PETRONET LNG LIMITED

CORPORATE PRESENTATION

Page 2: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 2/22

PLLPLL – – DAHEJ TERMINALDAHEJ TERMINAL

SHAREHOLDERS

ONGC, BPCL, GAIL & IOCL – (Public Sector Undertakings)

GDFI (Strategic Partner), Asian Development Bank , Institutions & Public

DAHEJ TERMINAL

oca e n one o e us es n us r a u s n es ern n a.

10.0 MMTPA capacity

7.5 MMTPA sourced through Long Term Contract with RasGas

 Additional LNG being sourced through Spot /Short Term Contracts

Entered into marketing alliance with GAIL, IOCL & BPCL under a passthrough contract

Connected to major trunk pipelines HBJ, DUPL and GSPL network 

Currently supplying around 21% of total gas consumption

DAHEJTERMINAL

Page 3: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 3/22

SECOND LNG BERTH AT DAHEJSECOND LNG BERTH AT DAHEJ

 Developing second LNG Jetty at Dahej Terminal.

. .

 Existing marine facilities adequate for 11.0 MMTPA 

of LNG.

 New Jetty helps mitigating risk.

 Facilitating berthing of tankers up-to 260,000 CBM

Q-Max .

 Commissioning – III Quarter, 2013.

 – .

Page 4: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 4/22

LNG STORAGE TANKSLNG STORAGE TANKS

Page 5: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 5/22

DAHEJ EXPANSION FACILITIESDAHEJ EXPANSION FACILITIES

HP PUMPSHP PUMPS SHELL & TUBE VAPORIZERSSHELL & TUBE VAPORIZERS

Page 6: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 6/22

DAHEJ EXPANSION FACILITIESDAHEJ EXPANSION FACILITIES

 AIR HEATER GTG

GLYCOL WATER SYSTEM

Page 7: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 7/22

PETRONET’S III LNG VESSELPETRONET’S III LNG VESSEL --ASEEM ASEEM

Page 8: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 8/22

INDIA’S GAS INFRASTRUCTUREINDIA’S GAS INFRASTRUCTURE

Page 9: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 9/22

INTEGRATED POWER PLANT AT DAHEJINTEGRATED POWER PLANT AT DAHEJ

 Completed Detail Feasibility Report for a 1200 MW Power Plant.

  In process - Land Acquisition & Environment Clearance.

 LNG terminal facilitates harnessing Cold Energy.

 Configuration of:

  3 x 356 MW total 1068 MW Sin le shaft CCGT Investment of US 700 Million

  10% increase in power generation capacity, arising out of harnessing cold energy.

  Aggregate Project cost of about Rs 3,000 crore (Rs 2.80 crore / MW).

  Primary fuel for Project to be sourced from international markets.

  Aggregate gas requirement of 1.0–1.1 MMTPA.

 –to Power Plant.

  Implementation time-frame of 12-15 months for pre-development activities & further 27-33 monthsfor commencement of commercial operations.

Page 10: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 10/22

LNG TRUCK LOADING FACILITIESLNG TRUCK LOADING FACILITIES –– DAHEJDAHEJ

 Truck Loading facility at Dahej terminal wascommissioned in August 09, 2007 as a Pilot

.

 Currently about 3-4 trucks are loaded on dailybasis & total of around 1700 trucks have beenoa e a e.

 Facility can handle 2500 loadings per year.

 At present LNG (by road tanker) is being sold tothree consumers – two in Gujarat and one inMaharashtra.

  Several new customers (up to 800 KMS) arelined up for off-take of LNG for industrial andcity gas use.

Page 11: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 11/22

TRUCK LOADING FACILITIESTRUCK LOADING FACILITIES –– DAHEJDAHEJ

WEIGH BRIDGE VAPORISATION FACILITIES

Page 12: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 12/22

SOLID CARGO PORT PROJECTSOLID CARGO PORT PROJECT-- DAHEJDAHEJ

  Petronet formed a 26% Joint Venture Company with the Adani Group to execute a Solid Cargo.

  Port is being constructed North of the existing LNG jetty in Dahej

  Being executed in two phases

  Handling 18.0 MMTPA of cargo/year

  Cost Rs.1200 crore (US$240 Million)

  Scheduled to be completed by August, 2010 (Phase-I) & December, 2010 (Phase-II)

Page 13: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 13/22

SOLID CARGO PORT PROJECTSOLID CARGO PORT PROJECT-- DAHEJDAHEJ

PILE DRIVING IN MAIN BERTH 1 APPROACH BUND

13

Page 14: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 14/22

KOCHI LNG TERMINALKOCHI LNG TERMINAL

  LNG Terminal is a part of newly created Special Economic Zone and PLL is one of the Co-developers.

 Capacity - 2.5 MMTPA, expandable to 5.0 MMTPA 

 Whessoe - Project Management Consultant.

 Site Grading and Reclamation Work – Completed.

 Work for building two LNG Storage Tanks awarded to IHI, Japan.

, .

 Work related to Marine Facilities awarded to Afcons Infrastructure Limited.

 Work related to Administration Buildin Warehouse Worksho & Occu ational Health Centre

awarded to MARG Limited.

 Scheduled Mechanical Completion– December, 2011SITE FOR KOCHI LNG TERMINAL

Page 15: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 15/22

KOCHI LNG TERMINALKOCHI LNG TERMINALFACILITIES

  Jetty & other Marine Facilities for handling ship

IMPLEMENTATION SCHEDULE

sizes (65000 m3 to 216000 m3)

  Unloading and vapor return arms   Two Full Containment Storage Tanks (155000 M3

net Capacity)n- an umps, o o ompressors

 Re-condenser, Booster Pumps   2 High Pressure Shell & Tube Vaporizers.

  1 High Pressure Shell & Tube Vaporizer for Heat.

  1 Submerged Combustion Vaporizer.   Metering Units, Gas Turbine Generators  Air Heaters, Utilities   Cold Heat Recover Condensate Water Stora e

 Additional investment on Vaporizer Plant/Utilities for handling 5 MTPA will be US$100million(approx.) SITE FOR KOCHI LNG TERMINAL

Page 16: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 16/22

KOCHI PROJECTKOCHI PROJECT

Page 17: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 17/22

TANK 101 & 102TANK 101 & 102

Page 18: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 18/22

MARINE FACILITIESMARINE FACILITIES

Page 19: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 19/22

Page 20: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 20/22

PLLPLL-- FINANCING STRUCTUREFINANCING STRUCTURE

Particulars Dahej Dahej Expansion Kochi Total

Equity CapitalInternal accruals/Premium

170-

-85*

-210*

170295

Shareholders Fund 170 85 210 465

Debt 280 235 490 1005

Total Means of Finance 450 320 700 1470

*PLL generates approx. US$ 100 Million cash from its existing operations. After servicingshareholders, the balance will be used to finance Expansion Projects.

Page 21: DAHEJ TERMINAL LNG

8/12/2019 DAHEJ TERMINAL LNG

http://slidepdf.com/reader/full/dahej-terminal-lng 21/22

CAPITAL EXPENDITURE/INVESTMENTCAPITAL EXPENDITURE/INVESTMENT

--Particulars Rs. (Crore) US$ (Million)

CAPEX

 2nd Jetty at Dahej (2013) Power Plant at Dahej (March, 2013) Kochi LNG Terminal First uarter 2012

10003200

220700

3600 800

INVESTMENT

o argo or – w an ecem er,

Grand Total 7900 1742

The Company has also undertaken expansion of an Institution to accommodate 500additional differently abled /challenged children (difficult to put a value to this initiative).