd.

Wind rose (24hrly) for the month of ‘May 2016’

Appendix 1

Page 30 of 30