Region IX Postharvest Development Plan 1 D. REGIONAL LEVEL AGREEMENTS/IMPLEMENTATION PLAN/STRATEGIES This section contains the regional agreements made during the regional postharvest workshop of Region IX. In the regional postharvest workshop, the proposed interventions of the provinces and city were validated and some of the locations for proposed projects at the provincial level have been cancelled. Participants were keener on the components of the proposed project rather than the cost. Thus, some projects have been renamed based on its components. Locations of the proposed projects were changed and some provinces added more locations for the proposed projects. They based their validation on the on-going projects and the necessity of the project in the locality. Other proposed locations that are for consideration of Office of the Provincial Agriculturist (OPAg) or Office of the City Agriculturist (OCAg) in the Provincial/City Postharvest Development Plans have been identified. In addition, during the regional postharvest workshop the participants have also come up with new proposed projects or priority development projects to address the major development concerns of the region. These lists of proposed projects will also serve as an input in the planning or decision making of the DA- Regional Field Unit IX for agricultural development. It will also serve as reference to interested investors, be it local or private and to collaborators who provide grants or financial assistance from the local government, private entities and even foreign agencies. Realization and proper implementation of these proposed projects in the region will definitely improve its agricultural environment. Their existence will provide farmers access of adequate and appropriate production and postproduction facilities and technologies that would empower them to become more productive, competitive and to develop their capability to become entrepreneurs. Economic impact of these projects upon operationalization in the long run include employment generation, reduced postharvest losses, improved status of living of farmers, enhancement of local economy, entrepreneurial development and farm mechanization, among others. The following are the new project proposals and priority agricultural development programs identified during the regional postharvest workshop to address the major development concerns at the regional level. These projects need further analysis in order to determine the factors to be considered for the implementation of such project. a. Provision of Postharvest Facilities for Rice and Corn

Upload: duongdung

Post on 16-Mar-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Region IX Postharvest Development Plan 1

D. REGIONAL LEVEL AGREEMENTS/IMPLEMENTATION

PLAN/STRATEGIES

This section contains the regional agreements made during the regional postharvest

workshop of Region IX. In the regional postharvest workshop, the proposed interventions of

the provinces and city were validated and some of the locations for proposed projects at the

provincial level have been cancelled. Participants were keener on the components of the

proposed project rather than the cost. Thus, some projects have been renamed based on its

components. Locations of the proposed projects were changed and some provinces added

more locations for the proposed projects. They based their validation on the on-going

projects and the necessity of the project in the locality. Other proposed locations that are for

consideration of Office of the Provincial Agriculturist (OPAg) or Office of the City

Agriculturist (OCAg) in the Provincial/City Postharvest Development Plans have been

identified. In addition, during the regional postharvest workshop the participants have also

come up with new proposed projects or priority development projects to address the major

development concerns of the region.

These lists of proposed projects will also serve as an input in the planning or

decision making of the DA- Regional Field Unit IX for agricultural development. It will also

serve as reference to interested investors, be it local or private and to collaborators who

provide grants or financial assistance from the local government, private entities and even

foreign agencies.

Realization and proper implementation of these proposed projects in the region will

definitely improve its agricultural environment. Their existence will provide farmers access

of adequate and appropriate production and postproduction facilities and technologies that

would empower them to become more productive, competitive and to develop their

capability to become entrepreneurs.

Economic impact of these projects upon operationalization in the long run include

employment generation, reduced postharvest losses, improved status of living of farmers,

enhancement of local economy, entrepreneurial development and farm mechanization,

among others.

The following are the new project proposals and priority agricultural development

programs identified during the regional postharvest workshop to address the major

development concerns at the regional level. These projects need further analysis in order to

determine the factors to be considered for the implementation of such project.

a. Provision of Postharvest Facilities for Rice and Corn

Region IX Postharvest Development Plan 2

b. Establishment of Small Scale Storage Facility for Seeds (Rice and Corn)

c. Establishment of Banana Processing Facility

d. Establishment of Minimal Processing and Packaging Plant for Fruits and

Vegetables

e. Establishment of Coffee Processing Center

f. Establishment of Abaca Processing Facility

g. Establishment of Agricultural Tramline for Cassava

h. Establishment of Fish Landing Site with Ice Plant and Cold Storage

i. Establishment of Multi-Commodity Solar Tunnel Dryer

j. Establishment of Fish Processing Plant

k. Establishment of Seaweed Noodle Processing Center

Region IX Postharvest Development Plan 3

Table 52. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX

List of Projects Brief Description Proposed Locations Regional Level Agreement

RICE AND CORN

Establishment of

Community

Based Drying

Center for Rice

and Corn

The center shall serve as a service

provider, and will showcase different

technologies for drying grains

COMPONENT:

MODULE 1- Maligaya Flatbed Dryer (1 unit)

Drying shed (1 unit)

Moisture Meter (1 unit)

MPDP (2 units)

Tarpaulin sheet (1 unit)

Weighing Scale (1 unit)

Hauling Tractor (1 unit)

MODULE II – Maligaya Flatbed Dryer (2 units)

Drying shed (1 unit)

Moisture Meter (1 unit)

MPDP (1 unit)

Tarpaulin Sheet (1 unit)

Weighing Scale (1 unit)

Hauling Tractor (1 unit)

MODULE III – MPDP (4 units)

Moisture Meter ( 1 unit)

Tarpaulin sheet (1 unit)

Temporary Storage (1 unit)

Weighing Scale (1 unit)

Hauling Tractor (1 unit)

Zamboanga City: Vitali District, Ayala District,

Culianan District

Zamboanga del Norte: District I: Sergio Osmeña, Polanco

District II: Dipolog City, Siayan,

Katipunan, Manukan

District III: Salug, Liloy, Gutalac

Zamboanga del Sur: District I: Mahayag, Molave,

Dumingag

District II: San Pablo, San Miguel,

Kumalarang

Zamboanga Sibugay: District I: Payao, Alicia, Diplahan

District II: Titay, RT Lim,

Tungawan, Siay (2 units)

ADDITIONAL LOCATIONS

Zamboanga City: Brgy Manicahan, Brgy Quinipot & Brgy

Talabaan

Zamboanga del Sur:

(w/ Recirculating Dryer) District I: Tambulig, Ramon

Magsaysay, Midsalip

District II: Guipos, Dimataling, Bayog,

Tigbao

Zamboanga Sibugay: (Village Type Level)

District I: Malangas

District II: Ipil, Naga, Titay

Region IX Postharvest Development Plan

4

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

RICE AND CORN

Establishment of

Farmers Service

Center for Rice

and Corn

The center is either a service provider

or a business enterprise engage in

delivering postharvest operations like

drying, warehousing, hauling, milling,

and marketing.

Zamboanga City: Manicahan District, Culianan District,

Vitali District

Zamboanga del Norte: District I: Polanco, Sergio Osmeña,

Dapitan City

District II: Dipolog City, Sindangan,

Katipunan

District III: Siocon, Kalawit,

Labason

Zamboanga del Sur: District I: Mahayag, Tambulig,

Labangan, Molave

District II: Kumalarang, Tigbao,

Guipos, Bayog

Zamboanga Sibugay:

District I: Diplahan, Buug, Alicia,

Talusan

District II: Titay, R.T. Lim

ADDITIONAL LOCATIONS

Zamboanga City: (Village-Type w/ Combine Harvester)

Brgy. Quinipot & Brgy. Ayala

Zamboanga del Sur: (w/ 4WD Tractor)

District I: Aurora

District II: San Pablo, San Miguel,

Diñas

Zamboanga Sibugay:

(w/ Mobile Corn Mill) District II: Ipil

Region IX Postharvest Development Plan

5

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

CORN

Establishment of

Integrated Grains

Processing Center

This center will be equipped with

improved postharvest facilities and

will provide services on grain

postharvest processing and corn feed

processing.

Zamboanga City

CANCELLED

ADDITIONAL PROPOSED PROJECT for RICE AND CORN

Provision of

Postharvest

Facilities for Rice

and Corn

The facilities include rice threshers,

corn shellers with hauler, mobile rice

mill and mobile corn mill.

Zamboanga del Sur: District I: Tambulig, Midsalip,

Ramon Magsaysay,

Tukuran, Labangan,

Aurora, and Molave

District II: Guipos, Dimataling,

Kumalarang, San Pablo,

Margosatubig, Lapuyan,

Tigbao, V. Sagun

Region IX Postharvest Development Plan

6

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

ADDITIONAL PROPOSED PROJECT for RICE AND CORN

Establishment of

Small Scale

Storage Facility

for Seeds (Rice

and Corn)

The small scale storage facility will

preserve the viability of certified

seeds. This facility will also help the

farmers to gain rapid access to quality

seeds of the most profitable varieties at

an affordable price.

Zamboanga City:

Brgy Tumaga

HIGH VALUE COMMERCIAL CROPS

Provision of

Mango

Packinghouse

This establishment will provide

postharvest operations for mango such

as sorting, grading, application of hot

water treatment, labeling and

packaging.

Zamboanga del Norte

ADDITIONAL LOCATIONS

Zamboanga del Norte: District II: Sindangan, Katipunan,

Manukan, Roxas, Jose

Dalman

District III: Labasan, Liloy

Zamboanga del Sur: Dumalinao

Region IX Postharvest Development Plan

7

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

HIGH VALUE COMMERCIAL CROPS

Establishment of

“First Fry”

Processing Plant

for Banana

The facility will provide technology

and equipment to banana growers. The

farmers will also be provided with the

basic training and equipment on

postharvest handling and processing.

Zamboanga del Norte

INSTEAD OF “FIRST FRY”

CHANGED IT TO BANANA

PROCESSING FACILITY

Zamboanga del Norte:

Roxas, Dapitan City

Zamboanga del Sur:

Pitogo, Dimataling

Zamboanga Sibugay:

RT Lim, Kabasalan

Establishment of

Calamansi

Processing Center

This center envisioned to produce

good quality calamansi fruits and

process them into calamansi juice and

other calamansi products.

Zamboanga Sibugay: District I: Imelda, Alicia

District II: Siay, Kabasalan, Naga

ADDITIONAL LOCATION

Zamboanga del Sur:

Tambulig

Region IX Postharvest Development Plan

8

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

HIGH VALUE COMMERCIAL CROPS

Establishment of

Rubber

Processing Plant

The plant will engage in processing

different rubber products and by-

products to meet local and foreign

demands.

Zamboanga Sibugay: District I: Imelda, Alicia, Buug

District II: Siay, Kabasalan,

Naga,Ipil

ADDITIONAL LOCATIONS

Zamboanga del Sur: Lake Wood, Dumalinao, Dumingag

Zamboanga del Norte; Sindangan, Roxas, Siayan, Piñan

Establishment of

Cold Chain

System for

Vegetables

This facility will keep the appropriate

temperature of perishable crops at

every chain to preserve its quality and

prolong its shelf life.

Zamboanga del Sur

ONLY FOR TOMATOES

Zamboanga del Sur: Dumingag, Dumalinao

Region IX Postharvest Development Plan

9

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

HIGH VALUE COMMERCIAL CROPS

Establishment of

Cassava

Processing Center

The center is either a service provider

or a business enterprise engage in

delivering postharvest operations like

chipping, drying and marketing.

Zamboanga Sibugay: District I: Malangas, Payao, Buug

District II: Ipil, RT Lim, Titay,

Tungawan

Zamboanga del Sur: Lake Wood, Dumalinao, Dumingag

ADDITIONAL LOCATIONS

Zamboanga del Sur: (w/ MPDP, Chipping facility &

Granulator)

One unit per municipality

Zamboanga del Norte: Katipunan, Roxas, Manukan

Zamboanga City: Brgy Vitali & Brgy Curuan

ADDITIONAL PROPOSED PROJECT for HIGH VALUE COMMERCIAL CROPS

Establishment of

Coffee

Processing Center

The project will establish a home industry

processing of coffee for farmers to augment

their income. The farmers will be provided

with the basic training and equipment on

postharvest handling and processing of coffee.

COMPONENT:

Coffee pulper Coffee cleaner

Fermentation tank

Coffee dryer (mechanical or MPDP)

Harvesting machine

Coffee storage

Roaster

Coffee mill and/or grinder

Coffee huller

Floatation tank

Zamboanga del Norte: Roxas

Region IX Postharvest Development Plan

10

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

ADDITIONAL PROPOSED PROJECT for HIGH VALUE COMMERCIAL CROPS

Establishment of

Minimal

Processing and

Packaging Plant

for Fruits and

Vegetables

A processing plant with complete facilities

for minimally processed fruits and

vegetables. To increase sustainable supply

of safe and quality minimally processed

fruits and vegetables at reasonable prices.

COMPONENT;

Building

Refrigerated Trucks

Cold Storages

Re-usable Plastic Crates

Stroller

Automatic Platform Scale

Table Scale

Automatic Continuous Washer

Automatic Continuous Spin Dryer

Automatic Weighing Machine

Vacuum Cooler

MAP applicator (with sealer)

Zamboanga City: Brgy Sta. Cruz

Zamboanga del Norte: Sergio Osmeña, Roxas, Sindangan,

Piñan, Mutia, Dipolog City

Establishment of

Agricultural

Tramline for

Cassava

A tramline is an alternative transport system in

production areas under extremely difficult

conditions. It is a hauling facility using cables

and pulleys to transport agricultural products.

COMPONENT:

Powerhouse

Loading & unloading platforms

Cables & pulleys

Carriers

Posts & Anchors

Zamboanga del Sur: Josefina, Dumingag

Region IX Postharvest Development Plan

11

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

ADDITIONAL PROPOSED PROJECT for HIGH VALUE COMMERCIAL CROPS

Establishment of

Banana Processing

Facility

The project will establish a home industry

processing of banana for farmers to augment

their income. The farmers will be provided

with the basic training and equipment on

postharvest handling and processing

COMPONENT:

Mixer Blender

Chipper Dryer

Frying pan Slicer

Screen Cotton towels

Chula Thermometer

Cooling Trays/racks

Steam Jacketed Kettle

Stainless Working Table

Plastic Sealer/Bag sealer

Assorted Kitchen Utensils

Trolleys/Handling Equipment

Triple Beam balance

Zamboanga del Norte:

Roxas, Dapitan City

Zamboanga del Sur:

Pitogo, Dimataling

Zamboanga Sibugay:

RT Lim, Kabasalan

Establishment of

Abaca Processing

Facility

The abaca processing center will provide

services to the farmers/growers such as

stripping and storage at reasonable cost

Zamboanga del Norte:

Mutia, La Libertad, Godod, Roxas,

Manukan

Zamboanga del Sur:

Dumingag, Lapuyan

Zamboanga Sibugay:

Kabasalan, Alicia

Region IX Postharvest Development Plan

12

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

NEW PROPOSED PROJECTS for FISHERIES

Establishment of

Fish Landing Site

with Ice Plant and

Cold Storage

The project will establish common

service facilities that will supply ice to

the fisher folks and cold storage that

will serve as temporary storage to

preserve the quality of their fishes at a

reasonable cost and/or rental fee.

COMPONENT:

Cold storage

Ice block molders

Ice block lifter

Thawing pit

Temperature device and data logger

Ice crusher/ice slicer

Water sinks

Pallets

Sensors

Ice container

Ice conveyor

Working gears

Plastic pallets

Generator set

Refrigerated Van/Truck

Mobile Ice Maker

Zamboanga City: Barangays: Lugpond, Tictapul

Dungcaan,Manguso

Manicahan

Arena Blanco

Sangali (East Coast)

Baliwasan(West Coast)

Zamboanga del Norte: Sibutad, Rizal, Sindangan, Roxas,

Liloy

Zamboanga del Sur: Pitogo, Tabina, Margosatubig,

Kumalarang, Dumalinao, Vicenzo

Sagun

Zamboanga Sibugay:

Alicia, Ipil, Naga, Talusan, Mabuhay,

Olutanga, Tungawan,

Region IX Postharvest Development Plan

13

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

NEW PROPOSED PROJECTS for FISHERIES

Establishment of

Multi-Commodity

Solar Tunnel

Dryer

The MCSTD will be owned and

operated by either a cooperative or by

the LGU. Fish drying services will be

offered to interested clients for a fee.

Zamboanga City: Barangay Tugbungan

Zamboanga del Norte: Jose Dalman, Sindangan, Manukan,

Rizal, Sibutad

Zamboanga del Sur: Kumalarang, Margosatubig, Vicenzo

Sagun, Dimataling, Diñas, San Pablo,

Dumalinao, Labangan, Lapuyan

Zamboanga Sibugay: Talusan, Mabuhay, Payao, Tungawan,

RT Lim, Ipil

Establishment of

Seaweed Noodles

Processing Center

Provision of equipment (with vacuum

sealer and other facilities) and

establishment of processing center

(display area) for the expansion of the

seaweed noodles processing project.

Zamboanga City: Barangay Mampang

Zamboanga del Norte: Jose Dalman, Sindangan, Sibutad

Zamboanga del Sur: Dimataling, Dumalinao, San Pablo,

Labangan, Margosatubig, Diñas

Region IX Postharvest Development Plan

14

(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)

List of Projects Brief Description Proposed Locations Regional Level Agreement

NEW PROPOSED PROJECTS for FISHERIES

Establishment of

Fish Processing

Plant

The project will establish a processing

plant for fish, to augment fisher folks’

income. Finished products will be dried,

smoked, canned, fillets and other fish

products.

COMPONENT:

Grading machine (mechanical)

Slicing machine/slicer

Slime removing machine

Filleting machine/equipment

Washer

Beheading machine/cutter

Skinning machine

Containers

Gutting machine

Smoking chamber

Smoking trays

Equipment for cutting fins

Fish Dryer (MCSTD)

Meat separator (meat-bone separator)

Packing and labeling equipment

Drying trays or panels

Kitchen utensils/paraphernalia

Chiller, freezer, refrigerated storage

Zamboanga del Sur: Pitogo, Tabina, Margosatubig,

Kumalarang, Dumalinao, Vicenzo

Sagun

Region IX Postharvest Development Plan 15