1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 05
2. REPORTS SUBMITTED 07
3. RESEARCH PAPERS
3.1 Submitted 07
3.2 Published 07
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 08
5. LECTURES DELIVERED 08
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 08
6.2 Other Committees 08
7. TRAINING OF PERSONNELS 09
8. IMPORTANT VISITORS 09
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 09
10. TRAINING PROGRAMMES ORGANIZED 10
11. OTHER INFORMATION 11
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in
May 2018
2
Summary Information For 2010-2018
Years Jobs Awarded
_____________________
Nos. | Amount (Rs.)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnel
Training Programmes/ Conferences Organized
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
2015-16 85 13,95,89,971 106 65 51 74 17 120 10
2016-17 111 25,90,34,704 95 90 114 97 23 315 17
2017-18 147 33,97,19,710 105 58 64 38 38 823 18
STUDIES AWARDED FOR CURRENT YEAR 2018-2019
Till May 2018 25 4,32,00,646 11 06 07 01 16 32 01
During June -18
19 2,88,03,980 04 03 00 06 02 16 01
Total 44 7,20,04,626 15 09 07 07 18 48 02
Estimate submitted to Client but yet to be awarded
June 2018 31 8,89,07,195 - - - - - - -
CWPRS Information Bulletin June2018
3
1. ESTIMATES
1.1 Submitted: ( 31 Nos. totaling to Rs. 8,89,07,195/- )
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1 Running & Maintenance of Kandla Estuary Model [Scale H-1/1000, V-1/100 DURING (2018-19)].
Ex.Engg, Deendyal (Kandla) Port Trust, Nirman Bhavan, New Kandla, Kutchch, Gujarat-370210
PH-1 14,90,440
2 Maintenance of existing (3-D) Physical Wave Model of Paradip port during the year (2018-19) and Installation of Table Model of Paradip Port, Odisha
Superintending Engg., Harbour Work Division, Paradip Port Trust, Paradip Port-754142, Dist-Jagat Singpur, Odisha
CHS-II 70,45,310
3 Geotechnical Stability and seepage studies for Shali earth dam in Bankura dist, West Bengal.
Shri. K. Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 5,89,480
4 Geotechnical Stability and seepage studies for Bandhu Extension earth dam in Purulia dist, West Bengal.
Shri. K. Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 7,34,480
5 Geotechnical Stability and seepage studies for Beko earth dam in Purulia dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 5,89,480
6 Geotechnical Stability and seepage studies for Ramchandrapur earth dam in Purulia dist, West Bengal.
Shri. K Islam, Chief Engineer & RM(ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 8,88,260
7 Geotechnical Stability and seepage studies for Lipania dam in Purulia dist, West Bengal.
Shri. K Islam, Chief Engineer & RM(ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 7,34,480
8 Geotechnical Stability and seepage studies for Moutorjore earth dam in Purulia dist, West Bengal.
Shri. K Islam, Chief Engineer & RM(ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 7,34,480
9 Geotechnical Stability and seepage studies for Kangsabati Kumari earth dam in Bankura dist, West Bengal.
Shri. K Islam, Chief Engineer & RM(ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 13,89,290
10 Geotechnical Stability and seepage studies for Kumari earth dam in Paruliya dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 7,34,480
11 Geotechnical Stability and seepage studies for Golamarajore earth dam in Paruliya dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 7,34,480
12 Geotechnical Stability and seepage studies for Patloi earth dam in Paruliya dist, West
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc,
GE-II 5,89,480
CWPRS Information Bulletin June2018
4
Bengal. 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
13 Geotechnical Stability and seepage studies for Hanumata earth dam in Paruliya dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 5,89,480
14 Geotechnical Stability and seepage studies for Barabhum earth dam in Paruliya dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 5,89,480
15 Geotechnical Stability and seepage studies for Parga earth dam in Paruliya dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 7,34,480
16 Geotechnical Stability and seepage studies for Tatko earth dam in Paruliya dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 7,34,480
17 Mathematical model studies for evolving flood protection works of chainth khad in Tehsil Bhoranj Dist- Hamirpur HP.
Ex. Engg, I & PH Division, Barsar, Dist-Hamirpur, Himachal Pradesh-174305
RH 15,69,015
18 Mathematical model studies for wave tranquility for the proposed extension of breakwater at Mvs in Car Nicobar Island.
The Chief Engineer & Administrator, Andaman Lakshadweep Harbour Works, Port Blair-744101
PH-II 9,94,570
19 Assessment of suitable epoxy based grout systems through Laboratory studies towards controlling seepage of water through lift Joints of spillway piers and NOF blocks of Kutni Feeder dam, Rajnagar, Chhatarpur, Dist-Madhyapradesh.
Ex.Engg, Kutni Dam (WRD) Division, Irrigation Colony, Near Panna Nakka Chattarapur Dist, Madhyapradesh-471001
CT 16,70,860
20 Cementitious grout material mix design through studies for controlling seepage through body of Kutni Feeder dam, Rajnagar, Chhatarpur, Dis- Madhyapradseh
Ex.Engg, Kutni Dam (WRD) Division, Irrigtion Colony, Near Panna Nakka Chattarapur Dist, Madhyapradesh-471001
CT 19,94,240
21 Non-destructive testing of thrust blocks of Penstocks of Saharavathi Generating Satation, Gerusoppa Karnataka.
Chief Engineer (Electrical Designs), Karnataka Power Corporation Ltd, Sudarshan Complex, 3rd floor, 22/23, Sheshadri Road, Bengaluru, Karnataka-560009.
VT 24,32,650
22 Hydraulic model studies for the proposed New Rail Alignment and Bridges passing through the Flood plain area of Kosi, Kamalabalan and Karech rivers between khagaria and kusheshwar Asthan, Patna.
Shri. Shailesh Prasad, Chief Engineer (con/North), Office of the chief Admin Officer/con/North, East Central Railway, Mahendrughat, Patna-800004.
BE 1,51,28,340
23 Mathematical model studies for Siltation studies of Bhadbhut Barrage Project, Gujarat.
Chief Engineer(K-2) and Additional Secretary Kalapsar Department, Government of Gujarat, Block No. 8,7th floor, New Sachivalya, Gandhinagar-382010, Gujarat
HAPT 29,83,180
CWPRS Information Bulletin June2018
5
24 Mathematical studies for Bhadbhut Barrage Project, Gujarat.
Chief Engineer(K-2) and Additional Secretary Kalapsar Department, Government of Gujarat, Block No. 8,7th floor, New Sachivalya, Gandhinagar-382010, Gujarat
HAPT 34,96,420
25 Hydraulic studies for Bhadbhut barrage project, Gujarat.
Chief Engineer(K-2) and Additional Secretary Kalapsar Department, Government of Gujarat, Block No. 8,7th floor, New Sachivalya, Gandhinagar-382010, Gujarat
HAPT 1,22,53,510
26 Desk and wave flume studies for the design of cross-sections for the protection structure to the main dam of Kalpsar Project in Gujarat.
Superintending Engineer Narmada Water Resources, Water Supply & Kalpasar Department Government of Gujarat, Block No. 8,7th floor, New Sachivalaya, Gandhinagar-364001
CHS-II 1,60,87,680
27 3D stress analysis by FEM of 3 blocks namely Non-Overflow Block, Spillway Block & Power Dam Block of Sardar Srovar Dam, Gujarat.
Shri P. R. Vijay Vargiya, superintending Engineer, N. P. Designs (Dam & Power House) Circle, 3rd floor, A-Block, Narmada Bhavan, Indira Avenue, Vadodara-39001, Gujarat
SMA 39,80,340
28 Running and Maintenance of Chennai Port regular wave Physical model of during 2018-19.
Chief Engineer, Chennai Port Trust, Rajaji Salai, Chennai-60001.
PH-II 31,82,760
29 Mathematical Model studies to assess the impact of extension of breakwater at Kasagod Fishery Harbour in Kerala.
Chief Engineer, Harbour Engineering Department, Manacaud P.O. , Kamaleswaram, Thiruvananthapuram-695009
MMCE-II 9,25,820
30 Maintenance of 3-D random wave physical model of Kamarajar Port, Ennore under Research and Development Scheme of Kamarjar Port during year 2018-19
The Chairman -cum-Managing Director, Kamarajar Port Ltd, P.T. Lee C.N. Maaligai, No.23, 1st Floor, Rajaji Salai, Chennai-60001, Tamilnadu.
PH-II 27,16,270
31 Geotechnical Stability and seepage studies for Hinglo earth dam in Birbhum dist, West Bengal.
Shri. K Islam, Chief Engineer & RM (ER), WAPCOS Ltd, Regional Offc, 10th Floor, Jalasampad Bhawan, Salt Lake City, Karnatka-70091
GE-II 5,89,480
1.2 Awarded: (19 Nos. totaling to Rs . 2,77,21,770/- + Rs. 10,82,210/- for calibration works 06 Nos.)
Sl. No.
Name of Work
Sponsoring Agency Division Amount (Rs.)
1. Desk and wave flume studies design of breakwater for providing infrastructure post harvesting facilities at fish landing centre at Bhatodi Bunder, Tal & Dist- Thane.
Ex. Engg, Commissioner of Fisheries, Tapaporevala Aquarium, Netaji Subash Road, Mumbai-400002
CHS-I 8,00,000
2. Desk and wave flume studies for the design of breakwater for providing infrastructure post harvesting facilities at fish landing centre at Uttan Patan Bunder, Tal & Dist- thane.
Ex. Engg, Commissioner of Fisheries, Tapaporevala Aquarium, Netaji Subash Road, Mumbai-400002
CHS-I 8,00,000
3. Desk and wave flume studies for the design of breakwater for providing infrastructure post harvesting facilities
Ex. Engg, Commissioner of Fisheries, Tapaporevala Aquarium, Netaji Subash Road,
CHS-I 8,23,000
CWPRS Information Bulletin June2018
6
at Burondi, Tal- Dapoli, Dis- Ratnagiri. Mumbai-400002
4. Mathematical model studies for Wave Tranquility for proposed Development of infrastructure facility of fish landing centre at Bhatodi Bunder, Tal- Thane , Dist- Thane.
Ex. Engg, Commissioner of Fisheries, Tapaporevala Aquarium, Netaji Subash Road, Mumbai-400002
PH-II 7,51,560
5. Mathematical model studies for wave tranquility for proposed Development of infrastructure facility of fish landing at Uttan- Patan Bunder, Tal- Thane , Dist- Thane.
Ex. Engg, Commissioner of Fisheries, Tapaporevala Aquarium, Netaji Subash Road, Mumbai-400002
PH-II 7,62,310
6. Mathematical model studies for wave tranquility for proposed Development of infrastructure facility of fish landing at Burondi, Tal- Dapoli , Dist- Ratnagiri..
Ex. Engg, Commissioner of Fisheries, Tapaporevala Aquarium, Netaji Subash Road, Mumbai-400002
PH-II 7,50,930
7. Field studies for discharge of live flow data measuring systems for Tungbhadra Canal System at 25 locations, Tungbhadra, Project Karnataka.
Superintending Engg, Irrigation Branch , Tungbhadra Board, Tungbharda Dam Project, Tal. Hospet-583225, Dist. Bellary, Karnataka
HAPT-I 37,27,200
8. Mathematical model studies for assessing flow parameters for Inland Waterways in River Yamuna From Delhi to Allahbad for WAPCOS.
Shri. Bal Krishna, ACE/PM, WAPCOS Ltd Pune office, Swastik Building , 2nd Floor, Gulmohor Path, Near SNDT Rear Gate, Law College Road, Erandawane, Pune-41104
BE 52,10,930
9. Estimate for site visit for inspection of the dam and discussion towards undertaking studies for the rehabilitation of damaged spillway bucket of Jawahar Sagar dam Rawatbhata Rajasthan.
Ex.Engineer,RPS and Stores Division, Rawatbhata, via Kota, Rajasthan-323305
CT 1,92,640
10. Mathematical model studies for assessment of wave tranquility for proposed harbour layout at Mini fishery Harbour at Chethi, Kerala.
Chief Engineer, Harbour Engineering Department, Kamaleshwaram, Manaud-P.O, Thiruvananthapuram-695009
MMCE-II 11,83,530
11. Physical model studies for wave tranquility for development of port infrastructure at Kamorta bay for Andman Lakshdweep harbour work.
Deputy Chief Engineer ALHW, Port Blair, Government of India, Ministry of Shipping, Andaman Lakshdweep harbour work.
PH-I 21,15,550
12. Physical model studies for wave tranquility for development of port infrastructure at Campbell bay for Andman Lakshdweep harbour work.
Deputy Chief Engineer ALHW, Port Blair, Government of India, Ministry of Shipping, Andaman Lakshdweep harbour work.
PH-I 21,15,550
13. Mathematical model studies for improvement of navigability and development of water transport Facilities from Sangam Bridge to Lower Jhelum Power Project in river Jhelum (NW-49) for WAPCOS.
Additional Chief Engineer, WAPCOS Ltd, Swastik Gulmohor Path, Behind SNDT, Erandawana, Pune-411004
RH 31,01,310
14. Running and Maintenance of New Wave model of Mormugao Port, Goa during 2018-19.
Chief Engineer, Mormugao Port Trust, Administrative Office , Headland Sada, Mormugao, Goa-403804
PH-I 13,81,560
15. Modified Estimate for conducting Site inspection visit of 16 earth dams in west
Shri K. Islam, Chief Engineer 7 RM(ER), WAPCOS Ltd. Regional
GE-II 2,75,090
CWPRS Information Bulletin June2018
7
Bengal for undertaking geotechnical studies for the stability and seepage.
Office, 10th Floor, Jalasampad Bhawan, Salt Lake City, Kolkata-700091
16. Determining Insitu Strength Parameters of Masonry of Temghar Dam, Dist: Pune, Maharashtra.
Ex. Engineer, Bhama Ashked Dam Division, Pune-37, Maharashtra.
GE-I 7,60,020
17. Estimation of site specific Seismic Design Parameters for Kuri-Gongri H.E. Project, Bhutan for WAPCOS (1) Ltd.
The General Manager ( D & RE), WAPCOS, 76-C, Institutional Area, sector-18, Gurgaon-122015(Haryana)
ES 12,97,230
18. Determination of properties of construction material from Lower Tapi Project, Jalgoan, Maharashtra.
Ex. Engineer, Lower Tapi Project, Amalner, Jalgoan, Maharashtra.
WQAM 10,23,820
19. Model studies of properties for protection work of spill channel, Polavaram Project, Andhra Pradesh.
Mr. R.K. Gupta. , Member Secretary, Polavaram Project Authority, Krishna Godavari Bhavan, H.No. 11-4-648, 1st Floor, A.C. Guards, Hyderabad-500004
HAPT 6,49,540
2. REPORTS SUBMITTED: (04 Nos.)
S. No.
Title Report No Month/Year
1. Desk and Mathematical model studies for flood protection/river stabilition work in Nakerkhad from Rainta to sour kalam bridge in District- Kangra, Himachal Pradesh.
5600 6/2018
2. Mathematical model studies for locating dumping ground in the nearby area for disposal of drudged material from approach Channel at NEIL Island, A&N Islands
5601 6/2018
3. Additional Mathematical model studies for tranquility to optimize harbour layout of fisheries harbour at Kerala.
5602 6/2018
4 Hydraulic model studies for modified design of spillway and Energy Dissipator of Devsari H.E Project, Uttarkhand,1:40 Scale, 2-D Sectional Model.
5603 6/2018
3. RESEARCH PAPERS:
3.1 Submitted: (1 No.)
1. Shri M. Selva Balan, “Restoring reservoir sustainability and performance affected due to sedimentation arising from anthropogenic & natural interventions”, International Journal of
Environment Science and Technology (JEST), June 2018.
3.2 Published: (3 Nos.)
1. Dr. Gadge P.P., Jyotiprakash V., Dr. (Mrs) V.V. Bhosekar, “Hydraulic investigation and design of roof profile of an orifice spillway using experimental and numerical models”, Journal of Applied Water Engineering and Research, IAHR, 6(2), 85-94.
2. Dr. Gadge P.P., Jyotiprakash V., Dr. (Mrs) V.V. Bhosekar, ”Hydraulic design considerations for orifice spillways”, ISH Journal of Hydraulic Engineering, 10.1080/09715010.2018.1423579.
3. Dr. V. M. Prabhakar, Ashwini R Patil, Kishor Kumar Swain, Balaji B Mane, Mayur S, Nerkar, Puja C Kharat, “Assesment of Water Quality Index of Indrayani River, Alandi , Pune , Maharashtra”, International Journal Of Science Engineering and Technology Resaerch, vol 7, ISS 6, pp 398-402, ISSN; 2278-7798.
CWPRS Information Bulletin June2018
8
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES/ - NIL
5. LECTURES DELIVERED – (6 Nos.)
Sl. No. Title Event, Place, Date Name of Officer
1. Aerators in Tunnel spillways
CBIP, New Delhi 12th June 2018
Dr. M. R. Bhajantri, Sci-D
2. Hydraulic Modelling and application for designing various components of hydropower project.
CBIP, New Delhi 12th June 2018
Dr. M. R. Bhajantri, Sci-D
3. Hydraulics design Consideration for Tunnel Spillway-Role of model studies.
CBIP, New Delhi 12th June 2018
Dr. (Mrs) Prajakta P. Gadge, Sci-B
4. Hydraulic Design Consideration for orifice spillway
CBIP, New Delhi 12th June 2018
Dr. (Mrs) Prajakta P. Gadge, Sci-B
5. Hydro-metrological data collection techniques in designing GIS
Symboisis Institute (SIG), Pune 23rd June 2018
Shri M. Selva Balan, Sci-D
6. Hydromet Network Design and Instrumentation
Model College, Pune 25th June 2018
Shri. R.S. Jagtap, JD
6. PARTICIPATION IN MEETINGS: 6.1 Technical Committee Meetings: (01 Event, 02 Participant)
Sl. No.
Name of Committee Place and Date Participant(s)
1. Attended 18th meeting of WRDC at BIS, New Delhi
New Delhi 27th June, 2018
Dr. (Mrs.) V.V. Bhosekar, Director Dr. R.G. Patil, Sci-D
6.2 Other Meetings: (2 Events, 2 Participants)
Sl. No.
Name of Committee Place and Date Participant(s)
1. Attended meeting of Board of Assessment (BOA) at UPSC, New Delhi to consider in-situ promotion to the grade of Scientist-E at CWPRS
New Delhi 28th June, 2018
Dr. (Mrs.) V.V. Bhosekar, Director
2. Meeting with Joint Secretary (Adm.), MoWR, RD&GR
New Delhi 12th June, 2018
Dr. (Mrs.) V.V. Bhosekar, Director
CWPRS Information Bulletin June2018
9
7. TRAINING OF PERSONNEL – (06 Trainings and 16 Personnel)
Sl. No.
Title Event, Place, Date Name of Officer
1. Hydromet Network Design and Instrumentation
CWPRS, PUNE 18th -22nd June 2018
Shri. P.K. Dorale , Sci-B Shri Ujjal Chaudhary, RA Shri Shaneel S.Sao, RA Shri. Ramesh Baskey, RA Mrs. Anuradha, AE
2. Calibration Techniques for Process Parameters
(CETE) Kolkata 18th -22nd June 2018
Shri Saurabh Anand, RA
3 Planning and designing large scale sample surveys.
NSSTA Greater Noida, Uttar Pradesh 18th -22nd June 2018
Shri. K.B.Thesia, SRO
4 Surge analysis and design of surge protection systems
IIT Hyderabad 23rd -25th June 2018
Shri G. V. R. Murthy, Sci-B Shri S. J. Ghule, Sci-B Shri V. S. Telgote, ARO Shri M. S. R. Naidu, Sci-B
5 Reservoir simulation using NIH ReSyP
BITS Pilain Campus, Hyderabad 25th -29th June 2018
Shri N. Vivekanandan, Sci-B
6 Pay Fixation and MACP Regional Training Centre, INGAF, Mumbai 26th -27th June 2018
Shri R. R. Ashtikar, Supdt. Shri G. J. Bhawsar, UDC Shri J. A. Patwekar, LDC Shri M. Chaudhary, LDC
8. IMPORTANT VISITORS: 1. Shri S.B. Joshi, CE, MBRAPP, Shri S.K. Bangad, DCE, Shri K. Giridhar, ACE (Civil), Shri H.W.
Pandey, ACE (LWS), Shri Sirish R. Gandhi, Sr. EE (SO/E)LWS, Shri Amit Y. Vartak, Sr. EE (S/O/E) RPG-WM from NPCIL visited CWPRS on 01st June, 2018.
2. Shri. A.P. Kandiyal, Deputy Director FE and SA Directorate, CWC Visited CWPRS on 28th June,
2018.
3. Shri G.P. Roy, Chief Engineer, WRD planning Odisha visited CWPRS on 28th – 29th June, 2018.
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No.
Name of Person Designation Group Division Date
New Entrants
1. Shri Deepak Jha LA-II C PH-II 29.06.2018
2. Shri Vivek Kumar JE B CPC 14.06.2018
3. Shri Santosh Kumar LDC C Admin 25.06.2018
Promotions
NIL
Retirement
CWPRS Information Bulletin June2018
10
1. Shri N.P. Khaparde Sci-D A HAPT 30.06.2018
2. Shri M.S.Choudhari Sci-C. A GP 30.06.2018
3. Shri. S.T. Patil AE B Inst-II 30.06.2018
4. Smt. V.N. Kulkarni Supdt B CPC 30.06.2018
5. Shri G.D. Bagul Craftsman – A B RSWG 30.06.2018
6. Shri D. T. Girme LA-II C GE (RM) 30.06.2018
Voluntary Retirement
NIL
Repatriation/Transfer
1. Shri S. K.Barve LA-II C SM 01.06.2018
Resignation
1. Shri Govind Kumar MTS (Technical Resignation)
C Bills 20.06.2018
2. Shri Sagar B Sonune MTS Technical Resignation)
C TC 27.06.2018
Demises
NIL
10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: (1 No.)
1. Training course on “Hydromet Network Design and Instrumentation under NHP” during 18th –
22nd June 2018 at CWPRS, Pune.
CWPRS Information Bulletin June2018
11
11. OTHER INFORMATION: (1 No.) 1. International Yoga day is celebrated on 21st June, 2018 at CWPRS.