Daily and Real Time Daily and Real Time yyMonitoring of Non Revenue Monitoring of Non Revenue
WaterWater
Joaquim Poças MartinsJoaquim Poças Martins
[email protected]@[email protected]@gmail.com
IWA Water Loss 2010 – São Paulo, Brasil
M l l F l ’ Bl Ski P lMalcolm Farley’s Blue Skies Pannel (London, 2010)
The best future water supply systems:• Will not leak (Dennis Dellow) • Will last for more than one hundred years• Wll be monitored/controlled in real time• Will have full AMR
Estimating the ELL and defining a strategy to reach it
JPM IWA Water Loss JPM IWA Water Loss 2010 2010 S.PauloS.Paulo 22
This system:This system:
Will leakIt will be difficult to know when/where it isIt will be difficult to know when/where it is leakingWill t l t 100Will not last 100 years… but it is cheaper, faster and easier to but t s c eape , aste a d eas e tobuiild it this way (in the short run)
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 55
AGUAS DO PORTO(400,000 ep)
October 2006 May 2009
System Input Volume(m3/day) 104,000 69,000
Revenue Water 48 000 48 000Revenue Water(m3/day) 48,000 48,000
Non-Revenue Water(%) 54% 30%
(with very little investment)
Non-Revenue Water(m3/day) 56,000
22,000
(savings of M€ 4.0 /year, 10% of the annual turnover)tu o e )
FunctionsWater Supply +
Sewerage+ Wastewater Treatment
Water Supply + Sewerage+ Wastewater Treatment+ Stormwater + Stream
Rehabilitation+ Beaches
Tariff Increases n.a. 0% in 2007, 2.75% in 2008, 1% in 2009
Number of Workers 574 498
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 88
Number of Workers 574 498
Net results- M€ 3.5
(Loss)
+ M€ 1.0
(Profit)
Reduction of Water LossReduction of Water LossReduction of Water LossReduction of Water Loss
SIVSIV
NRW
m3/year
NRW
RW
Time
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1111
Reduction of NRWReduction of NRWImpact on the Annual ResultsImpact on the Annual Results
RW (m3/d)RWRW ++RWRWffSIVSIVii
RWRWii ++00
nX €/m3
X €/ 3SIVSIV X €/m3
(m(m33/d/d))SIVSIVff
+Y +Y €€/year/year
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1212
--
Alternative Paths to Reduce Non-Revenue Water and the Respective ImpactNon Revenue Water and the Respective Impact
on the Annual ResultsSystem Input Revenue Water (m3/day)System Input
Volume (m3/day)
Revenue Water (m3/day)
48 000 50 000 52 000 55 000
104 000 0 0 1 1 2 2 3 854%
35%
42%
104 000 0.0 1.1 2.2 3.8
86 000 2.0 3.1 4.2 5.8
80 000 2 7 3 8 4 9 6 5
36%
31%80 000 2.7 3.8 4.9 6.5
75 000 3.2 4.3 5.4 7.1
70 000 3 8 4 9 6 0 7 629%
20%
15%
70 000 3.8 4.9 6.0 7.6
65 000 4.4 5.4 6.5 8.2
60 000 4 9 6 0 7 1 8 760 000 4.9 6.0 7.1 8.7
56 000 5.4 6.5 7.5 9.2
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1313
IWA Standard Water BalanceIWA Standard Water BalanceIWA Standard Water BalanceIWA Standard Water Balance
Authorized
RevenueWater
BilledAuthorized
Consumption
Billed Metered Consumption
Billed Unmetered ConsumptionConsumption
Consumption
UnbilledAuthorized
Consumption
Billed Unmetered Consumption
Unbilled Metered Consumption
System
Input
VolumeNon
Revenue
Consumption
Apparent (commercial)
Unbilled Unmetered Consumption
Unauthorized Consumption
C t M t I i dVolume Revenue
Water
(commercial)Losses
Customer Meter Inaccuracies and Data Handling Errors
Leakage on Transmission andDistribution Mains
Water
LossesReal
(physical)Losses Leakage on Service Connections
t i t f C t M t
Leakage and Overflows at Storage Tanks
Losses
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1414
up to point of Customer Meter
Reduction of Water LossReduction of Water LossReduction of Water LossReduction of Water Loss
Authorized
RevenueWater
BilledAuthorized
Consumption
Billed Metered Consumption
Billed Unmetered ConsumptionConsumption
Consumption
UnbilledAuthorized
Consumption
Billed Unmetered Consumption
Unbilled Metered Consumption BBILL
System
Input
VolumeNon
Revenue
Consumption
Apparent (commercial)
Unbilled Unmetered Consumption
Unauthorized Consumption
C t M t I i d
B
TVolume Revenue
Water
(commercial)Losses
Customer Meter Inaccuracies and Data Handling Errors
Leakage on Transmission andDistribution Mains
Water
Losses
M
4Real
(physical)Losses Leakage on Service Connections
t i t f C t M t
Leakage and Overflows at Storage Tanks
Losses
RR
RREDUCE
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1515
up to point of Customer Meter RR
Strategy for Real Losses Strategy for Real Losses Reduction Reduction
PRESSURE MANAGEMENT
SPEED AND QUALITY OF REPAIRS
ACTIVE LEAKAGECONTROL
UNAVOIDABLE
RECOVERABLE
PIPELINE AND ASSETS
MANAGEMENT:RENEWAL
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1616
RENEWAL, REPLACEMENT
Strategy for Apparent Losses Strategy for Apparent Losses Reduction Reduction
CUSTOMER METER
INACCURACY
UNAUTHORIZED CONSUMPTION
(THEFT)
DATA TRANSFER
ERRORS
UNAVOIDABLE
(THEFT) ERRORSRECOVERABLE
DATA ANALYSISERRORS
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1717
ERRORS
Priority MeasuresPriority Measures
1 IWA W t B l1. IWA Water Balance2.Repair all visible leaks3.Universal billing/metering4.Control room4.Control room5.Monitoring and telemetry6 Pressure control6.Pressure control7.Active leakage control teams8.Fast repair teams
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1818
MeasuresMeasuresMeasuresMeasuresTypes of water loss Measures 1 Measures 2 Measures 3 Measures 4Types of water loss
(from Water Balance)Measures 1 Measures 2 Measures 3 Measures 4
Water loss in pipes (leaks and bursts) Pressure control Fast repair of l k d b
Active Leakage C l
Replacement f ileaks and bursts Control of pipes
Water loss in connections (leaks and bursts)
Pressure control Fast repair of leaks and bursts
Active Leakage Control
Replacement of pipes
Water loss in storage tanks Detect and prevent overflows
Repair of water tanks
Water loss due to metering errors (old Local Inspection of Replacement of meters) meters meters
Water loss due to unauthorized consumption (theft)
Local Inspection
Water loss due to unbilled, unmetered Installation ofWater loss due to unbilled, unmetered consumptions (watering public gardens, street washing, …)
Installation of meters and bill
Water loss due to unbilled, metered Bill
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 1919
consumption (free water)
Reduction of Water Losses
35 000
40.000
Accumulated Savings
100 000 000 €
20.000
25.000
30.000
35.000
m3/
d
40.000.000 €60.000.000 €80.000.000 €
100.000.000 €
€
0
5.000
10.000
15.000
0 €20.000.000 €
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
YearsReal losses Apparent Losses NRW
YearsReal Losses Apparent losses NRW
SIV and RW (€/year)
30000000
40000000
Savings due to the reduction of NRW
6.000.000
7.000.000
0
10000000
20000000
30000000
1 000 000
2.000.000
3.000.000
4.000.000
5.000.000
€/ye
ar
00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Ye a r sSIV - System Input Volume RW - Revenue water
0
1.000.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
YearsReal losses Apparent Losses NRW
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 2121
Case study Case study ––yyAldoarAldoar
400 Clients with AMR
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 2626
Leakage Control DMADMA
Flow variation (m3/hour) – Max, Average and Min
burst burst
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 2727
Real time monitoring ofReal time monitoring ofReal time monitoring of Real time monitoring of SIV and RWSIV and RW
10
56789
12345
Consumption
TotalizerSIVRW
0
4-5-
10 1
9:0
5-10
22:
005-
5-10
1:0
05-
5-10
4:0
05-
5-10
7:0
05-
10 1
0:00
5-10
13:
005-
10 1
6:00
5-10
19:
005-
10 2
2:00
6-5-
10 1
:00
6-5-
10 4
:00
6-5-
10 7
:00
5-10
10:
005-
10 1
3:00
5-10
16:
005-
10 1
9:00
5-10
22:
007-
5-10
1:0
07-
5-10
4:0
07-
5-10
7:0
05-
10 1
0:00
5-10
13:
005-
10 1
6:00
5-10
19:
005-
10 2
2:00
8-5-
10 1
:00
8-5-
10 4
:00
8-5-
10 7
:00
5-10
10:
005-
10 1
3:00
5-10
16:
005-
10 1
9:00
5-10
22:
00
14 14- 15 15 15 15-
15-
15-
15-
15- 16 16 16 16-
16-
16-
16-
16- 17 17 17 17-
17-
17-
17-
17- 18 18 18 18-
18-
18-
18-
18-
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 2828
Our ancestors installed pipesOur ancestors installed pipes that lasted over 100 years
How long will last the onesHow long will last the ones we are installing now?
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 3939
Replacement of Victorian water Replacement of Victorian water mainsmains
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 4040
Replacement of pipesReplacement of pipesp p pp p p
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 4141
Trenchless pipe replacementTrenchless pipe replacementReliningRelining
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 4343
Th b t t l tThe best water supply systems:Will not leak Will l t f th h d dWill last for more than one hundred yearsFull AMR, monitored in real time, meters with no moving parts lasting much longermoving parts, lasting much longerAll the water measured and billed
…but we still will have to live with many sub-…but we still will have to live with many suboptimal ones, for many years, in many parts of the world
JPM IWA Water Loss 2010 JPM IWA Water Loss 2010 S.PauloS.Paulo 4545