Ministry of Transport
Vietnam Expressway Corporation
RESETTLEMENT PLAN
Volume 2- QUANG NAM SECTION
January 2011
DA NANG – QUANG NGAI
EXPRESSWAY PROJECT
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
i
CONTENTS CONTENTS ............................................................................................................... i
LIST OF TABLES ....................................................................................................... iii
ABBREVIATIONS ...................................................................................................... v
DEFINITION OF TERMS ........................................................................................... vi
EXECUTIVE SUMMARY ............................................................................................ 1
I. INTRODUCTION .......................................................................................... 7
I.1. The project ........................................................................................................ 7
I.2. Minimizing Land Acquisition and Resettlement Impacts ............................... 10
II. LEGAL FRAMEWORK ................................................................................. 13
II.1. Relevant Vietnamese Legislation .................................................................... 13
II.2. Involuntary Resettlement Policy of the WB (PO 4.12 - December 2001) ...... 15
II.3. Main gaps between Viet Nam policies and WBPolicy on IR ........................... 15
III. ENTITLEMENT POLICY ............................................................................... 18
III.1. Objectives .................................................................................................... 18
III.2. Eligibility to compensation and relocation assistance ................................ 18
III.3. Compensation Principle and Entitlement ................................................... 19
III.3.1. Principles of Replacement Cost ................................................................. 19
III.3.2. Compensation policy for agricultural land ................................................. 20
III.3.3. Compensation for Residential Land ........................................................... 22
III.3.4. Compensation houses/other structures .................................................... 22
III.3.5. Compensation for Graves/Tombs .............................................................. 23
III.3.6. Compensation for loss of Standing Crops and Trees ................................. 23
III.3.7. Compensation for Loss of Income and/or Business/Productive Assets .... 24
III.3.8. Compensation for temporary impact during construction ....................... 24
III.3.9 Compensation for Loss of Community Assets ............................................ 25
III.3.10. Allowances and Rehabilitation Assistance during Transition Period ...... 25
III.3.11. Allowances / Assistance Targeted to Vulnerable Households ................ 27
IV. SOCIOECONOMIC CHARACTERISTICS ....................................................... 29
IV.1. General socioeconomic conditions of the Quang Nam Province ............... 29
IV.2. Survey on the socioeconomic conditions of the project DPs ...................... 29
IV.2.1. Demographic Characteristics of DPs..................................................... 30
IV.2.2. Educational status ................................................................................. 31
IV.2.3. Occupation and Employment ............................................................... 33
IV.2.4. Household Incomes .............................................................................. 33
IV.2.5. Households below Poverty level .......................................................... 34
IV.2.6. Access to public facilities ...................................................................... 34
IV.2.7. Access to utilities and services ............................................................. 36
IV.2.8. Ownership of Consumer Goods ............................................................ 37
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
ii
V. RESETTLEMENT IMPACTS ......................................................................... 38
VI. RELOCATION ARRANGEMENT ................................................................... 69
VI.1. The potential of the resettlement sites ...................................................... 69
VI.2. Process of site development and resettlement policy ................................ 77
VI.3. Cost for the site development ..................................................................... 80
VI.4. Issues of relocation should be done once RP is approved. ......................... 80
VII. INCOME RESTORATION AND REHABILITATION ......................................... 81
VIII. CONSULTATION, PARTICIPATION AND INFORMATION DISCLOSURE,
DISSEMINATION .................................................................................................... 94
VIII.1. Purposes and contents of consultation and information dissemination. ... 94
VIII.2. Consultation during RP preparation. ........................................................... 95
VIII.3. Consultation during RAP Implementation ................................................ 102
XIII.4. Disclosure ................................................................................................. 102
IX. IMPLEMENTATION ARRANGEMENTS ...................................................... 103
IX.1. Responsibility ............................................................................................. 103
IX.2. Implementation arrangements ................................................................. 107
IX.3. RAP implementation schedule .................................................................. 113
X. MONITORING AND EVALUATION ............................................................ 116
X.1. Internal monitoring ....................................................................................... 116
X.2. External Monitoring ...................................................................................... 116
XI. GRIEVANCE REDRESS MECHANISM ......................................................... 120
XII. COST AND BUDGET ................................................................................. 122
XII.1. Compensation Prices ................................................................................. 122
XII.2. Cost estimate ............................................................................................. 123
ANNEX A: Comparision Table .................................................................................. 1
ANNEX B: Socio-economic Characteristics ............................................................. 10
ANNEX C: Resettlement Impacts ........................................................................... 21
ANNEX D: TOR for Replacement Cost Survey ......................................................... 35
ANNEX E: Resettlement Cost for Quang Nam Province .......................................... 36
ANNEX F: TOR for External Monitoring Agency ...................................................... 47
ANNEX G : DMS Questionaire ................................................................................ 54
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
iii
LIST OF TABLES
Table I-1: General technical specifications of the project ............................................... 8
Table I-2: Districts and Communes covered by the Expressway .................................... 9
Table IV-1: Demographic Characteristics of DPs ........................................................... 30
Table IV-2: Age structure of surveyed population ........................................................ 31
Table IV-3: Educational status of the heads of householders....................................... 32
Table IV-4: Education Level of Surveyed DPs ................................................................ 32
Table IV-5: Types of employment.................................................................................. 33
Table V-1: Number of HHs and heads affected by land acquisition in 07 Districts ...... 38
Table V-2: Number of affected area of different land types......................................... 39
Table V-3: DPs Affected by Loss of Agricultural Land ................................................... 43
Table V-4: Loss of other Structures ............................................................................... 51
Table V-5: Impacts on annual crops and trees by Districts ........................................... 52
Table V-6. Affected Small Scale Business household .................................................... 53
Table V-7: Affected vulnerable households .................................................................. 54
Table V-8: Number of Household Are Entitled to Receive Land Plot in Resettlement
Sites ................................................................................................................................ 55
Table V-9: Summary of Impacts .................................................................................... 56
Table VI-1. The households have to relocate and potential of resettlement sites by
district ............................................................................................................................ 75
Table VII-1: Consultation with institutions, local NGOs of the affected districts ......... 83
Table VII-2: Potential programs, loans and training courses in Quang Nam province
could be considered for the economic restoration and livelihood improvement for the
project affected people ................................................................................................. 85
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
iv
Table VIII-1: Meetings in affected districts.................................................................... 96
Table VIII-2: Preferences, choices of DPs to the modes of economic restoration .....100
Table IX-1: Proposed schedule for RAP implementation with key activities ..............114
Table XII-1: Summary Estimated Resettlement Cost for the Quang Nam section .....124
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
v
ABBREVIATIONS CPC Commune People’s Committee
DPC District People’s Committee
DCSCC District Compensation and Site Clearance Committee
DARD Department of Agriculture and Rural Development
DOC Department of Construction
DOF Department of Finance
DONRE Department of Natural Resources and Environment
DPI Department of Planning and Investment
DOT Department of Transport
DMS Detailed Measurement Survey
DP Displace Person
EMA External Monitoring Agency
FS Feasibility Study
GOV Government of Viet Nam
IDA International Development Association of the World Bank
IOL Inventory of Losses
LURC Land Use Rights Certificate
MOLISA Ministry of Labor, Invalids and Social Assistance
MOT Ministry of Transport
NGOs Non-governmental Organizations
PIP Project Information Pamphlet
PMU85 Project Management Unit 85
PPC Provincial Peoples’ Committee
RCS Replacement Cost Study
RAP (or RP) Resettlement Plan
SES Socio-Economic Survey
TOR Terms Of Reference
USD US Dollar
VND Vietnam dong
WB World Bank
WU Women’s Union
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
vi
DEFINITION OF TERMS
Assistance
Means additional support provided to DPs who lose assets
(particularly productive assets), incomes, employment or sources of
living, to supplement payment of compensation for acquired assets,
in order to achieve, at a minimum, full restoration of living
standards and quality of life or otherwise improvement.
Cut-off date
Is the date of commencement of census and asset inventory
surveys by the provincial authorities following approval of the
project by GOV. The cut-off date has to be formally declared by the
relevant authorities to stakeholders. Persons who occupy the
project site after the cut-off date will not be eligible for
compensation and relocation assistance.
Detailed
Measurement
Survey (DMS)
Means the detailed survey of affected assets for preparation of
Inventory of Losses (IOL), including the loss of land, structures and
other fixed assets, business, employment and sources of
households incomes; and preparation of detailed list of households
thus impacted by the project. The final cost of compensation,
assistance and resettlement is determined following completion of
the DMS. The DMS will be done by respective District
Compensation Committees in the RAP implementation phase once
the benchmarks of the project site demarcation are put on the
ground.
Displaced Persons
Term used in OP 4.12 of the World Bank. Means any person or
persons, household, firm, private or public institution that, on
account of changes resulting from the Project, will have their or its
(i) standard of living adversely affected; (ii) right, title or interest in
any house, land (including residential, commercial, agricultural,
forest and/or grazing land), water resources or any other moveable
or fixed assets acquired, possessed, restricted or otherwise
adversely affected, in full or in part, permanently or temporarily;
and/or (iii) business, occupation, place of work or residence or
habitat adversely affected, with or without displacement. DPs
including all persons who are affected by land acquisition for the
project construction (permanently or temporary) and persons who
are affected by land acquisition for the relocation site development
for the relocating households.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
vii
Entitlement
Means the range of measures comprising compensation, assistance,
(including income restoration support, transfer assistance, income
substitution, relocation support and assistance to the vulnerable
DPs etc.) in order to achieve the objective of Resettlement Plan.
Host community Means the community residing at, or in the vicinity of the
relocation sites designated for relocating households.
Livelihood
restoration/
Improvement
Means the restoration of livelihood and household incomes of
relevant DPs through the RP policy and its implementation.
Inventory of Losses
(IOL)
Means the process of identification, location and measurement of
all fixed assets that will be acquired / recovered or adversely
affected by or as a result of the project. These include, (without
limitation or being an exhaustive list) lands used for residence,
commerce, agriculture, ponds; dwelling units, stalls and shops,
other structures, such as fences, tombs, wells; trees with
commercial value, sources of income and livelihood. It also includes
the assessment of the severity of the impact of land and property
on the affected assets and the severity of impact to the livelihood
and productive capacity of DPs. Detailed and final IOL is carried out
in the initial phase of RP implementation .
Land recovery
Means the processes by which all or part of land and property
owned, possessed, occupied or used, are compulsorily recovered or
otherwise acquired from an individual, household, firm or private
institution by the State or are acquired by agreement. Decision on
land recovery will be done through two steps (i) Decision at the
provincial or city for the whole project areas and subsequently (ii)
Decision by the district to each individual.
Resettlement Means the physical relocation of DP from the DP’s pre-project place
of residence and/or business.
Vulnerable People
Means individuals or distinct groups of people who might suffer
disproportionately or face the risk of being further marginalized by
the effects of land and property recovery or resettlement and
specifically includes: (i) female headed households with dependents
(ii) households with disabled persons, (iii) households falling under
the current MOLISA benchmark poverty line, (iv) children and
elderly households who are with no other means of support, and (v)
landless households.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
viii
Replacement Value
Means the amount calculated before displacement which is
needed to replace an affected asset without deductions for taxes,
and/or costs of transaction as follows:
(i) Productive land (Agricultural, fishpond, garden, forest)
based on market prices that reflect recent land sales of
comparable land in the district and other nearby areas, and in
the absence of such recent sales, based on equivalent
productive value;
(ii) Residential land based on market prices that reflect recent
sales of comparable houses and residential land in the district
and other nearby areas, and in the absence of such recent land
sales, based on sales in other locations with similar attributes;
(iii) Houses and other related structures based on current
market prices of materials and labor without depreciation or
deductions for salvaged building materials;
(iv) Standing crops equivalent current market value of the crop
at the time of compensation;
(v) Perennial crops and trees, cash compensation equivalent to
current market value given the type, age and productive value
(future production) at the time of compensation.
(vi) Timber trees, the price that would currently be paid for the
tress on the nearest market based on the diameter of each
tree at breast height.
Replacement Cost
Study
Means the process involved in determining the replacement cost
of land, houses and other affected assets based on surveys by
independent evaluators.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 1
EXECUTIVE SUMMARY
1. The project
According to JETRO Study, one of major reasons of traffic accident on National
Highway 1A is considered of “Mixed Traffic.” That is mixing of industrial and living
transportation, mixing of Quang Nam short traffic, and mixing of bicycle, motorcycle
and vehicle. The Expressway is designed to receive long trip traffic, which will
contribute for reducing traffic accident.
Da Nang - Quang Ngai Expressway Project is with the objective of improving the road
transportation system with the scopes of i) providing safe and secured transportation
for the high speed and heavy vehicles, and ii) strengthening of institution to manage
the expressway transportation system. Through realizing the scopes, the Expressway
is also aimed to achieve the following targets:
(a) Support Nationwide Socio-Economic Development
(b) To Promote Socio-Economic Development of Central Vietnam
(c) To Promote Improvement of Environment; and
(d) To Promote Traffic Safety
The alignment of the Expressway passes through two provinces (Quang Nam and
Quang Ngai) and Da Nang city, with 139.52 km in total length and tolled dual 2-lane
facility (2-lane at each direction) at the entire alignment.
The Resettlement Plan summarizes the impacts due to the proposed expressway
traversing the province of Quang Nam. Approximately 92 km length of the road
alignment crosses through 7 districts namely Dien Ban, Duy Xuyen, Que Son, Thang
Binh, Nui Thanh, Phu Ninh and Tam Ky city, covering a total of twenty four communes
of Quang Nam Province.
2. Land acquisition impacts
According to Vietnam Regulation, the width of the corridor for the project is 70m.
Based on this required area, land acquisition impacts in the Quang Nam province are
summarized as below:
There are a total of 3,874 households in 24 communes of 07 districts of Quang Nam
province who will be impacted by land acquisition for the project. Of these:
- 878 Households will be impacted by the loss of residential land either
partially or fully with the total affected area is 347,138 m2
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 2
- 2,473 Households will be impacted due to the loss of agricultural land with
the total area of 2,686,623 m2.
- 1,923,858 m2 other land (public land) will be impacted
- About 1,700,762 m2 of forestry land (Production forestland) will be impacted.
- 763 Households will be impacted on either partially or fully by the loss of
houses with the total affected area of houses being 37,594 m2..
- There are 771 HHs have to relocate to new places, of which relocated HHs
due to loss of residential land (both with and without structure) are dominant
one, which are 364 HHs (including 25 hh affected by loss of businesses),
followed by loss of agriculture land whee remaining land is rendered unviable
for continued use (407 HHs).
- There are 02 collective or public institutions that will be affected by loss of its
assets.
3. Legal and Policy Frameworks
The RP is developed based on the laws of the Government of Viet Nam (GOV) and the
World Bank Policy on Involuntary Resettlement (OP 4.12- December 2001).
The policy of GOV on compensation, assistance and relocation has been improved
significantly in recent years (Land law-2003; Decree 197-2004; Decree 84-2007;
Decree 69-2009 etc.) and very close to the requirements of the World Bank standards
on involuntary resettlement (OP 4.12). The entitlements for compensation and other
assistance take into consideration the latest provisions of the Decision 23/2010/QĐ-
UB of Quang Nam People’s Committee, dated 30th September 2010.
The main policy objectives and principles of the Project Compensation and
Resettlement policy are (i) land acquisition should be minimized as much as possible,
if unavoidable, the policy should be developed to (ii) ensure that affected people
receive compensation at full replacement values and with relocation assistance so
that they will be at least as well off as they would have been in the absence of the
project or otherwise improved.
The cut-off date of the project coincides with the date of commencement of the
census of affected persons and inventory of losses (IOL) and will be stablished when
DMS begins following approval of the project by GOV. The cut-off date will be
formally announced by the relevant authorities to stakeholders.
4. Public Participation and consultation
Several meetings of consultations, public meetings and commune discussions were
held with affected households and local authorities. Many DPs and local officials at
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 3
the different levels from the province to commune as well as local NGOs have been
consulted for different aspects of compensation and resettlement such as
compensation and resettlement policy, options to compensation modes (in cash or in
kind, cash for self-relocation or to relocate at the resettlement sites which will be
constructed by the project), preference to the livelihood restoration/development
programs etc. Many different instruments and channels of consultation and
participation were applied and organized. A lot of feedback has been obtained from
DPs, local NGOs, local authorities and relevant Provincial, District Departments. Public
consultation activities will continue throughout the implementation phase. At the
early time of the RP and project implementation, Public Information Booklet (PIB) will
be prepared by the Project Management Unit 85 and will be disseminated to the
affected households and posted at the public places.
5. Relocation arrangements and livelihood restoration
Since no public agricultural land is available that can be offered to the DPs as
replacement agricultural land, the project authorities will make special efforts to
assist DPs who wish to purchase replacement private agricultural land on willing-
buyer willing-seller basis. The project will also provide logistical support for such
transactions and all legal and documentation costs would be covered by the project if
carried out within a period of six months from the date of receipt of compensation by
the DPs. External Monitoring agency will closely monitor this activity.
There are 771 households have to be relocated with total required area of
resettlement sites being 24,720m2. The resettlement sites will be well developed
with physical infrastructures and social services such as inter roads, water and power
supply system, drainage and sewage water treatment systems etc.
The economic restoration programs to the DPs losing their productive land, including
vulnerable groups are developed to make sure that they would improve or at least
restore their livelihood as before displacement levels. The programs are proposed to
be based on the consultation with DPs and other stakeholders, especially local NGOs.
Implementation of livelihood restoration programs, including outcome of the
training, extension services etc. will be closely monitored by the project authorities as
well as by the external monitoring agency. A post-implementation evaluation by the
external monitoring agency would be carried out to determine whether the
objectives of the income rehabilitation and livelihood restoration have been
achieved. The project authorities will provide additional resources for continued
assistance to the DPs until they have restored their livelihood at least to the pre-
project levels.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 4
Planning and implementation of selected income restoration plans will be based on
extensive and well-documented consultation with the affect people.
6. Implementation Arrangements
Responsibilities of all relevant authorities and institutions from Central to Commune
levels are clearly described in the Decree 197/ND-CP-2004 and Decree 84/ND-CP-
2007.
The VEC under the Ministry of Transport (MOT), is the Executing Agency of the
Project. It is responsible for realization of the Da Nang - Quang Ngai Expressway
Project, including resettlement policy framework.
PMU85, on behalf of the VEC, has direct responsibility and day-to-day management
oversight for implementing all aspects pertained to the Expressway’s works, including
planning, programming, budgeting, design, implementation, monitoring, evaluation,
ensuring overall project’s coordination and supervision of resettlement activities and
coordination/liaison with the World Bank.
The PMU 85 will provide overall guidance and closely coordinate with all district and
commune levels for the project and RP implementation.
The PPC of Quang Nam Province and their relevant Departments are responsible for
review, approve on land recovery; compensation at the replacement values,
relocation site development and direct its lower levels in implementing the RP.
District People’s Committees, District Compensation and Resettlement Committees
(DCSCC), affected Communes will be responsible for carrying out for the DMS,
prepare compensation plans for each HH or individuals, affected institutions, pay
compensation to DPs as well as settle for complaints from DPs.
7. The implementation schedule
The implementation schedule of RAP is proposed based on the schedule of the
project construction; a schedule for key activities is summarized as below.
Proposed schedule for RP implementation with key activities (this RP implementation
schedule will be modified after the finalization of the proposed construction
schedule).
8. Information disclosure and dissemination
Key information about the project, compensation and assistance will be summarized
as in Public Information Booklet (PIB) and will be disseminated to all DPs once this
RAP is approved by the competent authorities. The Project Management Unit 85 is
responsible for disclosing the final RAP. The RAP and/or Vietnamese Version of
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 5
Table 0.1: Schedule for key activities of RP implementation
Activities Target dates/time
1. Information campaign: Information disclosure and
dissemination of RP at info shop of the WB in DC and VIDIC at
Viet Nam office and at PC office Quang Nam Province. A
summary of project background and RP disseminated to all
affected communities and DPs.
January to February
2011
2. Update detailed measurement surveys and census of DPs March to December
2011
3. Start up of planning for income rehabilitation measures June 2011 to September
2011
4. Resettlement site construction June 2011 to September
2011
5. Pay compensation to and relocation of DPs. May 2011 to December
2011
6. Relocation of Households April 2012 to June 2012
7. Monitoring June 2011 to April 2013
8. Post-implementation evaluation of resettlement June 2013
Entitlement Matrix will be disclosed at affected districts and Communes level as well
as at DONRE and DOF offices of Quang Nam Province. The full RAP will be disclosed at
Info-shop of the World Bank and VIDIC of the World Bank office in Viet Nam. VNM
version of the Entitlement Matrix would be made available to the DPs in each
commune. An external monitoring report on the RP implementation will be made
available at the project affected communes, affected districts and to relevant
Departments of Quang Nam Province.
9. Grievance redress mechanism
The Grievance Redress Committee (called GRC) at 03 levels (commune/district and
provincial level) will be established before the start of resettlement implementation
and announcement publicly. At each level, the committee members will include 5-7
representatives from: PMU, CRC (1-2 persons at each 03 level), mass
organization/civil society/CBOs/NGOs (1-2 persons), Lawyer Union/associations, and
DP representatives, which is a positive way to resolve issues that concerns of DPs. If it
is impossible to solve their complaints at the commune or ward level, DPs can take 04
steps, which are (i) first stage- at Commune level; (ii) second stage- at District level;
(iii) third stage-at Provincial level; and (iv) final stage- Courts. Persons filing a
complaint will not be charged administration or complaint fees.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 6
Participation of civil society members and DPs representatives would ensure that the
GRCs function without any coercion, remain independent, and discuss all the issues
and complaints, and take decisions in an objective and transparent manner.
10. Cost and budget
Table 0.2: Estimated Resettlement Cost for the Quang Nam section
No Items Total cost (VND) Exchange USD (1USD = 19,000
VND)
I Compensation for land 254,558,427,600 13,054,278
II Compensation for Structures 39,790,540,000 2,040,541
III Compensation for other fixed assets 20,923,770,000 1,073,014
IV Compensation for crops and trees 20,678,815,300 1,060,452
V Cost of resettlement site development 98,137,600,000 5,032,697
VI Cost of Public Facilities 908,500,000 46,590
VII Compensation for Loss of Businesses 499,000,000 25,590
VIII Allowances 581,103,826,000 29,800,196
IX SUB-TOTAL A (I+II+III+IV+V+VI+VII+VIII) 1,016,600,478,900 52,133,358
0
X Cost of Management (2% of I - VII) 20,332,009,578 1,042,667
XI Cost of RCS (Resettlement Cost Survey) 240,000,000 12,308
XII Cost of External Monitoring & Evaluation (1% of I-VII) 10,166,004,789 521,334
XIII SUB-TOTAL B (X+XI+XII) 30,738,014,367 1,576,308
0
XIV Contingency 10% x (IX+XIII) 104,733,849,327 5,370,967
Grand Total 1,152,072,342,594 59,080,633
To ensure that all compensation is paid at replacement cost, the VEC will contract an
independent land price appraisers licensed by the Department of Finance to carry out
Replacement Cost Study (RCS) for all the affected assets based on the prevalent
market prices. The findings of the RCS will be submitted to the PPC for comparison
and revisions, where necessary to ensure that the final rates reflect market prices and
that all assets are compensated at the replacement cost.
In case of over-run of resettlement cost, VEC will ensure that adequate additional
funds are available in a timely manner.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 7
I. INTRODUCTION
I.1. The project
According to JETRO Study, one of major reasons of traffic accident on National
Highway 1A is considered as “Mixed Traffic.” That is mixing of industrial and living
transportation, mixing of Quang Nam short traffic, and mixing of bicycle, motorcycle
and vehicle. The proposed Da Nang - Quang Ngai Expressway is designed to receive
long trip traffic, which will contribute in reducing traffic accidents and congestion
Da Nang - Quang Ngai Expressway Project is expected to improve the road
transportation system with the scope of i) providing safe and secured transportation
for the high speed and heavy vehicles, and ii) strengthening of institution to manage
the expressway transportation system. Through realizing the scopes, the Expressway
is also aimed to achieve the following targets:
(a) Support Nationwide Socio-Economic Development: According to the
logistic survey conducted at the time of JETRO Study in 2007 (JETRO Study),
20% of passing vehicles in the central Vietnam was bound for Hanoi and Quang
Nam. In addition, more than 40% of passing vehicles between Da Nang and
Quang Ngai was long trip connecting to the North and the South of Vietnam.
The Expressway will be the pivot of traffic to connect these two regions.
(b) To Promote Socio-Economic Development of Central Vietnam: The
Expressway is considered to play the important role on transportation of
goods and passengers in the whole country in combination with National
Highway No.1A (NH1A). In addition, the Expressway is expected to contribute
for the international transportation of economic triangle (Lao PDR – Cambodia
– Vietnam) via East West Economic Corridor (EWEC) to ports in Central areas
in Vietnam.
(c) To Promote Improvement of Environment: Environmental condition
alongside NH1A is becoming worse due to heavy traffic volume. The
Expressway will contribute for improving environmental condition alongside
NH1A by receiving long trip traffic.
(d) To Promote Traffic Safety: The alignment of the Expressway passes through
two provinces (Quang Nam and Quang Ngai) and Da Nang city with 139.52 km
in total length and tolled dual 2-lane facility (2-lane at each direction) at the
entire alignment. The general technical specification of the project is described
as in Table I-1 below.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 8
Table I-1: General technical specifications of the project
No. Item Unit Quantity of total
project
Quantity in Quang
Nam Section
1 Road length Km
139.52 (Including 131.5
Km of Expressway and
8.02 Km of road
connecting to NH1A.
92 (From Km08 to
Km100)
2 Class of road
4 lane expressway
(Reservation for 6
lanes future
expansion).
4 lane expressway
(Reservation for 6
lanes future
expansion).
3 Travel speed 120 km/h 120 km/h
4 Width of road base M 26 26
5 Road surface Asphalt and concrete Asphalt and
concrete
6
Frequency of flood return period Super bridge: 1/100
Super bridge:
1/100
7 Land to be permanently acquired m2 9,605,859 6,425,285
8 House to be demolished m2 66,288 37,383
9
Bridge/
culvert
Major Bridge Set/m 04/2670 02/1,372
Minor waterway
Bridge Set/m 72/7,942
6,109 m Overpass bridge Set/m 30/4,299
Viaduct Set/m 22/2,587
Culvert for waterway Set/m 254/13,198
10 Tunnel Set/m 01/540 01/540
11 Crossing Interchange Set 09 04
Culvert for road Set 106 68
12 Facilities
Service zone Set 02 02
Parking yard Set 04 04
Traffic Management
Center Set 01 01
Expressway Operation
Offices Set 01 0
Throughway Toll
Barriers Set 02 0
Toll station Set 10 05
(Source: Relevance Specified in the Feasibility Study Report of Da Nang – Quang Ngai Project by TEDI, February 2010)
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 9
I.2 Scope of the RAP
The Resettlement Action Plan (RAP) summarizes the impacts due to the proposed
expressway traversing the province of Quang Nam. Approximately 92 km length of
the road alignment crosses through 7 districts covering a total of twenty four
communes of Quang Nam Province. The list of districts and communes traversed by
the expressway in Quang Nam province is shown in Table I-2.
Table I-2: Districts and Communes covered by the Expressway
Number District Communes
1 Dien Ban
Dien Tien
Dien Tho
Dien Quang
2 Duy Xuyen
Duy Trinh
Duy Son
Duy Trung
3 Que Son
Que Xuan 1
Que Xuan 2
Phu Tho
4 Thang Binh
Binh Qui
Binh Chanh
Binh Que
5 Nui Thanh
Tam Nghia
Tam My Dong
Tam My Tay
Tam Anh Nam
Tam Xuan 1
Tam Xuan 2
6 Phu Ninh
Tam Thai
Tam Phuoc
Tam Dai
Tam Dan
Tam Thanh
7 Tam Ky city Tam Ngoc
The right of way is 70 m wide. The impacts on land acquisition for this RAP are
surveyed based on the design of the route of feasibility studies and the cadastral
maps of affected communes. Any potential adverse impacts due to the associated
structures, service areas, approach road etc. are not foreseen at this stage as all the
proposed work will be carried out within the existing ROW. However, if any adverse
impacts are identified or any change in the design of associated structures, approach
roads etc. during the implementation phase, they will be addressed in accordance
with the policy provisions specified in the RAP and in compliance with the WB OP
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 10
4.12.
The impacts on land acquisition will be updated with detailed measurement survey
(DMS) after the detailed engineering design is made available and the demarcation of
the affected area is marked by the benchmarks on the ground by local authorities and
PMU 85. The route of the expressway is shown as Figure I-1 below.
I.2. Minimizing Land Acquisition and Resettlement Impacts
A lot of efforts have been made by technical and social teams as well as local
authorities to minimize impacts on land acquisition through different phases of the
project study. The consultation with relevant parties was also held, based on their
feedback, the alignment was adjusted to minimize negative impacts on environment
and land acquisition. As the result of alignment adjustment, number of households
have to be relocated is reduced significantly compared to the original alignment
proposed by TEDI in its Feasibility Study. The changes made to reduce impacts on
land acquisition, especially to reduce the number of households that have to be
relocated, are summarized below:
The original alignment was proposed by TEDI in its Feasibility Study (TEDI F/S 2005)
with due examination in order to reduce negative social impacts as well as to realize
technical feasibility. The JETRO Study and the WB Supplemental Study followed the
alignment proposed by TEDI in its FS for the section of Quang Nam province. From
December 10, 2009, the TEDI design consultant (DC) made adjustment to the
alignment at sections: Km0+00 to Km16+00 and Km 60+00 to km 73+00 basing on the
Announcement 422/TB-BGTVT signed on September 23, 2009 and
Announcement 594/TB-BGTVT signed on September 25, 2009 by MOT in order to
reduce negative social impacts. As a result the major modifications at the following
six sections in Quang Nam province (from Km8 to Km161, Km21 to Km26, Km35 to
Km43, Km 58+00 to km73+00, Km75 to Km80, and Km83 to Km97) were proposed in
order to reduce adverse environmental and social impacts.
Section from Km8 to Km16
An alignment is proposed to avoid Thai Cam industrial zones, and Thai Cam
residential area. By adjusting alignment in this area, it reduces the number of
affected houses significantly. Total affected structures in this section were reduced
from 171 to only 106.
1Although the modification section is from Km0 to Km16, Section from Km0 – Km8 which belongs to Da Nang
City is specified in Da Nang RAP.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan (Draft) – Quang Nam Section June 2010
Page 11
Figure I-1: The route of the project
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 12
Section from Km 21 to Km 26
With TEDI F/S, the proposed alignment passes through the residential areas by
curving along the national railways. The WB Supplemental Study proposed to adjust
the route by straightening the alignment and providing a tunnel through a mountain.
By adjusting alignment in this area, the number of the affected houses were reduced
from original 77 to only 39.
Section from Km 35 to Km 43
This section is proposed to be straightened and therefore, several populated areas
are avoided compared to the alternative proposed in the FS prepared by TEDI such as
Hamlet 3, Hamlet 4, and Hamlet 5 of Phu Tho commune; Quy Thanh village; Quy Xuan
village; and Hamlet 1 of Binh Quy commune.
Section from Km 58 to Km 73
This section is proposed to avoid cutting across many 500kV high voltage
transmission lines, and impacts on temples.
Section from Km75 to Km80
The World Bank Supplemental Study, an alignment is proposed to be between TEDI
FS and JETRO Study to avoid military facilities.
Section from Km83 to Km97
The alignment proposed by TEDI FS and JETRO Study in this area runs parallel with
the Chu Lai Open Economic Zone. During the course of discussions among relevant
parties, it was confirmed that future expansion of the zone would be secured.
Therefore, adjustment of the alignment is proposed in the World Bank Supplemental
Study for securing future expansion of the zone.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 13
II. LEGAL FRAMEWORK
The relevant laws and regulations of the Government of Viet Nam define the legal
framework for compensation, resettlement and rehabilitation under the project and
the World Bank social safeguards policies. In case of discrepancies between the
National laws, regulations, and procedures and WB's policies and requirements, WB's
policies and requirements will prevail, consistent with Decree No. 131/2006/ND-CP
(which provides that in case of “discrepancy between any provision in an
international treaty on Official Development Assistance, to which the Socialist
Republic of Viet Nam is a signatory, and the Vietnamese Law, the provision in the
international treaty on ODA shall take precedence” -Article 2, Item 5). The same
statement was mentioned in the Decree 197/2004/ND-CP on compensation and
resettlement when the Government takes over the land for the defense, security
purposes, benefits of nation and public works as well as for economic development.
Decree No. 17/2003/ND-CP, promulgating the regulation on the exercise of
democracy in communes, including requirements for consultation with and
participation of people in communes.
II.1. Relevant Vietnamese Legislation
The policies of GOV on compensation, resettlement and assistance have been
significantly improved from time to time, especially, 2003; National Assembly passed
the date of land law. Many Laws, Decrees, Circulars and amendments to Laws;
Decrees issued by the GOV to improve the policies on land acquisition, compensation
and assistance. The policies on land acquisition, compensation and assistance have
also significantly improved on the requirements of consultation, participation,
information dissemination, monitoring and evaluation. For the projects financed by
the International Banks, the GOV has also approved for the required waivers to meet
with the international standards on involuntary resettlement.
- Land Law 2003/QH11, providing Viet Nam with a comprehensive land
administration law.
- Decree No. 197/2004/ND-CP dated 3 December 2004, on compensation,
rehabilitation and resettlement in the event of land recovery by the State, as
amended by Decree No. 17/2006/ND-CP.
- Decree No. 17/2003/ND-CP, promulgating the regulation on the exercise of
democracy in communes, including requirements for consultation with and
participation of people in communes.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 14
- Decrees No. 188/2004/ND-CP and 123/2007, specifying the methods for land
pricing and land price frameworks in the event of land recovery by the State.
- Decree No. 84/2007/ND-CP, dated May 25, 2007 supplementary stipulations
on issue of LURC, land acquisition, land use right implementation, procedure
of compensation, assistance in the event of land recovery by the state and
grievance redress.
- Circular 57/2010/TT-BTC, dated on 16 April 2010 of Ministry of Finance
regulating the establishment of cost estimation, use and finalization of
expenses for resettlement’s compensation and support in the case of land’s
recovery.
- Circular No. 114/2004/TT-BTC elaborates in detail the methods (direct
comparison and income methods) for determining land prices.
- Decree No. 17/2003/ND-CP, promulgating the regulation on the exercise of
democracy in communes, including requirements for consultation with and
participation of people in communes.
- Decree No. 131/2006/ND-CP, on the management and use of Official
Development Assistance (ODA). Decree No. 131/2006/ND-CP provides that in
case of “gaps between any provision in an international treaty on Official
Development Assistance, to which the Socialist Republic of Viet Nam is a
signatory, and the Vietnamese Law, the provision in the international treaty on
ODA shall take precedence” (Article 2, Item 5).
- Decree 69/2009/ND-CP to amend for planning on land use, cost for land, land
recovery, compensation and resettlement. This Decree requires a lot of
assistance to the DPs who are affected by loss of productive land and are left
with unviable land holdings; especially households have to relocate and losing
the agricultural land.
- Circular 14/2009/TT-BTNMT dated 01 October 2009 guides on the details of
implementing about compensation, resettlement and resettlement assistance,
process of land acquisition, land allocation, leasing land.
- Decision 23/2010/QĐ-UB of Quang Nam People’s Committee, dated 30th
September 2010, on compensation and resettlement policy.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 15
II.2. Involuntary Resettlement Policy of the WB (PO 4.12 - December 2001)
The objective of the policy on involuntary resettlement is:
(a) Involuntary resettlement should be avoided where feasible, or minimized,
exploring all viable alternative project designs.
(b) Where it is not feasible to avoid resettlement, resettlement activities should
be conceived and executed as sustainable development programs, providing
sufficient investment resources to enable the persons displaced by the project
to share in project benefits. Displaced persons should be meaningfully
consulted and should have opportunities to participate in planning and
implementing resettlement programs.
(c) Displaced persons should be assisted in their efforts to improve their
livelihoods and standards of living or at least to restore them, in real terms, to
pre-displacement levels or to levels prevailing prior to the beginning of project
implementation, whichever is higher.
II.3. Main gaps between Viet Nam policies and World Bank Policy on
involuntary resettlement
There are a number of ways in which the approaches of the Vietnam Government,
either in policy or practice are compatible with World Bank policy. The most
important compatibilities are:
1. On the issue of land tenure and the legal right to compensation, the
Government and World Bank approaches are compatible. Vietnam has a
process whereby people without legal land rights may meet conditions of
legalization and receive compensation for losses up to a rate equal to 100% of
land price minus the taxes and fee for land use right registration from 15
October 1993 (Article 42, 49 and 50 of 2003 Land Law)
2. All DPs, who satisfy residence conditions in accordance with the provisions of
the Decree 197, are provided with options that include relocation to an
improved site, or cash, or a combination of the two.
3. Resettlement offer not only better improved infrastructure and social services
but represent a higher standard of living.
4. Allowances and livelihood support are provided to help DPs in the transition
period and there is an institutional structure through which people are
informed, can negotiate compensation, and can appeal.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 16
5. Compensation at replacement cost is ensured in Article 6 of Decree
197/2004/ND-CP dated December 3rd, 2004 that “people who have land being
acquired shall be compensated with land of similar land use purpose. If there
is no land for compensation, cash compensation equal to land use rights value
at the time of land acquisition shall be applied. If there is any difference in
value, in case of compensation by new land or house, such difference shall be
settled in cash” and Article 19 in the same Decree states that “house and
structure of domestic use of household or individual shall be compensated
with the value of construction of new house, structures of similar technical
standard”.
With the promulgation of the 2003 Land Law and the adoption of Decrees No.
197/2004/ND-CP and No. 188/2004/ND-CP, Decree 84/2007/ND-CP, the policies and
practices of the Government have become more consistent with WB’s social
safeguards policies. However, there are several gaps in the provisions of the WB
policy with those of the Vietnamese regulations and local provincial practices. A
comparative analysis between the WB policy and Vietnam’s national and provincial
policies together with the policy provisions adapted for the project is provided in
Annex A. The main gaps between national and provincial policies and OP 4.12 on
involuntary resettlement of the World Bank are as follows.
According to the Decree 197 and Decree 69, the ‘significance’ of impact is
triggered by a loss of 30 percent or more of agricultural land while in OP 4.12
the trigger is at a loss of 20 percent or more of productive land. In the project
however, all households losing their productive land, irrespective of the
degree of loss, would be provided income rehabilitation assistance.
Decree 197 recognizes non-legal users or users without papers or documents
only if they have been using the land to be affected by a project in a stable
manner prior to 15th October 1993. However, in accordance with the
provisions of the WB policy, all the affected users as of the cut-off-date would
be entitled to compensation for their affected assets and appropriate
relocation assistance.
Land Law and Decree 197 provide for deductions from both land and assets
compensation in a number of circumstances. In the project, all compensation
would be at replacement cost and without any depreciation or deduction for
salvaged material.
In accordance with the Vietnamese regulations, houses and structures will not
be compensated if they have been constructed without permission,
constructed in contravention of a land use plan, or if they have encroached
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 17
upon a demarcated safety protection corridor. In the project all affected
structures would be paid at 100% of their replacement cost.
Vietnamese regulations provide for compensation at 80% for houses and
structures if they have been built on land that is ineligible for compensation. In
the project all affected structures would be paid at 100% of their replacement
cost.
Decree 197 recognizes businesses or economic entities as DPs only if they hold
a business certificate (i.e. excludes non-registered businesses). In the project
all affected businesses, registered as well as unregistered would be entitled to
compensation for losses and other applicable assistance.
Decree 197 recognizes DPs losing employment and provide for economic
support only if they have employment contract and are employed by a
business or economic entity holding a business certificate. In the project
however, the DPs losing sources of livelihood due to the adverse impacts on
business establishments would be provided some assistance for a limited
period and assistance in finding alternative employment even if they do not
hold employment contract or if the businesses are not registered.
Under Decree 197 and Decree 69, assistance for occupational change and job
creation is only provided to DPs engaged directly in agricultural production
and in cases where more than 30% of their agricultural land is affected.
However, in the project all DPs affected by loss of productive land, irrespective
of degree of impact, will be entitled to additional assistance and employment
and income rehabilitation measures.
Vietnamese regulations do not fully cover the scope of the vulnerable groups
as defined under the OP4.12 on Involuntary Resettlement of the World Bank.
However, the project provides for additional assistance to the households that
fall within the definition of the vulnerable groups (poor households who fall
below the poverty line, the landless, the elderly, women headed households,
disable persons).
Despite the key gaps, summarized above, the provisions and principles adopted in
the project will supersede the provisions of relevant decrees currently in force in Viet
Nam consistent with Decree No. 131/2006/ND-CP on ODA management. With the
approval of this RAP, the gaps analyzed above and the measures to address these
gaps are also approved by the competent authorities of GOV.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 18
III. ENTITLEMENT POLICY
III.1. Objectives
The overall objectives of this resettlement policy are (i) to avoid, or if not, minimize
resettlement impacts; (ii) if land acquisition impacts are unavoidable, RP is prepared
in a way to ensure that displaced persons will not be worse off; rather, they should
be able to at least maintain or otherwise improve their pre-project living standards
and income-earning capacity. The Project will also provide an opportunity for the
local population to derive benefits from it. Likewise, the Project should serve as an
occasion for the local population to participate in its planning and implementation,
thereby engendering a sense of ownership over this development undertaking.
III.2. Eligibility to compensation and relocation assistance
Cut-Off Date: The cut-off date of the project coincides with the date of
commencement of the DMS that will be carried out by project authorities following
approval of the RAP by the Government of Vietnam and includes census and
inventory of losses (IOL). The cut-off date will be formally declared by the relevant
authorities to stakeholders. Persons who occupy the project site after the cut-off
date will not be eligible for compensation and relocation assistance.
Eligibility: DPs eligible for compensation and rehabilitation will include: (a) those who
have formal legal rights to land or other assets; (b) those who initially do not have
formal legal rights to land or other assets but have a claim to legal rights based upon
the laws of the country; upon the possession of documents such as land tax receipts
and residence certificates; or upon permission of local authorities to occupy or use
the project affected plots; and (c) those who have no recognizable legal right or claim
to the land they are occupying.
Persons covered under (a) and (b) are provided compensation at full replacement
costs for the land they lose, payment for non-land assets they own and necessary
assistance in cash or in-kind. Persons covered under (c) are provided compensation at
full replacement cost for non-land assets they own and resettlement assistance in
lieu of compensation for the land they occupy, and other assistance, as necessary, to
achieve the objectives set out in this policy provided that they occupy the project
area prior to the cut-off date of the project.
Persons who occupy the project area after the cut-off date will not be eligible to any
compensation or assistance.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 19
III.3. Compensation Principle and Entitlement
Compensation policy and entitlements proposed in the project, and as specified in
the following sections, take into consideration the Vietnamese national and
provincial regulations and provisions of the WB’s OP 4.12. The overall objective is to
ensure that the DPs are able to improve or at least restore their livelihood to pre-
project level. Vulnerable households are provided with additional assistance to meet
the above stated objectives.
III.3.1. Principles of Replacement Cost
All compensation will be based on the principle of replacement cost in cash or in kind.
In case of cash compensation, replacement cost is the amount calculated before
displacement, which is needed to replace an affected asset without deduction for
taxes and/or costs of transaction as follows:
(a) Productive Land (agricultural, aquaculture, garden and forest) based on
actual current market prices that reflect recent land sales in the area, and
in the absence of such recent sales, based on recent sales in comparable
locations with comparable attributes, fees and taxes for LURC or in the
absence of such sales, based on productive value;
(b) Residential land based on actual current market prices that reflect recent
land sales, and in the absence of such recent land sales, based on prices of
recent sales in comparable locations with comparable attributes; fees and
taxes for LURC;
(c) Houses and other related structures based on actual current market prices
of materials and labor without depreciation or deduction for salvaged
building materials and fees;
(d) Annual crops equivalent to current market value of crops at the time of
compensation;
(e) For perennial crops, cash compensation at replacement cost is equivalent
to current market value given the type, age and productive value (future
production) at the time of compensation;
(f) For timber trees, cash compensation at replacement cost is equivalent to
current market value for each type, age and relevant productive value at
the time of compensation based on the diameter at breast height of each
tree.
In case of in kind compensation, the principles will be as follows:
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 20
(a) Replacement residential land will be of the locational advantage and
physical attributes similar to the land lost with equivalent or better access
to physical infrastructure and social services.
(b) Replacement productive land will be of equivalent productive potential and
locational advantage similar to the land lost, with improved or better
condition for cultivation compared to that at the time of handing over to
the project.
(c) Building and other substructures will be at the replacement conditions.
(d) Either grant with LURC and ownership of building without any taxes fees or
if not, taxes and fees for LURC and ownership of building must be included
in the package of compensation to DPs.
III.3.2. Compensation policy for agricultural land
The DPs will be entitled to the following types of compensation and rehabilitation
measures: The general mechanism for compensation of lost agricultural land will be
through provision of "land for land" arrangements of equal productive capacity at
location satisfactory to the DP. If land compensation size is smaller or lower quality,
DPs will be entitled to compensation on cash equivalent for the differences. However,
if land is not available or at the informed request of the DP, cash compensation for
the lost land will be give as follows:
(a) Legal and legalizable land users:
(i) if the portion of the land to be lost represents 20% or less of the total
area of the landholding by DP, and the remaining plot of land is still
economically viable, cash compensation for the lost area at full
replacement cost. The DPs will also be entitled to income rehabilitation
assistance as described in itm (iii) below.
(ii) if less than 20% of productive land affected rendering the remaning
land unviable for continued use, the project, at the request of the DP,
will acquire entire land holding and the DP will be entitled to assistance
and support similar to that in item (iii) below.
(iii) if more than 20% of a household’s agricultural land is acquired, then
in addition to cash compensation at full replacement cost for the lost
area (or for the entire affected plot if the remaining area of the plot is
not economically viable), or replacement land of equivalent
productivity, the Project will provide rehabilitation allowances for
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 21
training/retraining and intensifying of the existing occupation or shifting
to new ones, combining with technical assistance such as agricultural
extension, credit etc.
The forms of assistance and support would be decided through close consultation
with the entitled DPs to ensure appropriate and effective measures assisting the DPs
to restore their income generating capacity and income levels.
(b) Users with temporary/ leased rights to use land:
(i) The DPs will be refunded the lease payment they have made for the
affected portion of the land corresponding to the remaining lease
period. Additionally, the DPs will be compensated for any investment
they have made on the affected land or 30% of the replacement cost of
the affected land, whichever is higher.
(ii) if the remaining land is rendered unviable, at the request of the DP,
the project will take back entire land and provide the DP with suitable
replacement land at location acceptable to DP. If suitable replacement
land is not available, at the request of the DP, the project will refund
the payment made by the DPs corresponding to the remaining lease
period. Additionally, the project will compensate DP for the investment
made on the affected land or 30% of the replacement cost, whichever is
higher.
(c ) Land Users without recognized Rights to Use Land
(i) In lieu of compensation for land, the DPs will receive assistance
corresponding to 50% of land replacement cost.
(ii) For poor and vulnerable households and DPs losing their productive
land, including landless, as priority, allocation of arable land equal to
per capita arable land in commune as regulated by Decree 64/1993/CP,
OR, if there no land available for allocation or, at the informed request
by the DPs, in addition to above, a rehabilitation/training assistance will
be provided to ensure the DPs are able at least to restore or improve
their income levels and living standards.
In case when the affected persons utilizes the public land (in Right of Way), that
subjects to be recovered under the project, with conditions to return, on request, the
land to the Government, they (DPs) will not be compensated for this public land, but
will be compensated for crops and trees at full market prices.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 22
III.3.3. Compensation for Residential Land
(a) DPs losing residential land without structures: Compensation for loss of land
in cash at replacement cost
(b) DPs losing residential land with structures built thereon and the remaining
land is sufficient (not less than 40 m2 in the urban area and not less 100 m2 in
the rural area) to rebuild their house on (reorganizing DP), the DPs will be
compensated for a part of loss of land in cash at the replacement cost and
compensation for fully affected structures at full replacement cost. If
house/structure is partially affected, repairing cost to restore it to former or
better conditions.
(c) DPs losing residential land with structures built thereon and without
remaining land sufficient (less than 40 m2 in the urban rural area and less 100
m2 in the rural area) to rebuild on (relocating DP) are entitled to:
For the DPs, who have legal or legalizable rights to the affected land, can opt
to one of the followings:
(i) The provision of replacement residential land (plot at the relocation site)
of equivalent size, at a similar location and with land title without any
cost. The relocation site will be developed with basic infrastructure,
including access road, access to electricity, to water supply, drainage,
which at least are equal to conditions existed at the former location; or
(ii) Cash compensation for entire residential land at full replacement cost
and additional assistance for self-relocation equivalent to the unit cost of
physical infrastructure invest per plot at the relocation site.
For the DPs, who do not have legal or legalizable rights to the affected residential
land, are entitled to the assistance amount equal to 30% of replacement cost.
For poor or vulnerable DPs who have no other residential land in the same
ward/commune, the project will provide either a residential plot of minimum size at a
common RS or on a individual residential plot, with title to the land (plot of 40 m2 in
urban area and 100m2 in rural area); or on request of the DPs, cash assistance
equivalent to 60% of the land replacement cost for them to arrange relocation by
themselves.
III.3.4. Compensation houses/other structures
DPs losing houses and/or other structures will be entitled to the following:
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 23
(i) For fully affected house (including house whose whole area is affected
or partly affected but non-affected part could not be used either
because of technical issue or because of inconvenient to use):
Compensation in cash for entire affected structures will be provided at
100% of the full replacement cost for materials and labor, regardless of
whether or not they have title to the affected land or permit to build
the affected structure. The amount will be sufficient to rebuild a
structure the same as the former one at current market prices. No
deductions will be made for depreciation or salvageable materials.
(ii) If house/structure is partially affected and the remaining structure is
viable for continued use, the project will provide a house/structure
repair cost, in addition to the compensation, to enable DPs to restore it
to former or better conditions.
(iii) Compensation for other structures/fixed assets will be at full
replacement cost and will be in cash.
(iv) Tenants, who have leased a house for residential purposes will be
provided an assistance equal to the remainder of rental contract value,
but not exceeding rental value for three months, OR a relocation
allowance of 0.3 miliion /person /month for a duration of 6 months,
whichever is higher; and transportation allowance for moving assets, as
well as assistance in identifying alternative accommodation.
III.3.5. Compensation for Graves/Tombs
The level of compensation for the removal of graves/ Tombs will be for all costs of
excavation, relocation, reburial and other related costs (to meet with some
traditional custom). Compensation in cash will be paid to each affected family or to
the affected groups. The level of compensation will be decided in consultation with the
affected families/communities.
III.3.6. Compensation for loss of Standing Crops and Trees
For annual and perennial standing crops, regardless of the legal status of the land,
compensation will be paid to households who cultivate the land, according to the full
market value of the affected crops and at replacement cost for affected perennial
trees (wooden and fruit trees).
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 24
III.3.7. Compensation for Loss of Income and/or Business/Productive Assets
For DPs losing income and/or business/productive assets as a result of land acquisition,
the mechanism for compensating will be:
A. Allowance for Business Loss: All affected businesses and production households whose income is affected will be compensated or supported for losses in business equivalent to 50% of their actual annual income i.e. equivalent to 6 months of average net income: (i) For licensed businesses the compensation will be based on their average yearly income declared with the taxation agency over the previous three years, and (ii) For unregistered affected businesses the compensation will be based on the income data collected at the the time of DMS but the compensation will not be less than 3.0 mil.VND/month.
B. Employees who are affected by acquisition of residential/commercial land acquisition, public land or land of enterprises: Allowance equivalent to the minimum salary as per the provincial regulations to affected employees during the transition period for a maximum of 6 months and will be assisted in finding alternative employment.
C. If the business has to be relocated, the project will provide alternative site with locational advantage and physical attributes similar to the land lost with easy access to customers base, satisfactory to the DP, OR compensation in cash for the affected land at replacement cost, plus transportation allowance to remove movable attached assets.
III.3.8. Compensation for temporary impact during construction
For temporary loss of land and properties, particularly during the implementation
phase, DPs are entitled to follows:
(a) For arable land: Compensation for the affected harvests of crops/trees at
full market prices. Restoration of land to its previous or better conditions by
providing measures to improve land quality in cases of land being adversely
affected or acidified, and if the duration of project's use the land exceed more
than two years, then the DPs have option to: (i) Continue using land, OR, (ii)
Give it to the Project and be compensated as permanent loss
(b) For residential land: Compensation for all affected movable properties at
full replacement cost. Restoration of land to its previous or better quality
before handing land over the owner.
(c) For temporary impact on business: Compensation for temporary loss of
income, equivalent an average monthly net income. Compensation for all
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 25
affected movable properties at full replacement cost and restoration of land to
its previous or better quality.
(d) For damages caused by contractors to private or public structures: Under
their contract specifications, the contractors will be required to take extreme
care to avoid damaging property and businesses during their construction
activities. Where damages do occur, the contractor will be required to pay
compensation immediately to affected families, groups, communities, or
government agencies following the compensation policy specified in the RAP.
In addition, damaged property will be restored immediately to its former
condition.
The above mentioned policy also applies to those affected by development of
individual resettlement or group resettlement sites, gravel and borrow pits etc.
III.3.9 Compensation for Loss of Community Assets
In cases where community infrastructure such as schools, bridges, factories, water
sources, roads, sewage systems is damaged, the project will ensure that these would
be restored or repaired as the case maybe, at no cost to the community.
III.3.10. Allowances and Rehabilitation Assistance during Transition Period
The DPs will be eligible to the following entitlements based on the different impacted
categories:
A. For impacts on Residential Land:
a. Relocation Allowance: (i) in-district relocation: 3 mil; (ii) out-district
relocation: 4 mil and (iii) out-province relocation: 7 mil, and (iv) rebuilt
on the remaining land: 1.5 mil; (v) affected tenant will receive relocation
allowance of : 0.3 mil per person per month, for a duration of 06
months.
b. House Renting Allowance to affected owners of Residential Land:
0.35-0.5 mil per month, for duration of 12 months if the DPs has to be
relocated, and for 6 months if the DP has to reorganize on the remaining
residential plot.
c. Assistance for Relocation: All DPs, except for poor or vulnerable DPs who
have no other residential land in the same ward/commune, relocating to
RS will be required to pay for the cost of the plot at the RS. However,
where the compensation amount received by a DP is lower than the cost
of minimum size of plot at the RS, the project will pay for the difference
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 26
to enable DPs to get at least the minimum size of plot at RS. The DPs
who opt for self-relocation (except those reorganizing on their
remaining residential plot) will be provided one-time payment of the
amount equivalent to the cost of the developed plot of minimum size at
the RS.
B. For impacts on Agricultural Land:
a. Allowance for Living/production Stabilization (during the transition
period): households who lose 20% or more of their agricultural lands
affected by the project will be compensated with one time payment at
cash equivalent to 30 kg of rice/person/month at local market price
(about 300,000 VND), including: (a) : Affected households losing 20% to
70% of their agricultural land will be assisted for living stabilization for 6
months if the remaning land is vible for continued use, and for 12
months in case the remaning land is rendered unviable and entire land is
acquired by the project; (b) Affected households with more than 70% of
their agricultural land acquired will be assisted for living stabilization for
12 months if the remaining land is viable for continued use, and for 24
months in case the remaining land is rendered unviable and entire land
is acquired by the project; (c) households affected by loss of <20% of
land and the remaining land is rendered unviable for continued use, the
DPs will be assisted with living stabilization support for 12 months; and if
the remaining land is viable for continued use the DPs will be assisted
with one time payment at cash equivalent to 30 kg of rice/person/month
multiplied with percentage of productive land acquired to total land
holding, for duration of 04 months.
b. Households affected by loss of agricultural land where the remaining
land is rendered unviable for continued use (<300 M2) would be
provided with a minimum size plot of 100 m2 at the resettlement site.
c. Assistance for agricultural land in the residential area, garden land, pond
land adjacent to residential land but are not recognized as residential
land: Additional assistance (equivalent to 50% of the cost of
compensation for the adjacent residential plot) for garden land and
pond land; and (at 40% of the cost of compensation for the adjacent
residential plot) for agricultural land.
d. In case of land-for-land compensation, DP will be assisted with seedlings,
agricultural-forestry extension programs, husbandry etc (Item 4 of
Article 20 of Decree 69/2009).
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 27
e. Every DP affected by loss of productive land, irrespective of the degree
of impact, will be provided with additional assistance equivalent to 3
times the compensation amount.
f. Support for vocational training and job creation: At least one member of
households affected by loss of productive land will be entitled to
vocational training and assistance in getting employment in the
province. The DPs participating in such training programs will be
exempted from payment of tuition fees. Trainees will be paid a lump-
sum allowance of VND 200,000/month to cover the lodging and
boarding expenses during the training period. After finishing training
courses, they will be given priorities to be recruited in local
manufacturing industries. At least 30% of training facilities would be
reserved for women.
C. Other Allowances/Assistance:
- Incentive Bonus: All DPs who vacate the affected land immediately after
receiving compensation and allowances will be given an incentive
allowance of 3-5 mil VND.
- Repair Allowance: If house/structure is partially affected and the remaining
structure is viable for continued use, the project will provide a repair
allowance equivalent of 20% of compensation for the affected part of the
structure to enable DPs to restore it to former or better conditions.
- Every relocating DPs will be provided with a lump-sum one time amount of
3,500,000 VND to cover the cost of domestic water, power and telephone
connections at the new site.
- Transport Allowance for all relocating households, independent business
and commercial establishments: VND 3,000,000/ DP or equivalent to the
actual cost of relocation expenses (labor, transport) if relocating within the
Province/City and VND 5,000,000/DP or equivalent to the actual cost of
relocation expenses (labor, transport) opting to transfer to another
province.
III.3.11. Allowances / Assistance Targeted to Vulnerable Households
All poor or vulnerable Dps will get additional assistance as described below:
(1) For landless households, assistance through provision of land-for-land with
secure tenure at no cost to landless households. The size of land will not be
less than 40 m2 in urban area and 100m2 in rural area, or cash equivalent
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 28
to the cost of minimum size of the plot at RS, if DPs prefer for self-
relocation.
(2) Social Policy: (i) Relocated Households including social policy heroic
mothers, ware veterans, wouded or dead soldiers families: 1.5-4 mil/HH:
(ii) Poor Relocated Household or Poor Household whose 20% or more of
their productive land affected or where <20% land affected but the
remaining land is rendered unviable: 3-5 mil/HH (to be certified by local
authority)
(3) Other vulnerable groups (female headed household, household with
disable person, elderly without any source of support) will get the same
support (1.5-4.0 mil. VND/household) given to poor households in
accordance with the provincial policy.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 29
IV. SOCIOECONOMIC CHARACTERISTICS
IV.1. General socioeconomic conditions of the Quang Nam Province
Quang Nam Province is located in Central Viet Nam, at latitudes of 14057’- 16003’N
and longitudes of 107012’ - 108044’ E, 860km from Hanoi to the South and 865 km
from Ho Chi Minh to the North. It borders with Da Nang city to the North, with Quang
Ngai province to the South, with the sea to the East and with Kon Tum province and
Laos PDR to the West. Most of the province’s geographic area is mountainous, so
transportation in this region is particularly difficult. Quang Nam lies on rich biological
resources, mining products, and water energy.
The land area of Quang Nam is 10,438.4 km2 with a population of 1.5 million. There
are seventeen districts and towns in the province. Quang Nam is a province that
consider agriculture as the main industry. With the two famous traditional products:
the world's highest essential oil content Tra My cinnamon and Ngoc Linh ginseng.
Meanwhile it also pushes forward the development of the industry and infrastructure
facilities, thus scoring the stable growth of the national economy. In 2008, the GDP
of the province is 17,514 billion Dongs, of which the gross domestic product of
Agricultural is 4,375 billion Dongs, taking 24.98% of GDP, the industrial production
value is 6,687 billion Dongs taking 38.18 % of GDP and Service production value is
6,451 billion Dongs, taking 36.84%. GDP grew at an average rate of more than 10% in
the period 2001-2006 and at 12.7% in 2008.
IV.2. Survey on the socioeconomic conditions of the project affected
households
The IOL and socioeconomic survey was originally conducted during December 2008-
March 2009. However, following changes in the alignment by TEDI (December 2009)
additional survey was carried out during January 2010 based on TEDI adjusted
alignment. The data on the socioeconomic conditions of the project affected
households covered a total of 1,436 households. The selection of households for
socioeconomic survey was based on the results of Inventory of loss (IOL), and
households affected severally by loss of agricultural land and businesses. The
socioeconomic household survey accounted for 37 % of the 3,874 affected
households in the Quang Nam province. Formal and informal meetings and group
discussions with local authorities and other stakeholders including local NGOs was
also carried out during the socioeconomic survey.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 30
At the time of survey and information gathering as mentioned above, only the
Feasibility Study (FS) was available. Precise affected area has not yet identified and
marked on the ground. Hence the socioeconomic characteristics of the communities
and potential DPs presented below will necessarily be updated after the final detailed
designs are completed and the bench marks demarcating for the project boundaries
are put on the ground and officially declared to local authorities and local people. The
results of survey from a sample of the project affected households are as follows.
IV.2.1. Demographic Characteristics of DPs
According to the results of census and IOL for 1,436 affected HHs (5,811 persons)
who are located in the project affected areas, all respondents are Kinh people.
The socioeconomic survey also did not indicate presence of any ethnic minorities in
the Quang Nam section.
The average HH size is 4 persons for the whole section. The average age of the total
surveyed population is 36 years old with the average proportion of males is 49.8 %
and females is 50.2 %. The detailed Demographic Characteristics of DPs by
communes are presented in Annex B.
Table IV-1: Demographic Characteristics of DPs (Quang Nam Province Section)
District
Total affected
HHs surveyed
with census and IOL
Affected Persons Household Size ( %) Gender Ratio
Population
Average household
size (person/HH)
Less than 4
(persons/HH)
From 5-8 (persons
/HH)
More than 8
(persons/HH)
Male (%)
Female (%)
Dien Ban 295 1,314 4.3 47.5 46.1 6.4 48.7 51.3
Duy Xuyen 164 716 4.3 53.9 42.4 3.7 50.3 49.7
Que Son 84 329 4.0 66.6 30.8 2.6 47.3 52.7
Thang Binh 207 871 4.0 56.8 41.5 1.7 51.3 48.7
Nui Thanh 346 1,357 4.2 61.7 34.6 3.7 49.8 50.2
Phu Ninh 336 1,207 4.0 48.2 45.1 6.7 50.4 49.6
Tam Ky city 4 17 4.0 50.9 47.2 1.9 50.0 50.0
Total 1,436 5,811 4.1 55.7 40.1 4.2 49.8 50.2
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 31
Table IV-2: Age structure of surveyed population
District
Total
affected
HHs
surveyed
Population
Average age
of surveyed
population
Percentage of age group (%)
Less 5
years
old
From 5
to 18
years
old
From
18 to
35
years
old
From
36 to
55
years
old
Over
55
years
old
Dien Ban 295 1,314 37.7 6.5 15.2 31.3 26.2 20.8
Duy Xuyen 164 716 35.3 5.9 13.9 34.7 27.4 18.1
Que Son 84 329 36 6.2 15.3 32.2 31.9 14.4
Thang Binh 207 871 34 6.5 21.0 31.5 24.5 16.5
Nui Thanh 346 1,357 35.8 5.3 12.6 37.0 30.8 14.3
Phu Ninh 336 1,207 37.4 5.5 11.0 45.0 26.6 11.9
Tam Ky city 4 17 43 4.6 9.9 36.7 37.5 11.3
Total 1,436 5,811 36.4 5.8 14.0 36.3 28.6 15.3
IV.2.2. Educational status
The illiteracy rate among survey HHs is 3 . 4 %. About 4 0 .9 % of the total surveyed
population has attained basic secondary education level while 31.1 % of the total
surveyed population has attained at least primary education level. The survey found
encouraging percentage of the surveyed population (about 19.1%) achieving high
school level and just small portion (5.5%) got college or university degree.
As for the HHs’ Head, the illiteracy rate is very low, just 0.8 %. 47.7 % of the surveyed
HHs Heads has reached primary education. More than 37.3% has got basic secondary
education. The details of educational status of analysis on the heads of households
and surveyed affected persons are described as in Table IV-3 and Table IV-4 below.
The details of educational status by communes are shown in Annex B.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 32
Table IV-3: Educational status of the heads of householders
District
Total Surveyed HH Heads
Education Level of DP Households Heads
Illiterate (%)
Primary Education
(%)
Basic Secondary Education
(%)
High School Education
(%)
College and University
(%)
Dien Ban 295 2.4 44.5 45.7 6.9 0.5
Duy Xuyen 164 1.5 57.0 35.6 5.1 0.8
Que Son 84 0.0 54.3 41.9 3.3 0.5
Thang Binh 207 2.2 38.5 51.8 6.6 0.9
Nui Thanh 346 0.0 50.0 31.1 17.3 1.6
Phu Ninh 336 0.0 41.2 33.3 21.9 3.6
Tam Ky city 4 0.0 55.0 20.0 11.2 13.8
Total 1,436 0.8 47.7 37.3 12.1 2.1
Table IV-4: Education Level of Surveyed DPs
District Total
surveyed population
Education Level of DP Population
Illiterate
(%)
Primary Education
(%)
Basic Secondary Education
(%)
Higher Secondary Education
(%)
College and University
(%)
Dien Ban 1,314 6.4 29.6 39.3 19.7 5
Duy Xuyen 716 3.7 36.9 38.2 15.8 5.4
Que Son 329 2.3 35.7 42.5 14.8 4.7
Thang Binh 871 2.4 31.4 42.3 18.2 5.7
Nui Thanh 1,357 3.3 31.9 36.8 22.3 5.7
Phu Ninh 1,207 2.9 24.9 47.5 19.1 5.6
Tam Ky city 4 3.1 28.9 37.2 24.3 6.5
Total 5,811 3.4 31.1 40.9 19.1 5.5
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 33
IV.2.3. Occupation and Employment
The main employment sectors in the project areas include agriculture, business,
industry, government services, professional, self-employed, which is shown in the
table below. Among them, the agricultural section is the dominant one, which
accounts for 64.3% of the employed population. There is no statistic figure for
unemployment because except for specific works such as workers, government
staffs, etc. people in these areas are listed in agriculture section. The employment
details are presented in the Annex B.
Table IV-5: Types of employment
District Survey
population Agriculture
(%) Business
(%)
Workers in
industry (%)
Gov service
(%)
Profess-ionals
(%)
self-employed
(%)
Other (%)
Dien Ban 1,067 62.3 10.6 16.4 1.4 6.9 0.6 1.8
Duy Xuyen 585 69.9 4.9 12.7 2.5 3.5 5.0 1.5
Que Son 259 74.1 6.2 9.5 2.6 4.1 0.8 2.7
Thang Binh 636 67.6 12.6 10.9 2.3 4.9 0.0 1.7
Nui Thanh 1,112 59.8 9.7 10.0 8.4 6.4 3.5 2.2
Phu Ninh 1,059 59.1 12.8 9.8 8.4 4.8 3.1 2.0
Tam Ky city 4 66.7 3.5 9.6 12.1 5.9 1.1 1.1
Total 4,733 64.3 9.5 11.1 5.4 5.3 2.4 2.0
Note: Survey populations are at the age of 18 to 55 of the surveyed 1,436 households.
IV.2.4. Household Incomes
More than 64.3 % of the surveyed DPs are engaged in the agricultural sector. From
these, it is identified that the primary income of the DPs comes from agricultural
activities.
The average monthly income of the surveyed HH in affected districts is about VND
843,000 per capita per month, of which Tam Ky city has the highest figure, which is
VND 925,000 per capita per month; and Que Son district has the lowest figure, which
is VND 819,149 per capita per month. The monthly income per capita by communes
is presented in Annex B.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 34
IV.2.5. Households below Poverty level
The poverty line for residents of the Project Area for the period 2006-2010 was set at
200,000VND per person per month in rural area and 260,000VND per person per
month in urban area2. However, since the project predominantly covers rural areas,
the criteria applied to assess the poverty line is 200,000 VND per person per month.
About 76.5% of households have their average monthly incomes per capita over VND
200,000 per month. Findings from the survey show that a considerable high
proportion (23.5%) of monthly income per capita is less than VND 200,000 and would
need additional assistance to meet the project objectives. The details of Number of
poverty household in each commune are described in the Annex B.
Table IV-6: Number of poverty household base on MOLISA poverty line
District Total
Surveyed HHs
Income Capita with Less than VND 200,000
Income Capita from VND 200.000 to
500,000
Income Capita with More than VND
500,000
HHs % HHs % HHs %
Dien Ban 295 69 21.0 154 51.1 72 27.9
Duy Xuyen 164 37 24.5 77 46.6 50 28.9
Que Son 84 22 26.2 37 43.6 25 30.1
Thang Binh 207 43 21.5 92 44.9 72 33.6
Nui Thanh 346 83 25.0 154 43.1 109 31.9
Phu Ninh 336 83 24.8 156 44.7 97 30.5
Tam Ky city 4 1 25.0 2 50.0 1 25.0
Total 1,436 338 23.5 672 46.8 426 29.7
IV.2.6. Access to public facilities
Health
In the affected districts, the most common health problems are flu, food poisoning,
diarrhea, and traffic accident consequences. HIV/AIDS is a concern although the
reported numbers of affected persons are very limited at present. There is a high
2 Source: Decision No 170/2005/QĐ-TTg
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 35
under-nutrition among children below five years old and comparatively low uptake of
contraceptive methods for family planning.
Public health centers are presented in each commune, and there is a hospital in each
district. However, facilities are poor in the main project area and there is a lack of
nurses as well as medicine.
It was learned that there is just about 26.3 % of the HHs experience with periodic
health check. There is only 21.8% of survey population who work as professional,
workers and government officer have health insurance.
Table IV-7: Percentage of HHs experience with periodic health check in affected
area
Districts Total Surveyed
HHs
Periodic health care check
(%)
No Periodic health care check
(%)
Dien Ban 295 31.7 68.3
Duy Xuyen 164 29.0 71.0
Que Son 84 27.6 72.4
Thang Binh 207 37.3 62.7
Nui Thanh 346 18.9 81.1
Phu Ninh 336 24.3 75.7
Tam Ky city 4 20.0 80.0
Total 1,436 26.3 73.7
Education
All communes have kindergartens and a school with primary and lower secondary
levels. However school facilities are poor and many villages are far away from a
school. Many adults have only completed 6 years, or 4 years or only 1 year of primary
education. Difficult economic conditions lead to high numbers of children dropping
out of school. The lack of high school and of opportunities for non-agricultural
employment leads to low motivation for study among the young.
The details of the number of HH accessing to public facilities are shown in the Annex
B.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 36
IV.2.7. Access to utilities and services
Water supply
None of surveyed HHs is connected to safe water system and all HHs have to use
drinking water derived from wells. Only a few of households have filter and
treatment system for drinking water. Water is in short supply during the dry season,
dirty during the rainy season. Poor water supply may be one of the reasons that there
is a high incidence of water borne diseases in the area.
Electricity
Hundred percent (100%) of the affected communes are connected to the national
power grid with private meter. However the electricity usually interrupted in dry
season.
Sanitation
Some 66 % of the DPs have latrine with semi-septic tank and 32.3 % use latrine with
septic tank, the remaining 1.7 percent of the population are without toilet facilities.
The detail by communes is shown in Annex B.
Table IV-8: Percentage of HHs has toilet facilities
District Total Surveyed
HHs
Latrine with septic tank
(%)
Latrine with semi septic tank
(%)
Latrine over pond or river
(%)
Dien Ban 295 87.0 10.3 2.7
Duy Xuyen 164 60.0 38.3 1.7
Que Son 84 45.4 52.6 2.0
Thang Binh 207 53.3 43.3 3.4
Nui Thanh 346 4.9 95.1 0.0
Phu Ninh 336 1.7 95.7 2.6
Tam Ky city 4 0.0 100.0 0.0
Total 1,436 32.3 66.0 1.7
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 37
IV.2.8. Ownership of Consumer Goods
Most of the population has access to telecommunication systems, for instance, more than 86.9 % of the HHs has TV, and about 30 % of the HHs has telephones.
Table IV-9: Consumer Goods of the surveyed households
Districts Surveyed
HH
HH with telephone
(%)
HH with motorbike
(%)
HH with TV (%)
HH with Video Player
(%)
HH with washing machine
(%)
Dien Ban 295 44.0 45.7 87.7 37.0 4.4
Duy Xuyen 164 33.3 50.3 73.0 28.0 6.1
Que Son 84 38.7 75.7 71.0 38.3 0.0
Thang Binh 207 34.3 37.7 73.0 26.3 4.3
Nui Thanh 346 26.5 77.8 95.3 55.5 3.1
Phu Ninh 336 13.8 59.2 100.0 34.0 2.8
Tam Ky city 4 25.0 80.0 100.0 62.0 0.0
Total 1,436 29.3 61.3 86.9 39.8 3.2
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 38
V. RESETTLEMENT IMPACTS
There are a total of 3,874 households in 24 communes of 07 districts of Quang Nam
province who will be impacted by land acquisition for the project. Of these:
- 878 Households will be impacted by the loss of residential land either
partially or fully with the total affected area is 347,138 m2
- 2,473 Households will be impacted due to the loss of agricultural land with
the total area of 2,686,623 m2.
- 1,923,858 m2 other land (public land) will be impacted
- About 1,700,762 m2 of forestry land (Production forestland) will be impacted.
- 763 Households will be impacted on either partially or fully by the loss of
houses with the total affected area of houses being 37,594 m2..
- There are 771 HHs have to relocate to new places, of which relocated HHs
due to loss of residential land (both with and without structure) are 364 HHs
including 25 households affected by loss of businesses, and by loss of
agriculture land (407 HHs).
- There are 02 collective or public institutions that will be affected by loss of its
assets.
The number of households affected due to the acquisition of different categories of
land in each district is shown in Table V-1 below. Details of land acquisition impacts
on the households by communes are shown in Annex C.
Table V-1: Number of HHs and heads affected by land acquisition in 07 Districts
Districts Number of affected HHs Number of affected people
Dien Ban 569 2,459
Duy Xuyen 397 1,753
Que Son 502 1,940
Thang Binh 463 1,886
Nui Thanh 1,207 4,487
Phu Ninh 622 2,621
Tam Ky 114 410
Total 3,874 15,556
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 39
Among the 7 affected districts given in the table above, Nui Thanh has the highest
number of affected HHs by the project, which is 1,207 whereas 114 affected HHs
were recorded in Tam Ky City which is the lowest number compared to others.
A. Impact on types of land
Impacts on the different types of land by districts are shown in Table V-2 below and by communes are presented in Annex C.
Table V-2: Number of affected area of different land types
Districts Loss of
residential land (m2)
Loss of agricultural land (m2)
Loss of production
forestry land (m2)
Loss of other3 types of land (m2)
Total (m2)
Dien Ban 74,182 612,145 0 154,602 840,929
Duy Xuyen 19,202 437,378 59,794 110,957 627,331
Que Son 20,832 241,307 448,467 170,527 881,133
Thang Binh 73,258 309,710 97,912 361,334 842,214
Nui Thanh 60,856 595,836 863,644 712,693 2,233,029
Phu Ninh 87,638 456,119 215,927 169,106 928,790
Tam Ky 11,170 34,128 15,018 11,543 71,859
Total 347,138 2,686,623 1,700,762 1,690,762 6,425,285
Residential land, agriculture land, production forestry land and other land are the
main types of land that are lost by the project. Among them, agriculture land lost the
highest area compared to others, which is 2,686,623 m2. Forestry land and other land
has nearly the same amount of areas that are lost, which are 1,700,762 m2 and
1,690,762 m2 respectively. Residential land experienced the lowest amount of
affected area which is 347,138 m2. Each types of affected land is discussed detail in
the following sections.
1. Loss of Agricultural Land
The number of households who are affected by the loss of agricultural land (losing more than 20% of the total area of the agricultural land holding) by districts and
3 Other land or Public land is the land that being used for other purposes, not for agriculture, forestry and living.
It includes vacant land along roads, water surface; cultural and historical relics land; land used by Security and
national defense offices; and other specially used land such as land for industrial waste
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 40
number of households which fully affected on agricultural land holding (fully affected or the remaining areas are less than 300 m2) are shown as in Table V-3 below.
As can be seen in the Table V-3 below, 2,473 HHs are affected by loss of agricultural land, of which 2,126 HHs lose more than 20% of their land holding and 407 HHs lose more than 70% of their total agriculture land holding. Of the 407 households affected by loss of >70% of agricultural land, 210 households lose entire land holdings.
347 households are affected by loss of <20% of land holdings. The DPs in this category would also be entitled to additional assistance and income rehabilitation.
Only 1,485 households have red book, 791 households have not received red book, but are legalizable and are entitled to receive red book. A total of 197 households will not be eligible to have red book. These households are part of annual voluntary migration from other places to the project site, which is endowed with very fertile land and moderate climate. However, these HH are not considered as permanent residents of the area and therefore they are not eligible to have red book.
Degree of Impact and land-for-land option
Although 2473 households are affected by the loss of agricultural land, not many would have their remaining land holding falling below 300 m2. Further, the total loss of agricultural land compared to total area of agricultural land in the project communes is minor, varying between 0.45-4.96% in Quang Nam province - the overall average being 1.47%. Table V-4 presents the total and affected area of agricultural land in the project communes of all the three provinces covered by the project.
The average agricultural land holding in the project communes vary between 300 to 1000 m2 per person. Taking an average household size of 4, the total land holding varies between 1200 m2 to 4000m2 per household. Most of the HHs in the project area have the average amount of 2,000 m2 of agricultural land. Even if the lowest land holding of 1200 m2 is considered, on an average the households would have to lose 75% or more of their land holding before the remaining land falls below minimum economic size of 300 m2. Only 407 households would lose >70% of their land holding in this province. It is therefore safe to assume that the number of households where the remaining land is rendered below 300 m2 is not likely to be more than 400. However, this will be verified further when the DMS is completed.
The WB’s Op 4.12 policy provides for preference to ‘land-for-land’ option to households who are affected by loss of >20% of their productive land. Total number of 2126 households fall in this category. Of these 407 would lose >70% of their productive land. The remaining 1719 hh would lose between 20-70% of their land holding. As discussed above, there would be very few of these households entitled to land-for-land option OR looking for replacement land because the remaining area of their land would be more than sufficient to support the family.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 41
As required by the policy, the project is required to offer land-for-land option to these households. However, district and commune authorities have confirmed that although there is non-agricultural public land in the project communes, there is no public agricultural land available that can be used for replacement land. As such project would not be in a position to ‘offer’ land-for-land option to the DPs.
The authorities also confirmed, and can be seen from Table V.4 below, there is significant area of private agricultural land in each project commune, as well as in other communes adjoing the project area, that can be purchased by the DPs if they so wish on willing-buyer willing-seller basis. During the public consultation exercise, many DPs expressed that it would not be difficult for them to buy private agricultural land (Section VIII.2.a). Field investigations have revealed that although there are cases of households buying and selling agricultural land holdings in the project area, these deals are done unofficially. In Vietnam, people cannot buy/sell agricultural land officially although private deals when done and are routinely regularized by commune authorities.
Project authorities have also committed to provide following assistance to DPs who wish to buy agricultural land in communes within and adjoining the project:
i) provide information to the DPs on available replacement land and facilitate visit to the area;
ii) provide logistical support to relocating DPs when they find replacement land;
iii) facilitate processing of legal documents such as registration, issuance of LURCs. The project will also cover the cost of legal documentation if the DPs buy replacement land within 6 months from receipt of compensation for affected agricultural land.
External monitoring agency will closely monitor the type of assistance sought by the DPs and the level of support provided by the project authorities.
Although compensation rates for affected land and other assets would be established based on the Replacement Cost Surveys to ensure that they reflect prevalent market prices, it is recognized that in case of large number of households willing to buy private agricultural land, the land prices in the market would most likely rise compared to the pre-project level and may in some cases go above the compensation rates DPs receive. However, Every DP affected by loss of productive land, irrespective of the degree of impact, will be provided with additional assistance equivalent to 3 times the compensation amount. This additional cash amount would ensure that DPs would be able to buy land in private market even if there is marginal rise in land prices.
The entitlements to compensation and other assistance to the DPs affected by loss of >20% of their productive land, or where <20% affected but the remaning land is rendered unviable for economic use (<300m2), as outlined in Section III.3.10, will
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 42
ensure that even if the land-for-land option is not made available the DPs would be able to improve, or at least restore their livelihood to the pre-project levels. All the DPs exposed by impact other than those considered to be minor, will have a range of programs, as described in Section III.3.10, to support their full livelihood restoration and assure asset compensation at replacement value.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 43
Table V-3: DPs Affected by Loss of Agricultural Land
District Loss of
agricultural land (m2)
Number of HH affected by loss of Agricultural
land
Number of HH affected by loss
of <20% of total
agricultural land holding
Number of HH affected
by loss of 20% - 70% of
the total agricultural land holding
Number of HH affected by loss of >70% of the
total agricultural land holding
Legal status on land use right
Households have Red book
Households have not
granted with Red book
households will not be eligible
to have Red book
Dien Ban 612,145 440 44 294 102 265 141 34
Duy Xuyen 437,378 347 52 239 56 208 111 28
Que Son 241,307 316 47 210 59 190 102 24
Thang Binh 309,710 290 43 204 43 173 93 24
Nui Thanh 595,836 631 94 468 69 379 201 51
Phu Ninh 456,119 394 59 269 66 237 125 32
Tam Ky 34,128 55 8 35 12 33 18 4
Total 2,686,623 2,473 347 1,719 407 1,485 791 197
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 44
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 45
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 46
2. Loss of Residential Land
Number of households which fully affected on residential plot (fully affected or the
remaining areas are less than 100 m2 in the rural area and less than 40 m2 in the
urban area) and residential landless households are identified by districts as in Table
V-5 below.
Table V-5: Number of households affected on residential land by district
District Loss of
residential land (m2)
HH affected by
loss of residential
land
Number of HH fully
affected on residential plot with structure
Number of HH fully
affected on residential
plot without
structure
Number of HH
partially affected
on residential plot with structure
Number of HH partially affected on residential
plot without
structure
Dien Ban 74,182 154 55 9 78 12
Duy Xuyen 19,202 65 21 5 34 5
Que Son 20,832 46 11 0 32 3
Thang Binh 73,258 139 58 9 63 9
Nui Thanh 60,856 197 61 7 112 17
Phu Ninh 87,638 257 106 15 118 18
Tam Ky 11,170 20 7 0 7 6
Total 347,138 878 319 45 444 70
As can be seen from the Table V-5, 878 HHs are affected by loss of residential land, of
which 514 HHs are partially loss of land both with and without structure. The
remaining land is sufficient for them to continue to live there; so that relocation
option is not applicable. The compensatory money will be provided to those. 364 HHs
are fully affected and needed to be relocated and the project has to acquire and
compensate for a whole plot.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 47
Table V-6: Legal status on land use right
Districts HH affected by
loss of residential land
Legal status on land use right
households have LURC
Households have not granted with
LURC
households will not be eligible to
have LURC
Dien Ban 154 102 37 15
Duy Xuyen 65 41 16 8
Que Son 46 30 9 7
Thang Binh 139 85 42 12
Nui Thanh 197 124 50 23
Phu Ninh 257 153 75 29
Tam Ky 20 14 4 2
Total 878 549 233 96
It is identified that there are 549 households have LURC, 233 households have not
granted with LURC, but are legalizable to be granted with LURC and 96 households
will not be eligible to have LURC because they have changed the use of land from
agricultural to non-agriculture without permission. When these HHs are affected by
the land acquisition, they will be compensated based on the agriculture land use
according to the Decision 29/2008/QD-UBND of Quang Nam PPC dated on 26th
August 2008.
3. Loss of Forest Land
Total 1,700,762 m2 of forest land are lost due to the project implementation. Most of
them are the production forest (details in table 5.2). About 80% of forest land
belongs to public forest, the remaining (20%) is provided to local people through 135
program. The numbers of affected HHs due to the loss of forest land under the 135
program would need to be collected at the time of DMS.
4. Loss of Other Land
There are 1,690,762 m2 of ‘other land’ affected by the project. However, this
category of land is public land. Ttherefore, no households are considered affected by
the loss of this land by the project.
B. Impacts on Structures
1. Loss of Houses
Based on impacts of the project, two affected kinds of houses are collected including
fully affected and partly affected houses. Each kind of house is concretely discussed
in the following subsections. Houses that are collected here including houses in
residential land (residential land with structure) and houses in business households.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 48
Fully affected houses.
The number of HHs who are fully affected due to the loss of houses is 319, which is
also the number of affected houses. These households would be entitled to
relocation as the remaining residential land would not be of minimum size for for
continued use and reconstruction of houses. These houses consist of 5 types
depending upon their construction types. Class 4 and temporary house are of the
lowest quality in terms of use of building material and condition.
The total affected area is 22,037 m2, of which 9,563 m2 belongs to class 4 houses,
followed by 7,054 m2 of class 2 houses, 2,718 m2 of class 1, 1,717 m2 of temporary
houses and finally is 985 m2 of class 3. The losses of houses by communes are
described in Annex C.
There are no houses on non-residential land.
Table V-7: Fully affected houses by districts (fully affected area or partially acquired
by the project but the remaining area unviable for use)
Districts
Total No. of HHs who are
fully affected on
houses
Number of fully
affected houses
Classes
Class 14 Class 2 Class 3 Class 4
Temporary house
Dien Ban 55 55 7 3 1 24 20
Duy Xuyen 21 21 3 5 1 8 4
Que Son 11 11 0 3 2 4 2
Thang Binh 58 58 3 13 1 30 11
Nui Thanh 61 61 4 21 3 31 3
Phu Ninh 106 106 9 38 2 48 9
Tam Ky 7 7 0 1 0 6 0
Total 319 319 26 84 10 151 49
4 The classes of house is specified in Circular No. 07/LB-TT dated 30 September 1991, of which:
- House class 1: House with brick and concrete structures, complete and convenient living facilities (such as Kitchen, toilet, bathrooms, electricity and water…).
- House class 2: House with brick and concrete structures; living facilities are less complete and convenient than house class 1.
- House class 3: House with brick structures, fibro or tile roof, normal living facilities. - House class 4: House with brick or wood structures, tile roof, bad living facilities.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 49
Table V-8: Area of fully affected houses according to each house class
Districts Total
Affected area (m
2)
Affected area (m2)
Class 1 Class 2 Class 3 Class 4 Temporary
house
Dien Ban 3,300 720 249 75 1,560 696
Duy Xuyen 1,423 295 396 80 520 132
Que Son 679 0 233 125 245 76
Thang Binh 3,769 330 1,050 65 1,950 374
Nui Thanh 4,453 425 1,781 200 1,943 104
Phu Ninh 7,933 948 3,255 440 2,955 335
Tam Ky 480 0 90 0 390 0
Total 22,037 2,718 7,054 985 9,563 1,717
1.2 Partially impacted houses
The total number of households who are partially affected by the loss of houses and
the numbers of affected houses of each types and their areas are shown in Table V-9
and Table V-10 below.
Table V-9: Partially affected houses by districts
Districts
Total No. of HHs who are partially
affected on houses
Number of partially affected
houses
Classes
Class 1 Class 2 Class 3 Class 4
Dien Ban 78 78 8 1 2 67
Duy Xuyen 34 34 2 12 6 14
Que Son 32 32 0 7 7 18
Thang Binh 63 63 4 21 6 32
Nui Thanh 112 112 4 28 2 73
Phu Ninh 118 118 25 49 5 39
Tam Ky 7 7 0 0 0 7
Total 444 444 43 118 28 250
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 50
Table V-10: Area of partially affected houses according to each house class
Districts Total Affected
area (m2)
Affected area (m2)
Class 1 Class 2 Class 3 Class 4
Dien Ban 2,715 290 40 40 2,345
Duy Xuyen 985 45 430 110 400
Que Son 945 0 260 139 546
Thang Binh 2,231 188 822 260 961
Nui Thanh 3,829 140 1,042 92 2,555
Phu Ninh 4,274 835 1,894 180 1,365
Tam Ky 245 0 0 0 245
Total 15,224 1,498 4,488 821 8,417
There are 444 households whose their houses are partially affected, which also the
number of affected houses. Class 4 houses attribute to the highest number of
affected houses with 250 houses. No temporary houses were recorded by partially
loss.
The total affected area is 15,224 m2.
These partially affected houses will received the compensation at replacement cost
for the affected area plus Repair Allowance equivalent to 20% of compensation for
affected structure, which will enable them to improve their housing condition.
2. Loss of Other Structures
Structures include kitchens (which are separated from living houses), Houses for
poultry, other structures with fibro cement font cover, cement Playground, brick wall
fence, iron gate, graves, wells. Areas or numbers of each affected types in district
level are concretely discussed in the table below. The losses of other structures by
communes are described in Annex C.
Cement ground has the highest affected areas, which are 11,949 m2; followed by the
area of kitchen (which is 7,927 m2), Houses for poultry (which is 5,114 m2), sub-
house with fibro cement font cover (5,077 m2), Brick wall fence (4,522 m2), and
finally, the lowest affected areas belongs to iron gate with 1,429. The number of
graves and well are considerable high, which are 3,737 and 404 respectively.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 51
Table V-4: Loss of other Structures
Districts Kitchen (m2) Houses for
poultry (m2)
Other structures with Fibro
cement font cover (m2)
Cement Playground
(m2)
Brick wall fence (m2)
Iron Gate (m2)
Number of Graves
Number of Well
Dien Ban 4,445 829 1,567 1,217 730 243 648 103
Duy Xuyen 324 855 545 1,255 753 251 608 41
Que Son 93 84 142 323 285 114 252 4
Thang Binh 1,570 3,204 1,213 3,300 1,980 660 775 112
Nui Thanh 544 79 578 2,010 288 58 691 47
Phu Ninh 942 62 1,018 3,793 509 102 700 94
Tam Ky 9 15 14 51 7 1 63 3
Total 7,927 5,128 5,077 11,949 4,552 1,429 3,737 404
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 52
C. Impacts on crops and trees
Crops are raised in agriculture land, and trees in both agriculture land and residential
land. The main types of crops including rice and maize, and of trees are sugar cane,
acacia, eucalyptus.
There are 2,283,630 m2 of land under rice crop, 349,263 m2 of land under maize
crops, 72,335 m2 of land under sugar cane, 731,327 trees of acacia and 963,735 trees
of eucalyptus will be affected. The number of other affected trees are 11,445.
Table V-5: Impacts on annual crops and trees by Districts
Districts Rice (m2) Maize (m2) Sugar cane
(m2) Acacia (tree)
Eucalyptus (tree)
Number of other trees
Dien Ban 520,323 79,579 13,944 0 88,123 1,995
Duy Xuyen 371,771 56,860 9,969 25,711 63,245 825
Que Son 205,111 31,370 6,703 192,841 97,201 645
Thang Binh 263,254 40,262 10,169 42,102 205,961 1,815
Nui Thanh 506,461 77,460 19,757 371,367 406,235 2,595
Phu Ninh 387,701 59,295 10,983 92,848 96,390 3,360
Tam Ky 29,009 4,437 810 6,458 6,580 210
Total 2,283,630 349,263 72,335 731,327 963,735 11,445
The number of households affected by the loss of crop areas and those affected by
the loss of agricultural land are the same i.e. 2,473 households. In addition, a total of
878 households are affected by loss of over 1,7 million trees in kind of acacia,
eucalyptus and other trees.
D. Loss of Business and Employment
Business here are small shop including vegetable shops, groceries and others
essential things for life. These business HHs are run by their members in the houses,
do not hire employee to support their business; therefore, the affect to employees
are not present.
There are 34 small scale businesses (independent shop) are affected, of which 25 will
have to be relocated. These affected households (25 HHs) are eligible to organize on
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 53
a resettlement site or in a market area. The rest households (9 HHs) are partly
affected by the project. The remaining areas of their shops are large enough for them
to continue their business. The assistance is provided to those households depending
on the total of the areas that they loss and dependence on business income. If their
incomes are diversity (mean that they have other income except for business like
income from agriculture, etc.), the assistance is different from the HHs whose income
just originated from business.
The data on affected major business and manufacturing establishments, both
registered and un-registered, was not collected at this time. The data would need to
be collected during the DMS period.
Of the affected small-scale household businesses, 18 businesses are registered while
the remaining 16 are un-registered. These will receive compensation in accordance
with the provisions of the compensation policy. The income of HHs are quite high, the
monthly average income of each household is about 2.5 million VND, especially 4.5
million VND per household per month was recorded in Que Son district, which is the
highest figure among 7 affected districts.
Table V-6. Affected Small Scale Business household
Districts Number of
affected business HH
Number of affected
business HH who have to
relocated
Number of Registered
business HHs
Number of Non-
Registered business HHs
Average Incomes of affected business
House (VND/HH/month)
Dien Ban 3 2 3 0 2,333,333
Duy Xuyen 3 1 2 1 3,333,333
Que Son 5 5 3 2 2,300,000
Thang Binh 4 2 1 3 1,437,500
Nui Thanh 9 7 5 4 2,422,222
Phu Ninh 10 8 4 6 2,160,000
Tam Ky 0 0 0 0 0
Total 34 25 18 16 2,283,824
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 54
E. Impacts on Collective assets and public works
All the collective assets and public works are affected by the project need to be
relocated, including:
- One 500KV electricity pole in Tam Thai commune, Phu Ninh district
- Five 220 kV electricity poles in Dien Ban district
- Eight 35 kV electricity poles
- Eleven 10kV electricity poles, and
- Thirty- five 0,4kV electricity poles
All these electricity poles belong to Quang Nam electricity.
- Eighteen telephone poles, belonging to Quang Nam post office.
F. Impact on vulnerable people
Vulnerable groups include HHs who are under the poverty line set forth by MOLISA
(338 HHs) , female headed HHs (471 HHs) and those eligible to the social policy5 of
the Government (249 HHs). Among 7 affected districts, Duy Trung contains the
highest number of HHs in each vulnerable groups, which is 126 HHs who are under
the poverty line set forth by MOLISA, 62 HHS have problems with social policy and
number of female headed HHs are 115. Most of the these households fall in more
than one category. However, a household will receive support/assistance for only one
criteria. Thus the maximum number of households that can be classified as
vulnerable would be 471.
Table V-7: Affected vulnerable households
Districts Number of HH is under the
poverty line set forth by MOLISA
Number of HH covered under social policy
Number of female- headed HH
Dien Ban 69 45 69
Duy Xuyen 37 35 51
Que Son 22 55 69
Thang Binh 43 31 71
Nui Thanh 83 50 77
Phu Ninh 83 62 115
Tam Ky 1 16 19
Total 338 294 471
5 Social Policy households are those with heroes – mother, and/or with member who lay down one’ life for
country and/ or wounded in the war...
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 55
Presently, the information on households incomes and below poverty line and those
falling in the category of vulnerable people is based on the sample survey. However,
in order to determine the total number of such households for entitlements, the
aggregate numbers would need to be collected at the time of DMS.
G. Relocation Requirements
Based on data given above, Table V-8 below indicates the number of HHs that need
to be relocate due to the loss of residential land, or entitled to receive a minimum
land plot by loss of agriculture land, and by loss of structures and businesses. As can
be seen from the table, there are 796 would be entitled to relocation and are entitled
to receive plots at the RS. Of these, 364 households are affected by loss of residential
land (both with and without structures). 25 of these households would be provided
space for carrying out business activities at the resettlement sites. Additionally, 407
households affected by loss of agricultural land where the remaining land is rendered
unviable for use (<300 M2) will receive minimum size plots of 100 m2.
Table V-8: Number of Household Are Entitled to Receive Land Plot in Resettlement
Sites
Districts
Number of HH who have to relocated
due to loss of residential land with structure
Number of HH who have to
relocated due to loss of
residential land without
structure
Number of HH who are entitle to get land plot in resettlement site due to loss of agricultural
land
Number of affected
business HH
Total No. of HHs who have to be relocated or entitled to
receive a minimum land
plot
Dien Ban 55 9 102 2 166
Duy Xuyen 21 5 56 1 82
Que Son 11 0 59 5 70
Thang Binh 58 9 43 2 110
Nui Thanh 61 7 69 7 137
Phu Ninh 106 15 66 8 187
Tam Ky 7 0 12 0 19
Total 319 45 407 25 771
During the consultations with the DPs many relocating households, specially those affected by loss of residential land, have shown preference for self-relocation. Actual number of DPs opting for project sponsored RS would therefore be much smaller than estimated above and will be finalized following more consultations, after completion of the DMS.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 56
Summary of Impacts
Based on the description of impacts in the previous sections, the summary is
presented in the Table V-9 below:
Table V-9: Summary of Impacts
Number Item Number of Affected HHs
Unit Quantity
I Land
1 Agricultural land 2,473 m2 2,686,623
2 Residental Land 878 m2 347,138
3 Production forest land Number of HHs to be collected at DMS
m2 1,700,762
4 Other land - m2 1,690,762
II Structure
1 House Class 1 69 m2 4,216
2 House Class 2 202 m2 11,542
3 House Class 3 38 m2 1,806
4 House Class 4 401 m2 17,980
5 Temporary House 52 m2 1,839
6 Other Structure 763 m2 39,095
III Crops and trees
1 Crops 2,473 m2 2,686,623
2 Forest trees - Tree 1,695,062
3 Other Trees 878 Tree 1,706,507
IV Loss of Business 34 VND/HHs/ Month
1,837,143
V Collective assets and public works electricity poles Number 43
Telephone poles Number 12
VI Relocation Requirement 771 - -
Entitlement Matrix
The entitlement matrix for compensation and relocation is described as in Table V.17
below.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 57
Table V.17: Entitlement Matrix
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
1. Productive Land (Agricultural, Aquaculture etc.) either in or out of the residential area.
2,473 DPs
1.1. Marginal loss (<20% of land holding)
Single affected plot: The remaining area of affected plot is still economically viable (>300 m2) for use or meets the expected personal yield.
347 DPs
(a) Owners of land with
(i) LURC (Red book) or (ii) in the process of acquiring LURC or (iii) are eligible to acquire LURC according to the regulations of GOV.
244 DPs
- Cash compensation at replacement cost (free from taxes and transaction costs) for the affected area of the land.
- For non-land assets: See the subsequent Items of compensation for other assets below.
- Process of preparing application dossier and obtain decision on land recovery, information publicize/ dissemination (DMS, compensation and assistance package (Compensation Plan), compensation payment etc.,) followed the Articles 53, 55, 57 and 58 of Decree 84/2007 and Articles 27, 28, 29, 30 and 31 of Decree 69/2009.
- Affected households to be notified at least ninety days before land recovery by the Project (Land law-2003; Article 39- Item 2). The owner of land will hand over the land within 20 days from the date PMU 85 fully pays compensation for land (Article 58 of Decree 84/2004).
For poor and vulnerable, affected farmers, including landless, allocation of arable land equal per capita arable land in commune as regulated by Decree 64/1993/CP, or if there no land available for allocation or, on the DPs’ request as informed choice.
(b) Users with temporary or leased rights to use land.
76 DPs
- The DPs will be refunded the lease payment they have made for the affected portion of the land corresponding to the remaining lease period. Additionally, the DPs will be compensated for any investment they have made on the affected land or 30% of the replacement cost of the affected land, whichever is higher.
- if the remaning land is rendered unviable, at the request of the DP, the project will take back entire land and provide the DP with suitable replacement land at location acceptable to DP. If suitable replacement land is not available, at the request of the DP, the project will refund the payment made by the DPs corresponding to the remaining lease period. Additionally, the project will compensate DP for the investment made on the affected land or 30% of the replacement cost, whichever is higher.
(c)Land Users without recognized Rights to Use Land
27 DPs
DPs will receive assistance corresponding to 50% of land replacement cost. In addition to above, rehabilitation/training assistance will be provided.
1.2. Loss (>20%) Fully (a) Owners of land (i) with - if more than 20% of a household’s agricultural land is This considered as a similar
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 58
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
affected plot or where <20% land affected but the remaning land is rendered unviable
Affected plots: To be fully acquired if the remaining land is no longer viable for continued use or does not meet the expected yield. This will be determined by the DCSCC and concurred with by the affected household during DMS).
2,126 DPs
LURC; or (ii) In the process of acquiring LURC; or (iii) Eligible to acquired LURC.
1,241 DPs
acquired, then in addition to cash compensation at full replacement cost for the lost area (or for the entire affected plot if the remaining area of the plot is not economically viable), or replacement land of equivalent productivity, the Project will provide rehabilitation allowances for training/retraining and intensifying of the existing occupation or shifting to new ones, combining with technical assistance such as agricultural extension, credit etc.
The forms of assistance ans support would be decided through close consultation with the entitled DPs to ensure appropriate and effective measures assisting the DPs to restore their income generating capacity and income levels.
- For non-land assets: See the entitlement for non-land assets is described as in next items below. - Assistance for stabilizing the livelihood (Item 2 of Article 17 of Decree 69/2009). - Assistance for agricultural land in the residential area, garden land, pond land adjacent to residential land but are not recognized as residential land: Additional assistance (equivalent to 50% of the cost of compensation for the adjacent residential plot) for garden land and pond land; and (at 40% of the cost of compensation for the adjacent residential plot) for agricultural land. - In case of land-for-land compensation, DP will be assisted with seedlings, agricultural-forestry extension programs, husbandry etc (Item 4 of Article 20 of Decree 69/2009). - Assistance for changing job, employment with cash either at three (03) times of compensation for agricultural land or allocated with one plot or apartment or business land plot.
principles said in Decree
197/2009 and Article 16 of
Decree 69/2009 ND-CP of GoV
- Other assistances which each
province or city could decide
based on the locality conditions
(Article 23 of Decree 69/2009).
- Affected households to be
notified at least ninety days
before land recovery by the
Project (Land law-2003; Article
39- Item 2). The owner of land
will hand over the land within 20
days from the date PMU 85 has
paid compensation and other
allowances in full..
(b) Users with temporary or leased rights to use land.
715 DPs
As the same policy mentioned for categories 1.1 (b) above.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 59
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
(c)Land Users without recognized Rights to Use Land
170 DPs
. As the same policy mentioned for categories 1.1 (c) above.
2. Residential Land and joint garden.
878 DPs
2.1. Marginal loss
(i.e., land is still viable
for use and not
requiring relocation).
This will be determined
by the DCSCC and
concurred with by the
affected household
during the DMS. It is
proposed that in the
urban area, the non-
affected residential
area is not less than 40
m2 and in the rural
area, non-affected
residential area is not
less than 100 m2 and
the shape of the
remaining plot are
acceptable for DP to
rearrange the house.
514 DPs
(a) Owners of land with
(i) LURC or (ii) in the process
of acquiring LURC or (iii) are
eligible to acquire LURC
according to the regulations
of GOV, or(iv) Those
covered by customary
rights, such as members of
ethnic minority groups.
315 DPs
- For the portion to be acquired permanently: Cash
compensation at replacement cost (free from taxes and/or
transaction costs).
- DPs losing residential land with structures built thereon and
the remaining land is sufficient (not less than 40 m2 in the
urban area and not less 100 m2 in the rural area) to rebuild
their house on (reorganizing DP), the DPs will be compensated
for a part of loss of land in cash at the replacement cost and
compensation for fully affected structures at full replacement
cost. If house/structure is partially affected, repairing cost to
restore it to former or better conditions.
- For non-land assets, see the entitlement for other non-land
assets describe in items below.
- Affected household to be
notified at least 180 days before
land recovery by the Project
(Land law-2003; Article 39- Item
2). The owner of land will hand
over the land within 20 days from
the date PMU 85 fully pays
compensation for land.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 60
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
(b) Users with temporary or
leased rights to use land.
137 DPs
- DPs who reorganize will be compensated for temporary land
loss at 30% of replacement cost
- Repair cost for partially affected structures or subsistence
allowance for fully affected structures.
(c)Land Users without
recognized Rights to Use
Land.
62 DPs
DPs will not be compensated for illegal land loss .
2.2. Loss of productive land with remaining land unviable for continued use
(i.e., land no longer viable for continued use and the entire property to be acquired). This will be determined by the DCSCC and concurred with by the affected household during DMS. It is proposed in the urban area, the non-affected residential area is less than 40 m
2
and in the rural area, non-affected residential area is less than 100 m
2.
(a) Owners of land with
(i) LURC or (ii) in the process of acquiring LURC or (iii) are eligible to acquire LURC according to the regulations of GOV, or (iv) Those covered by customary rights, such as members of ethnic minority groups.
234 DPs
DPs losing residential land with structures built thereon and
without remaining land sufficient (less than 40 m2 in the urban
rural area and less 100 m2 in the rural area) to rebuild on
(relocating DP) are entitled to:
(i) The provision of replacement residential land (plot at the
relocation site) of equivalent size, at a similar location and with
land title without any cost. The relocation site will be
developed with basic infrastructure, including access road,
access to electricity, to water supply, drainage, which at least
are equal to conditions existed at the former location; or
(ii) Cash compensation for entire residential land at full
replacement cost and additional assistance for self-relocation
equivalent to the unit cot of physical infrastructure invest per
plot at the relocation site.
For poor or vulnerable DPs who have no other residential land
in the same ward/commune, the project will provide either a
residential plot of minimum size at a common RS or on a
- Affected household to be notified at least 180 days before land recovery by the Project (Land law-2003; Article 39- Item 2). The owner of land will hand over the land within 20 days from the date PMU 85 fully pays compensation for land.
The process of compensation a plot at the resettlement site will be as follows:
- If the selling cost of plot(s) at the new site is more than the value of the affected residential land, DPs receive new plot at no additional cost (Item 1 of Article 19 of Decree 69/2009). If the plot(s) at the new site is equal the value of affected residential land, DPs receive new plot at the new site without any balance. If the
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 61
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
364 DPs individual residential plot, with title to the land (plot of 40 m2
in urban area and 100m2 in rural area); or on request of the
DPs, cash assistance equivalent to 60% of the land
replacement cost for them to arrange relocation by
themselves.
plot(s) at the new site is less than the value of affected residential land, DPs will receive plot and the difference in cash. The planning and detailed design for the relocation sites will be done by consultant of PMU 85 in consultation with stakeholders and then approved by the PC of Quang Nam Province. Detailed regulation on plot allocation will be developed by PMU 85 and DCSCC through consultation with district, commune and DPs then needs an approval of district PC.
(b) Users with temporary or leased rights to use land.
96 DPs
For the DPs, who do not have legal or legalizable rights to the affected land, are entitled to the assistance amount equal to 30% of replacement cost.
For poor or vulnerable DPs who
have no other residential land in
the same as their affected
ward/commune, the project will
provide either a residential plot
of minimum size at a common
RSs or an individual resettlement
site, with titled to the land (plot
of 40 m2); or on request of the
DPs, as their informed choice, an
assistance amount corresponding
60% of the land replacement cost
for them to rearrange relocation
by themselves.
(c)Land Users without recognized Rights to Use Land
34 DPs
For the DPs, who do not have legal or legalizable rights to the affected land, are entitled to the assistance amount equal to 30% of replacement cost.
For poor or vulnerable DPs who have no other residential land
in the same ward/commune, the project will provide either a
residential plot of minimum size at a common RS or on a
individual residential plot, with title to the land (plot of 40 m2
in urban area and 100m2 in rural area); or on request of the
DPs, cash assistance equivalent to 60% of the land
replacement cost for them to arrange relocation by
themselves.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 62
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
3. Structures
763 DPs
3.1.Marginal impact
(i.e., unaffected portion of the house is still viable for use and could be remained from the technical viewpoints, therefore, require no relocation.
The indicators for a marginal impact on house will be determined by the DCSCC with the technical assistance from District or Provincial Construction Department and concurred by the commune authorities and affected household during the DMS.
444 DPs
Owners of the structures with or without acceptable proof of ownership over the land; with or without building permit.
444 DPs
- If house/structure is partially affected and the remaining structure is viable for continued use, the project will provide a house/structure repair cost, in addition to the compensation for affected portion at replacement cost , to enable DPs to restore it to former or better conditions.
- Compensation for other structures/fixed assets will be at full
replacement cost and will be in cash.
- Tenants, who have leased a house for residential purposes
will be provided an assistance equal to the remainder of rental
contract value, but not exceeding rental value for three
months, OR a relocation allowance of 0.3 miliion /person
/month for a duration of 6 months, whichever is higher; and
transportation allowance for moving assets, as well as
assistance in identifying alternative accommodation.
- For allowances see from subsequent items below.
The calculation of rates will be based on the actual affected area and not the useable area.
3.2. Severe impact (i.e., house is partially acquired by the project but no longer viable for continued use or the entire structure is acquired). Two cases could be (i) The
Owners of the structures with or without acceptable proof of ownership over the land; with or without building permit
319 DPs
- For fully affected house (including house whose whole area is
affected or partly affected but non-affected part could not be
used either because of technical issue or because of
inconvenient to use): Compensation in cash for entire affected
structures will be provided at 100% of the full replacement cost
for materials and labor, regardless of whether or not they have
The calculation of rates will be based on the actual affected area and not the useable area.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 63
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
remaining residential land is sufficient for re-constructed of the house (equal or more than 100 m
2 in the
rural area and 40 m2 in
the urban area) or (ii) residential land is less than 100 m
2 in the
rural area and 40 m2 in
the urban area (considered not convenient to rebuild the house), so that HH has to move to new site.
319 DPs
title to the affected land or permit to build the affected
structure. The amount will be sufficient to rebuild a structure
the same as the former one at current market prices. No
deductions will be made for depreciation or salvageable
materials.
- Compensation for other structures/fixed assets will be at full
replacement cost and will be in cash.
- Tenants, who have leased a house for residential purposes
will be provided an assistance equal to the remainder of rental
contract value, but not exceeding rental value for three
months, OR a relocation allowance of 0.3 miliion /person
/month for a duration of 6 months, whichever is higher; and
transportation allowance for moving assets, as well as
assistance in identifying alternative accommodation.
- For allowances see from subsequent items below.
4.Secondary Structures (kitchen, barn, fence, yard, latrine, etc)
763 DPs
Loss of, or damage to assets
763 DPs
Owners of the structures with or without acceptable proof of ownership over the land; with or without building permit.
763 DPs
Cash compensation based on current market prices of materials and labor without depreciation or deductions for salvaged building materials
The calculation of rates will be based on the actual affected area and not the useable area.
5. Crops and Trees, aquaculture products
Loss of, or damage to assets.
3,351 DPs
Owners regardless of tenure status
3,351 DPs
- Annual crops and aquaculture products equivalent to current market value of crops/aquaculture products at the time of compensation;
- For perennial crops trees, cash compensation at replacement cost equivalent to current market value given the type, age and productive value (future production) at the time of
DPs will be given notice several months in advance regarding evacuation. Crops grown after issuance of the deadline will not be compensated.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 64
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
3,351 DPs compensation.
- Timber trees based on diameter at breast height at current market value
6.Public Facilities
none
Loss of, or damage to assets
Owners of assets
Either in (i) cash compensation to cover the cost of restoring the facilities or (ii) in kind compensation based on the negotiation between DCSCC and owners of assets.
7. Communal-owned assets, collective assets
02 DPs
Loss of, or damage to, assets
02 DPs
Village, ward, commune, district, provincial government unit
Either (i) Cash compensation to cover the cost of affected assets or (ii) in kind compensation based on the negotiation between DCSCC and commune authorities or with owner of the collective assets.
8.Graves/ Tombs
155 DPs
Have to move the graves or tombs
155 DPs
Affected households or group of HHs
155 DPs
- All costs of excavation, relocation and reburial will be reimbursed in cash to the affected family.
- Graves to be exhumed and relocated in culturally sensitive and appropriate ways.
9. Loss of Income/ Livelihood due to loss of productive land
2,126 DPs
Impacts due to permanent loss of 20% or more of their total productive land or where <20% land affected but the remaining land is rendered unviable.
2,126 DPs
Owners of land (i) with LURC;
(ii) in the process of acquiring LURC;
(iii) are eligible to acquire LURC; and
(iv) affected households with lease agreement over the affected land
2,126 DPs
Allowance for Living/production Stabilization: households who lose 20% or more of their agricultural lands affected by the project will be compensated with one time payment at cash equivalent to 30 kg of rice/person/month at local market price (about 300,000 VND), including: (a) : Affected households losing 20% to 70% of their agricultural land will be assisted for living stabilization for 6 months if the remaning land is vible for continued use, and for 12 months in case the remaning land is rendered unviable and entire land is acquired by the project; (b) Affected households with more than 70% of their agricultural land acquired will be assisted for living stabilization for 12 months if the remaining land is viable for continued use, and for 24 months in case the remaining land is rendered unviable and entire land is acquired by the project; (c) households affected by loss of <20% of land and the remaining
The amount will be given in tranches every 6 months to coincide with the cropping season while affected households are taking part in the income restoration program in order to restore their pre-project income/livelihood.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 65
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
land is rendered unviable for continued use, the DPs will be assisted with living stabilization support for 12 months; and if the remaining land is viable for continued use the DPs will be assisted with one time payment at cash equivalent to 30 kg of rice/person/month multiplied with percentage of productive land acquired to total land holding, for duration of 04 months.
Households affected by loss of agricultural land where the remaining land is rendered unviable for continued use (<300 M2) would be provided with a minimum size plot of 100 m2 at the resettlement site.
Assistance for agricultural land in the residential area, garden land, pond land adjacent to residential land but are not recognized as residential land: Additional assistance (equivalent to 50% of the cost of compensation for the adjacent residential plot) for garden land and pond land; and (at 40% of the cost of compensation for the adjacent residential plot) for agricultural land.
In case of land-for-land compensation, DP will be assisted with seedlings, agricultural-forestry extension programs, husbandry etc (Item 4 of Article 20 of Decree 69/2009).
Every DP affected by loss of productive land, irrespective of the degree of impact, will be provided with additional assistance equivalent to 3 times the compensation amount.
Support for vocational training and job creation: At least one member of households affected by loss of productive land will be entitled to vocational training in the province. The DPs participating in such training programs will be exempted from payment of tuition fees. Trainees will be paid a lump-sum allowance of VND 200,000/month to cover the lodging and boarding expenses during the training period. After finishing training courses, they will be given priorities to be recruited in
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 66
Type of Loss/ Impacts
Application Eligible Persons Entitlements Implementation Arrangements
local manufacturing industries.
10. Loss of Income/ Livelihood due to relocation of business
34 DPs
Marginal Impacts
9 DPs
Owner of the affected business.
9 DPs
For DPs losing income and/or business/productive assets as a result of land acquisition, the mechanism for compensating will be:
(i) Allowance for Business Loss: All affected businesses and production households whose income is affected will be compensated or supported for losses in business equivalent to 50% of their actual annual income i.e. equivalent to 6 months of average net income: (i) For licensed businesses the compensation will be based on their average yearly income declared with the taxation agency over the previous three years, and (ii) For unregistered affected businesses the compensation will be based on the income data collected at the the time of DMS but the compensation will not be less than 3.0 mil.VND/month.
(ii) Employees who are affected by acquisition of residential/commercial land acquisition, public land or land of enterprises: Allowance equivalent to the minimum salary as per the provincial regulations to affected employees during the transition period for a maximum of 6 months and will be assisted in finding alternative employment.
Impacts on shops or other types of services
25 DPs
Relocating shop owners regardless of tenure status.
25 DPs
If the business has to be relocated, the project will provide alternative site with locational advantage and physical attributes similar to the land lost with easy access to customers base, satisfactory to the DP, OR compensation in cash for the affected land at replacement cost, plus transportation allowance to remove movable attached assets.
DPs will be given priority for business relocation along highway, communal roads and along canals near the bridges or footbridges in order to maximize their benefit from business opportunities. At the time of compensation, allowances will be adjusted to account for inflation.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 67
11. Allowances /Assistance Targeted to Vulnerable Households
Loss of land and non-land assets
Affected vulnerable groups regardless of severity of impacts. The vulnerable groups were defined as in Terms of Terminology
Specific assistance to vulnerable groups would be as follows:
- For landless households, assistance through provision of land-for-land with secure tenure at no cost to landless households. The size of land will not be less than 40 m2 in urban area and 100m2 in rural area, or cash equivalent to the cost of minimum size of the plot at RS, if DPs prefer for self-relocation.
- Social Policy: (i) Relocated Households including social policy heroic mothers, ware veterans, wouded or dead soldiers families: 1.5-4 mil/HH: (ii) Poor Relocated Household or Poor Household whose 20% or more of their productive land affected or where <20% land affected but the remaining land is rendered unviable: 3-5 mil/HH (to be certified by local authority)
- Other vulnerable groups (female headed household, household with disable person, elderly without any source of support) will get the same support (1.5-4.0 mil. VND/household) given to poor households in accordance with the provincial policy.
- Entitled to take part in Income Restoration Program
- Allowance for households as per Government regulation (social policy households, heroic mothers, wounded, dead soldiers). If the household eligible to more than one additional support allowance for the vulnerable people, only one package with the highest value will be applied.
12. Other Allowance/Assistances
Loss of land and non-land assets
Affected vulnerable groups regardless of severity of impacts. The vulnerable groups were defined as in Terms of Terminology
Incentive Bonus: All DPs who vacate the affected land immediately after receiving compensation and allowances will be given an incentive allowance of 3-5 mil VND.
Repair Allowance: If house/structure is partially affected and the remaining structure is viable for continued use, the project will provide a repair allowance equivalent of 20% of compensation for the affected part of the structure to enable DPs to restore it to former or better conditions.
Every relocating DPs will be provided with a lump-sum one time amount of 3,500,000 VND to cover the cost of domestic
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 68
water, power and telephone connections at the new site.
Transport Allowance for all relocating households, independent business and commercial establishments: VND 3,000,000/ DP or equivalent to the actual cost of relocation expenses (labor, transport) if relocating within the Province/City and VND 5,000,000/DP or equivalent to the actual cost of relocation expenses (labor, transport) opting to transfer to another province.
13. Temporary Impacts
Temporary loss of land User of affected land - For the portion to be used temporarily during construction (no more than 2 years of acquiring land): (i) rental in cash which will be no less than the net income that would have been derived from the affected property during disruption; (ii) restoration of the land within 3 months after use; the PMU 85 will pay full replacement cost or ‘land for land” compensation if contractor fails to restore the affected land within 3 months after end of use (agreement between parties will be monitored by independent monitoring agency.
If the quality of land will be radically changed when return to DPs, requiring DPs to change in the types of land use, then DPs should be compensated for all envisaged cost of losses.
14. Any other impacts that may be identified during implementation
- - Entitlements to compensation and other assistance would be provided in accordance with the compensation policy.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 69
VI. RELOCATION ARRANGEMENT
Based on the results of IOL, described in Chapter 5, the number of households that
would need to be relocated and results of consultation on the preference of HH to
the modes of relocation (self-relocation or to plots at the relocation sites which will
be developed by the project), together with need of resettlement sites in the districts
is shown in table below.
A total of 771 HHs would need to be relocated. Out of the 364 households eligible for
relocation due to the loss of residential land (with and without structures) some are
likely to opt for self-relocation. This will be further reconfirmed during the
implementation phase and exact number of DPs willing to go for the project
sponsored resettlement sites and for self-relocation would be determined based on
the consultations. DPs would be requested to confirm their decision in writing.
Households opting for self-relocation will be entitled to compensation and relocation
assistance. For those opting for project sponsored RS, the minimum number of
households for a RS would be at least 25 to make it economically feasible for
provision of utilities and public services. Particularly, in Tam Ky City, there are only 19
households eligible for relocation. These households would be pooled with other
relocating households in the adjoining districts provided they are willing to move
there.
VI.1. The potential of the resettlement sites
Information on the potential resettlement sites in the communes was obtained
through a series of consultation and discussion with the local authorities, community
leaders and DPs. General description of potential resettlement sites is summarized
below:
Dien Ban district
Dien Ban district authorities advised that the Project Management Unit should plan
for group relocation and if HH prefer to the relocation site, the project should buy
plots from land developers rather than to construct the new sites.
1) There is one site in Dien Tho commune. The site is in Ward 2 with the area of
about 25,000 m2. This site is close to the commune link road, health care
station, kindergarten, and community cultural house, about 0.5 km to old
residential area. The transmission lines of 35Kv and 0.4 kv are available nearby
the site.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 70
2) There are two sites in Dien Tien commune of Dien Ban district (i) the first site
is with the area of about 6,000 m2 in Ward 5, the former owner was the local
government. This site is about 600 m far from the old residential area. The site
is also very close to the commune-link roads, health care station, kindergarten,
and community cultural house. The transmission line of 110 KVA, 35 KVA and
0.4 KVA are available nearby the site. The site is located on agricultural land
thus there is no household that have to relocated to new place. (ii) The other
site is in Ward Thai Cam of Dien Tien commune with the area of about from
10000 m2 to 15,000 m2. This site is close to the commune link road (11 m
wide with asphalt payment), health care station, kindergarten, and community
cultural house, about 1 and 0.5 km to old residential area. The transmission
lines of 110 kv and 0.4 kv are available near by the site.
Duy Xuyen district
3) There are two sites in Duy Son commune of Duy Xuyen district (i) the first site
is with the area of about 25,000 m2 in Ward Chiem Son, the former owner was
the local government. This site is about 100 m far from the old residential
area. The site is also very close to the commune-link roads, health care station,
kindergarten, and community cultural house. The transmission line of 35 KVA
and 0.4 KVA are available nearby the site. The site is located on agricultural
land thus there is no household that have to relocated to new place.. (ii) The
other site is in Ward Phu Nham Dong with the area of about 10,000 m2. This
site is close to the commune link road, health care station, kindergarten, and
community cultural house, about 100 m to old residential area. The
transmission lines of 35 kv and 0.4 kv are available nearby the site.
4) There is one site in Duy Trung commune of Duy Xuyen district. The site is with
the area of about 11,000 m2 in Ward Nam Thanh, the former owner was the
local government. This site is about 700 m far from the old residential area.
The site is also very close to the commune-link roads, health care station,
kindergarten, and community cultural house. The transmission line of 0.4 KVA
are available nearby the site.
Thang Binh district
5) There is one site in Binh Que commune of Thang Binh district. The site is with
the area of about 30,000 m2 in Ward Binh Hoi, the former owner was the local
government. This site is about 600 m far from the old residential area. The site
is also very close to the commune-link roads, health care station, kindergarten,
and community cultural house. The transmission line of 35 KVA and 0.4 KVA
are available nearby the site.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 71
6) There is one site in Binh Chanh commune. The site is in Ward My Tra of Binh
Chanh commune with the area of about 15,000 m2. This site is close to the
commune link road, health care station, kindergarten, and community cultural
house, about 1 and 1.5 km to old residential area. The transmission lines of
110 kv, and 0.4 kv are available nearby the site.
7) There are two sites in Binh Quy commune of Thang Binh district (i) the first
site is with the area of about 16,000 m2 in Ward Quy Thanh 1, the former
owner was the local government. This site is about 700 m far from the old
residential area. The site is also very close to the commune-link roads, health
care station, kindergarten, and community cultural house. The transmission
line of 35 KVA and 0.4 KVA are available nearby the site. (ii) The other site is in
Ward Quy Phuoc 1 with the area of about from 15,000 m2 to 20,000 m2. This
site is close to the commune link road, health care station, kindergarten, and
community cultural house, about 600 m to old residential area. The
transmission lines of 0.4 kv are available nearby the site.
Phu Ninh district
8) There are two sites in Tam Thanh commune of Phu Ninh district (i) the first
site is with the area of about 6,500 m2 in Ward 6, the former owner was the
local government. This site is about 150 m far from the old residential area.
The site is also very close to the commune-link roads, health care station,
kindergarten, and community cultural house. The transmission line of 0.4 KVA
are available near by the site. (ii) The other site is in Ward 7 with the area of
about 5,000 m2. This site is close to the commune link road, health care
station, kindergarten, and community cultural house, about 100 m to old
residential area. The transmission lines of 0.4 KVA are available nearby the
site.
9) There is one site in Tam Phuoc commune. The site is in Ward Phu My with the
area of about 10,500 m2. This site is close to the commune link road, health
care station, kindergarten, and community cultural house, about 0.5 km to old
residential area. The transmission lines of 35Kv and 0.4 kv are available nearby
the site.
10) There are three sites in Tam Thai commune of Phu Ninh district (i) the first site
is with the area of about 10,500 m2 in Ward Hoa Binh, the former owner was
the local government. This site is about 300 m far from the old residential
area. The site is also very close to the commune-link roads, health care station,
kindergarten, and community cultural house. The transmission line of 0.4 KVA
are available nearby the site. (ii) The second site is in Ward Truong My with the
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 72
area of about 10,500 m2. This site is close to the commune link road, health
care station, kindergarten, and community cultural house, about 300 m to old
residential area. The transmission lines of 0.4 KVA are available nearby the
site. (iii) the third site is in Ward Khanh Tho with the area of 11,500m2. This
site is about 200 m far from the old residential area. The site is also very close
to the commune-link roads, health care station, kindergarten, and community
cultural house. The transmission line of 0.4 KVA are available nearby the site.
11) There are two sites in Tam Dan commune of Phu Ninh district (i) the first site is
with the area of about 6,000 m2 in Ward Xuan Trung, the former owner was
the local government. This site is about 150 m far from the old residential
area. The site is also very close to the commune-link roads, health care station,
kindergarten, and community cultural house. The transmission line of 0.4 KVA
are available nearby the site. (ii) The other site is in Ward Trung Dinh with the
area of about 7,000 m2. This site is close to the commune link road, health
care station, kindergarten, and community cultural house, about 150 m to old
residential area. The transmission lines of 0.4 KVA are available nearby the
site.
12) There is one site in Tam Dai commune. The site is in Ward Dong Tay with the
area of about 4,000 m2. This site is close to the commune link road, health
care station, kindergarten, and community cultural house, about 0.5 km to old
residential area. The transmission lines of 35Kv and 0.4 kv are available nearby
the site.
Tam Ky City
No potential resettlement sites were identified in Tam Ky city.
Nui Thanh district
Nui Thanh district authorities advised that the Project Management Unit should plan
for group relocation and if HH prefer to the relocation site, the project should buy
plots from land developers rather than to construct the new sites.
13) There is one sites in Tam Xuan 1 commune. The site is with the area of about
25,000 m2 in Ward 5, the former owner was the local government. This site is
about 200 m far from the old residential area. The site is also very close to the
commune-link roads, health care station, kindergarten, and community
cultural house. The transmission line of 110 KVA and 0.4 KVA are available
nearby the site.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 73
14) There is one site in Tam My Dong commune. The site is in Ward 5 with the
area of about 20,000 m2. This site is close to the commune link road, health
care station, kindergarten, and community cultural house, about 0.5 km to old
residential area. The transmission lines of 110Kv are available nearby the site.
Que Son district
Que Son district authorities advised that the Project Management Unit should plan
for group relocation and if HH prefer to the relocation site, the project should buy
plots from land developers rather than to construct the new sites.
15) There is one sites in Que Xuan 2 commune. The site is with the area of about
10,000 m2 in Ward 5, the owner is the local government. This site is about 200
m far from the old residential area. The site is also very close to the commune-
link roads, health care station, kindergarten, and community cultural house.
The transmission line of 35 KVA and 0.4 KVA are available nearby the site.
16) There is one site in Phu Tho commune. The site is in Ward 1 with the area of
about 10,000 m2. This site is close to the commune link road, health care
station, kindergarten, and community cultural house, about 0.5 km to old
residential area. The transmission lines of 35Kv are available nearby the site.
PMU 85 will carry out extensive consultations with the district and communes
authorities to identify available potential resettlement sites and finalize the sites in
further consultations with the relocating DPs to ensure that the location of
resettlement sites are acceptable to them.
Land allocation in resettlement site: it is proposed that the land allocation in above
mentioned resettlement site is as following:
1. For DPs, who affected with residential land and have to be relocated
would be offered plots of varying sizes, the minimum being 100 m2 in
rural areas and 40m2 in urban areas.
2. Of the households affected by loss of residential land, 25 households
would be provided with separate space for business activities.
3. For DPs, who where remaining agricultural land is rendered unviable
are entitled to get land plot of minimum size 100m2.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 74
Based on the land requirement, land plots from the 24 resettlement sites will be
provided to DPs as described in Table V.1 below6.
The number of resettlement sites to be developed would depend on the final number
of DPs opt for the project sponsored resettlement sites. Further, if the holding
capacity of resettlement site in a district is lower than the demand, some of the DPs
would be given the option to relocate to the resettlement sites in the adjoining
districts with surplus land in the resettlement sites.
The land for the all the potential sites are owned by respective local authorities.
However, some of these areas may have been provided to local community members
on lease. If such leased areas are used for development of RS, appropriate
compensation and assistance will be provided to affected households in accordance
with the policy provisions in this RAP.
The area of potential sites is more than required to relocate DPs. During the
implementation phase and following consultations with the DPs entitled to
relocation, precise requirement for RS would be determined and preference for RS
development would be given to the areas without any encumbrances. Preference
would also be given to develop only non-agricultural land for RS.
6 It is noted that, the construction coefficient for resettlement site development is about 2.2 time. This includes
areas allocated for public facilities and utilities as well areas for establishing local shops/market.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 75
Table VI-1. The households have to relocate and potential of resettlement sites by district
District
Number of HHs who is entitled to
relocate Required resettlement area (m2)
Avaiability of Potential
Resettlement Area
Remarks
Total
HH
relocated
due to
loss of
Res. Land
Number of
HH Affected
by loss of
agricultural
land with
unviable
remaining
land
Total
Resettlement
Area
Resettlemnt
Land-plot
Area
Basic Service
Area
Number of
potential
resettlement
site
Area of
potential
resettlement
site (m2)
Dien Ban 166 64 102 53,1200 16,600 36,520 03 46,000
The land for the potential RS is owned by
local government. All the potential sites
have good road access and are close to
the existing public facilities and utilities.
Duy
Xuyen 82 26 56 26,240 8,200 18,040 03 46,000
The land for the potential RS is owned by
local government. All the potential sites
have good road access and are close to
the existing public facilities and utilities.
Que Son 70 11 59 22,400 7,000 15,400.0 02 20,000
The land for the potential RS is owned by
local government. All the potential sites
have good road access and are close to
the existing public facilities and utilities.
Thang
Binh 110 67 43 35,200 11,000 24,200 04 81,000
The land for the potential RS is owned by
local government. All the potential sites
have good road access and are close to
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 76
the existing public facilities and utilities.
Nui
Thanh 137 68 69 43,840 13,700 30,140 02 45,000
The land for the potential RS is owned by
local government. All the potential sites
have good road access and are close to
the existing public facilities and utilities.
Phu Ninh 187 121 66 59,840 18,700 41,140 10 71,500
The land for the potential RS is owned by
local government. All the potential sites
have good road access and are close to
the existing public facilities and utilities.
Tam Ky 19 7 12 6,080 1,900 4,180 0 0 -
Total 771 364 407 246,720 77,100 169,620 24 309,500
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 77
VI.2. Process of site development and resettlement policy
Fully affected residential plot with house (households have to be relocated): Plot no
longer viable for continued use and the entire property to be acquired. The DPs
would be entitled to relocation if in the urban area, the non-affected residential area
is less than 40 m2 and in the rural area, non-affected residential area is less than 100
m2. This will be finally determined by the DCSCC and concurred with by the affected
household during the DMS.
DPs who are fully affected on residential plot and house have an option on either:
(i) Cash compensation at replacement cost (free from taxes and transaction
costs) for the entire land plus with bonus for self-relocation, or
(ii) Plot at the resettlement site, which will be developed by the project.
Based on the differences in cost between the residential land and the new
sites, compensation options including:
(a) If the selling cost of plot(s) at the new site is more than the value of the
affected residential land, DPs receive new plot at no additional cost. If
the plot at the new site is equal the value of affected residential land,
DPs receive new plot at the new site without any balance.
(b) If the plot(s) at the new site is less than the value of affected residential
land, DPs will receive plot(s) and the difference in cash.
(c) The planning and detailed design for the relocation sites will be done by
consultant of PMU 85 and approved by the PC of Quang Nam Province.
(d) Detailed regulation on plot allocation will be developed by PMU 85 and
DCSCC through consultation with commune authorities and DPs then
need an approval of district PC.
(e) For landless households, assistance through provision of land-for-land
of similar attributes with secure tenure at no cost to landless
households. The size of land will not be less than 40 m2 or cash
equivalent, if DPs prefer for self-relocation.
Actual the number of plot on resettlement sites will depend on the preference by the
DPs.
Following the final decision of affected households with regard to their relocation
options, the key steps below presents the required activities, timeline, and groups
responsible in order to design, construct and relocate households to the new
resettlement sites.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 78
(a) The Project Management Unit 85 and the DCSCC to propose the sites to
the PPCs of Quang Nam for their approval (total area of the site,
number of plots, areas of plots etc.).
(b) The Project Management Unit 85 and the DCSCC to prepare the TOR for
the site planning and detailed design, select consultants for these
services, consultants to prepare for the site planning and detailed
design.
(c) The Project Management Unit 85 and the DCSCC to submit the site
planning and detailed design including the cost of the site construction
and EIA for the sites to DOCs, DONREs of Quang Nam province for its
review and then to the PPCs of Quang Nam for the approval on the land
recovery and detailed planning of the sites.
(d) The DCSCC to carry out for DMS, prepare the Compensation Plan for
each DP get plan reviewed and approved by the relevant authorities
and then pay compensation to DPs who are affected by land acquisition
for the sites. Bidding and selection of contractors for the site
construction (could be included of housing if HH prefer the project to
construct the house for them).
(e) Plot allocation to HH and issuance of LURC and ownership of house.
(f) During the preparation of detailed planning, the DCSCC will (i) consult
with relocating households to discuss final location of the relocation
site, size of plot, costs, payment conditions, relocation schedule, and
procedures for the awarding of plots to households; (ii) inform the
affected households that if the value of the plot is lower than the
replacement cost of the affected household’s lost residential land, the
price difference will be paid in cash to the affected household; (iii)
document agreements reached with the households and posted in the
office of the commune. The DCSCC will also take into consideration
suitable plots for households who have businesses and ensure that the
plot that will be allocated for them will have suitable commercial
potential.
With regard to timing of payment to DPs and relocation, disbursement
of compensation will be at least four months prior to displacement. This
will allow DPs to have sufficient time to rebuild their houses. Affected
households will not be displaced until the commune/ward allocates
land acceptable to DPs and until DPs received full compensation and
allowances due them.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 79
Following the site selection and approval by the DPs, the steps for site planning and
site development are summarized in Table VI-2 below.
Table VI-2: Steps for Site Planning, Development and Relocation Implementation
No. Steps Time/Estimated
No. of Days Group Responsible
1 Final survey and proposal for the
potential sites
December 2009
to October 2010 DCSCC
2 Approval for selected sites of
city/province PC February 2011
DCSCC to submit to the PCs
of Da Nang City
3 Prepare TOR and selection of consultants
for site planning and detailed design
February to
March 2011 PMU 85 and DCSCC
4
Prepare a draft detailed planning
according to Vietnam standards (physical
infrastructure, plot arrangement,
kindergarten, market etc)
April 2011 to June
2011
Consultants under the
supervision of PMU 85 and
DCSCC
5 Consultation with stakeholders on the
site planning, get feedback from them. June 2011
Consultants with the help
from PMU 85 and DCSCC
6
Finalize the planning including EIA,
Compensation Plan for the site, submit
to DOC, DONRE, DOF for their reviews
and then to the PC of Quang Nam
province for their Approval. Disclose the
approved planning at the affected
communes.
July-August 2011 PMU 85 and DCSCC
7
Detailed Design and Bidding Document
based on the approved detailed
planning.
September-
October 2011 Consultants of PMU 85
8
Bidding invitation, bidding evaluation
and selection of contractors for the site
construction. Approval of relevant
authorities on the results of bidding
evaluation and award the contract to the
successful bidder
October-
November 2011 DCSCC
9 Construction of the site December 2011
to March 2012 Contractor
10 Demarcate Plot March 2012 Contractor
11 Allocate Plot to HH based on the
regulation of plot allocation March-April 2012 DCSCC
12 Construction of Houses and Public social
services (done in parallel) April-July 2012
HH and
Contractors
13 Relocation of HHs May-August 2012 HH with the help of local
authorities
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 80
For affected households who opt to receive cash compensation for self-relocation will
be compensated in full for all their losses (land and non-land assets) and the
necessary relocation and transition allowances. The DCSCC and commune authorities
to help relocating households through the process of land purchasing and having
legal papers for the ownerships. DCSCC also help relocating families (if needed) to
deal with residential land developers in the localities in case DPs want to buy plots or
apartments at the sites which developed by site developers or by districts (not by the
project).
VI.3. Cost for the site development
According to the entitlement policy and the principles described in item VII.2 above,
the cost for the site development by PMU 85 will be partially repaid by the DPs from
their compensation package for residential land (DPs receive compensation for
residential land lost and buy the plot at the resettlement sites). However, to achieve
the objectives of the RP, the following item will not be included in the selling cost of
plot (will be subsidized by the project owner)
(i) Cost for topographic, geologic, hydrologic survey;
(ii) Cost for site planning, detailed design and EIA;
(iii) Cost for the access road (off site road); AND
(iv) Cost for social services such as health care station, kindergarten,
community cultural house etc.
VI.4. Issues of relocation should be done once RP is approved.
The following activities need to be done by DCSCC once the RP is approved.
(i) Finalize the list of relocating HH in each commune after the DMS
completion, based on the bench marks demarcate for the project site on the
ground.
(ii) Get reconfirmed from relocating HH on their options to the relocation (to
the relocation sites or to the sites in the commune which re
underdevelopment or will be developed by non-project owners or self-
relocation management).
(iii) Develop for the steps and mechanisms of site approval, site planning and
design, cost estimate, bidding and site construction and construction
supervision, plot allocation and granting of LURC to relocating HH.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 81
VII. INCOME RESTORATION AND REHABILITATION
Experience has it that, unless mitigated, involuntary resettlement resulting from
development projects often gives rise to severe economic, social, and environmental
problems: production systems are dismantled; people face impoverishment when
their affected productive assets or income sources are not replaced; people are
relocated to environments where their productive skills may be less applicable and
the competition for resources greater; community institutions and social networks
are weakened; kin groups are dispersed; and cultural identity, traditional authority,
and the potential for mutual help are diminished or lost. In addition, there are people
who on account of their position in society and/or their physical and economic
situation are less capable of re-establishing themselves than the others and,
therefore, face greater risks of impoverishment. Consequently, compensation at the
replacement cost itself is not enough, relocation assistance through different types of
allowances and economic restoration plan need to be developed in order to make
sure that the project affected person will not be worse off or otherwise improved
their livelihood and living standards at new places. The livelihood restoration and
improvement are required in the involuntary resettlement policy of WB. The GoV has
improved its policy on land acquisition, compensation and assistance to resettlement
from time to time, especially for the assistance policies in order to make sure that the
affected persons will not be worse off or otherwise improve their living conditions
and livelihood at the new place (e.g., Laws, Decrees of GoV such as Land law 2003,
Decree 197/2004, Decree 69/2009 etc.).
The DPs affected by loss of productive land, irrespective of the degree of impact
would be eligible for the variety of income rehabilitation programs and assistance
additional to the compensation. Additionally, households affected by loss of business
and employment , poor and other vulnerable households would also be entitled to
income rehabilitation assistance. The entitlement for the economic restoration and
livelihood improvement are described in detail in Chapter 3. The combination of
income rehabilitation measures focusing on the DPs affected by loss of productive
land, loss of businesses, and vulnerable households include:
A. For Loss of Residential Land:
a. Relocation Allowance;
b. House Rental Allowance;
c. Additional assistance to relocating DPs where the compensation amount
they receive falls short of the minimum size plot at the RS;
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 82
d. Providing cash equivalent to the cost of a developed minimum size plot to
the self-relocating DPs;
B. For Loss of Residential Land:
a. Allowance for Living/Production Stabilization (during the transition period);
b. Provision of a free minimum size plot of 100m2 to DPs who are affected by
loss of productive land and the remaning land is rendered unviable for
continued use;
c. Assistance to DPs for lost agricultural/pond/garden land adjacent to
residential land but not recognized as residential land;
d. Agriculture extension services to farmers affected by partial loss of
productive land and the remaining land is viable for continued use;
e. Every DPs affected by loss of productive land is provided with additional
cash assistance equivalent to three times the compensation amount
f. Support for vocational training to at least one member of affected
households. 30% of such positions would be reserved for women. Trainees
would be provided with subsistence allowance during the training period
C. Other Allowances/Assistance
a. Incentive Bonus
b. Repair Allowance for partially affected structures
c. A lump sum cash amount to cover cost of utility connections at new site to
all relocating DPs;
d. Transport allowance to all relocating DPs
Vulnerable DPs will get additional assistance as follows:
a. Provision of minimum size of plot at RS to landless DPs, or cash equivalent;
b. DPs covered under provincial social policy to receive cash assistance;
c. Other vulnerable groups not covered under the provincial social policy to
receive the same assistance as provided to social policy
The process of consultation with DP’s on different options to the economic
restoration/activities was described as in Table VIII-2 of Chapter VIII below. For the
economic restoration needs, the consultant of PMU5 has carried out for the
following:
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 83
(a) Effort of seeking agricultural land to compensate for agricultural lost land
Since no public agricultural land is available that can be offered to the DPs as
replacement agricultural land, the project authorities will make special efforts
to assist DPs who wish to purchase replacement private agricultural land on
willing-buyer willing-seller basis. The project will also provide logistical support
for such transactions and all legal and documentation costs would be covered
by the project if carried out within a period of six months from the date of
receipt of compensation by the DPs.
Further, the compensation amount plus additional cash support provided to
the DPs would ensure that they would be able to buy replacement productive
land in the areas within or adjoining the project even if there is some increase
in the land prices due to the increase demand.
(b) Employment Opportunities and Income Restoration Activities
Not withstanding the aforementioned, the project will plan and implement a
responsive and sustainable income restoration activity for eligible households
as needed. In the consultation from December 2009 to January 2010, various
institutions, including local NGOs in Quang Nam province were met with
regard to possible employment opportunities, trainings, loans availability in
the localities and income restoration program activities that are available or
can be made available for the affected people. Discussions were held with
regard to programs available and basic requirements in order for households
to be eligible for employment. Organizations providing small loans were also
explored. The description about consultation with stakeholders was detailed
in Chapter 8 above. For the specific purpose of consultation for the economic
restoration activities, the institutions were met with is as in Table VII-1 below.
Table VII-1: Consultation with institutions, local NGOs of the affected districts
Meeting Venue Time Consulted institutions
1. With Dien
Ban district,
Quang Nam
province
At offices of
consulted
institutions
From 28 to 31
December 2009 - District Department of Labor and invalid and Social Affairs.
- Center for vocational training and employment orientation.
- Center for agricultural extension programs.
- Farmer Association
- Women Union
- Social and policy Bank Branch
2. With Duy
Xuyen
At offices of
consulted
From 23 to 26
December 2009 - District Department of Labor and invalid and Social Affairs.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 84
district,
Quang Nam
province
institutions - Center for vocational training and employment orientation.
- Center for agricultural extension programs.
- Farmer Association
- Women Union
- Social and policy Bank Branch
3. Thang
Binh district,
Quang Nam
province
At offices of
consulted
institutions
From 21 to 23
December 2009 - District Department of Labor and invalid and Social Affairs.
- Center for vocational training and employment orientation.
- Center for agricultural extension programs.
- Farmer Association
- Women Union
- Social and policy Bank Branch
4. With Tam
Ky city,
Quang Nam
province
At offices of
consulted
institutions
From 15 to 18
December 2009 - District Department of Labor and invalid and Social Affairs.
- Center for vocational training and employment orientation.
- Center for agricultural extension programs.
- Farmer Association
- Women Union
- Social and policy Bank Branch
5. With Que
Son district,
Quang Nam
province
At offices of
consulted
institutions
From 21 to 23
December 2009 - District Department of Labor and invalid and Social Affairs.
- Center for vocational training and employment orientation.
- Center for agricultural extension programs.
- Farmer Association
- Women Union
- Social and policy Bank Branch
6. With Phu
Ninh district,
Quang Nam
province
At offices of
consulted
institutions
From 4 to 8
January 2010
- District Department of Labor and invalid and
Social Affairs.
- Center for vocational training and
employment orientation.
- Center for agricultural extension programs.
- Farmer Association
- Women Union
- Social and policy Bank Branch
7. With Nui
Thanh
district,
Quang Nam
province
At offices of
consulted
institutions
From 12 to 15
January 2010
- District Department of Labor and invalid and
Social Affairs.
- Center for vocational training and
employment orientation.
- Center for agricultural extension programs.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 85
- Farmer Association
- Women Union
- Social and policy Bank Branch
Through the consultation, the potential of programs proposed by the districts,
available in the project localities and resources of implementing agencies in the
project Districts, cities are summarized as Table VII-2 below:
Table VII-2: Potential programs, loans and training courses in Quang Nam province
could be considered for the economic restoration and livelihood improvement for
the project affected people
Province Key information and possibility of activities/programs
1. Dien Ban
district
- Vocational training center has 47 trainers but is with limited functions
and at the presence just mainly doing vocational training for the high
school pupils. This vocational training center could organize the courses
on IT, garment industry, mechanical, electrical etc. the courses are from
03 months or 6 months to two years or three years.
- Extension Center for Agriculture has 05 staff who are working at the
center office and 15 people who are working at communes. The staff of
this center is with the background on agriculture and husbandry. It is
implementing the programs in the district such as animal husbandry
(cow, pig etc.) and planting sugar, rice, fruit trees. These programs are
implementing with the co-operation of district women union and
farmer association.
- Farmer Association is implementing the programs for 1,905 HHs on
poverty reduction, loan assistance to the students from the poor
families, loans for farming and husbandry etc.
- Women Union is implementing the programs such as loans for the
poor female headed HH, microfinance for gender programs etc.
- Social and policy Bank Branch is implementing the programs with
loans for economic development, each poor HH could borrow not more
than VND 30,000,000 and with an interest of 0.65% per month. One
family could borrow not more than VND 20,000,000 for self-
employment and with an interest of 0.65% per month. This Bank also
supports loans for students from poor families, and for improving
sanitation facilities of families as well as for labor export and buying
houses.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 86
2. Duy Xuyen
district
- Vocational training center has 39 trainers. This vocational training
could organize the courses on IT, garment industry; mechanical,
electrical, accounting etc. the courses is from 03 or 6 months to two or
three years. The center has also carried out technical assistance on
mushroom making, husbandry and other TA on agricultural activities.
After training, the trainees would be introduced by the center to many
companies, enterprises for employment and with a monthly salary is
about VND 1,200,000 to 1,500,000.
- Extension Center for Agriculture has 04 staff; the staff of this center is
with the background on agriculture and husbandry. It is implementing
the programs in the district such as fresh vegetable planting, TA for
planting with new types of rice and livestock rising.
- Farmer Association has 04 persons with the university degrees and
implementing the programs for on poverty reduction, loan assistance to
husbandry and agricultural activities.
- Women Union has is implementing the programs such as loans for the
poor female headed HH from the social and policy Bank, microfinance,
employment for women etc.
- Social and policy Bank Branch is implementing 07 programs with loans
for economic development, for poor HH, for students in poor families,
for improving sanitation facilities etc. The poor families could borrow
not more than VND 30,000,000 and with an interest of 0.65% per
month.
3. Thang Binh
district
The same functions of the relevant institutions in Thang Binh district are
as below:
- Vocational training Center of Thang Binh district has 39 staff. Targets
on the training courses for rural households. Training includes animal
husbandry, agricultural extension, rubber tree planting; handicrafts
mushroom growing, sewing, electrical/mechanical trainings, driving
lessons. Courses offered vary from 3 months to 3 years.
- Agricultural Extension Center has 06 staff and including Engineers of
Agriculture and Veterinary Medicine. It is implementing some programs
for poverty reduction, new rice seedlings etc.,
- Farmer Association has 05 persons. It is implementing for the loan to
farmers (with low interest) for employments and assist for selling
products. Borrowing conditions are: Households have farm, fish ponds
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 87
and each household can borrow up to VND 5 million.
- Women Union is running for programs on loans to the farmers, loans
from the Social and Policy Bank etc.
- Loan from the Social and policy Banks: Targets to help the poor
families. Long-term repayment with low interest (0.17% per month in
three years). Maximum amount household can borrow is VND
30,000,000. The loan from the Social and policy Bank supports for the
poor families, students, improving for family sanitation facilities.
4. Que Son
district
- Vocational training center has 12 trainers; of which 12 persons
graduated from universities. This vocational training could organize the
courses on garment industry, mechanical, electrical, motorbike
reparation, construction and IT etc. the courses is from 03 months or 6
months to two years or three years.
- Extension Center for Agriculture has 12 staff; of which, 05 are working
at the center office and 07 staff are working in the communes. Staff of
this center is with the background on agriculture and husbandry. It is
implementing the programs in the district such as fish and shrimp
farming, salt farming, TA for planting with new types of rice and
livestock rising, animal husbandry.
- Farmer Association has 06 persons and implementing the agricultural
programs and assistance families to access loans for husbandry and
agricultural activities.
- Women Union has 06 persons and it is implementing the programs
such as loans for the poor female headed HH from the social and policy
Bank, microfinance, employment for women etc.
- Social and policy Bank Branch is implementing several programs with
loans for economic development, for poor HH, for pupils from the poor
families, for improving sanitation facilities etc. The poor families could
borrow not more than VND 30,000,000 and with an interest of 0.65%
per month.
5. Phu Ninh
district
- Vocational training center has 47 trainers. This vocational training
could organize for 13 courses yearly and on garment industry,
mechanical, electrical, motorbike reparation, TA on agriculture and
husbandry. The courses are from 03 months or 6 months to two years
or three years. People complete class 9 above is acceptable to the
training courses of this center.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 88
- Extension Center for Agriculture are with the background on
agriculture, forestry and husbandry. It is implementing the programs
such as fish farming, TA for planting with new types of rice and livestock
raising, animal husbandry. The HH participate to the programs will be
assisted with 60% for seedlings and materials need for the programs.
- Farmer Association is implementing the agricultural programs and
assist families to access loan for husbandry and agricultural activities.
The Farmer Association is in a cooperation with the vocational training
and carry out the training programs on garment industry, IT, electrical
technique etc.
- Women Union is implementing the programs such as loans for the
poor female headed HH from the social and policy Bank, microfinance,
employment for women, applying new technology on farming and fish
farming.
- Social and policy Bank Branch of Phu Ninh district is implementing
several programs with loans for economic development, for students,
for poor HH, for labor export and for improving sanitation facilities etc.
6.Nui Thanh
district
- Vocational training center has 22 staff with degree of economics, IT,
Finance and Administrative skills etc. This center trains on the areas of
electricity, mechanics, repairing motorcycles etc., It organizes with the
short term and medium term courses.
- Farmer Association has 06 staff. Currently, this Association is
implementing several programs such as planting fresh vegetables, fish
farming etc.
- Women Union has is cooperating with the district Social and Policy
Bank to run some programs for the poor families. The poor family could
borrow from VND 5 to 15 million.
- Agricultural Extension Center of Nui Thanh District has 05 staff, all of
them are with University Degrees. It is running the programs on
husbandry, aquaculture and agriculture.
- Social and policy Bank has 05 loan programs for the poor families, for
students from the poor families, for sanitation improvement, for labour
export, employment.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 89
7.Tam Ky City There are many Vocational training centers in Tam Ky City. These
centers train on the areas of electricity, mechanics, repairing
motorcycles, animal husbandry, agricultural extension, rubber tree
planting; handicrafts mushroom growing, sewing, electrical/mechanical
trainings, driving lessons etc., It organizes with the short term and
medium term courses.
- Farmer Association is implementing several programs such as planting
fresh vegetables, fish farming etc.
- Women Union has is cooperating with the district Social and Policy
Bank to run some programs for the poor families.
- Agricultural Extension Center of Nui Thanh District has 05 staff, all of
them are with University Degrees. It is running the programs on
husbandry, aquaculture and agriculture.
- Social and policy Bank has programs for the poor families, for students
from the poor families, for sanitation improvement, for labour export,
employment.
In Quang Nam province, many companies posting employment opportunities in front
of their offices, recruitment posters are also found in public places and commune
offices. This is due to the fact that many companies are in need of both skilled and
unskilled laborers. The employment is also could be accessible through DOLISA of
Quang Nam province.
(c) Design and Implementation of Income Restoration Programs
As a result of consultation with local authorities, various organizations and affected
households, the following farm-based and non-farm based activities/programs are
listed for consideration in the planning of a responsive income restoration program
that will cater to the needs and preparedness of each eligible households:
- Piloting of selected production and income generating opportunities that
are endorsed by the province and district. Vocational training and non-farm
based employment should be in a first priority.
- Intensive agricultural production for farmers who still have remaining
productive land.
- Priority employment for qualified persons of both genders during the
construction and operation of the Project.
- Skills training program for persons wishing to receive training on selected
fields. The training should be on (i) vocational courses; (ii) intensive
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 90
farming; (iii) animal husbandry; (iv) aquaculture; (v) managing small
business.
- For households who wish to venture into small businesses, the Project will
provide seminars on entrepreneurship (idea generation and visioning, basic
sales, marketing and finance management).
The aforementioned possible income restoration activities are generic in nature,
tentative and initial and, therefore, cannot be used as basis for detailed planning.
During the conduct of detailed measurement survey (DMS), the consultants will help
design and implement the income restoration program and will spearhead the
process of identifying the livelihood activities of each household by evaluating the
household’s specific needs against the household’s preferences, inclination and
preparedness, and by assessing the availability of external support needed by the
household to pursue its chosen livelihood activities. The consultants will investigate
and evaluate possible employment, credit facility and provider of training when
conducting needs and opportunities assessment for each participating eligible
household.
The singular objective of the income restoration program is to help the households
affected by loss of productive land to rebuild their sources of livelihood and thus
regain, if not improve, their pre-project standards of living. In addition to the
principles governing the project resettlement policy, the income restoration program
will abide by the following precepts: be responsive to the specific needs and attuned
to the level of preparedness of the household; be sustainable and geared towards
self-determination and empowerment rather than dependence; foster justice and
fairness, camaraderie, social consciousness; and, be gender sensitive and
environmentally sound.
Moreover, depending on its needs, preferences, and available human and material
resources within the household and those that the project could provide, each
participating eligible household may engage in one main source of livelihood to be
augmented by secondary livelihood activities, especially when the main livelihood
does not yield immediate returns, such as livestock and crop production. Secondary
livelihood activities will help provide for the daily sustenance of the household in the
interim. A key ingredient of the program is to ensure that each DP household has the
means for daily sustenance. Planning and implementation of selected income
restoration plans will be based on extensive and well-documented consultation with
the affect people.
Information pamphlets for each program will be prepared by PMU 85 and will be
made available to households and in commune offices. Information will include but
not limited to the following:
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 91
- Production (farm and non-farm based)/Income-generating activities: type
of program, investment costs and net returns, time frame for income
stream to develop, sustainability, and risks.
- Project-related opportunities: type of workers needed, duration of
contract, minimum salary and benefits, schedule, basic
requirements/qualifications of workers, contact persons.
- Employment opportunities: name and address of organization, nature of
organization, number of required workers, basic requirements/
qualifications of workers; trainings to be provided; minimum salary and
benefits, contact persons,
- Skills Trainings: type of trainings, objectives, duration, cost to trainee,
qualification of trainee, type of certification to be issued upon completion
of training; links to jobs.
- Access to credit: type of loans; requirements to avail loan, term of
payments and interest rates, risks involved.
The consultants of PMU 85 will be composed of various experts to design, implement
and administer various programs. The process of planning appropriate income
restoration activities of eligible households begins about the same time as that of the
DMS. Data gathering and in-depth investigation of needs and opportunities will be
done in parallel with the DMS. The various income restoration activities planned and
agreed with the participating households will be included in the updated RP including
the analysis of risk, marketing for the planed programs etc. The implementation of
the program will be monitored regularly to ensure that targets are achieved and will
be included in the resettlement progress report. An evaluation of the income
restoration program will be conducted to sum up what has been achieved, to identify
additional interventions, as needed; and to draw out lessons and insights. The
affected households participating to the programs, activities will be their allowance
as described above.
(d) The process for economic restoration during RP implementation
The following activities and steps to help the affected households will need to be
done by DCSCC.
- Finalize the list of the DPs affected by loss of productive land in each
commune, consult and finalize the choices of DPs to the programs or for
self-employment.
- Based on land acquisition schedule (linked to the construction works
required) design for different programs (objectives, list of trainees, agenda
of training, marketing, risk analysis, cot of the program or activity,
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 92
monitoring and evaluation). It is better to (i) implement the economic
restoration before acquire land for the project; (ii) pilot with some
selective programs first, then draw the lesion learned for the subsequent
programs; (iii) each program should be carefully design with the
participation of stakeholders and with details analysis on the potential
risks, marketing to make sure that they will be sustainable; and (iv) good
mechanism of monitoring and evaluation for the programs to draw the
lessons learned for the subsequent programs.
- Determine requirement of company; assess qualification of affected
households; assess trainings and certifications required in order for
households meet the requirements for employment;
- Assess manpower, qualified individuals to teach various programs.
Determine facilities and equipment available. Certification issued as an
additional credential Cost of training for trainers and trainees.
- Suitability of trainings to individuals; link for employment after training.
- Information dissemination needed to properly inform affected households
available trainings7, duration, fees, and importance of certificates issued
by training institutions.
- To determine: clear conditions and requirements in order for households
to avail loans; terms and interest rate vis-à-vis capacity of households to
re-pay; role of PMU 85 and DCSCC to facilitate/ assist households to avail
loans; fees to be incurred during loan processing; sustainability and risks
assessment to ensure that households do not end up in debt.
Information dissemination needed to properly inform affected households the
pros and cons of each program.
- Develop a mechanism and closely monitor the use compensation money
by DPs in order to help them avoid the risks and maximize the
effectiveness of investment from the compensation package. Specially
care to the vulnerable groups, DPs plan to manage employment
themselves through monitoring and evaluation system.
Implementation of livelihood restoration programs, including outcome of the
training, extension services etc. will be closely monitored by the project authorities as
well as by the external monitoring agency.
7 It is noted that, one member of each household who is entitled to income rehabilitation assistance would be
included for any training programs and that at least 30% of the candidates thus selected will be women.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 93
A post-implementation evaluation by the external monitoring agency would be
carried out six to 12 months after completion of resettlement implementation to
determine whether the objectives of the income rehabilitation and livelihood
restoration have been achieved. The project authorities will provide additional
resources for continued assistance to the DPs until they have restored their livelihood
at least to the pre-project levels.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 94
VIII. CONSULTATION, PARTICIPATION AND
INFORMATION DISCLOSURE, DISSEMINATION
VIII.1. Purposes and contents of consultation and information dissemination.
The general objectives of Consultation with participation of the affected people and
stakeholders are:
- To fully disseminate key information about the project to the affected
persons, local authorities and other stakeholders such as local NGOs (e.g.,
project background, purposes, studied alternatives, environmental and
resettlement issues etc.).
- To obtain information about the needs and proposed priorities of the
affected persons, local communities, local authorities, local NGOs as well
as their reactions/feedback to proposed studied alternatives of the routes,
resettlement policies and other relevant activities.
- To obtain the cooperation and participation of the affected persons,
relevant institutions through all phases of resettlement planning and
implementation.
- To ensure transparency in all activities related to land acquisition,
compensation, resettlement and rehabilitation measures.
Information dissemination, consultation and participation were and will continue to
be carried out through entire period of RP implementation and through different
channels and instruments, such as:
- Meetings with provincial, district, commune and village leaders and
representatives of their key departments to study about the compensation
and relocation policies of the city and province; the principles of
determining the compensation cost, replacement costs in localities and
potential of land for replacement, possibilities of economic restoration
programs, employment in the locality, among others.
- Meetings with local organization such as women’s unions, farmer’s
association, father front, veteran’s association etc., to draw their concerns
and suggestion to RP.
- Meetings with all affected communes and affected households, including
conduct of group meetings with women, the elderly, and other vulnerable
groups.
- Distribute resettlement pamphlet to leaders of communes and affected
people.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 95
- Conduct of socio-economic and affected property surveys with the latter
asking households about their choices of relocation sites, options for
compensation, i.e. “land for land or cash for land”; proposals for economic
restoration activities as well as other concerns of the different affected
groups.
VIII.2. Consultation during RP preparation.
From December 2008 to March 2009 and from December 2009 to January 2010,
many meetings with related institutions including the Provincial Departments, the
District People’s Committees, Leaders of affected communes, DCSCC, Farmer
Association, Vocational Training Centers, Agricultural Extension Centers and Banks or
Loan Management Institutions, Industrial Zone Management Boards were carried
out. The key objectives, principles of compensation and resettlements as well as all
additional assistance were brought to discuss in those meetings. The consultation for
the RP preparation consists of two rounds:
a. The first round is for an Interim RP
In December 2008, the PMU85 with the assistance of resettlement team held one
meeting with each affected district (07 meetings with 07 affected districts of Quang
Nam province) and communes. These meetings introduced to local authorities and
local NGOs about:
(i). General information on the project
(ii). List of affected districts, communes and scale of land acquisition for the
project.
(iii). Objectives and Principles of RP according to the requirements of GOV and
including WB’s policy on involuntary resettlement.
(iv). Schedules of socio-economic survey and IOL
(v). Livelihood restoration through RP
(vi). Compensation and relocation modes (options to cash or in kind
compensation)
(vii). Gender issues in RP; and
(viii). Mechanisms of participation, complaint, monitoring and evaluation
through all phases of RP preparation and implementation. The
compensation and resettlement pamphlet for the first round of
consultation was prepared under the agreement of PMU85 and will be
disseminated to all participants in meetings.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 96
The resettlement consultant proposed to discuss following issues:
(i). The area of remaining residential land which is needed to relocate
(consultant proposed the area of 40 m2 for the urban area and 100 m2
for the rural area).
(ii). Possibility of arranging “land for land” compensation in the district,
commune, especially agricultural land.
(iii). Potential risks if insufficient productive land for land compensation.
(iv). Preference of local people and local authorities on the modes of
resettlement (to the relocation sites or self-relocation).
(v). Compensation cost.
(vi). Potential of employment and economic restoration programs in the
localities.
(vii). Mechanisms of payment, complaint.
(viii). Gender and vulnerable group issues.
The meetings were held with seven districts are described as in table below.
Table VIII-1: Meetings in affected districts
No Meeting Time Venue Participants
1 Dien Ban district March 2009 Dien Ban DC office
03 Leaders of District PC
2 Duy Xuyen District March 2009 Duy Xuyen DC
office 02 Representatives of commune
3 Thang Binh District March 2009 Thang Binh DC
office 03 Representatives of commune
4 Que Son district March 2009 Que Son DC
office 03 Representatives of the district.
5 Tam Ky City March 2009 Tam Ky DC
office 03 Representatives of the district.
6 Phu Ninh District March 2009 Phu Ninh DC
office
03 Representatives of
the district.
7 Nui Thanh district March 2009 Nui Thanh DC
office
03 Representatives of
the district.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 97
Responses from meetings were collected and analyzed, including:
The area of remaining residential land that is needed to relocate is 40 m2
for the urban area and 100 m2 for the rural area. Besides, the shape of the
remaining residential land is also considered. If the area is more than 40m2
in urban area and 100m2 in rural area, but the shape is not enough to build
a house, relocation would be applied. For the productive land, many
participants requested that if the remaining area is <300 m2 it would not
be economically viable, the project has to acquire for a whole plot.
In term of possibility of “land for land” compensation model in the districts,
communes, especially agricultural land: All communes and districts
confirmed that there is no public agricultural land to compensate for
agricultural land. However, most of interviewees said that It would not be
difficult to buy land from the other households in the affected areas
provided that the price of land compensation is sufficient compared to high
price of land in the local market. Preference of local people and local
authorities on the modes of resettlement (to the relocation sites or self-
relocation): Dien Quang commune, Dien Ban District and Tam Ky city
commented that no land is available for building the resettlement site, but
the project could buy plots, apartments from developers of residential
areas in the district. However, the district also confirmed that the
compensation price of Quang Nam is lower than the price of plot at the
residential areas. Consequently, people would not afford to buy the plot or
apartment selling by land developers. The details of preference of local
people and local authorities on the modes of resettlement are shown in
chapter VI.
Concerns on compensation cost: All districts said that the compensation
costs need to be based on prices at the market price, especially the
agricultural land. Duy Xuyen district commented that the compensation
price should be surveyed and evaluated by independent evaluators. Thang
Binh district suggested that it is experienced from other projects in this
district that about 70% of HHs accepted the compensation prices enacted
by the Province. However, all compensation will be at replacement cost.
Potential of employment and economic restoration programs in the local
areas: Participants in the meetings requested for the assistance on loans
for DPs to develop their households economic, the vocational training and
employment priorities in project construction sites. Quang Nam province
have programs of training for people who are impacted by land acquisition.
Skills requirement including garment industry, mechanics, electrician etc. It
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 98
was advised by local authorities that, the project should not pay cash for
HHs to generate employment themselves; it should be organized through
the programs or activities to make sure that allowance for economic
restoration is used in a right purpose and with an sustainable results.
Mechanisms of payment and complaint: All the participants to the
meetings suggested that the District Compensation, Site Clearance and
Resettlement Committee should make compensation payment though
Communal Leader and/or at the communal office. Besides, both husband
and wife in a household are required to be present at the payment time.
Gender and vulnerable group issues: Most of participants gave suggestions
that the project should pay a special attention in economic restoration to
the vulnerable groups (elderly, disable persons, poor families and female-
headed HH etc.).
Capacity and experiences of District Compensation, Site Clearance and
Resettlement Committee with national and international financed projects:
All districts confirmed that they have their district compensation, site
clearance and resettlement committees, which could implement for the RP
of the project (they are experienced with DMS, compensation calculation,
payment arrangement etc.). However, they requested that these
Committees need capacity building, especially for implementing the RP
according to WB’s requirements and programs of economic restoration.
The districts also need the working facilities for their compensation
committees to effectively implement for the project RP.
b. Second round of consultation is a draft RP and final RP
The purpose of this round consultation is to:
- Disseminate to stakeholders (DPs, local authorities, local NGOs, Local vocational
Training Centers, Agricultural Extension Centers, Residential Site Developers, Building
Designers, Contractors etc), especially at the commune level the further detailed
information related to the project and planning for compensation and resettlement
(draft entitlement policy, effort in seeking replacement land for compensation,
potential of resettlement sites in each commune, DPs’ options to the economic
restoration programs and local capacity and experience in implementing the
livelihood restoration, possibility of employment in the industrial zones and to the
relocation modes etc).
- Get the feedbacks from stakeholders for preparing a draft and final RP.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 99
From September to early November 2009, the second round of consultation was
carried out. In this period, stakeholders, tools and the contents of consultation are as
follows:
(i) Prepared and disseminated to all affected HHs and affected communes a
pamphlet of compensation and resettlement for the second round of
consultation and participation. This pamphlet included (a) project
background, (b) summary on the key contents related to RP (objectives and
principles, legal framework, entitlement policy, land acquisition impact,
economic restoration programs, resettlement arrangements,
implementation arrangement, mechanisms of DMS, approvals on land
recovery and compensation plan for each HH, payment, complaint,
supervision and monitoring, implementation schedule). This pamphlet was
prepared by resettlement consultant team, which had sent to WB to
review and agreed by PMU85.
(ii) Held meetings (24 meetings in 24 communes) with all affected households
and representative of affected communes. Meetings and interviews were
also held with senior staffs of relevant departments (DONRE, DOF, DOC,
DOLISA etc) of Quang Nam province and local NGOs, affected districts to
consult about the status of land use map (cadastral map), process of DMS,
steps of information disclosure and approvals for land recovery, potential
of resettlement sites or residential areas in each commune, compensation
plans, potential of resettlement sites, feasible economic restoration
programs/activities, possibility of employment in the project localities,
vulnerable groups and gender issues as well as mechanisms grievance and
payment compensation to DPs. The separate discussion by different groups
were held after a general session such as groups of affected women, group
of poor families etc; feedbacks from stakeholders on the entitlement
policy, economic restoration programs for the DPs affected by loss of
productive land, assistance to relocation, to the vulnerable groups, needs
for building capacity in implementing RP and implementation
arrangements (responsibilities, schedules etc.,) were obtained.
Main feedback from the meetings of the second round consultation is summarized as
follows:
Most of participants supported for a draft of compensation and
resettlement policy developed for the project.
Leaders of communes confirmed that there are no ethnic minorities in the
project area. About the potential of the sites for relocating people,
participants said that there is no sites are planned in the commune. Seven
households said that they have residential land outside of the project area
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 100
and confirmed that they would not have any difficulty in self-relocation.
People also suggested that local authorities should consider letting the
households who are fully affected on residential land to convert some areas
of their other land to residential land in order to reduce the need for the
resettlement site development in the locality. Participants request that if
the relocation site would be constructed for the relocating households, it
must be developed with good quality of physical infrastructure and social
services.
Among 1,436 affected people were interviewed, 80% preferred livelihood
restoration programme, participation in vocational training, invest to the
education for their children, participate to the agricultural extension
programs etc. About 30% of participants at the meetings requested for the
help on seeking the jobs after the training and help them accessing to
loans. Most of participants appreciated on the policy and request the
project to pay attention to the vulnerable groups. About receiving
compensation payment, participants proposed that, both husband and wife
should be present to receive compensation and sign for the receipt of
payment.
Table VIII-2: Preferences, choices of DPs to the modes of economic restoration
Districts
Number of
HH
affected
by loss of
productive
land
Total
affected
HHs
surveyed
with
census
and IOL
Number of HH
prefer cash for
self-
employment
Percentage of
HH prefer cash
for self-
employment
Number of
HH prefer to
economic
restoration
programs
Percentage of
HH prefer to
economic
restoration
programs
Dien Ban 613 295 231 78.3 64 21.7
Duy Xuyen 443 164 123 75.0 41 25.0
Que Son 446 84 74 88.1 10 11.9
Thang Binh 462 207 157 75.8 50 24.2
Nui Thanh 831 346 271 78.3 75 21.7
Phu Ninh 769 336 282 83.9 54 16.1
Tam Ky 106 4 4 100.0 0 0.0
Total 3,670 1,436 1,142 79.5 294 20.5
A summary of draft RAP will be prepared by PMU 85 and disseminated to authorities
of affected districts and affected communes. A full draft RAP will be sent to DONRE
and DOF of Quang Nam province for their review and concurrence.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 101
hé
i c¶
n g
®-
ê
n g
t h
uû
Community meetings: After decision on land, acquisition is obtained and before
starting detailed design, community meetings will be held to announce
supplementary information to DPs and create a chance to discuss publicly about
policies and resettlement procedures in every affected site. All DPs will be invited to
participate in the meeting and to give ideas.
Related information and documents will be delivered to DPs in this meeting.
Methods of meeting include:
a) Verbal explanations, images, drawings and documents of the Project.
b) Adequate opportunities will be provided for DPs to present their wishes, to
raise their questions and comments and to get immediate feedbacks. DPs are
encouraged to contribute their ideas for rehabilitation and relocation options.
c) The DCSCC and District/Ward’s authorities will prepare a complete list of all
DPs present at the meetings.
d) The DCSCC will make a complete record of all questions, comments, opinions
and decisions that arise during the information/consultation meetings, and
present a report of all the meetings to the Quang Nam Province PC .
Content of the meetings will include: Project component information, project
impacts: compensation entitlements and rehabilitation of DPs; grievance mechanism
and procedures; participation & consultation entitlement; resettlement activities;
implementation progress etc. their agreement with the assessment. Any complaints
the DPs have about the contents of the form will be recorded and will be solved at
this time.
e) Consultation regarding DPs preferred option for rehabilitation assistance. This
applies to DPs affected by loss of productive land and vulnerable DPs.
f) in order to ensure transparency, a copy of the DMS surveys will be given
to the affected DP for his/her record. Moreover, a summary form for
each affected household will be prepared and a copy will be given to DPs
summarizing lost assets, applicable compensation rates and entitlements.
Consultation and participation with stakeholders will be done through entire period
of RAP implementation in order to make sure that stakeholders will participate and
give their feedbacks to all aspects of RAP and to make sure that RAP will be
implemented in a transparent way.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 102
VIII.3. Consultation during RAP Implementation
At the beginning of Compensation and Resettlement implementation, meetings will
be held with and information dissemination to stakeholders to inform them about
the policy, implementation process (e.g., mechanisms of DMS, land recovery,
participation and consultation procedures, publicize for the approvals, complaint
redress mechanism, monitoring and evaluation etc). These are required as the
policies of the World Bank and Decrees 197/2004; 84/2007 and 69/2009 of GoV. This
task will be done by PMU 85, DCSCC and commune authorities.
XIII.4. Disclosure
The DCSCC will disclose (i) Approved RAP at the offices of DONRE and DOF of Quang
Nam province and at the offices of affected district; (ii) A pamphlet of Compensation
and resettlement will be prepared by PMU 85 and disseminated to DPs and affected
commune authorities. The pamphlet will include at least the following information:
(a) project background, (b) summary on the key contents related to RAP (objectives
and principles, entitlement policy, land acquisition impact, economic restoration
programs, resettlement arrangements, implementation arrangement, mechanisms of
DMS, approvals on land recovery and compensation plan for each HH, payment,
grievance redress mechanism, supervision and monitoring, implementation
schedule).
Besides that, A summary of draft RAP will be prepared by PMU 85 and disseminated
to authorities of affected districts and affected communes. A full draft RAP will be
sent to DONRE and DOF of Quang Nam province for their review and concurrence.
Full approved RAP will be also disclosed at the Info shop of the World Bank
headquarters and at the VIDIC of the World Bank office in Viet Nam. Translation of
Entitlement Matrix will be disclosure at public places in each commune.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 103
IX. IMPLEMENTATION ARRANGEMENTS
IX.1. Responsibility
The following key institutions (the project owner, local authorities, local NGOs etc.)
will be responsible and accountable for RP implementation.
(1) The Vietnam Expressway Corporation (VEC) and Project Management Unit 85
(PMU 85)
The VEC under the Ministry of Transport (MOT), is the Executing Agency of the
Project. It is responsible for realization of the Da Nang - Quang Ngai Expressway
Project, including resettlement policy framework.
PMU85, on behalf of the VEC, has direct responsibility and day-to-day management
oversight for implementing all aspects pertained to the Expressway’s works, including
planning, programming, budgeting, design, implementation, monitoring, evaluation,
ensuring overall project’s coordination and supervision of resettlement activities and
coordination/liaison with the World Bank. It will have the following key
responsibilities:
- Updating DMS information in collaboration with the People’s Committees
at various levels and the Compensation, Assistance and Resettlement
Boards of the provinces and districts and preparation of Compensation
Plans for each commune or section. Where the number of DPs exceed by
more than 10% compared to that identified at the time of the draft RAP,
the compensation plan would be submitted to the WB for information;
- Secure the budget for implementing the RAP, ensuring that funds for
resettlement (i.e., compensation and all other entitlements) are available
in a timely manner and in sufficient amounts;
- Assist local authorities, District Compensation Committees and GRCs in
resolving grievances and complaints of the affected households.
- Contract a professional appraiser to conduct Replacement Cost Study
(RCS) to establish prevalent market prices for different types/categories of
affected assets and if the rates thus established are found to be higher
than those established by the provincial authorities, submit the findings of
the RCS to the province for upward revision of the rates to ensure that all
compensation is paid at replacement cost.
- Provide overall guidance and coordinate closely with the concerned
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 104
departments and local authorities on social- and resettlement-related
activities for the project.
- Provide standardize DMS and IOL forms and guidance in setting up data
management system at each province and district. Coordinate with the
district and commune authorities to regularly update information on the
status of resettlement implementation.
- Provide orientation, as needed, to the People’s Committees of the
province, districts, and communes, the DCSCCSC and related groups
regarding the Project and its Resettlement Policy, and on the specific tasks
of these groups in connection with the preparation, updating, and
implementation of the RP;
- Coordinate with the Provincial People’s Committee of Quang Nam to
reinforce for the DCSCC at the district level.
- Together with the DCSCCSC, spearhead field activities in connection with
the preparation, updating, and implementation of the RP, such as
dissemination of project information and consultation with affected
households and other project stakeholders;
- Coordinate with the Provincial/District Land Administration Offices for the
expeditious allocation of replacement land to eligible affected households;
- Supervise and monitor the preparation, updating, and implementation of
the RP.
- VEC will ensure that the contractors, under their contract specifications,
are required to take extreme care to avoid damaging property and
businesses during their construction activities. Where damages do occur,
the contractor will be required to pay compensation immediately to
affected families, groups, communities, or government agencies following
the compensation policy specified in the RAP. In addition, damaged
property will be restored immediately to its former condition.
- Contract an experienced External Monitoring Agency to conduct
independent monitoring of resettlement implementation and for post-
implementation evaluation.
- Prepare quarterly progress reports on RP implementation and submit to
WB and relevant authorities. This includes resettlement audit (payment
and allowances to DPs, cost of development of relocation sites, cost of
income restoration programs, external monitoring, administrative costs,
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 105
and use of contingencies).
- At the completion of resettlement implementation PMU would be
responsible for preparation of Resettlement Completion Report for
submission to the Bank.
(2) Provincial People’s Committee and its relevant Departments
The responsibilities of Provincial People’s Committee of Quang Nam and its lower
administrative levels are guidance as in the Decree 197/2004 and Decrees 84/ 2007
and 69/2009 related to implementing compensation and resettlement.
The Provincial People’s Committee (PPC) of Quang Nam will be overall responsible for
resettlement activities within its administrative jurisdiction. The main responsibilities
of the PPC include:
- Prior to Appraisal, reinforce the District Compensation and Site Clearance
Committees (DCSCC);
- Establish GRCs at the PC, district and commune levels to ensure
participation of CBOs, NGOs, and other civil society organizations and
representatives of the DPs;
- Review and approve findings of the RCS and revise unit costs, where
necessary, for private and public assets adversely affected by the Project
to reflect replacement cost;
- Approve on land recovery for the project and compensation plans for each
HH.
- Provide guidance in the updating and implementation of the RP.
- Provide guidance for the outstanding issues in the phase of RP
implementation.
- Department of Environment and Natural Resources to review dossier
applying for land recovery and submit to the PPC for its approval
- Departments of construction, finance and DONRE are responsible for
review the compensation and resettlement plans for each household and
then submit to the PPC of Quang Nam for its approval.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 106
(3) District Compensation and Site Clearance Committees (DCSCC)
The District Compensation and Site Clearance Committees (DCSCC), which is headed
by the Leader of DPCs, will include the heads of the Finance Department; the Natural
Resources and Environment Department; Transport Department; Agriculture
Department; Chair of affected communes and PMU 85, in addition to the
representatives of the provincial Farmers’ Association, Women’s Union; and affected
households in that province. The responsibilities of DPC are clearly described in the
Decrees 197/2004 and 84/2008. The main responsibilities of the DCSCC are the
following:
- Coordinate, supervise and manage resettlement activities which will be
done by Commune People’s Committees.
- Updating of the IOL through the conduct of the DMS;
- Coordinate with PMU 85 to prepare the Updated RP for endorsement to
the PPC;
- Implementation of the RAP;
- Organize, plan and carry out resettlement activities in the district on behalf
of the DPC and under the guidance of the PPC and request of PMU 85;
- Assist the DCSCC in the DMS, consultation and disclosure activities, design
and implementation of income restoration program, coordination with
various stakeholders,;
- Assist in the identification and allocation of land for eligible affected
households;
- Assist DPs by providing logictic support and documentation of purchase of
private agricultural land, where necessary;
- Along with the CPC, assist DCSCC in the timely delivery of compensation
payment and other entitlements to affected households; and
- Assist in the resolution of grievances;
- Prepare resettlement audit report on a quarterly basis.
- The DCSCC need to form at least for the following teams:
- Mapping and DMS team
- Compensation calculation team Relocation arrangement team
- Data base management team (for land recovery, DMS, payment,
relocation arrangement, complaint etc.,).
- Livelihood restoration and community liaison team, including for the
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 107
settling of complaints
Additionally, DCSCC will work closely with the Detailed Design consultant to ensure
that all the data collected during DMS and for socio-economic saurveys are as
required for efficient resettlement planning and implementation, and for livelihood
restoration programs.
(4) Commune People’s Committee (CPC)
The CPC will assist the DCSCC in their resettlement tasks. Specifically, the CPC will be
responsible for the following:
- Assign Commune officials to assist the DCSCC in the updating cadastral
map and the RP and implementation of resettlement activities;
- Identify replacement land for affected households;
- Sign the DMS/Agreement Compensation Forms along with the affected
households;
- Corporate with PMU 85 and DCSCC in organizing consultation and
participation of DPs
- Assist in the resolution of grievances; and,
- Actively participate in all resettlement activities and concerns.
IX.2. Implementation arrangements
(1). Reinforcement of District Compensation and Site Clearance Committees
(DCSCC) and commune working groups
The DCSCC in all affected districts were established to implement for all
compensation and resettlement works of all projects in each district. Therefore, to
smoothly implement for this project, all DCSCC need for (i) reinforcement of staff; (ii)
capacity building (especially the capacity building on the project policy, the
implementation of livelihood restoration and assistance to the vulnerable groups as
well as data base management and internal monitoring; and (iii) adequate facilitated
with working facility. The PC of Quang Nam Province and PMU 85 under MOT will do
this task. Most of DCSCC in Viet Nam are mainly experienced with compensation of
the national policy, but they lack or have very little experience in implementing the
social safeguards as required by the international standard. The areas which most of
Project Management Units and DCSCC are weak are internal monitoring and
livelihood restoration. To effectively plan and implement livelihood restoration
activities and monitor the progress of RP implementation, recruitment of adequate
and qualified staff for PMU 85 and DCSCC is required. To implement RP smoothly, in
each commune, an working team will be established (this team will be composed of
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 108
land management official, deputy Chairman of Commune, representative of women,
farther front, villages etc) to cooperate with DCSCC in RP implementation.
(2) Operation manual and Capacity building
To implement RAP smoothly, the manual on the RAP operation would be prepared
by the Quang Nam Province and by the safeguard consultant of PMU 85 with support
from key Departments including district and commune authorities. The manual will
clearly state the principles, objectives of RP and steps, methodologies used for each
specific task, forms for DMS, Compensation Plan, minutes of settling the complaint
and process/ Step of RAP implementation in general and steps for each specific task
(such as information dissemination, dossiers for approvals of land recovery,
compensation plan, compensation payment, plot allocation, settlement of complain
etc.)
In Vietnam, the implementation of livelihood restoration programs are constrained
due to: i) Weak implementation capacity of the Project Management Unit, DCSCC and
local authorities; (ii) experience of implementing agencies is limited to compensation
and relocation arrangement; and (iii) Lack of involvement of the relevant institutions
to the different aspects of RP implementation, especially in the livelihood restoration.
Therefore, adequate institutional arrangement and capacity building are very critical.
The human resource at PMU 85, its consultant team and at DCSCC need to be
adequate and qualified for the different positions of tasks, especially the specialists
who are with international and national experience with land acquisition issues.
Capacity building will include of workshops, training and the areas should be focused
are (i) Objective, Principle of RAP and Entitlement policy, (ii) Resettlement
arrangements; (iii) Economic restoration activities and schedule, (iv) Institutional
arrangements, (v) Mechanisms, requirements of monitoring and evaluation,
complaint; and (vi) Conditions of disbursement the fund from the Project for
compensation and resettlement, especially according to the WB requirements on the
procurement and disbursement.
(3) Information campaign
At the beginning of Compensation and Resettlement implementation, meetings will
be held with and information dissemination to stakeholders to introduce, inform all
of them about the policy, implementation process (e.g., mechanisms of DMS, land
recovery, participation and consultation, publicize for the approvals, complaint,
monitoring etc). These are required as the policies of WB and Decrees 197/2004;
84/2007 and 69/2009 of GoV. This task will be done by PMU 85, DCSCC and
commune authorities.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 109
(4) Consultation and Disclosure
Consultations will be conducted with stakeholders, especially with DPs and
particularly with the vulnerable households. All consultation and disclosure activities
will be properly documented. All minutes of meetings, photos, attendance sheets will
be prepared and recorded. Disclosure of the updated RAP to DPs will be carried out
prior to its submission to WB for review and approval.
The DCSCC will disclose at the Project and Resettlement information kiosks/centers
of districts/communes: (i) draft updated RAP prior to submission for review and
approval by WB; (ii) final updated RP approved by C/PPC and WB, and (iii) any
revisions to the updated RP as a result of changes in scope or design layout.
Key information in the updated RAP to be disclosed to the affected households
through the Public Information Booklet, Newspapers, radio/televion, and meetings
with affected households, will include (i) compensation, relocation and rehabilitation
options, (ii) DMS results, (iii) detailed asset valuations, (iv) entitlements and special
provisions, (v) grievance procedures, (vi) timing of payments, and (vii) displacement
schedule. The information will be made publicly available in Project and commune
offices and provided to the affected households in the form of a summary RAP, an
information leaflet or brochure.
Monitoring of resettlement implementation reports will also be made available to
affected households and will be uploaded on WB website. In the period of RP
implementation, information disclose according the requirements in the Decrees
197/2004, 84/2007 and 69/2009 (such as final cadastral map, of draft and final site
planning, draft and approved compensation plans for DPs, all decisions and approvals
related to compensation and resettlement etc) must be followed. It is good practice
that the project and resettlement information kiosks/centers should be set up at the
offices of DCSCC and affected communes and the updated information will be posted
there. It is also a good practice that DCSCC should prepare a Frequent Asked and
Answered Questions (question raised by DPs and answer to them by DCSCC). If this
are well organized, it would minimize the potential of complaint from DPs.
(5) Cadastral maps and land recovery approval
The PMU 85 and DCSCCs to put the benchmarks on the ground for the footprint of
the project affected area and update the cadastral maps for the affected areas of
each commune, get them reviewed and approved by DONRE of Quang Nam province.
Prepare dossier to apply for the approval of land recovery (project EIA and cadastral
maps). This dossier will be submitted to DONRE for its review and then to the PPC for
its approval. The PPC will approve on land recovery for the project in general and
then the District PCs will issue their decisions on land recovery to each individual
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 110
household. The cadastral maps and list of affected DPs will be prepared by DCSCC and
posted at each affected commune office.
(6). Mobilization of Consultants, Independent Valuation Agency and External
Monitoring Agency
Consultants will be mobilized as soon as the loan agreement between WB and GoV is
signed. Independent valuation agency on values of land and other affected properties
will also be recruited by PMU 85 to update the Replacement Cost Study (RCS), get it
reviewed, agreed by PMU 85 and then reviewed, approved by provincial authorities
of Quang Nam province. This task will be carried out in parallel with the DMS. The
external monitoring agency will be selected prior to commencement of DMS
activities. The external monitoring activities will begin as soon as the DMS and
entitlements are finalized based on the rates established by the RCS and approved by
the PPC. The Terms of References (TORs) for the replacement cost study and External
monitoring will be prepared by PMU 85. Consultants for these services should not by
any company or agency which established or under the management of the
Government authorities.
(7). Conduct of Detailed Measurement Survey
The conduct of the updated Census and Detailed Measurement Survey (DMS) will be
done after the approval of the Quang Nam Province on land recovery for the project.
The DMS will be done by DCSCCs following final design and staking of the road
alignment. The procedures for the DMS are similar to those for the IOL; i.e., detailed
recording of all land and non-land assets. The DMS form should be similar to the IOL
from used for this RAP in order to cover all information needed to determine all types
of impacts for the entitlement of DPs. It should be noted that at the time of DMS
activities, all DPs are required to submit copies of LURCs or any legal papers to assist
DCSCC in the preparation of the Compensation Plan. All DMS forms are reviewed and
signed by DPs as well as relevant parties involved to these activities are required by
the laws (e.g., Representatives of commune, DCSCC and Surveyor etc.). The DMS
form then need stamped by commune authorities and DCSCC, one copy of DMS will
be kept by the affected household. In case of any disagreement on the DMS, the DPs
will not sign the DMS forms until the issues are resolved following the grievance
redress process.
A new socio-economic survey will be carried out if RAP updating does not commence
within two years as demographic and socio-economic factors may change
significantly. It will at least cover 20% of DPs affected by loss of productive land and
at least 10% of other DPs. However, information on socioeconomic characteristics for
which the households would be entitled to assistance such as: tenure status,
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 111
household incomes (to determine poverty status), other vulnerability characteristics;
would be collected for all the affected households. Further, particular attention
would be paid to document all registered and un-registered business losses including
those of business establishments and industries.
The DMS would also pay particular attention to the ownership status or claims on the
land within the ROW and conduct extensive consultations with the DPs to reach
consensus on the claims and any entitlements that may emerge from such
consultations.
(8) Establishment of GRCs
The Grievance Redress Committee8 (called GRC) at 03 levels (commune/district and
provincial level) will be established at the time of the project announcement publicly.
At each level, the committee members will include 5-7 representatives from: PMU,
CRC (1-2 persons at each 03 level), mass organization/civil society/CBOs/NGOs (1-2
persons), Lawyer Union/associations, and DP representatives. GRCs will be
established by respective PPCs as soon as the RAP is approved by the Government of
Vietnam.
(9). Compensation, Resettlement and Assistance Plan
Together with the result of the Replacement Cost Study as reviewed and approved by
the PPC, DMS form will be the used as the basis for preparing the Compensation,
Resettlement and Assistance Plan for each affected household. The Compensation,
Resettlement and Assistance Plan for each affected household will be prepared by
DCSCC, reviewed by DOF and then approved by Quang Nam PPC or by its delegated
authorities . The official list of DPs, their losses, and corresponding payments
(compensation and allowances, incentive etc.,) will be disclosed to the affected
people and post at the affected commune offices for affected DPs to check and give
feedback to DCSCC (as required in the Decrees 197/2004 and 84/2007). Then
Compensation, Resettlement and Assistance Plans will be submitted to DOFs for their
review and to the PPC for the approval. Any disagreement on Compensation,
Resettlement and Assistance Plan will not be signed by DPs until it is resolved
following the grievance redress process.
8 The Committee will be established separatedly with District Resetlement Committees
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 112
(1) Planning for Relocation and Resettlement Site Development
The VEC, or PMU 85 together with Quang Nam province will responsible for planning
relocation and resettlement site. The resettlement site will be located close to the
project boundary and acceptable to the DPs.
(11) Planning for Income Rehabilitation Assistance
The income rehabilitation assistance programme will be prepared for DPs affected by
loss of productive land or relocated DPs, the income rehabilitation assistance might
be, includes credit loan, vocational training, job creation.
The Income Rehabilitation Assistance/Training will be delivered during the
implementation of compensation to DPs until the DPs have restored their livelihood
to pre-project levels.
(12). Compensation payment
The Approved Decision on the Compensation, Resettlement and Assistance Plans will
be posted at the commune offices to inform DPs and commune authorities. Each
household would be provided with a Summary Compensation Form showing the
summary of affected assets, compensation rates used to determine compensation,
and entitlements for allowances and other assistance. All households with the
approved plans will invited by DCSCC to receive their entitlement in cash. Payment
will need the presence of both husband and wife and with their identity cards. The
payment will be done by DCSCC or through local Bank with the supervision of
commune authorities.
(13) Resettlement Site Development and Relocation of DPs
The resettlement sites will be available 6 months (or at least 3 months) prior to the
project construction. Any relocated DPs, who are not assigned to land plot at the time
of the project construction will be entitled to get rental housing assistance for their
period of temporary residence.
(14) Preparation of Resettlement Completion Report
An EMA will be hired by the project owner and an Resettlement Completion Report
will be prepared when the compensation to DPs and construction completed. The
Resettlement Completion Report will provide in detail the category and scale of
impacts with the number of DPs in each category, detailed cost of compensation and
other components with the quantities/number of affected assets and number of DPs
for each type of resettlement cost component, compensation rates and total cost.
The Resettlement Completion Report will also provide comparative details on the
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 113
compensation rates established by the province and determined based on the
Replacement Cost Study and consultation with the DPs to ensure that the final rates
for assessment of compensation reflect prevalent market rates.
In case the review by the Bank identify any gaps in compliance of the policy and
entitlements specified in the RAP, additional assistance to the DPs would be
provided, as necessary.
IX.3. RAP implementation schedule
An implementation schedule for RAP is linked to the project physical works schedule.
It needs to be prepared in details by each DCSCC and the social safeguard team of
PMU 85 for quarterly or semi-annual plans. The main tasks and time respectively are
planed as table below.
Since planning and development of resettlement sites and income restoration
measures require coordination between several agencies and often a slow and long-
term process, these activities will be initiated as soon as the approval for the final RP
is obtained and its implementation begins.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 114
Table IX-1: Proposed schedule for RAP implementation with key activities
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 115
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 116
X. MONITORING AND EVALUATION
X.1. Internal monitoring
The Land Acquisition and Resettlement Unit under PMU 85 will serve as the Project’s
internal monitoring body. As such, the PMU 85 will maintain a file of all data gathered
in the field, including a data base on the affected households. The PMU 85 in turn will
include updates on resettlement in its regular progress reports to MOT and WB.
Social monitoring reports will be made available to the affected households and will
be submitted to WB for its review and concurrence. Internal monitoring and
supervision will have the following objectives:
(a) Compensation and other entitlements are computed at rates and
procedures as provided in the approved RP, with no discrimination
according to gender, vulnerability, or any other factor;
(b) Affected households are paid their compensation and other
entitlements as per approved updated RP, ensuring that all
entitlements are delivered as planned and agreed, including
compensation in cash or in kind, allowances, replacement land,
resettlement sites developed and people moved onto them; Grating of
LURC to relocating HH at the resettlement sites.
(c) Income restoration programs designed and delivered including
modifications in the programs and provision of additional cash and in-
kind assistance to the participating affected households as and when
necessary;
(d) Public information, public consultation and grievance redress
procedures are followed as described in the approved RP;
(e) Affected public facilities and infrastructure are restored promptly; and
(f) The transition between resettlement and commencement of civil works
is smooth and that sites are not handed over for civil works until
affected households have been satisfactorily compensated and
resettled.
X.2. External Monitoring
The main objective of external monitoring is to provide an independent periodic
review and assessment of (i) achievement of resettlement objectives; (ii) changes in
living standards and livelihoods; (iii) restoration of the economic and social base of
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 117
the affected people; (iv) effectiveness and sustainability of entitlements; and (v) the
need for further mitigation measures.
Strategic lessons for future policy formulation and planning will also be drawn from
the monitoring and evaluation of resettlement. This is possible through a Post-
Resettlement Implementation Evaluation Study that will be carried out 6-12 months
following completion of all resettlement activities.
The external monitoring agency (EMA) will be recruited prior to RAP implementation
activities. Relative to compliance monitoring during resettlement implementation,
the main activities of the EMA will revolve around the following:
(a) Review implementation capacity of DCSCC, existing baseline data and
gather additional socio-economic information, as necessary, on sample
affected households;
(b) Monitor updating and implementation of the RAP;
(c) Identify any discrepancy between policy requirements and actual
implementation of resettlement;
(d) Monitor the resolution of complaints and grievances of affected
households; and
(e) Provide recommendations for improving resettlement updating and
implementation.
(f) Issue certification that each DP has received the full payment in accordance
with the entitlements specified in the RAP.
(g) Carry out compensation and resettlement audit.
Specific to resettlement updating and implementation activities, the EMA will
monitor and evaluate specific issues such as the following:
- Public consultation and awareness of resettlement policy and
entitlements;
- Coordination of resettlement activities with construction schedule;
- Land acquisition and transfer procedures;
- Construction/Rebuilding of replacement houses and structures on
residual ROW or to new relocation sites (outside the ROW);
- Level of satisfaction of DPs with the provisions and implementation of
the RP;
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 118
- Grievance redress mechanism (documentation, process, resolution);
- Monitor the types and level of assistance provided by project
authorities to the DPs who wish to purchase replacement private
agricultural land;
- Effectiveness, impact and sustainability of entitlements and income
restoration programs and the need for further improvement and
mitigation measures if the objectivs of the project are not fully
achieved. Identify DPs who have not been able to restore their income
levels and in need for continued assistance.
- Relocation site development (housing and market) from identification
of sites in consultation with DPs, to resettlement site development and
relocation of DPs. Land title issues and process of land title granting.
- Capacity of DPs to restore/re-establish livelihoods and living standards.
Special attention will be given to DPs affected by loss of productive
land and vulnerable DPs;
- Resettlement impacts caused during construction activities.
- Participation of DPs in RP updating and implementation
The methods to be employed by the EMA in its monitoring work are
summarized here under:
(a) Review of detailed measurement survey documents to be able to establish
a baseline for monitoring and evaluating project benefits. The EMA to
check on a random basis the DMS process with DPs from identification to
agreement on DMS results. During the conduct of the DMS, the EMA will
also monitor the DMS process to determine and assess if DMS activities are
being carried out in a participatory and transparent manner.
(b) Review of Socio-economic Survey (SES) baseline. If land acquisition does
not occur for at least two years, EMA will carry out another SES. A post
resettlement survey will be carried out one year following completion of
resettlement activities. Sampling will include 20% of DPs affected by loss of
productive land as well as at least 10% of all other DPs. The same DPs
interviewed during RP updating will be interviewed. Special attention will
be paid to the inclusion of women, the very poor, the landless and other
vulnerable groups, with set questions for women and other target groups;
and, the database disaggregates information by gender, vulnerability and
ethnicity
(c) Participatory Rapid Appraisal (PRA), which will involve obtaining
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 119
information, identifying existing or potential problems, and finding specific
time-bound solutions through participatory means including: a) key
informant interviews; b) focus group discussions on specific topics such as
compensation payment, income restoration and relocation; c) community
public meetings to discuss community losses, integration of resettled
households in host communities or construction work employment; d)
direct field observations, for example, of resettlement site development; e)
formal and informal interviews with affected households, women, ethnic
minority, and other vulnerable groups to monitor and asses the progress
the DPs are making to restore their living standards; and, f) in-depth case
studies of problems are identified by internal or external monitoring and
required special efforts to resolve. The PRA will also focus on good practice.
(d) Resettlement audit will be conducted during the monitoring period. The
EMA will be present at the time of disbursement of payments to DPs during
monitoring. The EMA report will include resettlement audit per monitoring
period.
(e) The Terms of Reference for External Monitoring will be prepared by PMU
85 and get it agreed by WB before inviting for external monitoring for RP.
(f) The EMA will prepare monitoring reports every three (3) months up
through the period when DPs receive compensation and remove from
acquired land. The EMA will also conduct a post-resettlement evaluation
twelve (12) months after compensation and relocation are completed. All
EMA reports will be submitted to PMU 85 with a copy submitted to the
WB and to the VEC directly.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 120
XI. GRIEVANCE REDRESS MECHANISM
A well-defined grievance redress and resolution mechanism will be established to
address DP grievances and complaints regarding land acquisition, compensation and
resettlement in a timely and satisfactory manner. All DPs will be made fully aware of
their rights, and the detailed procedures for filing grievances and an appeal process
will be publicized through an effective public information campaign. The grievance
redress mechanism and appeal procedures will also be explained in the Project
Information Booklet (PIB) that will be distributed to all DPs The PIB will be prepared
and distributed to all affected communities during the meetings.
For the purposes of grievance redress and resolution, A Grievance Redress
Committees at province, district level and commune levels will be established. These
Grievance Redress Committees will draw its members from PMU85, DRC/CRC,
lawyers association, women’s association and other CBOs and NGOs, and
representatives of the DPs.
At each level, the committee members will include 5-7 representatives from PMU,
CRC (1-2 persons at each 03 level), mass organization/civil society/CBOs/NGOs (1-2
persons), Lawyer Union/associations and DP representatives , which is a positive way
to resolve issues that concern DPs. Participation of civil society members and DPs
representatives would ensure that the GRCs function without any coercion, remain
independent, and discuss all the issues and complaints, and take decisions in an
objective and transparent manner.
The commune officials, in coordination with the PMU85 staff, will make all attempts
to settle DP issues at the commune level through community consultation. However,
where DPs are still dis-satisfied with the outcome of these attempts and have
outstanding complaints and grievances would be encouraged to submit their
complaints to the commune level GRC.
DPs are entitled to lodge complaints regarding any aspect of the land acquisition and
resettlement requirements such as, entitlements, rates and payment and procedures
for resettlement and income restoration programs. DP complaints can be made
verbally or in written form. In the case of verbal complaints, the committee hearing
the complaint will be responsible to make a written record during the first meeting
with the DP. DPs will be exempt from or PMU 85 will pay for all administrative and
legal fees incurred in the resolution of grievances and complaints.
All meetings will be recorded by the members of the GRC at the respective commune
and district level resettlement committees and copies will be provided to DPs. Copies
of minutes of meetings will be provided to PMU 85 and WB upon request.
A four-stage procedure for redress of grievances is proposed:
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 121
If it is impossible to solve their complaints at the commune or ward level, DPs can
take the following steps:
Procedures and Steps to Resolve Complaints: Resolving complaints related to the RP,
including determining the area and value of affected assets will be conducted as
follows:
Step 1. Persons who are unsatisfied with any issues in the program of economic
recovery and resettlement can report verbally or in writing to their Ward/Communal
GRC that will be responsible for resolving their complaint in writing within 15 days.
Step 2. Persons who are unsatisfied with the decisions of the ward/communal level
in Step 1 can appeal to the District GRC within 15 days of the date of the decision in
Step 1. The District GRC will be responsible for resolving the complaint within 15
days.
Step 3. If they are unsatisfied with the decisions at the district level, DPs may appeal
to the Quang Nam province GRC within 15 days of the decision in step 2. The
Province GRC will give their decision on the complaint within 15 days.
Step 4. If the DPs are unsatisfied with the decision at the province level, they may
present their petition to their district court for a decision within 15 days of the
decision by the GRC at the city level.
Persons filing a complaint will not be charged administration or complaint fees.
The external monitoring agency will be responsible for checking the procedures for
and resolutions of grievances and complaints. The said EMA may recommend further
measures to be taken to redress unresolved grievances.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 122
XII. COST AND BUDGET
XII.1. Compensation Prices
The cost estimate for compensation of land, affected assets and rehabilitation,
resettlement FOR Quang Nam section is based on the followings:
The cost estimates for compensation of land, affected assets and rehabilitation,
allowance and resettlement implementation of the RA for Quang Nam section are
based on the Decision 29/2008/QD-UBND, 26 August 2008, issued by Quang Nam
Province on Compensation Rates and Resettlement Assistance and Decision
46/2009/QD-UBND dated 18 December 2009 on land prices in Quang Nam Province .
The prices will be updated following the latest Decision issued by Quang Nam
Province to reflect the annual updating of prices as required by Decree 197/2004/ND-
CP at the time of implementation.
The VET will contract an independent land price appraisers licensed by the
Department of Finance to cary out Replacement Cost Study (RCS) for all the affected
assets based on the prevalent market prices. The findings of the RCS will be submitted
to the PPC for comparison and revisions, where necessary to ensure that the final
rates reflect market prices and that all assets are compensated at the replacement
cost.
Currently, compensation rates of houses are determined by government on yearly
basis based on market value of different class of houses. The rates thus established for
each class are applicable to all houses in that class and cover the most expensive type
of houses. The RCS will cover a randomly selected sample of houses in each class to
show that the same price indeed applies to the houses/structures in the same class
and that the compensation rates were determined based on the maximum market
price.
According to results of preliminary replacement cost assessment the compensation
prices issued by the Quang Nam Province PC for movable assets are generally
reflecting replacement costs of affected houses and secondary structures as well as
of attached crops and trees. It is worth noting that the practice of resettlement
implementation in Vietnam shows that, in case of reasonable fluctuation of unit
construction costs, the local PCs used to update them accordingly. The New Land
Law 2003, especially the recent Decree 17/2006/CP has provided legal base for
land compensation reflecting market prices. According to the Land Law 2003,
Provincial or City PCs’ issued prices of land have to be updated annually and be
publicly announced on the 1st of January every year.
The cost for the allowances, resettlement assistance and economic restoration
includes of the items which were described in item III.3.10 of Chapter III above,
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 123
subsidized cost to the resettlement site development was described as in item VII.3
of Chapter VII.
Administration and management cost of 2% of resettlement cost is included in total
cost of resettlement. This is in addition to the contingency of 10 % to cover for any
unforeseeable cost incurred in detail implementation.
Monitoring cost: The PMU85 also is responsible for contracting with an or some
external organizations, specialized on social sciences or anthropology to carry out the
independent monitoring of the subproject’s resettlement implementation. Because
the cost of monitoring work has not yet detailed norms set by the Government, it is
estimated that it needs for at about 1.0% of the total compensation base cost. An or
some interested independent monitoring institutions will prepare the technical and
financial proposals for bidding and actual cost will be decided through procurement
for independent monitoring.
Contingency cost: It is learned from the implemented projects and from the
conservative side; the rate for contingency should be at about 10% of total cost of
compensation and RP preparation.
Before RAP implementation, the survey on the replacement cost will be done by
consultant and then propose the unit compensation costs at the replacement values
to the PPC of Quang Nam for its review and approval. Final rates established by the
province would be compared with the rates obtained through the Replacement Cost
Study and, in case of significant differences, updates as necessary. The final rates
thus determined and approved will be applied to the compensation plan to the
affected DPs.
XII.2. Cost estimate
The summarized total resettlement cost for the Quang Nam section is estimated
based on the compensation rats established by the province. These are estimated to be
1,152,072,342,594 VND, as presented in Table XII.1 below. The details of estimated
cost are presented in Annex E.
In case of any over-run of resettlement costs, VEC will ensure that sufficient
additional funds would be made available in a timely manner.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Page 124
Table XII-1: Summary Estimated Resettlement Cost for the Quang Nam section
No Items No. of Affected Asset No. of DPs Total cost (VND) Exchange USD
(1USD = 19,000 VND)
I Compensation for land 4,734,523 m2 3,351 254,558,427,600 13,054,278
II Compensation for Structures 37,261 m2 759 39,790,540,000 2,040,541
III Compensation for other fixed assets 40,203 m2 3,052 20,923,770,000 1,073,014
IV Compensation for crops and trees 2,795,228m2 Rice and annual
crops and 1,712,207 Trees 3,351 20,678,815,300 1,060,452
V Cost of resettlement site development 245,344 m2 2,342 98,137,600,000 5,032,697
VI Cost of Public Facilities 78 electricity and telephone
poles 2 908,500,000 46,590
VII Compensation for Loss of Businesses 34 Households 34 499,000,000 25,590
VIII Allowances
581,103,826,000 29,800,196
IX SUB-TOTAL A (I+II+III+IV+V+VI+VII+VIII)
1,016,600,478,900 52,133,358
0
X Cost of Management (2% of I - VII)
20,332,009,578 1,042,667
XI Cost of RCS (Resettlement Cost Survey) 24 communes
240,000,000 12,308
XII Cost of External Monitoring & Evaluation (1% of I-VII)
10,166,004,789 521,334
XIII SUB-TOTAL B (X+XI+XII)
30,738,014,367 1,576,308
0
XIV Contingency 10% x (IX+XIII)
104,733,849,327 5,370,967
Grand Total
1,152,072,342,594 59,080,633
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 1
ANNEX A
COMPARATIVE ANALYSIS OF WB,
VIETNAM NATIONAL AND
PROVINCIAL POLICIES AND
PROPSOED POLICY FOR THE PROJECT
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 1
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
1 Objectives Involuntary resettlement should be avoided where feasible, or minimized.
Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs
Displaced persons should be assisted in their efforts to improve their livelihoods and standards of living or at least to restore them, in real terms, to pre-displacement levels or to levels prevailing prior to the beginning of project implementation, whichever is higher.
There is no provision for similar objectives in Decree 197
Decree 197 does not include land acquisition policy, in fact, it describes the works carried out when a decision for land acquisition is issued.
As specified in the National Law
As specified in the National Law
As specified in the National Law
The project objective is to avoid, if not, minimize resettlement impacts;
Ensuring the affected persons shall receive compensations and other assistances to at least maintain or otherwise improve their pre-project living standards and income-earning capacity if involuntary resettlement impacts are unavoidable.
2 Impacts Covered
This WB’s policy covers direct economic and social impacts that both result from Bank-assisted investment projects, and are caused by (i) the involuntary taking of land resulting in relocation or loss of shelter; and (ii) lost of assets or access
Decree 197. The GoV’s policy cover direct impacts on land acquisition caused by the development projects
As in the National Law
As in the National Law
As in the National Law
The project policy covers all socio-economic impacts resulting in involuntary land acquisition, loss of assets or access to assets including loss of income sourses or means of livelihood.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 2
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
to assets;
(iii) loss of income sources or means of livelihood, whether or not the affected persons must move to another location
The indirect impacts such as income source or means of livelihood are not mentioned in the policy.
3 Criteria for Eligibility
Displaced persons may be classified in one of the following three groups: (a) those who have formal legal rights to land (including customary and traditional rights recognized under the laws of the country); (b) those who do not have formal legal rights to land at the time the census begins but have a claim to such land or assets—provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement plan; and (c) those who have no recognizable legal right or claim to the land they are occupying.
Decree 197 recognizes that the displaced households are identified as (i) those who have full title to land use right certificate (LURC) and (ii) non-legal users or users without papers or documents if they have been using the land to be affected by a project in a stable manner prior to 15th October 1993. For all said case, the DPs will be entitled to get compensation/assitances
Those who have no recognizable legal right or claim to the land they are occupying, if they have been using the land to be affected by a
National Law National Law National Law The criteria for eligibility in the project policy covers all Displaced Persons (DPs) who may be classified in one of the following three groups: (a) those who have formal legal rights to land (including customary and traditional rights recognized under the laws of the country); (b) those who do not have formal legal rights to land at the time the census begins but have a claim to such land or assets—provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement plan; and (c) those who have no recognizable legal right or claim to the land they are occupying.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 3
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
project in a stable manner after 15th October 1993 will not be compensated for land, but may be assisted, on case to case basis.
4 Cutoff date Cut-off date established at time of Inventory of Losses (IOL) and specified at the time of Detailed Measurement Survey (DMS) to determine eligibility for compensation.
Land Law: No specific requirement to establish a cut-off date
Decree 197: any changes to property on land to be recovered established after public disclosure of project approval decision to recover land are not eligible for compensation.
Provisions of the National Law
Provisions of the National Law
Provisions of the National Law
The date of commencement of census and asset inventory surveys by the provincial authorities following approval of the project by GOV.
5 Entitlements for DP who lack formal title to affected land/assets
Land
The absence of formal legal title to land is not a bar to entitlements.
This includes indigenous groups, ethnic minorities, people who claim affected land without formal legal rights and others who may have usufruct or customary rights to land or other resources, and often have no formal title to their land.
Non-titled DPs including displaced tenants,
Land Law 2003: a) DPs are considered illegal and excluded from eligibility for compensation if they do not possess Land Use Rights Certificates (LURC) or entitlements to LURC, or lease or other tenancy, or if they have not been in possession of land for a reasonable length of time. b) Illegal DPs are entitled to compensation for the value of remaining improvements to or on the affected land, and to rehabilitation assistance of various kinds.
Provision of the National Law
Provision of the National Law
Provision of the National Law
For residential land, in lieu of compensation for land, the DPs will receive assistance corresponding to 50% of land replacement cost. For poor or vulnerable DPs who have no other residential land in the same ward/commune, the project will provide either a residential plot of minimum size at a common RS or on a individual residential plot, with title to the land (plot of 40 m2 in urban area and 100m2 in rural area); or on request of the DPs, cash assistance equivalent to 60% of the land
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 4
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
sharecroppers and squatters are entitled to resettlement assistance that may include replacement land, ensure greater security of tenure and upgrading of livelihoods.
replacement cost for them to arrange relocation by themselves
For agriculture land, the DPs who do not have legal or legalizable rights to the affected land, are entitled to the assistance amount equal to 30% of replacement cost. For poor and vulnerable and farmers affected by loss of productive land, if there is no land available for allocation or, at the informed request by the DPs, in addition to above, a rehabilitation/training assistance will be provided to ensure the DPs are able at least to restore or improve their income levels and living standards.
Assets
For non-land assets, all eligible DPs whether legal, legalizable or non-titled need to be compensated at replacement costs, plus fees for relevant administrative procedures.
Decree 197: a) Article 6: In the case of DPs not eligible for compensation, PPC shall consider some form of assistance. b) Article 18: No compensation will be paid for houses, structures built i) without permission following notification of land use plans, ii) after July 2004 in violation of land use plans; or, for houses,
Provision of the National Law
Provision of the National Law
Provision of the National Law
All affected structure and houses will be compensated at 100% of replacement cost without any depreciation or deduction for salvaged material.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 5
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
structures or other property established after notification of land recovery. c) Article 20: In the case of acquired land that is not eligible for compensation, affected houses and structures will be compensated at 80% of replacement cost if they have not violated announced land use plans or the right-of-way; no compensation will paid for houses/ structures that have violated announced land use plans or the right-of-way, although the PPC will consider assistance on a case-to -case basis.
6 Compensation for Land, Structure, Tree/Crop, and other fixed assts
Based on replacement costs (reflecting market prices plus transaction fees).
Article 9, Decree 197.
Each city/province PCs set up tables of price for land/assets, in accordance with the allocated land use purpose, which will be the basis for compensation.
Provision of the National Law
Provision of the National Law
Provision of the National Law
The PMU will contract professional licensed appraiser to carry out Replacement Cost Study (RCS) to establish compensation rates reflecting prevalent market values and submit these to the City PC for comparison with the rates established by the respective PPCs. The PPC will finalize compensation rates for the project taking into consideration the findings of the RCS to ensure that the final rates
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 6
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
reflect compensation at replacement cost
7 Threshold of "severely affected income" for DPs when their agricultural land is acquired
Losing over 20% of their agricultural land (OP/BP 4.12)
Losing over 30% of their agricultural land (Decree 69/2009)
Provision of the National Law
Provision of the National Law
Provision of the National Law
All DPs affected by loss of productive land are considered entitled to receive additional support and income rehabilitation assistance
8 Resettlement Arrangment
All displaced households to be relocated.
Land Law and Decree 197
There is no specific eligibility criteria for resettlement. However, the DPs who are entitled for resettlement include: (i) The displaced households whose land and houses are eligible for compensation; and (ii) Households that are not eligible for compensation and have no other house will be considered on case to case.
Households identified as eligible for relocation if their remaning land is less than 30 m2 at urban area or household have many persons (above 8 members) demand for resettlement that will be considered by DRC for land provision.
Landplot in resettlement site (i) does not exceed 200 m2 for urban area, (ii) 300 m2 for rural area and (iii) 400 m2 for remoted mountanous area. Minimum area of 100 m2 for land plot at resettlement site is suggested
Households identified as eligible for relocation if (i) the remaning land is less than 50 m2 in urban area, and (ii) the remaning land is not less than 100 m2 in rural area.
Households identified as eligible for relocation if (i) DPs loosing entire residential land or if the remaining land is insufficient to rebuilt based upon regulation of the respective PPC and (ii) DPs do not have any accommodation in project commune/ward/town.
The size of plot at resetlement sites would be in accordance with the provision of the respective PPC regulations.
9 Business Loss Support for all affected households doing business
Decree 197: Articles 26, 28: Only registered businesses and their employees with long-term contract are eligible for compensation.
Provision of the National Law
Provision of the National Law
Probvision of the National Law
Support to be provided to both licensed and un-licensed affected business households, including their registered employees.
10 Rehabilitation Where necessary to achieve Rehabilitation Assistance during Assistance is Assistance is Assistance is The project policy on the
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 7
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
Measures the objectives of the policy, the resettlement plan or resettlement policy framework will also include measures to ensure that displaced persons are (i) offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standards of living; and (ii) provided with development assistance in addition to compensation measures such as land preparation, credit facilities, training, or job opportunities.
Transition Period will be appplied based on Clause 17, 20, 21, 22 Decree No 69/2009 của CP, including:
- Material Transport Allowance
- Relocation Allowance
- Allowance for Living and Production Stabilization
- Assistance for agricultural land in the residential area, garden land, pond land adjacent to residential land but are not recognized as residential land
- Allowance for Vocational Training and Job Creation, and;
- Other Assistances
Based on the strategic rehabilitation program, each province will issue specific rehabilitation, income restoration or assistances.
regulated in accordance with Decision No. 36/2009 of Da nang PPC, including:
- Material Transport Allowance
- Allowance for Living and Production Stabilization
- Assistance for agricultural land in the residential area, garden land, pond land adjacent to residential land but are not recognized as residential land
- Allowance for Vocational Training and Job Creation, and;
- Allowance for the Poors and Social
regulated in accordance with Decision No. 23/2010 of Quang Nam PPC, including:
- Allowance for Material Transport; house renting and Living Stabilization
- Assistance for agricultural land in the residential area, garden land, pond land adjacent to residential land but are not recognized as residential land
- Allowance for Production Stabilization and Vocational Training, Job Creation;
- Allowance for the Poors and Social
regulated in accordance with Decision No. 66/2009 of Quang Ngai PPC, including:
- Material Transport Allowance
- Relocation Allowance
- Allowance for Living and Production Stabilization
- Assistance for agricultural land in the residential area, garden land, pond land adjacent to residential land but are not recognized as residential land
- Allowance for Vocational Training and Job
rehabilitation is summarized as following: A. Impact on Residential Land
- Relocation Allowance - Rental House Allowance - Assistance for Relocation
B. Impact on Agricultural Land - Allowance for
Living/production Stabilization
- Assistance for agricultural land in the residential area, garden land, pond land adjacent to residential land but are not recognized as residential land
- Support for vocational training and job creation
C. Other Allowances/Assistance: - Bonus - House Repair - Facility Connection - Transport Allowance
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 8
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
Policy Households
- Incentive Bonus
- Other Assistances
Policy Households
- Incentive Bonus
- Other Assistances
Creation, and;
- Allowance for the Poors and Social Policy Households
- Other Assistances
11 Assistance to Vulnerable Group
To achieve the objectives of WB’s policy, particular attention should be paid to the needs of vulnerable groups among those displaced, especially those below the poverty line, the landless, the elderly, women and children, indigenous peoples, ethnic minorities, or other displaced persons who may not be protected through national land compensation legislation
Decree 197/2004; Decree 69/2009 There is not specific policy on the vulnerable group in general. However, displaced households including the poor, social policy household (heroic mothers, ware veterans, wouded or dead soldiers families) are provided with support.
Provision of the National Law
Provision of the National Law
Provision of the National Law
In the project, the vulnerable group means individuals or distinct groups of people who might suffer disproportionately or face the risk of being further marginalized by the effects of land and property recovery or resettlement and specifically includes: (i) female headed households with dependents (ii) households with disabled persons, (iii) households falling under the current MOLISA benchmark poverty line, (iv) children and elderly households who are with no other means of support, and (v) landless households. In the project, allowances/assistance Targeted to Vulnerable Households include (i) Landless Household; )ii) Social Policy; and (iii) other Vulnerable
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex A Page 9
No Criteria World Bank Policy
(OP/BP 4.12)
National and Project Provincial Regulations
Da Nang Quang Ngai Expressway
Project Policy National Law (revised version 2003) and Decree 197/2004
Da Nang PPC ( Dec 36/2009/QD-
UBND dated 24/12/2009)
Quang Nam PPC ( Dec 23/2010/QD-
UBND dated 30/09/2010)
Quang Ngai PPC
( Dec 66/2009/QD-UBND dated 31/12/2009)
(1) (2) (3) (4) (5) (6) (7) (8)
households.
12 External Monitoring Agency
Independent monitoring agency should be employed to monitor and evaluate the information of compensation and resettlement objectively.
Not applicable Not applicable Not applicable Not applicable Independent monitoring of resettlement implementation included. Post-implrementation evaluation recommended to determine whether the objectives of the policy are achieved.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 10
ANNEX B
SOCIO-ECONOMIC CONDITIONS OF
THE PROJECT AFFECTED HOUSEHOLDS
(QUANG NAM PROVINCE SECTION)
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 11
Demographic Characteristics of DPs by Commune
Commune
Total affected HHs surveyed
with census and IOL
Affected Persons Household Size ( %) Gender Ratio
Population Average
household size (person/HH)
Less than 4 persons/HH
From 5-8 persons/HH
More than 8 persons/HH
Male (%) Female (%)
Dien Tien 20 110 4.2 34.8 50.3 14.9 45.0 55.0
Dien Tho 178 783 4.0 57.2 38.3 4.5 49.0 51.0
Dien Quang 97 421 4.3 50.4 49.6 0.0 52.0 48.0
Duy Trinh 35 169 4.8 34.3 60.0 5.7 51.0 49.0
Duy Son 114 485 4.3 61.7 35.7 2.6 52.0 48.0
Duy Trung 15 62 4.1 65.7 31.4 2.9 48.0 52.0
Que Xuan 1 25 115 4.6 57.5 41.5 1.0 46.0 54.0
Que Xuan 2 29 121 4.2 65.5 27.6 6.9 49.0 51.0
Phu Tho 30 93 3.1 76.7 23.3 0.0 47.0 53.0
Binh Quy 107 448 4.2 58.8 39.3 1.9 50.0 50.0
Binh Chanh 40 157 3.9 70.0 30.0 0.0 54.0 46.0
Binh Que 60 266 4.4 41.5 55.2 3.3 50.0 50.0
Tam Nghia 105 374 4.0 71.0 25.0 4.0 45.0 55.0
Tam My Dong 111 427 3.7 52.0 31.0 17.0 53.0 47.0
Tam My Tay 24 100 3.3 70.2 29.8 0.0 49.0 51.0
Tam Anh Nam 18 77 4.5 65.9 34.1 0.0 47.0 53.0
Tam Xuan 1 46 193 4.3 66.2 32.6 1.2 49.0 51.0
Tam Xuan 2 42 186 3.1 45.0 55.0 0.0 56.0 44.0
Tam Thai 88 271 4.2 55.0 42.5 2.5 48.0 52.0
Tam Phuoc 80 297 4.4 55.0 35.0 10.0 45.0 55.0
Tam Dai 8 36 3.8 50.0 42.9 7.1 53.0 47.0
Tam Dan 59 195 4.2 40.0 56.0 4.0 52.0 48.0
Tam Thanh 101 408 4.3 41.0 49.0 10.0 54.0 46.0
Tam Ngoc 4 17 3.6 50.9 47.2 1.9 50.0 50.0
Total 1,436 5,811 4.1 55.7 40.1 4.2 49.8 50.2
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 12
Age structure of surveyed population by Commune
Commune Total affected HHs surveyed
Population Average age of
surveyed population
Percentage of age group ( %)
Less 5 years old From 5 to 18
years old From 18 to 35
years old From 36 to 55
years old Over 55 years
old
Dien Tien 20 110 32 8.2 20.9 29.1 23.6 18.2
Dien Tho 178 783 39 5.7 12.0 32.7 27.3 22.3
Dien Quang 97 421 42 5.5 12.6 32.3 27.8 21.8
Duy Trinh 35 169 35 7.7 12.4 33.7 27.8 18.4
Duy Son 114 485 34 4.3 14.2 35.7 25.4 20.4
Duy Trung 15 62 37 5.6 15.2 34.8 29.1 15.3
Que Xuan 1 25 115 38 4.7 17.1 35.6 37.1 5.5
Que Xuan 2 29 121 33 11.6 8.3 37.2 27.3 15.6
Phu Tho 30 93 37 2.2 20.4 23.7 31.2 22.5
Binh Quy 107 448 39 4.7 21.2 30.5 27.5 16.1
Binh Chanh 40 157 28 7.0 25.5 31.2 28.7 7.6
Binh Que 60 266 35 7.9 16.4 31.5 18.3 25.9
Tam Nghia 105 374 35 7.3 16.9 35.8 25.3 14.7
Tam My Dong 111 427 33 6.0 12.7 30.8 23.5 27.0
Tam My Tay 24 100 42 3.7 10.9 35.6 42.8 7.0
Tam Xuan 1 18 193 41 6.1 8.6 32.7 40.6 12.0
Tam Xuan 2 46 186 30 2.8 9.2 46.2 26.5 15.3
Tam Anh Nam 42 77 34 5.6 17.3 40.8 26.7 9.6
Tam Thai 88 271 45 4.8 11.3 31.7 41.5 10.7
Tam Phuoc 80 297 32 2.3 4.1 81.8 7.9 3.9
Tam Dai 8 36 32 11.2 14.3 41.8 25.5 7.2
Tam Dan 59 195 38 5.6 17.7 26.6 27.8 22.3
Tam Thanh 101 408 40 3.4 7.7 43.2 30.3 15.4
Tam Ngoc 4 17 43 4.6 9.9 36.7 37.5 11.3
Total 1,436 5,811 36.4 5.8 14.0 36.3 28.6 15.3
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 13
Educational status of the heads of householders by Commune
Commune Total Surveyed HH Heads
Education Level of DP Households Heads
Illiterate (%)
Primary Education (%)
Basic Secondary Education (%)
High School Education (%)
College and (%)
Dien Tien 20 0.0 29.9 59.7 10.4 0.0
Dien Tho 178 1.1 44.3 50.5 3.5 0.6
Dien Quang 97 6.2 59.6 26.7 6.5 1.0
Duy Trinh 35 2.9 54.2 42.9 0.0 0.0
Duy Son 114 1.8 54.6 39.6 3.1 0.9
Duy Trung 15 0.0 62.1 24.4 12.1 1.4
Que Xuan 1 25 0.0 57.8 30.8 9.8 1.6
Que Xuan 2 29 0.0 51.7 48.3 0.0 0.0
Phu Tho 30 0.0 53.3 46.7 0.0 0.0
Binh Quy 107 6.5 36.5 51.4 2.8 2.8
Binh Chanh 40 0.0 2.5 92.5 5.0 0.0
Binh Que 60 0.0 76.4 11.6 12.0 0.0
Tam Nghia 105 0.0 38.7 32.9 23.3 5.1
Tam My Dong 111 0.0 58.4 28.6 12.9 0.1
Tam My Tay 24 0.0 54.8 33.4 11.2 0.6
Tam Anh Nam 18 0.0 47.4 37.2 15.1 0.3
Tam Xuan 1 46 0.0 67.3 23.5 7.7 1.5
Tam Xuan 2 42 0.0 33.6 30.8 33.6 2.0
Tam Thai 88 0.0 29.2 55.2 12.1 3.5
Tam Phuoc 80 0.0 45.0 33.6 19.2 2.2
Tam Dai 8 0.0 50.3 24.6 25.0 0.1
Tam Dan 59 0.0 38.6 26.0 26.1 9.3
Tam Thanh 101 0.0 43.0 27.0 27.0 3.0
Tam Ngoc 4 0.0 55.0 20.0 11.2 13.8
Total 1,436 0.8 47.7 37.3 12.1 2.1
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 14
Education Level of Surveyed DPs
Commune Total surveyed population
Education Level of DP Population
Illiterate (%)
Primary Education (%) Basic Secondary
Education (%) Higher Secondary
Education (%) College and University
(%)
Dien Tien 110 6.8 31.2 39.7 19.5 2.8
Dien Tho 783 6.6 25.2 37.4 23.3 7.5
Dien Quang 421 5.7 32.4 40.7 16.4 4.8
Duy Trinh 169 4.1 40.9 32.9 18.2 3.9
Duy Son 485 5.4 32.9 41.6 13.7 6.4
Duy Trung 62 1.5 36.8 40.1 15.8 5.8
Que Xuan 1 115 3.4 37.5 41.3 10.4 7.4
Que Xuan 2 121 2.5 35.1 45.0 13.8 3.6
Phu Tho 93 1.1 34.5 41.1 20.1 3.2
Binh Quy 448 3.1 25.9 45.8 19.8 5.4
Binh Chanh 157 2.5 29.1 42.3 19.0 7.1
Binh Que 266 1.7 39.3 38.6 15.9 4.5
Tam Nghia 374 3.4 34.9 33.3 26.1 2.3
Tam My Dong 427 5.6 46.5 29.0 11.7 7.2
Tam My Tay 100 2.3 28.9 38.2 24.8 5.8
Tam Anh Nam 77 4.1 26.5 37.2 24.2 8.0
Tam Xuan 1 193 1.5 24.7 43.7 27.0 3.1
Tam Xuan 2 186 2.7 29.9 39.6 20.3 7.5
Tam Thai 271 2.7 20.3 55.2 15.6 6.2
Tam Phuoc 297 2.5 22.1 49.7 21.3 4.4
Tam Dai 36 3.1 28.6 37.1 23.8 7.4
Tam Dan 195 3.3 25.5 47.8 14.5 8.9
Tam Thanh 408 2.9 27.9 47.7 20.4 1.1
Tam Ngoc 17 3.1 28.9 37.2 24.3 6.5
Total 5,811 3.4 31.1 40.9 19.1 5.5
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 15
Types of employment
Commune Survey population Agriculture (%) Business (%) Workers in
industry (%) Gov service (%) Professional (%)
self-employed (%)
Other (%)
Dien Tien 78 61.0 8.9 20.8 0.0 7.1 0.0 2.2
Dien Tho 644 62.9 13.5 12.7 2.7 5.8 0.6 1.8
Dien Quang 345 62.9 9.5 15.8 1.4 7.7 1.4 1.3
Duy Trinh 135 69.6 4.8 13.0 3.2 2.9 5.3 1.2
Duy Son 395 63.3 4.3 14.2 4.2 5.8 7.6 0.6
Duy Trung 55 76.7 5.6 11.0 0.0 1.8 2.1 2.8
Que Xuan 1 90 75.8 5.2 7.8 2.9 2.9 2.6 2.8
Que Xuan 2 97 82.2 4.4 7.8 0.0 2.6 0.0 3.0
Phu Tho 72 64.3 9.0 12.8 4.8 6.8 0.0 2.3
Binh Quy 332 62.5 13.4 14.5 3.3 5.7 0.0 0.6
Binh Chanh 106 59.1 19.8 11.7 0.0 7.3 0.0 2.1
Binh Que 198 81.2 4.6 6.4 3.5 1.8 0.0 2.5
Tam Nghia 284 59.8 10.2 10.6 10.3 7.0 0.7 1.4
Tam My Dong 347 59.7 10.1 6.6 3.9 9.3 5.2 5.2
Tam My Tay 85 61.3 12.2 12.6 6.5 5.0 1.2 1.2
Tam Anh Nam 59 52.6 8.5 12.5 12.2 5.3 7.2 1.7
Tam Xuan 1 165 60.0 11.8 9.5 5.9 5.8 5.5 1.5
Tam Xuan 2 172 65.4 5.5 7.9 11.8 5.9 1.1 2.4
Tam Thai 227 55.0 18.4 11.3 12.3 2.4 0.1 0.5
Tam Phuoc 278 61.8 9.7 10.8 3.9 7.4 4.2 2.2
Tam Dai 27 52.5 19.5 12.1 11.1 2.4 0.6 1.8
Tam Dan 150 59.3 11.0 8.0 6.7 4.5 7.3 3.2
Tam Thanh 377 66.8 5.4 7.0 7.2 7.8 3.4 2.4
Tam Ngoc 15 66.7 3.5 9.6 12.1 5.9 1.1 1.1
Total 4,733 64.3 9.5 11.1 5.4 5.3 2.4 2.0
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 16
Average monthly income per capita and Number of poverty household base on MOLISA poverty line by commune
Communes Total Survey-ed HHs Average income per
capita (VND)
Income Capita with Less than VND 200,000
Income capita From VND 200.000 to 500,000
Imcome Capita With More than VND 500,000
HHs % HHs % HHs %
Dien Tien 20 910,000 3 15.0 10 50.0 7 35.0
Dien Tho 178 785,955 43 24.2 96 53.9 39 21.9
Dien Quang 97 827,320 23 23.7 48 49.5 26 26.8
Duy Trinh 35 767,143 9 25.7 19 54.3 7 20.0
Duy Son 114 852,632 24 21.1 52 45.6 38 33.3
Duy Trung 15 863,333 4 26.7 6 40.0 5 33.3
Que Xuan 1 25 854,000 7 28.0 9 36.0 9 36.0
Que Xuan 2 29 853,448 6 20.7 14 48.3 9 31.0
Phu Tho 30 750,000 9 30.0 14 46.7 7 23.3
Binh Quy 107 874,299 21 19.6 46 43.0 40 37.4
Binh Chanh 40 840,000 10 25.0 18 45.0 12 30.0
Binh Que 60 873,333 12 20.0 28 46.7 20 33.3
Tam Nghia 105 844,286 26 24.8 45 42.9 34 32.4
Tam My Dong 111 849,099 22 19.8 54 48.6 35 31.5
Tam My Tay 24 891,667 5 20.8 10 41.7 9 37.5
Tam Anh Nam 18 833,333 5 27.8 7 38.9 6 33.3
Tam Xuan 1 46 845,652 13 28.3 19 41.3 14 30.4
Tam Xuan 2 42 807,143 12 28.6 19 45.2 11 26.2
Tam Thai 88 867,045 19 21.6 41 46.6 28 31.8
Tam Phuoc 80 823,750 21 26.3 37 46.3 22 27.5
Tam Dai 8 862,500 2 25.0 3 37.5 3 37.5
Tam Dan 59 834,746 15 25.4 27 45.8 17 28.8
Tam Thanh 101 815,347 26 25.7 48 47.5 27 26.7
Tam Ngoc 4 925,000 1 25.0 2 50.0 1 25.0
Total 1,436 843,793 338 23.5 672 46.8 426 29.7
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 17
Number of poverty household base on MOLISA poverty line
Commune
Total Surveyed HHs
Income per Capita with Less than VND 200,000
Income Per Capita From VND 200.000 to 500,000
Income per With Capita More than VND 500,000
HHs % HHs % HHs %
Dien Tien 20 3 15.0 10 50.0 7 35.0
Dien Tho 178 43 24.2 96 53.9 39 21.9
Dien Quang 97 23 23.7 48 49.5 26 26.8
Duy Trinh 35 9 25.7 19 54.3 7 20.0
Duy Son 114 24 21.1 52 45.6 38 33.3
Duy Trung 15 4 26.7 6 40.0 5 33.3
Que Xuan 1 25 7 28.0 9 36.0 9 36.0
Que Xuan 2 29 6 20.7 14 48.3 9 31.0
Phu Tho 30 9 30.0 14 46.7 7 23.3
Binh Quy 107 21 19.6 46 43.0 40 37.4
Binh Chanh 40 10 25.0 18 45.0 12 30.0
Binh Que 60 12 20.0 28 46.7 20 33.3
Tam Nghia 105 26 24.8 45 42.9 34 32.4
Tam My Dong 111 22 19.8 54 48.6 35 31.5
Tam My Tay 24 5 20.8 10 41.7 9 37.5
Tam Anh Nam 18 5 27.8 7 38.9 6 33.3
Tam Xuan 1 46 13 28.3 19 41.3 14 30.4
Tam Xuan 2 42 12 28.6 19 45.2 11 26.2
Tam Thai 88 19 21.6 41 46.6 28 31.8
Tam Phuoc 80 21 26.3 37 46.3 22 27.5
Tam Dai 8 2 25.0 3 37.5 3 37.5
Tam Dan 59 15 25.4 27 45.8 17 28.8
Tam Thanh 101 26 25.7 48 47.5 27 26.7
Tam Ngoc 4 1 25.0 2 50.0 1 25.0
Total 1,436 338 23.5 672 46.8 426 29.7
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 18
Percentage of HHs experience with periodic health check in affected area
Commune Total Surveyed HHs Periodic health care
check (%) No Periodic health
care check (%)
Dien Tien 20 15.0 85.0
Dien Tho 178 42.0 58.0
Dien Quang 97 38.0 62.0
Duy Trinh 35 32.0 68.0
Duy Son 114 33.0 67.0
Duy Trung 15 22.0 78.0
Que Xuan 1 25 14.7 85.3
Que Xuan 2 29 31.0 69.0
Phu Tho 30 37.0 63.0
Binh Quy 107 42.0 58.0
Binh Chanh 40 38.0 62.0
Binh Que 60 32.0 68.0
Tam Nghia 105 20.0 80.0
Tam My Dong 111 25.7 74.3
Tam My Tay 24 10.0 90.0
Tam Anh Nam 18 25.0 75.0
Tam Xuan 1 46 12.5 87.5
Tam Xuan 2 42 20.0 80.0
Tam Thai 88 24.2 75.8
Tam Phuoc 80 33.0 67.0
Tam Dai 8 20.0 80.0
Tam Dan 59 24.2 75.8
Tam Thanh 101 20.0 80.0
Tam Ngoc 4 20.0 80.0
Total 1,436 26.3 73.7
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 19
Percentage of HHs has toilet facilities
Communes Total Surveyed HHs Latrine with septic
tank (%)
Latrine with semi septic tank
(%)
Latrine over pond or river (%)
Dien Tien 20 80.0 16.0 4.0
Dien Tho 178 93.0 5.0 2.0
Dien Quang 97 88.0 10.0 2.0
Duy Trinh 35 60.0 40.0 0.0
Duy Son 114 62.0 38.0 0.0
Duy Trung 15 58.0 37.0 5.0
Que Xuan 1 25 45.2 54.8 0.0
Que Xuan 2 29 43.0 51.0 6.0
Phu Tho 30 48.0 52.0 0.0
Binh Quy 107 62.0 34.0 4.0
Binh Chanh 40 55.0 42.0 3.0
Binh Que 60 43.0 54.0 3.0
Tam Nghia 105 0.0 100.0 0.0
Tam My Dong 111 5.7 94.3 0.0
Tam My Tay 24 21.3 78.7 0.0
Tam Anh Nam 18 0.0 100.0 0.0
Tam Xuan 1 46 2.2 97.8 0.0
Tam Xuan 2 42 0.0 100.0 0.0
Tam Thai 88 4.2 95.8 0.0
Tam Phuoc 80 0.0 87.0 13.0
Tam Dai 8 0.0 100.0 0.0
Tam Dan 59 4.2 95.8 0.0
Tam Thanh 101 0.0 100.0 0.0
Tam Ngoc 4 0.0 100.0 0.0
Total 1,436.0 32.3 66.0 1.7
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex B Page 20
Consumer Goods of the surveyed households
Communes Surveyed
HH
HH with telephone
(%)
HH with motorbike
(%)
HH with TV (%)
HH with Video Player
(%)
HH with washing machine
(%) Dien Tien 20 60.0 62.0 92.0 73.0 5.0
Dien Tho 178 47.0 32.0 96.0 25.0 3.0
Dien Quang 97 25.0 43.0 75.0 13.0 5.2
Duy Trinh 35 26.0 38.0 83.0 22.0 14.0
Duy Son 114 45.0 55.0 75.0 30.0 4.4
Duy Trung 15 29.0 58.0 61.0 32.0 0.0
Que Xuan 1 25 41.0 62.0 79.0 41.0 0.0
Que Xuan 2 29 43.0 85.0 70.0 33.0 0.0
Phu Tho 30 32.0 80.0 64.0 41.0 0.0
Binh Quy 107 34.0 32.0 83.0 32.0 4.7
Binh Chanh 40 35.0 43.0 75.0 19.0 0.0
Binh Que 60 34.0 38.0 61.0 28.0 8.3
Tam Nghia 105 10.0 75.0 100.0 65.0 10.0
Tam My Dong 111 6.0 80.0 100.0 74.0 8.6
Tam My Tay 24 35.0 77.0 82.0 47.0 0.0
Tam Anh Nam 18 44.0 83.0 98.0 55.0 0.0
Tam Xuan 1 46 51.0 85.0 92.0 57.0 0.0
Tam Xuan 2 42 13.0 67.0 100.0 35.0 0.0
Tam Thai 88 8.0 58.0 100.0 26.0 2.8
Tam Phuoc 80 14.0 68.0 100.0 48.0 6.3
Tam Dai 8 25.0 63.0 100.0 53.0 0.0
Tam Dan 59 13.0 50.0 100.0 30.0 0.0
Tam Thanh 101 9.0 57.0 100.0 13.0 5.0
Tam Ngoc 4 25.0 80.0 100.0 62.0 0.0
Total 1,436 29.3 61.3 86.9 39.8 3.2
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 21
ANNEX C
RESETTLEMENT IMPACTS
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 22
Number of HHs and heads affected by land acquisition in 24 communes
Communes Number of affected HH Number of affected people
Dien Tien 168 706
Dien Tho 287 1,263
Dien Quang 114 490
Duy Trinh 139 667
Duy Son 141 606
Duy Trung 117 480
Que Xuan 1 185 851
Que Xuan 2 97 407
Phu Tho 220 682
Binh Qui 134 563
Binh Chanh 249 971
Binh Que 80 352
Tam Nghia 40 160
Tam My Dong 240 888
Tam My Tay 115 380
Tam Anh Nam 242 1,089
Tam Xuan 1 169 727
Tam Xuan 2 401 1,243
Tam Thai 194 815
Tam Phuoc 149 656
Tam Dai 87 331
Tam Dan 65 273
Tam Thanh 127 546
Tam Ngoc 114 410
Total 3,874 15,556
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 23
Number of affected area of different land types
Commune Loss of
residential land (m2)
Loss of agricultural land (m2)
Loss of forestry land
(m2)
Loss of other types of land
(m2)
Total
(m2)
Dien Tien 19,071 116,100 0 114,669 249,841
Dien Tho 43,975 390,644 0 23,147 457,766
Dien Quang 11,136 105,401 0 16,786 133,322
Duy Trinh 0 180,876 23,459 1,272 205,607
Duy Son 12,589 210,144 20,710 8,692 252,135
Duy Trung 6,613 46,358 15,625 100,993 169,589
Que Xuan 1 8,243 70,503 126327 22,247 227,319
Que Xuan 2 0 79,127 122,054 89,001 290,182
Phu Tho 12,589 91,677 200,086 59,279 363,631
Binh Qui 38,333 96,503 31,917 232,743 399,496
Binh Chanh 11,380 151,466 46,095 39,254 248,195
Binh Que 23,545 61,741 19,900 89,337 194,523
Tam Nghia 3,540 158,584 161,846 113,401 437,371
Tam My Dong 24,630 105,958 185,863 130,227 446,679
Tam My Tay 14,579 73,149 61,459 56,068 205,255
Tam Anh Nam 1,273 109,235 305942 185,951 602,401
Tam Xuan 1 13,863 46,381 39,471 150,630 250,345
Tam Xuan 2 2,971 102,529 109,063 76,416 290,980
Tam Thai 54,463 98,389 34,289 28,482 215,623
Tam Phuoc 11,218 83,140 63,884 44,761 203,003
Tam Dai 4,276 26,745 11,012 21,074 63,107
Tam Dan 8,311 97,357 43,570 30,527 179,765
Tam Thanh 9,370 150,488 63,172 44,262 267,292
Tam Ngoc 11,170 34,128 15,018 11,543 71,859
Total 347,138 2,686,623 1,700,762 1,690,761 6,425,283
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 24
Degree of Impact on agricultural land by Commune
Communes Loss of
agricultural land (m2)
Total Number of HH due to
loss of Agricultural
land
Number of HH affected <20% of the
total agricultural land holding
Number of HH affected from 20% to 30% of
the total agricultural land holding
Number of HH affected from 30% to 70% of
the total agricultural land holding
Number of HH affected more
than 70% of the total
agricultural land holding
Number of HH fully
affected on agricultural land holding
Legal status on land use right
households have Red
book
Households have not granted
with Red book
households will not be eligible to have Red
book
Dien Tien 116,100 91 14 12 33 32 16 55 29 7
Dien Tho 390,644 268 18 20 168 62 31 161 86 21
Dien Quang 105,401 81 12 36 25 8 4 49 26 6
Duy Trinh 180,876 112 17 36 32 27 14 67 36 9
Duy Son 210,144 162 24 52 69 17 9 97 52 13
Duy Trung 46,358 73 11 13 37 12 6 44 23 6
Que Xuan 1 70,503 88 13 22 38 15 8 53 28 7
Que Xuan 2 79,127 86 13 25 37 11 6 52 28 6
Phu Tho 91,677 142 21 16 72 33 17 85 46 11
Binh Qui 96,503 89 13 10 55 11 6 53 29 7
Binh Chanh 151,466 152 23 5 98 26 13 91 49 12
Binh Que 61,741 49 7 21 15 6 3 29 15 5
Tam Nghia 158,584 128 19 60 42 7 4 77 41 10
Tam My Dong 105,958 136 20 13 86 17 9 82 43 11
Tam My Tay 73,149 77 12 19 37 9 5 46 25 6
Tam Anh Nam 109,235 122 18 26 65 13 7 73 39 10
Tam Xuan 1 46,381 61 9 15 32 5 3 37 19 5
Tam Xuan 2 102,529 107 16 6 67 18 9 64 34 9
Tam Thai 98,389 108 16 14 57 21 11 65 34 9
Tam Phuoc 83,140 79 12 13 45 9 5 47 26 6
Tam Dai 26,745 31 5 3 19 4 2 19 9 3
Tam Dan 97,357 63 9 12 32 10 5 38 20 5
Tam Thanh 150,488 113 17 29 45 22 11 68 36 9
Tam Ngoc 34,128 55 8 16 19 12 6 33 18 4
Total 2,686,623 2,473 347 494 1,225 407 210 1485 791 197
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 25
Number of households affected on residential land by commune
Communes Loss of
residential land (m2)
Number of residential
landless HH
Number of HH fully affected on residential
plot with structure
Number of HH fully affected on residential plot without
structure
Number of HH
particial
affected on
residential
plot with
structure
Number of HH
particial
affected on
residential
plot without
structure
Legal status on land use right
households have LURC
Households have not
granted with LURC
households will not be eligible to have LURC
Dien Tien 19,071 39 17 3 17 2 28 7 4
Dien Tho 43,975 83 26 4 46 7 52 24 7
Dien Quang 11,136 32 12 2 15 3 22 6 4
Duy Trinh 0 0 0 0 0 0 0 0 0
Duy Son 12,589 48 13 5 26 4 31 11 6
Duy Trung 6,613 17 8 0 8 1 10 5 2
Que Xuan 1 8,243 19 7 0 11 1 12 4 3
Que Xuan 2 0 0 0 0 0 0 0 0 0
Phu Tho 12,589 27 4 0 21 2 18 5 4
Binh Quy 38,333 48 18 3 24 3 28 18 2
Binh Chanh 11,380 38 12 2 22 2 25 8 5
Binh Que 23,545 53 28 4 17 4 32 16 5
Tam Nghia 3,540 26 4 0 18 4 15 6 5
Tam My Dong 24,630 38 15 2 18 3 22 11 5
Tam My Tay 14,579 32 19 3 8 2 20 8 4
Tam Anh Nam 1,273 12 6 0 5 1 7 3 2
Tam Xuan 1 13,863 64 13 2 45 4 44 16 4
Tam Xuan 2 2,971 25 4 0 18 3 16 6 3
Tam Thai 54,463 85 41 6 32 6 54 31 0
Tam Phuoc 11,218 58 22 3 30 3 35 15 8
Tam Dai 4,276 18 8 0 8 2 10 4 4
Tam Dan 8,311 64 24 4 34 2 38 20 6
Tam Thanh 9,370 32 11 2 14 5 16 5 11
Tam Ngoc 11,170 20 7 0 7 6 14 4 2
Total 347,138 878 319 45 444 70 549 233 96
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 26
Fully affected houses by commune (fully affected area or partially acquired by the project but the remaining area cannot be remained or not convenient for living)
Communes
Total No. of HHs who are fully
affected on houses
Number of fully
affected houses
Classes
Class 1 Class 2 Class 3 Class 4 Temporary
house
Dien Tien 17 17 0 3 1 9 4
Dien Tho 26 26 5 0 0 10 11
Dien Quang 12 12 2 0 0 5 5
Duy Trinh 0 0 0 0 0 0 0
Duy Son 13 13 3 2 1 5 2
Duy Trung 8 8 0 3 0 3 2
Que Xuan 1 7 7 0 2 0 4 1
Que Xuan 2 0 0 0 0 0 0 0
Phu Tho 4 4 0 1 2 0 1
Binh Quy 18 18 3 3 0 12 0
Binh Chanh 12 12 0 3 0 4 5
Binh Que 28 28 0 7 1 14 6
Tam Nghia 4 4 0 0 0 4 0
Tam My Dong 15 15 1 2 1 12 0
Tam My Tay 19 19 0 12 0 7 0
Tam Anh Nam 6 6 0 5 0 1 0
Tam Xuan 1 13 13 3 2 2 3 3
Tam Xuan 2 4 4 0 0 0 4 0
Tam Thai 41 41 4 8 1 25 3
Tam Phuoc 22 22 1 14 0 7 0
Tam Dai 8 8 1 5 0 2 0
Tam Dan 24 24 2 11 1 7 3
Tam Thanh 11 11 1 0 0 7 3
Tam Ngoc 7 7 0 1 0 6 0
Total 319 319 26 84 10 151 49
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 27
Area of fully affected houses according to each house class
Communes Total
Affected area (m
2)
Affected area (m2)
Class 1 Class 2 Class 3 Class 4 Temporary house
Dien Tien 1,048 0 249 75 585 139
Dien Tho 1,548 515 0 0 650 383
Dien Quang 704 205 0 0 325 174
Duy Trinh 0 0 0 0 0 0
Duy Son 936 295 166 80 325 70
Duy Trung 487 0 230 0 195 62
Que Xuan 1 430 0 150 0 245 35
Que Xuan 2 0 0 0 0 0 0
Phu Tho 249 0 83 125 0 41
Binh Quy 1,330 330 220 0 780 0
Binh Chanh 680 0 255 0 260 165
Binh Que 1,759 0 575 65 910 209
Tam Nghia 260 0 0 0 260 0
Tam My Dong 1,140 105 185 70 780 0
Tam My Tay 1,451 0 996 0 455 0
Tam Anh Nam 495 0 430 0 65 0
Tam Xuan 1 892 320 170 130 168 104
Tam Xuan 2 215 0 0 0 215 0
Tam Thai 2,995 412 765 65 1625 128
Tam Phuoc 1,667 100 1,162 0 405 0
Tam Dai 665 120 415 0 130 0
Tam Dan 1,966 206 913 375 375 97
Tam Thanh 640 110 0 0 420 110
Tam Ngoc 480 0 90 0 390 0
Total 22,037 2,718 7,054 985 9,563 1,717
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 28
Partially affected houses by Commune
Communes
Total No. of HHs
who are partially affected
on houses
Number of partially affected houses
Classes
Class 1 Class 2 Class 3 Class 4 Temporary
house
Dien Tien 17 17 0 1 2 14 0
Dien Tho 46 46 4 0 0 42 0
Dien Quang 15 15 4 0 0 11 0
Duy Trinh 0 0 0 0 0 0 0
Duy Son 26 26 2 9 6 9 0
Duy Trung 8 8 0 3 0 5 0
Que Xuan 1 11 11 0 4 0 7 0
Que Xuan 2 0 0 0 0 0 0 0
Phu Tho 21 21 0 3 7 11 0
Binh Quy 24 24 4 6 0 14 0
Binh Chanh 22 22 0 10 0 12 0
Binh Que 17 17 0 5 6 6 0
Tam Nghia 18 18 0 1 0 17 0
Tam My Dong 18 18 4 0 2 12 0
Tam My Tay 8 8 0 0 0 8 0
Tam Anh Nam 5 5 0 0 0 0 0
Tam Xuan 1 45 45 0 23 0 22 0
Tam Xuan 2 18 18 0 4 0 14 0
Tam Thai 32 32 5 11 0 16 0
Tam Phuoc 30 30 5 13 0 12 0
Tam Dai 8 8 3 4 0 1 0
Tam Dan 34 34 5 21 5 3 0
Tam Thanh 14 14 7 0 0 7 0
Tam Ngoc 7 7 0 0 0 7 0
Total 444 444 43 118 28 250 0
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 29
Area of partially affected houses according to each house class
Communes Total Affected
area (m2)
Affected area (m2)
Class 1 Class 2 Class 3 Class 4 Temporary
house
Dien Tien 570 0 40 40 490 0
Dien Tho 1,610 140 0 0 1,470 0
Dien Quang 535 150 0 0 385 0
Duy Trinh 0 0 0 0 0 0
Duy Son 700 45 320 110 225 0
Duy Trung 285 0 110 0 175 0
Que Xuan 1 336 0 175 0 161 0
Que Xuan 2 0 0 0 0 0 0
Phu Tho 609 0 85 139 385 0
Binh Quy 850 188 331 0 331 0
Binh Chanh 784 0 364 0 420 0
Binh Que 597 0 127 260 210 0
Tam Nghia 618 0 23 0 595 0
Tam My Dong 652 140 0 92 420 0
Tam My Tay 280 0 0 0 280 0
Tam Anh Nam 0 0 0 0 0 0
Tam Xuan 1 1,680 0 910 0 770 0
Tam Xuan 2 599 0 109 0 490 0
Tam Thai 1,120 175 385 0 560 0
Tam Phuoc 1,105 175 510 0 420 0
Tam Dai 324 105 184 0 35 0
Tam Dan 1,235 135 815 180 105 0
Tam Thanh 490 245 0 0 245 0
Tam Ngoc 245 0 0 0 245 0
Total 15,224 1,498 4,488 821 8,417 0
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 30
Loss of other Structures
Communes Kitchen (m2) Houses for
poultry (m2)
Sub-house with Fibro cement font
cover (m2)
Cement Playground
(m2)
Brick wall fence (m2)
Iron Gate (m2) Number of
Graves Number of
Well
Dien Tien 246 275 116 160 96 32 167 19
Dien Tho 3,729 235 1,133 845 507 169 304 65
Dien Quang 470 319 318 212 127 42 177 19
Duy Trinh 0 0 0 0 0 0 87 0
Duy Son 204 585 443 1,080 648 216 351 32
Duy Trung 120 270 102 175 105 35 170 9
Que Xuan 1 54 44 65 187 203 87 42 0
Que Xuan 2 0 0 0 0 0 0 90 0
Phu Tho 39 40 77 136 82 27 120 4
Binh Qui 370 1,605 596 1,570 942 314 449 56
Binh Chanh 888 700 269 525 315 105 240 18
Binh Que 312 899 348 1,205 723 241 86 38
Tam Nghia 48 3 63 155 31 6 59 6
Tam My Dong 223 15 290 1,152 145 29 164 22
Tam My Tay 32 43 24 60 12 2 73 0
Tam Anh Nam 13 1 25 83 13 3 129 2
Tam Xuan 1 99 7 79 64 39 8 161 7
Tam Xuan 2 129 10 97 496 48 10 105 10
Tam Thai 478 29 516 1,666 258 52 187 45
Tam Phuoc 152 11 139 602 69 14 89 14
Tam Dai 36 2 63 172 32 6 182 5
Tam Dan 117 9 153 601 77 15 148 15
Tam Thanh 159 11 147 752 73 15 94 15
Tam Ngoc 9 1 14 51 7 1 63 3
Total 7,927 5,114 5,077 11,949 4,552 1,429 3,737 404
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 31
Impacts on annual crops and trees by Commune
Communes Rice (m2) Maize (m2) Sugar cane (m2) Acacia (Tree) Eucalyptus (Tree) Number of other trees
Dien Tien 98,685 15,093 3,583 0 65,361 510
Dien Tho 332,047 50,784 8,068 0 13,194 1,080
Dien Quang 89,591 13,702 2,293 0 9,568 405
Duy Trinh 153,745 23,514 3,632 10,087 725 0
Duy Son 178,622 27,319 4,299 8,905 4,954 585
Duy Trung 39,404 6,027 2038 6,719 57,566 240
Que Xuan 1 59,928 9,165 1,655 54,321 12,681 270
Que Xuan 2 67,258 10,287 2,562 52,483 50,731 0
Phu Tho 77,925 11,918 2,486 86,037 33,789 375
Binh Qui 82,028 12,545 4,490 13,724 132,664 630
Binh Chanh 128,746 19,691 3,461 19,821 22,375 510
Binh Que 52,480 8,026 2,218 8,557 50,922 675
Tam Nghia 134,796 20,616 4,419 69,594 64,639 330
Tam My Dong 90,064 13,775 3,551 79,921 74,229 495
Tam My Tay 62,177 9,509 2,080 26,427 31,959 405
Tam Anh Nam 92,850 14,201 4,230 131,555 105,992 165
Tam Xuan 1 39,424 6,030 2585 16,973 85,859 870
Tam Xuan 2 87,150 13,329 2,892 46,897 43,557 330
Tam Thai 83,631 12,791 2,281 14,744 16,235 1095
Tam Phuoc 70,669 10,808 2,155 27,470 25,514 780
Tam Dai 22,733 3,477 767 4,735 12,012 240
Tam Dan 82,753 12,656 2,283 18,735 17,400 870
Tam Thanh 127,915 19,563 3,497 27,164 25,229 375
Tam Ngoc 29,009 4,437 810 6,458 6,580 210
Total 2,283,630 349,261 72,330 731,328 963,734 11,445
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 32
Affected Small Scale Business household
Communes Number of affected
business HH
Number of affected business HH who have to relocated
Average Incomes of affected business House (VND/HH/month)
Dien Tien 2 1 2,500,000
Dien Tho 1 1 2,000,000
Dien Quang 0 0 0
Duy Trinh 0 0 0
Duy Son 2 1 3,500,000
Duy Trung 1 0 3,000,000
Que Xuan 1 3 3 2,500,000
Que Xuan 2 2 2 2,000,000
Phu Tho 0 0 0
Binh Quy 2 1 2,000,000
Binh Chanh 1 0 750,000
Binh Que 1 1 1,000,000
Tam Nghia 0 0 0
Tam My Dong 3 2 3,000,000
Tam My Tay 3 2 3,000,000
Tam Anh Nam 1 1 2,000,000
Tam Xuan 1 1 1 600,000
Tam Xuan 2 1 1 1,200,000
Tam Thai 5 3 2,500,000
Tam Phuoc 2 2 2,000,000
Tam Dai 0 0 0
Tam Dan 1 1 1,500,000
Tam Thanh 2 2 1,800,000
Tam Ngoc 0 0 0
Total 34 25 2,283,824
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 33
Affected vulnerable households
Communes Number of HH is under the
poverty line set forth by MOLISA
Number of HH with social policy
Number of female- headed HH
Dien Tien 3 5 15
Dien Tho 43 35 38
Dien Quang 23 5 16
Duy Trinh 9 18 13
Duy Son 24 12 26
Duy Trung 4 5 12
Que Xuan 1 7 25 19
Que Xuan 2 6 9 8
Phu Tho 9 21 42
Binh Quy 21 12 20
Binh Chanh 10 12 43
Binh Que 12 7 8
Tam Nghia 26 12 12
Tam My Dong 22 5 8
Tam My Tay 5 5 7
Tam Anh Nam 5 7 17
Tam Xuan 1 13 16 17
Tam Xuan 2 12 5 16
Tam Thai 19 25 36
Tam Phuoc 21 7 24
Tam Dai 2 18 34
Tam Dan 15 7 16
Tam Thanh 26 5 5
Tam Ngoc 1 16 19
Total 338 294 471
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex C Page 34
Number of Household have to Relocated by Land Acquisition
Communes
Total No. of HHs who are fully affected
on houses
Number of HH fully affected on residential plot
without structure
Number of HH who are entitle to get land plot in resettlement site due to loss of agricultural
land
Number of affected
business HH who have to
relocated
Total HHs who have
to relocated
Dien Tien 17 3 32 1 52
Dien Tho 26 4 62 1 92
Dien Quang 12 2 8 0 22
Duy Trinh 0 0 27 0 27
Duy Son 13 5 17 1 35
Duy Trung 8 0 12 0 20
Que Xuan 1 7 0 15 3 22
Que Xuan 2 0 0 11 2 11
Phu Tho 4 0 33 0 37
Binh Quy 18 3 11 1 32
Binh Chanh 12 2 26 0 40
Binh Que 28 4 6 1 38
Tam Nghia 4 0 7 0 11
Tam My Dong 15 2 17 2 34
Tam My Tay 19 3 9 2 31
Tam Anh Nam 6 0 13 1 19
Tam Xuan 1 13 2 5 1 20
Tam Xuan 2 4 0 18 1 22
Tam Thai 41 6 21 3 68
Tam Phuoc 22 3 9 2 34
Tam Dai 8 0 4 0 12
Tam Dan 24 4 10 1 38
Tam Thanh 11 2 22 2 35
Tam Ngoc 7 0 12 0 19
Total 319 45 407 25 771
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex D Page 35
ANNEX D TOR for Replacement Cost Study
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 36
ANNEX E
Estimated Resettlement Cost for the
Quang Nam section
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 37
COST OF LOSS OF LAND
No Items
Number of
affected HH
Units Quantity Unit price
Total cost (VND)
I Compensation land
types 254,558,427,600
1 Agricultural land 106,603,300,800
Dien Ban 440 m2 612,145 54,000 33,055,830,000
Duy Xuyen 347 m2 437,378 36,000 15,745,608,000
Que Son 316 m2 241,307 38,400 9,266,188,800
Thang Binh 290 m2 309,710 36,000 11,149,560,000
Nui Thanh 631 m2 595,836 36,000 21,450,096,000
Phu Ninh 394 m2 456,119 30,000 13,683,570,000
Tam Ky 55 m2 34,128 66,000 2,252,448,000
2 Forest Land 30,881,686,800
Dien Ban m2 0 36,000 0
Duy Xuyen m2 59,794 21,600 1,291,550,400
Que Son m2 448,467 8,400 3,767,122,800
Thang Binh m2 97,912 28,800 2,819,865,600
Nui Thanh m2 863,644 21,600 18,654,710,400
Phu Ninh m2 215,927 16,800 3,627,573,600
Tam Ky m2 15,018 48,000 720,864,000
3 Residental Land 117,073,440,000
Dien Ban 154 m2 74,182 600,000 44,509,200,000
Duy Xuyen 65 m2 19,202 360,000 6,912,720,000
Que Son 46 m2 20,832 288,000 5,999,616,000
Thang Binh 139 m2 73,258 216,000 15,823,728,000
Nui Thanh 197 m2 60,856 360,000 21,908,160,000
Phu Ninh 257 m2 87,638 192,000 16,826,496,000
Tam Ky 20 m2 11,170 456,000 5,093,520,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 38
COST OF LOSS OF STRUCTURES
No Items
Number of
affected HH
Units Quantity Unit price
Total cost (VND)
II Cost for
Structures 60,714,310,000
1 House Class 1 7,378,000,000
Dien Ban 15 m2 1,010 1,750,000 1,767,500,000
Duy Xuyen 5 m2 340 1,750,000 595,000,000
Que Son 0 m2 0 1,750,000 0
Thang Binh 7 m2 518 1,750,000 906,500,000
Nui Thanh 8 m2 565 1,750,000 988,750,000
Phu Ninh 34 m2 1,783 1,750,000 3,120,250,000
Tam Ky 0 m2 0 1,750,000 0
2 House Class 2 18,120,940,000
Dien Ban 4 m2 289 1,570,000 453,730,000
Duy Xuyen 17 m2 826 1,570,000 1,296,820,000
Que Son 10 m2 493 1,570,000 774,010,000
Thang Binh 34 m2 1,872 1,570,000 2,939,040,000
Nui Thanh 49 m2 2,823 1,570,000 4,432,110,000
Phu Ninh 87 m2 5,149 1,570,000 8,083,930,000
Tam Ky 1 m2 90 1,570,000 141,300,000
3 House Class 3 2,076,900,000
Dien Ban 3 m2 115 1,150,000 132,250,000
Duy Xuyen 7 m2 190 1,150,000 218,500,000
Que Son 9 m2 264 1,150,000 303,600,000
Thang Binh 7 m2 325 1,150,000 373,750,000
Nui Thanh 5 m2 292 1,150,000 335,800,000
Phu Ninh 7 m2 620 1,150,000 713,000,000
Tam Ky 0 m2 0 1,150,000 0
4 House Class 4 11,687,000,000
Dien Ban 91 m2 3,905 650,000 2,538,250,000
Duy Xuyen 22 m2 920 650,000 598,000,000
Que Son 22 m2 791 650,000 514,150,000
Thang Binh 62 m2 2,911 650,000 1,892,150,000
Nui Thanh 104 m2 4,498 650,000 2,923,700,000
Phu Ninh 87 m2 4,320 650,000 2,808,000,000
Tam Ky 13 m2 635 650,000 412,750,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 39
No Items
Number of
affected HH
Units Quantity Unit price
Total cost (VND)
5 Temporary
house 527,700,000
Dien Ban 20 m2 696 350,000 243,600,000
Duy Xuyen 4 m2 132 200,000 26,400,000
Que Son 2 m2 76 250,000 19,000,000
Thang Binh 11 m2 374 300,000 112,200,000
Nui Thanh 3 m2 104 250,000 26,000,000
Phu Ninh 9 m2 335 300,000 100,500,000
Tam Ky 0 m2 0 400,000 0
6 Kitchen 3,170,800,000
Dien Ban 133 m2 4,445 400,000 1,778,000,000
Duy Xuyen 55 m2 324 400,000 129,600,000
Que Son 43 m2 93 400,000 37,200,000
Thang Binh 121 m2 1,570 400,000 628,000,000
Nui Thanh 173 m2 544 400,000 217,600,000
Phu Ninh 224 m2 942 400,000 376,800,000
Tam Ky 14 m2 9 400,000 3,600,000
7 Houses for
pountry 1,534,200,000
Dien Ban 133 m2 829 300,000 248,700,000
Duy Xuyen 55 m2 855 300,000 256,500,000
Que Son 43 m2 84 300,000 25,200,000
Thang Binh 121 m2 3,204 300,000 961,200,000
Nui Thanh 173 m2 79 300,000 23,700,000
Phu Ninh 224 m2 62 300,000 18,600,000
Tam Ky 14 m2 1 300,000 300,000
8 Other structures with
Fibro cement font cover 1,061,750,000
Dien Ban 133 m2 1,567 250,000 391,750,000
Duy Xuyen 55 m2 545 100,000 54,500,000
Que Son 43 m2 142 150,000 21,300,000
Thang Binh 121 m2 1,213 200,000 242,600,000
Nui Thanh 173 m2 578 250,000 144,500,000
Phu Ninh 224 m2 1,018 200,000 203,600,000
Tam Ky 14 m2 14 250,000 3,500,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 40
No Items
Number of
affected HH
Units Quantity Unit price Total cost
(VND)
9 Cement Playground 716,940,000
Dien Ban 133 m2 1,217 60,000 73,020,000
Duy Xuyen 55 m2 1,255 60,000 75,300,000
Que Son 43 m2 323 60,000 19,380,000
Thang Binh 121 m2 3,300 60,000 198,000,000
Nui Thanh 173 m2 2,010 60,000 120,600,000
Phu Ninh 224 m2 3,793 60,000 227,580,000
Tam Ky 14 m2 51 60,000 3,060,000
10 Brik Wall Fence 910,400,000
Dien Ban 133 m2 730 200,000 146,000,000
Duy Xuyen 55 m2 753 200,000 150,600,000
Que Son 43 m2 285 200,000 57,000,000
Thang Binh 121 m2 1,980 200,000 396,000,000
Nui Thanh 173 m2 288 200,000 57,600,000
Phu Ninh 224 m2 509 200,000 101,800,000
Tam Ky 14 m2 7 200,000 1,400,000
11 Iron Gate 86,580,000
Dien Ban 133 m2 243 60,000 14,580,000
Duy Xuyen 55 m2 251 60,000 15,060,000
Que Son 43 m2 114 60,000 6,840,000
Thang Binh 121 m2 660 60,000 39,600,000
Nui Thanh 173 m2 58 60,000 3,480,000
Phu Ninh 224 m2 102 60,000 6,120,000
Tam Ky 14 m2 15 60,000 900,000
12 Number of Grave 13,079,500,000
Dien Ban 399 Number 648 3,500,000 2,268,000,000
Duy Xuyen 165 Number 608 3,500,000 2,128,000,000
Que Son 129 Number 252 3,500,000 882,000,000
Thang Binh 363 Number 775 3,500,000 2,712,500,000
Nui Thanh 519 Number 691 3,500,000 2,418,500,000
Phu Ninh 672 Number 700 3,500,000 2,450,000,000
Tam Ky 42 Number 63 3,500,000 220,500,000
13 Number of Well 363,600,000
Dien Ban 103 Number 103 900,000 92,700,000
Duy Xuyen 41 Number 41 900,000 36,900,000
Que Son 4 Number 4 900,000 3,600,000
Thang Binh 112 Number 112 900,000 100,800,000
Nui Thanh 47 Number 47 900,000 42,300,000
Phu Ninh 94 Number 94 900,000 84,600,000
Tam Ky 3 Number 3 900,000 2,700,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 41
COST OF LOSS OF CROPS AND TREES
No Items
Number of
affected HH
Units Quantity Unit price Total cost (VND)
III Cost for Crop
and Trees 20,678,815,300
1 Rice 11,418,150,000
Dien Ban 440 m2 520,323 5,000 2,601,615,000
Duy Xuyen 347 m2 371,771 5,000 1,858,855,000
Que Son 316 m2 205,111 5,000 1,025,555,000
Thang Binh 290 m2 263,254 5,000 1,316,270,000
Nui Thanh 631 m2 506,461 5,000 2,532,305,000
Phu Ninh 394 m2 387,701 5,000 1,938,505,000
Tam Ky 55 m2 29,009 5,000 145,045,000
2 Annual crops 6,323,970,000
Dien Ban 440 m2 93,523 15,000 1,402,845,000
Duy Xuyen 347 m2 66,829 15,000 1,002,435,000
Que Son 316 m2 38,073 15,000 571,095,000
Thang Binh 290 m2 50,431 15,000 756,465,000
Nui Thanh 631 m2 97,217 15,000 1,458,255,000
Phu Ninh 394 m2 70,278 15,000 1,054,170,000
Tam Ky 55 m2 5,247 15,000 78,705,000
3 Production forest trees 1,105,495,300
Dien Ban 440 m2 0 650 0
Duy Xuyen 347 m2 59,794 650 38,866,100
Que Son 316 m2 448,467 650 291,503,550
Thang Binh 290 m2 97,912 650 63,642,800
Nui Thanh 631 m2 863,644 650 561,368,600
Phu Ninh 394 m2 215,927 650 140,352,550
Tam Ky 55 m2 15,018 650 9,761,700
4 Other Trees 1,831,200,000
Dien Ban 154 Number 1,995 160,000 319,200,000
Duy Xuyen 65 Number 825 160,000 132,000,000
Que Son 46 Number 645 160,000 103,200,000
Thang Binh 139 Number 1,815 160,000 290,400,000
Nui Thanh 197 Number 2,595 160,000 415,200,000
Phu Ninh 257 Number 3,360 160,000 537,600,000
Tam Ky 20 Number 210 160,000 33,600,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 42
COST FOR RESETTLEMENT SITES DEVELOPMENT
Districts Total No. of HHs who prefer to resettlement site
Number of Plots Required
Area of Resettlment Site Required (m2)
Unit Price (VND/m2)
Cost of Resettlement Area (VND)
IV
Resettlement Sites
Development 98,137,600,000
Dien Ban 428 428 44,880 400,000 17,952,000,000
Duy Xuyen 306 306 30,052 400,000 12,020,800,000
Que Son 272 272 25,806 400,000 10,322,400,000
Thang Binh 290 290 32,230 400,000 12,892,000,000
Nui Thanh 580 580 58,344 400,000 23,337,600,000
Phu Ninh 416 416 48,818 400,000 19,527,200,000
Tam Ky 50 50 5,214 400,000 2,085,600,000
Total 2,342 2,342 245,344 98,137,600,000
COST OF LOSS OF PUBLIC FACILITIES
No Items Units Quantity Unit price Total cost (VND)
V Public facility 908,500,000
500KV Electric Pole Number 1 75,000,000 75,000,000
220KV Electric Pole Number 5 50,000,000 250,000,000
35KV Electric Pole Number 8 30,000,000 240,000,000
10KV Electric Pole Number 11 20,000,000 220,000,000
0.4KV Electric Pole Number 35 2,500,000 87,500,000
Telephone pole Number 18 2,000,000 36,000,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 43
COST OF LOSS OF BUSINESSES
No Items
Number of
affected HH
Materials transport allowance
Business disruption allowance
Total cost (VND) Unit price
(VND/HH) Cost
Unit price (VND/HH/ 03Months)
Cost
VI Loss of Business
499,000,000
Non-Registered business HHs 16 2,500,000 40,000,000 9,000,000 144,000,000 184,000,000
Registered business HHs 18 2,500,000 45,000,000 15,000,000 270,000,000 315,000,000
COST FOR RCS (REPLACEMENT COST SURVEY)
No Items Units Quantity Unit price
(VND) Total cost
(VND)
IX Replacement Cost Study Commune 24 10,000,000 240,000,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 44
ALLOWANCES
No Items
Number of affected HH
Units Quantity Unit price
(VND) Total cost (VND)
Allowances/ Assistance 4,486
581,103,826,000
1 For Impact on Residential Land
34,047,600,000
Relocation Allowance
Relocation within the province
364 Houshold 364 3,000,000 1,092,000,000
Relocation to another province
0 Houshold 0 4,000,000 0
House Repairing Cost
House repairing cost in case of
house/structure is partially affected
444 m2 51,286 600,000 30,771,600,000
House Renting Allowance
House rental allowance for
temporary residential purposes
500.000/person for 6 months
364 Houshold 364 6,000,000 2,184,000,000
2 Impact on Agricultural Land
465,489,126,000
Allowance for Living/Production Stabilization
HH losing from 20% to 70% of agricultural land holding
HH losing from 20% to 70% of
agricultural land holding and have to be relocated
300,000/person/month;
assistance time: maximum in 2
years
32 Person 134 7,200,000 964,800,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 45
HH losing from 20% to 70% of
agricultural land holding and not
required to relocate
300,000/person/month;
assistance time: 6 months
1,687 Person 7,085 1,800,000 12,753,000,000
HH losing more than 70% of agricultural land holding
HH losing from more than 70% of agricultural land holding and have to be relocated
300,000/person/month;
assistance time: maximum in 3
years
178 Person 748 10,800,000 8,078,400,000
HH losing from more than 70% of agricultural land holding and not
required to relocate
300,000/person/month;
assistance time: 1 year (12 months)
229 Person 962 3,600,000 3,463,200,000
HH losing less than 20% of agricultural land holding
HH losing from more than 70% of agricultural land holding and not
required to relocate
300,000/person/month;
assistance time: 1 year (12 months)
347 Person 1388 3,600,000 4,996,800,000
Assistance for changing job
03 time of land price
2,473 m2 2,686,623 162,000 435,232,926,000
Training Course
2,473 Houshold 2,473 1,500,000 3,709,500,000
3 Other Allowance
53,932,100,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex E Page 46
Incentive Bonus
3,874 Houshold 3,874 5,000,000 19,370,000,000
House Repairing Cost
House repairing cost in case of
house/structure is partially affected
444 m2 51,286 600,000 30,771,600,000
Assistance for Connetion Fee
771 Houshold 771 3,500,000 2,698,500,000
Material Transport Allowance
364 Houshold 364 3,000,000 1,092,000,000
4 Allowance Targeted to Vulnerable Group
27,635,000,000.00
Allowance for Vulnerable group
2,126 Person 5,527 5,000,000 27,635,000,000
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex F Page 47
ANNEX F
TERMS OF REFERENCE (T.O.R.)
OF
EXTERNAL MONITORING SERVICE FOR
RAP IMPLEMENTATION
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex F Page 48
TERMS OF REFERENCE (T.O.R.)
OF
EXTERNAL MONITORING SERVICE FOR RP IMPLEMENTATION
(DA NANG – QUANG NGAI EXPRESSWAY PROJECT)
I. BACKGROUND
- The Da Nang - Quang Ngai Expressway Construction Project (the DQEP) is one
of the important transport infrastructure projects approved by the Viet Nam
Government’s Decision 412/QD-TTg of April 11, 2007. The Prime Minister’s
letter No. 1734/QD-TTG of December 1, 2008 gave high priority to early
completing this project.
- The technical design of Project has been completed with basic works including
the construction and operation of a road section which goes through one city
and two provinces in the central of Vietnam including Da Nang City, Quang
Nam and Quang Ngai provinces. It is the one component of the national North-
South trunk Expressway.
II. EXTERNAL MONITORING
II.1. Objectives
Broad objectives of monitoring include the following:
a. To provide the Bank with an objective feedback on the implementation of the
resettlement policy.
b. To provide project management with an effective tool for assessing
‘Resettlement and Rehabilitation Plan ‘ implementation at various stages and
to identify problem areas and recommend remedial measures for efficient
implementation of the policy.
c. To assess the effectiveness of the social policy and whether its objectives have
been achieved.
II.2. Monitoring Targets and Functions
The monitoring targets and functions will include the following:
- Review the existing baseline and data gather additional socio-economic
baseline data, if necessary, on sample families that are severally affected by
the project and are entitled to receive compensation for all of their lost assets
or for resettlement and rehabilitation;
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex F Page 49
- Monitor implementation of the compensation policy and public information
campaign;
- Identify and discrepancy between the policy requirements and actual practice,
as well as any local level grievances;
- Provide recommendations for improving implementation of its policy.
II.3. Methodology
Monitoring methodology will consist of the following:
a. Random review of DMS forms for correct inventory of assets and entitlements.
This review should sample about 30% of all the DMS forms
b. Random review of entitlement and compensation documents to ensure that
the assessment of compensation is based on “replacement cost” and is in full
compliance with policy’s requirements. This review shall cover 30% of all DPs,
selected through stratified random sampling method.
c. Random site visits, coordinated with the implementation activities are taking
place, to ascertain that compensation has been duly paid prior to the start up
of construction works under the projects; compensation is assessed based on
the principle of replacement cost and grievances, if any, are solved to the
satisfaction of the DPs. This activity should cover at least 20% of all DPs each
year. For these purposes monitoring of the following aspects will be required:
- Inventory of affected assets;
- Assessment of compensation for all types of affected assets based on
replacement cost;
- Compensation is paid prior to initiation of works.
d. Special studies aimed to ascertain adequacy of compensation paid for land
acquisition and/or other fixed assets, against current market prices.
e. Random field visits at least once every 3 months, covering at least 30% of the
DPs to check the following:
(i) Whether PMU85 has informed them of individual entitlements and
compensation amounts due to them and whether they have received
compensation entitlement forms;
(ii) To ascertain that affected people are adequately informed of project
objectives, its impacts, compensation policy and entitlements through an
effective public information campaign; and
(iii) To assess if grievance procedures are adequately explained to the affected
people and implemented.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex F Page 50
Sample
To verify the quantitative aspects of implementation, sample surveys of various types
of impacts should be conducted. A stratified sample should cover target groups for
each category, such as land owners, affected house owners, tenants or workers;
those affected by the loss of land, structures, incomes; and those need to be
reorganized and relocated. While making quantitative assessments of land
acquisition activities all the provinces and districts should be covered. Particular
attention should be paid to adequately cover all the towns effected by the project.
Data Collection Methods
Data and information will be gathered through:
Questionnaires, to be personally administered.
Direct interviews with affected households
Specific focus group interviews aimed at identifying the specific problem issues
related to groups such as self-employed persons with businesses, farmers and
workers affected by loss of job, tenants affected by loss of place of residence,
women heads of households, etc.
Community meetings to discuss problem issues and identify solutions
Project staff in the field
Data Analysis
Data and information collected will be analyzed by project, affected area,
resettlement sites, levels of compensation, type of impact, type of impact, etc.
Data Base Storage
The Monitoring Team will maintain a data base of resettlement monitoring
information that will be updated every three months. It will contain certain files on
each affected household and will be updated based on information collected in
successive rounds of data collection. All data bases compiled will be fully accessible to
the project authorities.
Monitoring and Evaluation Indicators
The following aspects of the resettlement policy will be monitored and evaluated
regularly by the MA:
a. Assessment and Payment of Compensation
(i) Whether the inventory of affected assets is recorded properly;
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex F Page 51
(ii) Whether the entitlements to compensation, resettlement and
rehabilitation assistance benefits to each DPs are provided correctly;
(iii) Whether the assessment of compensation for different types of assets,
especially for affected land and structures, are based on the current market
prices; and
(iv) The payment of compensation is in accordance with the summary
compensation forms given to the DPs.
b. Linkage to Resettlement and Construction
(i) The completion of land acquisition and resettlement activities on a phase,
section or sub-section of the project at least one month before the start of
physical works on that phase, section or sub-section.
c. Provision of Resettlement Site
(i) Affected people who are entitled to land-for-land option and for relocation
to a resettlement site and who opt for relocation to a resettlement site,
should be consulted about the location of the site;
(ii) Full public participation and consultation has taken place in respect to the
site design, provision of public facilities, plot allocation and relocation
activities.
d. Provision of Economic Rehabilitation Assistance (Training, Employment and
Availability of Credit Assistance)
(i) Full consultation with DPs entitled to economic rehabilitation assistance on
the types of assistance required (only severally affected DPs due to the loss
o productive assets, jobs, employment and businesses are entitled to
economic rehabilitation assistance)
(ii) Where training is the preferred option, it should be provided for one
member of each eligible family within three months of the date of
relocation. The kind of training will depend on the preference of the
affected person and the availability of a training course;
(iii) Whether the economic rehabilitation assistance covers at least 30%
women headed households; and
(iv) Job placement to entitled persons is provided within 2 months of the date
of land acquisition
e. Public Consultation
(i) Affected persons should be informed and consulted about resettlement
activities, such as implementation schedule for the project and shifting of
DPs from their present location, resettlement site design, location and plot
allocation (the monitoring team should attend at least one public
consultation meeting each month to monitor public consultation
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex F Page 52
procedures, problems and issues that arise during the meetings, and
solutions that are proposed).
f. Level of Satisfaction
(i) The level of satisfaction of affected persons with various aspects of the
RAP, especially with the compensation levels for affected assets;
(ii) With the grievance redressal mechanism and whether the DPs are satisfied
with the procedures and the outcome of the grievances. The survey should
cover at least 30% of the DPs who have raised grievances on various issues.
g. Standard of Living
(i) Throughout the implementation process, the trends of living standards
should be observed and the potential problems in the restoration of living
standards should be identified and reported
h. Awareness of Compensation Policy
(i) Awareness of the compensation policy and their entitlements among the
DPs;
(ii) Awareness of various options available to DPs as provided for in the policy
for land acquisition, compensation and resettlement;
(iii) Awareness of grievance redressal procedures; and
(iv) Whether the DPs have received a copy of the Public Information Booklet
(PIB).
II.4. Follow-up Socio-Economic Survey
Nine months to one year after the end of resettlement activities, the MA shall
conduct a follow-up socio-economic survey to determine the impact of the project on
income levels and living standards of the affected people. The households to be
covered by the follow-up study will be the same for whom the baseline data has
already been collected during the earlier stages of the monitoring activities.
It should be note that the agency assigned for external monitoring between
December 1997 - June 1999 has already completed baseline survey and the data is
available in PMU85 office for reference of the contracting agency.
III. REPORTING REQUIREMENT
III.1. Reports
The External Monitoring Agency (EMA) shall prepare and submit two copies to
PMU85 and one copy direct to the World Bank, of each of the following reports:
- Inception report: to be submitted 30 days after the work begins. The report
shall contain a brief methodological approach to external monitoring, review
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex F Page 53
of the baseline data collected by the former external monitoring agency
(Inventory of external monitoring reports for RAP implementation, Dec. 1st
1997 to June 30, 1999), and issues arising.
- Quarterly Monitoring Reports: MA shall prepare a comprehensive report
summarizing all activities and covering all aspects of resettlement and
monitoring indicators specified above. The report should highlight the issues
and problems arising and suggest mitigation measures. The quarterly
monitoring reports should be submitted within two weeks of completion of
the three-month monitoring period. The report should particularly focus on:
(i) A report of progress of implementation of all aspects of RAPs;
(ii) Deviations, if any, from the provisions and principles of the PMU85
policy on land acquisition, compensation and resettlement;
(iii) Identification of problem, issues and recommended solutions, so that
PMU85 is informed about the ongoing situation, and can resolve
problems in a timely manner; and
(iv) Report progress on the follow-up of problems and issues identified in
the previous report.
III.2. Reporting language:
All the reports will be prepared in two languages: Vietnamese and English with three
copies for each language.
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 54
ANNEX G
PROPOSED DMS QUESTIONNAIRE
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 55
DMS QUESTIONAIRE
Da Nang – Quang Ngai Expressway project
----------------------
Province Identification Number
GENERAL INFORMATION OF AFFECTED HOUSEHOLD
1. Name of household‘s head:......................................................................................
2. House number:................ Street:..............................................................................
3. Hamlet:……………………. Village:…….….… ………………………………...
4. Commune: ……………………………….….…………..………………………..
5. District:…………… ………………………………………………………………
6. Household Head’s Ethnicity :………… ..….……………………………….…….
7. Family Religion :…… ……………………….……………………………………
8. Number of residents in the household:.......................person
Date,.........................................
Household Representative's Signature Surveyor Signature
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 56
A1. SURVEY OF EXISTING BUILT STRUCTURES
No
Structure Item Description
Item code
Total area (m2)
Month & Year of
Construction
Legal status (See
code below)
Ownership (See code
below)
If rented, monthly rental (in
VND)
Building material (Using codes below for each relevant item)
House Class as specified in
certificate (ask only Household with certificate)
Affected/destroyd area (m2)
Found Floor wall Roof In ROW
area Total
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
1
2
3
4
5
6
7
8
9
10
11
Application Codes:
(2) Structure Item code (5) Legal Status (6) Ownership (8-11) Buiding material
1. Residential house 2. Secondary house 3. Workshop 4. Shop/Restaurant 5. Warehouse 6. Yard (cement/brick) 7. Detached Latrine
8. Detached bathroom 9. Well 10. Anima cage 11. Grave/Tomb 12. Fence 13. Other
1. With construction permission certificate 2. Without construction certificate
1. Inherited (from parent, grandparent etc.) 2. Constructed on Own 3. Purchased from private owner 4. Rented from private owner 5. provided by/rented from local gornment 6. provided by/rented from cooperative/employer/other organization 7. Other
1. Concrete 2. Brick/stone/cement 3. Wood 4. Floor tile 5. Roofing tile 6. Fibro-cement 7. Steal/iron/tin roofing sheet
8. PVC roofing sheet 9. Asphalted paper/canvas 10. Tree/baamboo/rattan 11. Straw/leaves 12. Mud/clay/earth 13. Other
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 57
A.2 SURVEY OF EXISTING LAND
No Land type
Land type Code (see
codes below)
Total area (m2)
Land quality classification (see codes below)
Legal status (see codes
below)
Land tunure (see codes
below)
Date of first use (month/year)
If rented, monthly rental
(in VND)
Lost of area due to land
acquisition (m2)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1
2
3
4
5
6
7
8
9
10
11
12
Application Codes:
(1) Land Type code (4) Land classification (5) Legal status (6) Land ownership
1. Residential land 2. Agricultural land 3. Garden/orchard land 4. Water surface 5. Grave/Tomb 6. Vacant land 7. Commercial land 8. Other
1. Class 1 2. Class 2 3. Class 3 4. Class 4 5. Unclassifiable
1. With long-term land use right certificate 2. With short-term land use right certificate 3. without land use right certificate
1. Inherited (from parent, grandparent etc.) 2. Purchased from private owner 3. Rented from private owner 4. provided by/rented from local gornment 5. provided by/rented from cooperative/employer/other organization 6. Squatter land 7. Dispute land 8. Other
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 58
A.3 SURVEY OF CROPS AND TREE
No
Crop Fruit Trees Wood Trees
Type of crop Crop classificatgion (see codes below)
Area of crop lost in ROW (m2)
Type of Tree Tree classificatgion (see codes below)
Number of tree lost in
ROW Type of Tree
Tree classificatgion (see codes below)
Number of tree lost in
ROW
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1
2
3
4
5
6
7
8
9
10
11
12
Applicable codes:
(2) Crop Classification (5) Fruit trees classification (8) Wood trees classification
A. Healthy and good yield B. Newly planted (less than 1 months)
A. Fruit Tree bearing fruit B. Fruit Tree without bearing fruit C. Newly planted (less than 1 year)
A. Big size and good quality B. Medium size and good quality. C. Newly planted (less 2 years)
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 59
A.4 SURVEY OF BUSSINESS HOUSEHOLDS
No Type of business Net annual money income earned from
business (VND) Legal status (see codes below) Number of worker
(1) (2) (3) (4)
1 Manufacturing
2 Sales
3 Hotel/restaurant
4 Service
5 Land and/or house rental
6 Other (specify)
Applicable codes:
(3) Legal status
1. Registered business household
2. Non-registered business household
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 60
A5. PREFERENCES AND OPINIONS OF AFFECTED HOUSEHOLDS
1. How would you prefer to get compensation for your house, land and other properties? That is (circle one which applies):
a. In cash b. In kind c. Both cash and kind
2. How would you prefer to be relocated? That is (circle one which applies): a. To be relocated on own within the remaining land b. To purchase land and/or house elsewhere and resettled there on own c. To get land in the proposed resettlement site and to build house on
own. d. To get pre-built house and land in the proposed resettlement site.
3. If your household is considered eligible for nominating one member to be trained in accordance with the government regulation, what occupation do you think the (appointed) person would prefer to be trained?
1. Agricultural technique/technology 2. Mechanic 3. Electric 4. Electronic 5. Construction worker6. Driver 7. Tailor
8. Carpenter 9. Welder 10. Barber 11. Computer 12. Accountant 13. Other
4. How do you think that the project will have impacts on the following aspect of your family (Surveyor ask to respondent’s self-assessment of possible impacts).
Aspect of self-assessment
Level of assessment
Strongly negative
Negative Neutral/ no
impact Positive
Don’t know
(1) (2) (3) (4) (5)
Household income
Employment
Education of children
Family integrity
5. Do you have any suggestions to the government relating to land and/or house compensation and relocation or so? If yes, Please specify (surveyor ask for maximum of 3 suggestions and write them down clearly and concisely in each row):
a. Suggestion 1:
b. Suggestion 2:
c. Suggestion 3:
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 61
B. SOCIO-ECONOMIC SURVEY QUESTIONAIRE
(To be conducted for one out of every three households in the survey area)
1. Please provide us the name and personal characteristics of all usuall members of your family, begining from household head.
No Name
Relationship to Household
head (see codes below)
Sex 1. Male 2. Female
Year of birth
Marital status (see
codes below)
Highest grade of education
completed (grade from 1 -12)
Highest skill level/tertiary
education attained (see codes below)
Working status/ Occupation (see codes
below)
Place of work
(see codes below)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1
2
3
4
5
6
7
8
9
10
Applicable codes:
(2) Relationship to Household head (5) Marital status (7) Highest skill level/tertiary
education attained (8) Working status/ Occupation (9) Place of work
1. Household head 2. Spouse 3. Child 4. Grandparents 5. Parent
6. Child in law 7. Grandchild 8. Sibling 9. Other relative 10. Non-relative
1. Never married 2. Married 3. Divorced/separated 4. Widowed
1. None 2. Technical worker 3. Middle vocational 4. College 5. University or higher
1. Cultivation 2. Husbandry/fishery 3. Manufacturing worker 4. Business 5. Professionals
6. Service 7. Government servant 8. Not working (because of old, sick, disable etc. 9. Other occupation 10. Not working, unemployed
1. On will be affected land 2. Other place in the village 3. Elsewhere
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 62
2. Please tell us all the income sources of your household (Not including individual income that were already reported in the table above)
Sources of income Estimated Net Monthly
Income (VND)
Estimated Annual Income If Monthly Income is inapplicable (VND)
(1) (2) (3)
Cultivation
Husbandry/fishery
Manufacturing
Business
Service
Land and/or house rental
Saving interest
Wage, Salary, Pension and Social benefit
Remittances from other place(s)
Other (specify)
3. What are your main sources of drinking water? (Circle all that apply):
1. In-house piped water
2. Public tap/tank
3. Pumped well (e.g. UNICEF type)
4. Traditional well (without pump)
5. River, stream, canal, lake, pond
6. Rain water
7. Bought from vendor
4. What type is your toilet facility? (circle one which that apply):
1. Flash toilet
2. Pit latrine
3. Without pit latrine (built on earth)
5. Public toilet
6. Latrine built on river, canal, pond
7. No (built) toilet at all
5. What is your main source of electric power? (Circle all that apply):
1. Electricity from national system
2. Electricity from private generator
3. Electricity from other sources
4. None-electricity
6. Does your household possess any of the the following assets/ equipments? (If yes, specify the quantity of each kind; if no, record 0 (zero) and do not leave blank):
No Type of
assets/durables/equipments Quantity No
Type of assets/durables/equipments
Quantity
1 Cassette/ Radio-cassette player
1 Motorbike
2 Black white TV set
2 Boat
3 Color TV set
3 Telephone
4 Refrigerator
4 Automobile
5 Electricity generator
5 Water pump
6 Bicycle/ cyclo
6 Washing machine
Da Nang – Quang Ngai Expressway Project
Resettlement Plan – Quang Nam Section January 2011
Annex G Page 63
7. Do your members in your household have health insurance? (circle one which that apply):
1. Yes
2. No
8. Does your household experience with periodic health check?
1. Periodic health care check
2. No perodic health care check
9. Where does your household check your health?
1. Local health unit
2. District health center
3. Private clinic
5. Hospital
6. Pharmacies
7. Oriental Pharmacies