d. medina's cv (01)
TRANSCRIPT
![Page 1: D. Medina's CV (01)](https://reader036.vdocuments.site/reader036/viewer/2022083115/58b8889c1a28ab44078b79ab/html5/thumbnails/1.jpg)
Danilo I. Medina#063 Rizal St. Poblacion Limay, Bataan, Philippines 2103
Cel Phone +639493972536, [email protected]
Position Applied: EX Inspector/Instrument Comm. Tech.-----------------------------------------------------------
Career Objective
To obtain a challenging and rewarding career as Instrumentation that will leverage on my significant Instrumentation and Electrical experiences and contribute to a company’s significant profitability and success. I thrive in and seek a work environment where commitment to excellent work equals or exceeds mine and affords opportunities to utilize my technical expertise onshore and offshore.
A computer literate hands on Microsoft office: Words, Excel and Power Point for corresponding emails, report presentations and generating monitoring database for daily and weekly reports.
-----------------------------------------------------------Executive Summary
I am a highly-experienced professional with over 24 years of international experience in all aspects of Instrumentation with expertise in Process Control Instrumentation. Particular exposure to the construction,
installation and termination of primary and secondary cables, impulse line tubing, calibration of process variables instruments, Maintenance (repairs and overhauling), inspections, and commissioning from field to
the DCS system up to start up for first oil and gas.
I am a conscientious worker who has a proven track record of success in all projects handled due to the application of my strong eye for detail and penchant for following through on all tasks and activities. I’m also a recognized leader who has formed, motivated, and led cohesive teams that consistently achieved success.
I have excellent organizational skills that have been applied in punch listing, manpower technical distribution as well as in planning and scheduling. I likewise have good communication and interpersonal skills that have
facilitated excellent work with various individuals from different cultures and has worked in different geographical locations.
-----------------------------------------------------------Core Expertise & Competencies
InstrumentationLevel, Pressure, Flow and Temperature Instruments
Maintenance and TroubleshootingPLC and DCS Systems
SupervisionCommissioning
Progress ReportingManpower Management
Punch Listing
-----------------------------------------------------------Career Highlights
Performed system analyses that effectively maintained 100% productivity growth in 2007 Was tasked with work in South Korea for the AKPO FPSO Project and handled the commissioning of
completed wirings of Junction Boxes through the System Modules up to DCS A Compex certified of EX 01, EX 02, EX 03 and EX 04
![Page 2: D. Medina's CV (01)](https://reader036.vdocuments.site/reader036/viewer/2022083115/58b8889c1a28ab44078b79ab/html5/thumbnails/2.jpg)
Accomplished work in the North Sea Britsat Platform for Amec Recognized with the Best Inspector Award on March 8, 2010
-----------------------------------------------------------Professional History
Air Energi Group Pte. Ltd. April 2, 2014 to Oct. 16, 2015SingaporeE&I EX Inspector
Assigned in Blue Water Kitan Field East Timor Offshore Glas Dowr FPSO (Operational Vessel) for E&I EX Inspection of All Equipment on Board (Modules), by using Electronic Handheld I-roc 620. Paperless electronic equipment for fast and efficient inspections. As a standalone inspector to work and to complies the following task below:
Installation of Radio Frequency Identification Device (RFID) to communicate on Electronic Handheld.
Generate my own monitoring database to assure no lift behind equipment and devises for EX inspection and add to the Arnlea database if not included on the list.
Up loading all inspected Equipment’s to Arnlea Data Base System to generate daily progress report. Failed Equipment inspections were rectified by the assigned Technician on board. Generate hand over report by the end of rotation for 28 days on.
Air Energi Group Pte. Ltd. Feb. 25, 2013 to Feb. 25, 2014SingaporeE&I EX Inspector
Assigned in Single Bouy Mooring (SBM) in N’ Goma FPSO project Keppel Shipyard for EX inspection of all Electrical and Instrument equipments in 23 Modules on board.
Inspections of all equipment for possible incorrect installations and unauthorized modification. Gathering manufacturer’s certificate to assure the materials installed are certified by the ATEX
notifying body’s. Carry out advance detailed inspection on Modules to avoid punch list and to rectify immediately by
the contractors. Checked the completed ITRs in our system data base E-COM and the remaining ITR to be done. Gathering updated vendor’s drawings in the intranet EZ search. Signing ITR’s for completion and encoding on database all information’s of the equipments. Generate data base for easy monitoring and summary reporting of completed ITRs. Installing Radio Frequency Identification Device (RFID) and using Electronic handheld I-roc Ci70 for
easy inspection.
Air Energi Group Pte. Ltd. Jan. 16, 2013 to Feb 16, 2013SingaporeE&I EX Inspector
Assigned in East Timor Blue Water Glas Dowr FPSO for a new EX inspection technique introducing and trained by Arnlea using electronic I-roc 620 handheld for efficient and accurate inspection of all Electrical and Instrument equipments.
Installing Radio Frequency Identification (RFID) device certified by ATEX in the hazardous Area’s for identifying tagging equipment for inspection.
![Page 3: D. Medina's CV (01)](https://reader036.vdocuments.site/reader036/viewer/2022083115/58b8889c1a28ab44078b79ab/html5/thumbnails/3.jpg)
Uploading all completed inspection items into the data base computer for updating reports and easy monitoring of the remaining items to be completed.
Kaz Project Operating LLP Oct. 7, 2012 to Dec. 21, 2012Karabatan, Kazakhstan E&I EX Inspector
Assigned in Kashagan East Field Development Experimental Project Program of AGIP Oil and Gas Process Plant Karabatan, Kazakhstan.
Inspection of all Instruments and Electrical Equipments to assure the integrity of the EX base on the installation, procedures, and project specifications in accordance with the relevant codes and standard.
Monitor the installation of equipments base on the classification of groups in hazardous and non-hazardous Areas.
Generating and clearing of punch list items as per compliance of the main contractor. Reporting as per day to day activities.
OGRE Singapore Pte. Ltd. June 10/12 to Sept. 15/12E&I EX Inspector
A Manpower supply to ATEC as EX Inspector of Anchieta FPSO in Keepel Shipyard bound to Brazil. Inspection of all instruments and Electrical equipments on Turret mooring system base on
accordance with codes and standard. Generating punch list for inaccurate installation of equipments according to their classification of
groups and hazardous Areas. Complete all necessary check sheets and signed for completion. Rectifying grounding system on earth boss tightening loose glanding, EX plugs and IP washers…etc. Completing necessary documents for hand over. Enhanced daily report.
BW Offshore Singapore Pte. Ltd. Jan. 2012 to May 23, 2012Instrument Commissioning Technician
Assigned in Sembawang Shipyard Singapore (Onshore) and Bali Indonesia Offshore for commissioning task of FPSO BW Jokotole on TOPSIDE in all Modules.
Checking loops to assure correct wirings from field, junction boxes, marshalling cabinet up to the DCS Hot loops by using Hart communicator 375 and other process variable equipments.
Coordinate to Electrical Department for essential wire input connections on small distribution Panels for actual test of trips and resets indications.
Checked all instrument installations for possible incorrect installation as per hook up drawings and generate punch list.
Simulating instruments for final calibration test thru the DCS. Trouble shooting on control valves with Siemens positioned for incorrect parameters programmed. Analyzing principle of operation on every module in Top Side for easy trouble shooting the system. Preparing the systems for dynamic testing in offshore. Satisfying cause and effect for every systems Module on Top Side including Fire and Gas system. Assist operation in the activity of first oil operation. To mitigate the malfunctioning instruments to
make the operation success and no disturbances. Enhance daily report in completed activities.
Air Energy Resources Limited, United Kingdom Aug 2008 to Dec 31,2010Instrument Inspector
![Page 4: D. Medina's CV (01)](https://reader036.vdocuments.site/reader036/viewer/2022083115/58b8889c1a28ab44078b79ab/html5/thumbnails/4.jpg)
Assigned and worked as a manpower supply in Qatar Gas for the QG 3&4 Project Construction Department.
Inspection carried out as per Qatar Gas NORMS such as…ITP, cable schedule, ILD, P&ID, hook up drawing, instrument specification, location drawing.
Through inspection of all instrument installations in the Process Area Train 6&7 including Sand Bedding inspection, laid main cables in trenches as well as stub up conduits.
Utilize the CDMS database in consistent verifications and update of drawings. Reliable performance of Bench Calibration inspection for all process variables instruments inclusive
of PRV’s and vendor’s equipment. Careful and accurate inspection of Junction Boxes, Marshalling Cabinets in the sites and main control
room. Ensure good performance of glanding’s, terminations, continuity test and megger test for all primary
and secondary cables in all sites and main control room cabinets. Verify the correct installation of all instrument tubing. Promptly prepared Non-Conformity Report (NCR) to alert on the inaccurate use of drawings as well
as below par performing instruments. Continuously uphold company standards via generated punch lists Utilize the WINPCS system in gathering information Continuously updating daily report inspections relative to Accepted and Rejected activities
Brunel International South East Asia Pte. Ltd., Singapore April 2008 to June 2008Instrument Inspector
Tasked work in South Korea for the AKPO FPSO Project and handled the commissioning of completed wirings of Junction Boxes, Calibration and installation of instruments through the System Modules up to DCS
Competently set up the loop testing by HHI contractor as witnessed by Total including verification of the Functional Test Sheet (FTS) to ensure complete documentations and ensured proper simulation and observance of correct procedures
Utilized the Integrated Commissioning and Progress System (ICAPS) database to check signed off punch list items in Category “A” and other drawings and documents.
Created needed instrument punch list Shared knowledge and expertise in the provision of recommendations on resolutions for tested
faulty instruments Used Lotus Notes 6.5 Process Data Base (PDB) as well as Vendor Data Base (VDB) to integrate
needed information Was responsible for signing of all completed and verified FTS to ICAPS encoder in preparation for
Operation Test Procedure (OTP) Reliably performed and reported all daily activities
V-People, United Kingdom Oct 2007 to Mar 2008E&I Completion Inspector (WinPCS No. 3CPI53)
Accomplished work in the North Sea Britsat Platform for Amec Inspected all installation completion priors to facilitate commissioning activities Ensured that all activities were at par with CompEx and Atex standards Completed work for loop testing and satisfied all Cause and Effects Closely worked and coordinated with the client, Conoco Philips for inspection and completion of all
Instrument construction activities Inspected all Distribution panels including Motors, Lightings and 220-supply cable for equipment Utilized the DCS system for synchronization and calibration of process variables Completed all priority “A” and “B” category punch list and indorsed to client Ensured performance of all necessary construction check sheets for commissioning Closely worked with the WINPCS encoder relative to check sheets
![Page 5: D. Medina's CV (01)](https://reader036.vdocuments.site/reader036/viewer/2022083115/58b8889c1a28ab44078b79ab/html5/thumbnails/5.jpg)
Consistently reported on completed daily activities as well as presented and applied recommendations for satisfactory completion
Successfully normalized permissive loops and commenced Cause and Effects including Fire and Gas Performed troubleshooting tasks for faulty systems Accurately synchronized digital output between field and DCS Ensured accurate building of loop drawings
Test Angola Company, Cabina Gulf Oil Company (CABGOC), Angola Mar 2007 to Jul 2007Metering Technician
Was tasked to work in Malongo Oil Field platforms for Chevron and replaced old metering device as well as performed calibration and installation of new turbine meters and transmitters
Performed system analyses that effectively maintained 100% productivity growth in 2007 Successfully calibrated all Nuflo, Halliburton and Rosemount 3095 flow meters Validated good working conditions of all Nuflo and Invalco turbine meters and Daniel flow elements
and performed replacement and reconditioning as needed Worked on reconfiguring electronic transmitters to meet data satisfaction and commissioning Consistently updated database with Calibration Reports that monitored calibration schedules as well
as instrument history Promptly reported all observed discrepancies affecting DCS accuracy measurements
Ramunia Fabricators Sdn Bhd Apr 2006 to Feb 2007Instrument Commissioning Engineer
Worked on the Talisman, Petronas’ Abu-Cluster and F13E (SC) DR-A Topside platform of Sarawak Shell. Berhad
Responsible for all system areas’ instrumentation works and procedures during Pre-commissioning and Commissioning stage
Ensured observance of set schedules through coordination of PMT and the weekly activity schedule Provided estimations for future Ramunia projects for Commissioning of tasks Completed documentations on Check Sheet Over View, Job Cards, Job Safety Analysis (JSA) and Check
Sheet Forms Provided schedules for commissioning works according to Man-Hour in 45 working days Consistently monitored construction Progress Report (PMT) as well as provided outstanding work Closely worked with vendors to anticipate and resolve problems and ensured continuous progress Developed and established guidelines for acceptance of project terms and operations for
commissioned system offered by hand over Facilitated the Weekly Progress Meeting Presentations
V-People, 2 Queen’s Garden Aberdeen AB15 4YD, UKSr. Inst. Comm. Tech’n. (Shell WinPCS No. NI-176) Jul 2005 to October 2005
Lead Man of 6 instrument commissioning Technician in BONGA FPSO Nigeria Synchronizing field instruments to the DCS monitoring system. Carried out punch list items. Trouble shooting of incorrect signal to DCS and PLC. Execute all instrument cause and effect to confirm the correct program in the PLC. Generate all check sheets, which are completed. Enhance daily activities report.
Mc Dermott Caspian Contractors Inc. (MCCI), Baku, Azerbaijan Mar 2004 to Mar 2005Instrument Commissioning Supervisor
![Page 6: D. Medina's CV (01)](https://reader036.vdocuments.site/reader036/viewer/2022083115/58b8889c1a28ab44078b79ab/html5/thumbnails/6.jpg)
Assigned to the CA-PDQ-Central Azeri-Platform Drilling Quarters and ACG-FFP Phase I (Azeri Chirag & Gumtree – Full Field Development Phase I Project of BP)
Adeptly performed all pre-commissioning works of all instrumentation from DSM to DES system onshore to the final commissioning offshore
Competently accomplished activities during the commissioning period to client A.I.O.C. including testing, troubleshooting, cause and effect system testing, manpower distribution, scheduling, planning and completion of documentation
Managed and led 20 instrumental technicians involved in the commissioning works Ensured the strict observance of cost effectiveness and schedule for weekly tasks Led the preparation of loop packages for completion of documents Established the practice of daily safety toolbox safety talks that increased worker safety via
instructions on proper execution of daily tasks Closely worked with corresponding departments for the anticipation and resolution of daily activity
issues Successfully avoided overlapping schedules through careful preparation of materials and equipment Consistently submitted daily progress reports
LIQUIGAZ Phil Corp, Philippines Mar 1999 to Mar 2004Operation and Maintenance
Ensured the good working condition of all instrumentation and electrical equipment Prior to the above, functioned as operator of hydraulic marine loading arm and booster pump in
offshore Jetty Established cost effective practices for the planned maintenance system that resulted to maximum
availability and output of the terminal facilities Promptly identified and resolved breakdowns and defects via readied resources and procedures Ensured strict compliance with all of the terminal’s manual on procedures and guidelines Regularly updated CMMS work schedules and successfully avoided backlogs Promptly applied troubleshooting measures and Instrument Equipment for malfunctioning units Take over responsibilities in instances of Maintenance Supervisor’s absence Provided Maintenance Supervisor with reliable assistance for the development, implementation, and
management of Maintenance Programs as well as the Procedures and Activities of E&I Maintenance inclusive of the following
o Implemented all comprehensive checklists and inspection records for all equipment and conscientiously monitored defects
o Created Maintenance Procedures and Programs for all equipment
Power System Engineering, Philippines Jan 1997 to Feb 1999Instrument Foreman
Worked on the calibration of instruments including flow, temperature, pressure and level transmitters
Provided supervision for all instrument installations including Cable Traying, Primary and Secondary Instrument Cable Pulling, Termination of all cable through junction boxes up to Main Control Room and field instruments
Performed commissioning in all areas and completed all documents needed for turnover to the main contractor
In charge of the supervision of 10 instrument men Responsible for weekly activity tasks schedules Competently prepared all subsystem packages for documentation for client sale out Conducted daily safety orientations (TBT) which maintained standards on worker safety, prevented
accidents and ensured smooth operations Prepared punch lists in anticipation of needs which helped maintain schedules Contributed to the Project Engineer’s Daily Progress Report
![Page 7: D. Medina's CV (01)](https://reader036.vdocuments.site/reader036/viewer/2022083115/58b8889c1a28ab44078b79ab/html5/thumbnails/7.jpg)
~Prior Work Experiences~
Darwish Chiyoda Keiso, Qatar Jan 1996 to Dec 1996(QC) Instrument Inspector
Consolidated-Contracting EST S.A.L. (CCIC), U.A.E. Feb 1995 to Dec 1995Instrument Change Hand
Al-Hugayet Trading and Contracting Est. Dammam, K.S.A. Jul 1991 to Apr 1993Instrument Technician Project Support Services Division(PSSD) of Aramco Tanajib
-----------------------------------------------------------Education
Don Bosco Technical College, PhilippinesInstrumentation, Process Control Instrumentation
-----------------------------------------------------------Seminars and Trainings
COMPEX Training in Singapore (EX-01, EX-02, EX-03, EX-04) Assest Training & Technical Services PTE LTD Singapore, August 13, 2013
Training on Arnlea Electronic Handheld I-roc 620 for EX inspection. Jan. 18, 2013 BOSEIT Training in Singapore, March 24 to 26 2012 COMPEX Training in Singapore (EX-01, EX-02, EX-03, EX-04) Assest Training & Technical Services
PTE LTD, Sep 2007 Swagelok Training Course – Britsat Platform North Sea, UK, Oct. 17, 2005 Hawke Cable Gland Training, Hawke Training Center Aberdeen UK, Oct. 12, 2005 Offshore Training on BOSEIT, June 2005 Process Control Instrumentation, University of the Philippines, July 2003 Computerized Maintenance Management System (CMMS), June 2002 Philippines Instrumentation & Control Society, Philippines, August 2001 Fire fighting, DILG, Philippines, March 2000 B.A. / H2S Toxic Gas, Qatar Cold and Hot Work Permit, Aramco Tanajib
-----------------------------------------------------------Personal Information
Date of Birth: June 23, 1965 Civil Status: Married Nationality: Filipino International Drivers License: C02-91-032488 Qatar Driving License: 26560800998 Language Spoken: Filipino and English Passport Number: P0416984A Seaman’s Book Number: B 236794 CompEx Certificate Number: 37624 Skype ID: libert0613