CYLINDER ADJUSTMENT 2. Remove the RED air line from elbow fing on the air cylinder, this will keep the air bag from inflang 1. Verify the Push/Pull valve is pulled OUT and lid is in the open posion

Upload: others

Post on 04-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CYLINDER ADJUSTMENT - RMC Engineering · forms (1&2), turn clevis counter clock wise 1/2 turn at a time to lengthen the cylinder (lid should rest in the closed position) 6. If little

CYLINDER ADJUSTMENT

2. Remove the RED air line

from elbow fitting on the

air cylinder, this will keep

the air bag from inflating

1. Verify the Push/Pull valve is pulled

OUT and lid is in the open position

Page 2: CYLINDER ADJUSTMENT - RMC Engineering · forms (1&2), turn clevis counter clock wise 1/2 turn at a time to lengthen the cylinder (lid should rest in the closed position) 6. If little

3. Push the Push/Pull

valve IN and verify air

comes out of the RED

air line once the top

casting is under all 5

wire forms

4. Loosen jam nut to turn clevis

Page 3: CYLINDER ADJUSTMENT - RMC Engineering · forms (1&2), turn clevis counter clock wise 1/2 turn at a time to lengthen the cylinder (lid should rest in the closed position) 6. If little

5. If air comes out of the RED elbow fitting prior to being under wire

forms (1&2), turn clevis counter clock wise 1/2 turn at a time to

lengthen the cylinder (lid should rest in the closed position)

6. If little or no air comes out once

the lid is closed and under wire

forms, turn clevis clock wise 1/2

turn at a time to shorten the

cylinder

Page 4: CYLINDER ADJUSTMENT - RMC Engineering · forms (1&2), turn clevis counter clock wise 1/2 turn at a time to lengthen the cylinder (lid should rest in the closed position) 6. If little

7. Once the cylinder is

adjusted properly,

tighten jam nut and

reinstall the RED air

line to cylinder

8. Push the Push/Pull

valve IN to close lid,

verify the lid is

under all 5 wire

forms

Page 5: CYLINDER ADJUSTMENT - RMC Engineering · forms (1&2), turn clevis counter clock wise 1/2 turn at a time to lengthen the cylinder (lid should rest in the closed position) 6. If little

9. Once the lid is closed the

control box air gauge should

reach between 80-120 PSI

in approximately

30-45 seconds