cycl e tropolis analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp...

16
CYCLeTROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011

Upload: kory-todd

Post on 27-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

CYCLeTROPOLISCYCLeTROPOLISAnalyzing america’s no.1 bike cityAnalyzing america’s no.1 bike city

cort eidemcrp 551 : july 2011

cort eidemcrp 551 : july 2011

Page 2: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Bike Commuter CitiesCity % Bike

Minneapolis 4.4%

Portland 4.2%

Sacramento 3.7%

San Francisco 3.7%

Tucson 3.3%

Fresno 2.9%

Boston 2.6%

Seattle 2.6%

Washington, D.C

2.5%

Albuquerque 2.4% U.S

. D

ep

tart

men

t of

Tra

nsp

ort

ati

on

20

08

Page 3: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

setting the scene

• Bicycling Magazine recently named Minneapolis the #1 Bicycling community in the U.S.

Page 4: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

So What’s the Problem?• Many cities in

America (including Minneapolis) are still designed primarily for vehicle traffic

This leaves many people without alternative transportation options

Page 5: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Goals• To find new sources of data

• To analyze transportation data in order to locate areas of special concern

• To create an output map that solves a transportation problem

Where can Minneapolis expand bike trails in order to provide an immediate benefit?

Page 6: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Why does it matter?• The recent recent economic recession

coupled with a shift towards “Green living” has been a catalyst for bicycle infrastructure in the U.S.

• Minneapolis is constantly upgrading their bike trail network - making bicycling within the city safer and more accessible.

• As petrol prices continue to rise, more communities will depend on alternative transportation infrastructure - such as bike paths.

Page 7: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Me + GIS = ?

• I sought out to perform a basic analysis that could be used to site a future bicycle trail in currently neglected neighborhoods

• Motivations:

• I ride a bike... everywhere

• I wanted to learn where to locate data for Minnesota, & figure out how to apply the data in a useful manner

Page 8: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

The forgotten cornerAnalysis of Census Data revealed a marked drop off in bicycle commuters in an area North of Downtown Minneapolis.

Further investigation showed that this decline occurred at the county boundary line.

Perhaps Anoka County does not have as much to invest into bicycle infrastructure as Hennepin County. Regardless, this area caught my attention, and I believe that bike paths would be welcome here due to the high percentage of bicycle commuters in surrounding neighborhoods.

Page 9: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Methodology• Download & Process Tabular Data in

Spreadsheet

• (This was more difficult than it should have been due to the fact that I’m poor, and use OpenOffice rather than Excel.)

• (Also, I’m fairly computer illiterate)

• Geodatabase

• Manage Census Data & Transportation Data

• Geoprocessing

• Merge, Clip, Union, Buffer, Rinse, Wash, Repeat

• Select By Location & Attribute

• Creating New Shapefiles

Page 10: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Collecting Data

MetroGISDataFinder

http://www.datafinder.org/

DNRData Deli

http://deli.dnr.state.mn.us/http://www.census.gov/geo/www/tiger/tgrshp2010/tgrshp2010.html

US CensusBureau

I found two new locations for GIS data (MetroGIS & the MN DNR Data Deli)

I also used an old friend (US Census), but downloaded new TIGER 2010 data

Page 11: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Tabular DataProcessed Census Data using OpenOffice

Page 12: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Geoprocessing

• I became very efficient at Geoprocessing through lots of Unions, Merging, and Clipping of layers

I wanted to remove extraneous data in order to focus attention on this area.

Page 13: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Joins, queries, and fun

• Joined Census data to DNR shapefiles

• Set Definition Queries to Select appropriate data for presentation

Page 14: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

• My final analysis area shows the high numbers of bikers near downtown, and highlights the Columbia Heights neighborhood as an outlier.

• I also wanted to look at data regarding race & income. This analysis showed Columbia Heights households have a bit more income, but there are still no opportunities for cycling once petrol prices become too high

FIN

AL

P

OS

TE

R

Page 15: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Thank You, Come Again• If I could do things over, I would have used 3D Analyst to

create a section profile of the elevation along new bike

routes.• I was able to create a 3D topography of the Twin Cities as

per Tutorial 10. Highly valuable tutorial for visual presentations. (This left me curious if the software can merge with Google SketchUp or Google maps for future projects?)

• Additional data on street trees, or building footprints would have enhanced the project

Page 16: CYCL e TROPOLIS Analyzing america’s no.1 bike city cort eidem crp 551 : july 2011 cort eidem crp 551 : july 2011

Final Thoughts

• I succeeded in locating new sources for data & teaching myself how to apply that data. However, I had to adjust my initial proposal concept because I couldn’t make enough sense out of available land cover data to make a cohesive final project - something that probably would have been more achievable if this course was face to face, rather than online. C’est la vie.