cwprs monthly information bulletincwprs.gov.in/writereaddata/file/mib/mib december 2018.pdf ·...

11
Government of India Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station Khadakwasla, Pune – 411 024 Issue No.: 12 December 2018 ____________________________________________________________________ CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________ 1. ESTIMATES 1.1 Submitted 03 1.2 Awarded 04 2. REPORTS SUBMITTED 04 3. RESEARCH PAPERS 3.1 Submitted 05 3.2 Published 05 4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 06 5. LECTURES DELIVERED 07 6. PARTICIPATION IN MEETINGS 6.1 Technical Committees 07 6.2 Other Committees 07 7. TRAINING OF PERSONNELS 08 8. IMPORTANT VISITORS 09 9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 09 10. TRAINING PROGRAMMES ORGANIZED 10 11. OTHER INFORMATION 11 Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in

Upload: others

Post on 17-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

Government of India

Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station

Khadakwasla, Pune – 411 024

Issue No.: 12 December 2018

____________________________________________________________________

CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________

1. ESTIMATES

1.1 Submitted 03

1.2 Awarded 04

2. REPORTS SUBMITTED 04

3. RESEARCH PAPERS

3.1 Submitted 05

3.2 Published 05

4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 06

5. LECTURES DELIVERED 07

6. PARTICIPATION IN MEETINGS

6.1 Technical Committees 07

6.2 Other Committees 07

7. TRAINING OF PERSONNELS 08

8. IMPORTANT VISITORS 09

9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 09

10. TRAINING PROGRAMMES ORGANIZED 10

11. OTHER INFORMATION 11

Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in

Page 2: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

2

Summary Information For 2010-2018

Years Jobs Awarded

_____________________

Nos. | Amount (Rs.)

Reports Submitted

Papers Published

Participation in Seminars/ Symposia/ Conferences

Lectures Delivered

Technical Committee Meetings

Training of Personnel

Training Programmes/ Conferences Organized

2010-11 159 17,06,34,397 95 94 38 52 23 61 11

2011-12 139 18,56,13,568 116 63 26 45 42 88 08

2012-13 150 22,53,10,859 120 67 44 57 24 55 08

2013-14 152 18,24,51,087 112 63 37 68 21 54 11

2014-15 153 25,69,14,032 113 62 58 47 12 62 09

2015-16 85 13,95,89,971 106 65 51 74 17 120 10

2016-17 111 25,90,34,704 95 90 114 97 23 315 17

2017-18 147 33,97,19,710 105 58 64 38 38 823 18

STUDIES AWARDED FOR CURRENT YEAR 2018-2019 Till November

2018 89 17,02,82,586 51 51 46 37 22 304 11

During December -18

20 74,11,020 08 13 25 11 01 49 02

Total 109 17,76,93,606

59 64 71 48 23 353 13

Estimate submitted to Client but yet to be awarded

December 2018 11 1,77,33,887

- - - - - - -

Page 3: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

3

1. ESTIMATES

1.1 Submitted: ( 11 Nos. totaling to Rs. 1,77,33,887/- )

Sl. No.

Name of Work Sponsoring Agency Division Amount (Rs.)

1 Desk studies for the design of proposed bank protection work along the bank of Waldhuni Creek,at Kalyan,Dist-Thane

Ex. Engineer, Kalyan Dombivali, Municipal Corporation,(KDMC), Kalyan,Dist-Thane

CHS-I 4,50,500

2 Estimation of site specific seismic Design Parameters for Selim H.E.Project, Jaintia Hills District, Meghalaya

Ex. Engineer(Civil), Investigation Division-II,MePGCL,Umiam,Ri-Bhoi District-Meghalaya-793103

ES 11,93,000

3 Desk studies for minimizing siltation in front of pump house of Chokka Rao Devdula lift Irrigation Scheme, Gangaram, Warangal, Telangana

G.Anil Kumar, Chief Engineer, I & CADD, Godavari Lift Irrigation Scheme,K.C.Colony,Chinthagattu,Warangal,Telangana-506015

BE 11,13,710

4 Hydrographic survey works for Inlet system of Kakrapar Atomic Power Project (3 & 4 Unit) of NPCIL

Tejas Bhamburkar, Ex. Director, Flowline System Pvt.Ltd,401/402,Bhoomi Landmark, Plot No. 34, Sector-17, Khanda Colony, New Panvel-410206

HAPT 5,00,520

5 CFD Analysis of Pump Intake of Pump house of J.Chokkarao Devadula Lift Irrigation Scheme, Gangaram, Warangal, Telangana

Engineer-in-Chief, CDO, Hyderabad, Telangana-506015

HMC 5,39,485

6 Estimation of site specific seismic design parameters for Eight Irrigation Schemes namely Upper Bansloi, Khudia Usari Bareto Bishuupar BhurBhuri, Kalipur Jamunnia in Jharkhand for Government of Jharkhand

Shri Abhay Kumar, Superintending Engineer, North-East Investigation Circle, Rebetkka Ville, Near Barik Point, Temple Road, Lower Lachumiere, Shillong-01

ES 84,43,130

7 Site visit for inspection of the Dam and discussion towards undertaking studies for Energy Dissipating Arrangement (EDA) of Koyana Dam, Satara, Maharashtra

Ex. Engineer, Koyana Irrigation Division, Koyananagar, Satara, Maharashtra

CT 1,09,060

8 Running and maintenance of Vishakhapatnam Port Physical model during (2018-2019)

Chief Engineer, Visakhapatnam Port Trust, Visakhapatnam -500035, Andhra Pradesh

PH-II 20,13,150

9 Mathematical model studies for evolving suitable flood protection measure for swan river and its tributaries joining the Beas Basin in the district Una, Himachal Pradesh for additional higher flood

Ex. Engineer, Flood Protection Division, Gagret, Dist.Una(HP)-177201

RH 2,51,440

10 Cross-hole seismic Tomography studies at Sirvani Dam, Palakkad

Superintending Engineer, Office of Superintending Engineer, Sirvani Project Circle,Palakkad-678012

GP 14,13,730

11 Estimation of site specific seismic Design parameters for 1200 MW-Pumped storage Project at Pinapuram Kurnool, Andhra Pradesh for M/s Greenko Group, Hyderabad

Shri Prakash Krishna Chaganty (AVP-C&P)M/s Greenko Group, 3rd floor, Sai square plot no.1331, Road No.36, Jubilee Hills, Hyderabad-500033

ES 17,06,162

Page 4: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

4

1.2 Awarded: (05 Nos. totaling to Rs. 54,91,860/- + Rs. 19,19,160/- for calibration works 15 Nos.)

Sl. No.

Name of Work

Sponsoring Agency Division Amount (Rs.)

1. Site inspection of Mahi Bajaj Sagar Reservoir for intake and outfall related studies for proposed Mahi Banswara Rajasthan Atomic Power Project (MBRAPP), Banswara, Rajasthan

S.B.Joshi, Chief Engineer, NPCIL Office, Near Fire Station , Housing Board Colony, Banswara, Rajasthan-327001

BE 8,20,810

2. Estimation of site specific seismic Design parameters for Sharavathy Pumped storage Project (200 MW) Karnataka for WAPCOS (I) Ltd.

The GENERAL Manager (D & RE) WAPCOS, 76-C, Institutional Area, Sector-18, Gurgoan-122015 (Haryana), India

ES 12,97,480

3. Site inspection and discussion regarding safety of Kirshnaraj Sagar dam, Karnataka from the adverse effects of near by Blashing activities

Chief Engineer, Irrigation (South) C.N.N.L. Mysore, Cauvery Neeravari Nigam Ltd, Public Offices Buildings, New Sayyajirao Road, Mysore-570024

VT 2,19,910

4. Running and maintenance of New Mangalore Port random wave physical model during (Year 2018-2019)

Chief Engineer (Civil), New Mangalore Port Trust, Panambur, Manglore-575010, Karnataka

PH-II 25,42,900

5. Geophysical Investigations at Megholi M.I.Tank, Maharashtra

Superintending Engineer, Office of the Superintending Engineer, Kolhapur Irrigation Circle, Sinchan Bhavan, Tarabai Park, Kolhapur-416003, Maharashtra

GP 6,10,760

2. REPORTS SUBMITTED: (08 Nos.) S. No.

Title Division Report No

1. Stability and Settlement Analysis for proposed Training Walls at Tenginagundi - Alvekodi in Uttar Kannada District, Karnataka

GE-II 5654

2. Analysis and Interpretation of Dam Instrumentation Data of Power House for period January 2017 to December 2018, Indira Sagar H.E. Project, M.P

SMA 5655

3. Mathematical model studies for Assessment of wave tranquility in the Mariana Area of Mandwa, Maharashtra

PH-I 5656

4 Field data collection and analysis for mathematical model studies for M/s Petronet LNG Ltd at Dahey Gujarat

CHS-II 5657

5 Mathematical model studies for surge analysis of modified layout of Dhunk Wadi Lift Irrigation Scheme Satara(Dist), Maharashtra

SED 5658

6 Mathematical model studies for shoreline changes for revised Alignment of offshore breakwater at Paradip Port, Odisha

MMCE 5659

7. Estimation of site specific seismic design parameters for Kuri-Gongri H.E. Project, Bhutan for WAPCOS(I)Ltd

ES 5660

8. Analysis and Interpretation of Dam Instrumentation data for Indira Sagar Dam, M.P. for the period of January 2017 to December 2017.

SMA 5661

Page 5: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

5

3. RESEARCH PAPERS:

3.1 Submitted: ( 06 Nos.)

1. M.R.Bhajantri, S.R.Patnaik, V.P.Gadhe, V.V.Bhosekar, “Hydraulic model studies for the optimum design of additional spillway of Hirakud Dam,Odisha”, in International Dam Safety Conference, December 2018. 2. D.K.Awasthi, Suman Sinha, S.Selvan, Rizwan Ali, Jerin Paul, Estimation of site specific design ground motion-methodology and a case study”, in International Dam Safety Conference, December 2018. 3. R.K.Patel, R.S.Jagtap, P.Vijayagopal, K.K.Swain, “Spatial and temporal viability in water quality of the Ganges: Vulnerability from population grown and anthropogenic factors”, in International Dam Safety Conference, December 2018. 4. B.S.Sundarlal, P.D.Patil, M.R.Bhajantri, Neena Issac, V.V.Bhosekar, “Finalizing the layout of spillway and power intake structure for Mangdechhu H.E.Project, Bhutan”, in International Dam Safety Conference, December 2018. 5. Amit Kulhare, M.R.Bhajantri, V.V.Bhosekar, “Rehabilitation and hydraulic improvement of existing Indira Sagar dam spillway, Madhya Pradesh”, in International Dam Safety Conference, December 2018. 6. Sachin Khupat, G.D.Naidu, Anamika Saha, Chaman Singh, “Dam safety in earthquake prevalence using seismic instrumentation”, in International Dam Safety Conference, December 2018.

3.2 Published: (13 Nos.) 1. V.S.Ramarao, M.R.Bhajantri, V.V.Bhosekar, “Optimization Of Hydraulic Design Of URI-II Dam Spillway” in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 2. Mrunmay Junagade, Kunal Chandale, Shrishti Kenjale, R.R.Bahte, “ Analysis of performance of orifice spillway using computational fluid dynamics” in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018.

3. S.J.Ghule, P.M.Abdul Rahiman, S.R.Naidu, K.U.Farande, T.K.Sahu, “Surge analysis of long piping line: A case study” in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018.

4. V.S.Ramarao,M.R.Bhajantri, Dr. (Mrs)V.V.Bhosekar, K.T. More, “ Modification of spillway Ski Jump bucket subjected to higher tail water levels” in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 5. Prabhat Chandra, S.S.Chavan, “Utility of physical wave model for deepening of inner harbour and approach channel at V.O.Chidambarnar” in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 6. A.A.Purohit, M.M.Vaidya, K.R.Karambelkar, “ Assessment of suitability of dumping sites for the disposal of dredged material in Macro tidal region by Hydro-Dispersive Modeling”, in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 7. Kuldeep Malik, N.A.Sonawane, M.K.Pawar, “Design of bank protection works down stream of Hippargi barrage, Karnataka”, in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 8. K.H. Barve, K.S Vighe, L.R Ranganath, “Numerical model studies to assess wave transmission through array of wave energy converters, with different configurations”, in 22nd International

Page 6: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

6

Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 9. Santosh Kori, Prabhat Chandra, “Numerical simulation of wave conditions for Mangrol fishing harbour”, in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 10. R.K.Chaudhari, Santosh Kori, Prabhat Chandra, “ Optimization of approach channel layout to the Kamarjar port”, in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 11. J.D.Agrawal, H.C.Patil, Sagar Chanda, “Determination of wave propagation in fishing harbour basin using mathematical models”, in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 12. K.H.Barve, V.K. Pingale, “Optimization of Harbour layout through mathematical modelling”, in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 13. Vaishali P.Gadhe, S.R.Patnaik, M.R.Bhajantri, V.V.Bhosekar, “Physical and numerical modeling of flow pattern near upstream guide wall of Jiagaon dam spillway, Maharashtra” in 22nd International Conference on Hydraulics Water resources and Coastal Engineering (HYDRO-2018) December 2018. 4. PARTICIPATION IN SEMINARS/SYMPOSIA/CONFERENCES - (05 Events, 25 Participants )

Sl. No.

Title Event, Place, Date Name of Officer

1. GPCON Conference 2018 IMA, Pune

01st – 02nd December, 2018 Dr. Sachin Parhad, SMO

2. Sustainable Water Management ISB Mohali, Chandigadh 10th -11th December, 2018

Dr. (Mrs) V.V. Bhosekar, Director Shri R.S.Jagtap, JD Shri S.D.Ranade, Sci-E Shri B.Suresh Kumar, Sci-C Shri P.Vijayagopal, Sci-C Shri N.Vivekanandan, Sci-B

3. Indian Geotechnical Conference 2018(IGC-2018)

IISC,Bengaluru 13th -15th December 2018

Shri Sudipta Bhowmick, Sci-B

4. 22nd International Conference on Hydraulics, Water Resources and Coastal Engineering (HYDRO- 2018)

NIIT, Patna 19th -21st December 2018

Dr.J.D.Agrawal, Sci -E Shri P.M.Abdul Rahiman, Sci-D Shri L.R.Ranganath, Sci-D Mrs Vaishali Gadhe, Sci -B Shri M.Z.Qumar, Sci-B Dr.K.C.Sahu, Sci-B Shri Kuldeep Malik, Sci-B Shri V.S.Ramarao ,Sci-B Shri S.S.Chavhan, Sci-B Dr.(Mrs.)Prajakta P.Gadge, Sci-B Shri R.K.Chaudhari, Sci-B Shri Santosh Kori ,ARO Shri K.R.Karambelkar, RA

5. 16th Symposium on Earthquake Engineering

IIT Roorkee, 20th -22nd December 2018

Shri Rizwan Ali, Sci-D Dr.Chaman Singh, Sci-B Dr.Suman Sinha, Sci-B Mrs. Anamika Saha, RA

Page 7: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

7

5. LECTURES DELIVERED – (11 Events, 11 Participants)

Sl. No. Title Event, Place, Date Name of Officer

1 Canal Automation NWA, Pune

03rd December 2018 Shri Mukesh Arora, Sci-C

2. Role of hydraulic model studies: Theory and concept of restoring to hydraulic model studies in Hydel civil. Case Study: Hydraulic model studies in Hydel Civil

NWA, Pune 04th December 2018

Dr.M.R.Bhajantri, Sci-E

3. Principles of analysis of PH electrical conductivity and total hardness

NWA,pune 19th December 2018

Shri Jitesh N Vyas, Sci-B

4 Principles of analysis of heavy metal BOD and DO

NWA,Pune 19th December 2018

Shri Kishore K Swain, Sci-B

5 Overview of Energy Dissipation Arrangements in Dams

CBIP,Bhopal 21st December 2018

Shri Kiran T.More, Sci-B

6 Problems Encountered in Energy Dissipation Arrangements

CBIP,Bhopal 22nd December 2018

Shri Amit Kulhare, Sci-B

7 New Materials for Repair of Energy Dissipation Arrangements

CBIP,Bhopal 22nd December 2018

Shri R.Vigneswaran, Sci-B

8 Design of Stilling Basin Energy Dissipator

CBIP,Bhopal 22nd December 2018

Shri Kiran T.More, Sci-B

9 Designs of Spillway with Bucket Type Energy Dissipator

CBIP,Bhopal 22nd December 2018

Shri Amit Kulhare, Sci-B

10 Seismic Parameter assessment and analysis for safety evaluation of Dams

NWA, Pune 26th December 2018

Dr. G. Dhanunjaya Naidu, Sci-B

11 Safety review and rehabilitation of concrete & masonary dams and Embankment & rockfill dams

NWA, Pune 26th December 2018

Dr. Sarabjit Singh, Sci-B

6. PARTICIPATION IN MEETINGS: 6.1 Technical Committee Meetings: (1 Event - 03 Participants)

Sl. No.

Name of Committee Place and Date Participant(s)

1. 8th meeting of NLSC for DRIP and discussions with CWC officials.

MoWR, RD& GR, 17th – 18th December, 2018

Dr. (Mrs) V.V.Bhosekar, Director Shri. Rizwan Ali, Sci-D Dr. Suman Sinha, Sci-B

6.2 Other Meetings: ( 03 Events – 05 participants)

Sl. No.

Name of Committee Place and Date Participant(s)

1. TAC meeting for Farakka Barrage Project

Farakkage Barrage, 03rd – 05th December, 2018

Dr. R.G. Patil, Sci-E

2. Attended meeting with Prof. S.K. Nath regarding “ Seismic Hazard

IIT Kharagpur 11th – 15th December

Dr. G. Dhanunjaya Naidu, Sci-B Dr. Suman Sinha, Sci-B

Page 8: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

8

Assessment of North and North-East India”

2018

3. Attended the 2nd meeting of NLSC for NHP

MoWR,RD&GR, New Delhi 20th December 2018

Shri R.S. Jagtap, JD Shri S.D. Ranade, Sci-E

7. TRAINING OF PERSONNEL – (07 Trainings, 49 Personnel)

Sl. No.

Title Event, Place, Date Name of Officer

1. Capacity Building Programme (CBP) on E-Office for EMD & Product Administrators (CBP Level III)

NICSI, New Delhi 05th -07th December 2018

Shri S.D.Ranade , Sci-E Smt. Anuja Rajagopalan, Sci-B Smt. Shailaja Patil, ARO Shri Awais M. Hanegaonkar, RA Ms. Baby Bhardwaj, LA-II

2. Noting and Drafting INGAF, Mumbai 26th -27th December 2018

Shri Sanjay Kumar, LDC Shri Aditya Raj, MTS Shri Rushikesh H. Hariyan, MTS Shri Santosh Kumar, LDC

3. Hydromet Network Design and Instrumentation

CWPRS, Pune 03th -07th December 2018

Mrs. M.S.Deshpande, AE Mrs. Madhuri Ghodke, JE Shri Yognath, JE Mrs.Anuradha, AE Shri Santosh Ranga, ARO Dr.(Mrs.)Annapurna Patra, Sci-B Shri K.K.Swain, Sci-B Shri Ajit Singh, RA

4 Digital surface modelling and waterhead modelling using open source GIS

NWA, Pune 31st December -11th January 2019

Shri K. Narasayya, ARO Ms. Mansi Mulay, RA

5. Computer basics and IT usage (Batch- IX & XI)

CWPRS,Pune 11th -13th December 2018

Shri Shelar Puranmjit Vishnu, MTS Shri Walkoli Lotiram Dulaji, MTS Mrs. Maya V. Gaikwad, MTS Shri Mate Yuvraj Baban, MTS Shri Bansode Kirankumar, MTS Shri Mate Maruti Digambar, MTS Shri Parshuram M. Khurade, MTS Shri Baid Sanjay Atru, MTS Shri J.R.Suryavanshi, MTS Mrs.Chavhan Ratna Sanjay, MTS Shri Dhor Rakesh Chol, MTS Shri G.Rathod Bhoju , MTS Shri Pal Gokul Chandra, MTS Shri Kante Meena Dilip, MTS Shri Bhalchim Jayram Sakharam, MTS Shri N.Dalvi Ramesh , MTS Shri Patil Madhukar Ukha, MTS Shri Yadhav Sandeep Shrirang, MTS Shri Ishte Sunil Bhimaji, MTS Mrs. Shubhadra C.Thopate, MTS Shri Salve Bhivaji Tukaram, MTS Shri Jadhav Vasant Pandurang, MTS Shri Gadad Laxman Shamrao, MTS Shri Shelar Sanjay Bhivram, MTS Shri D. Gaikwad Kakasaheb, MTS Shri Shaikh Aklahamad Ibrahim, MTS

Page 9: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

9

Shri Tulve Sunil Manaji, MTS Shri R.P.Jadhav, MTS Shri D.G. Sonawane, MTS Shri T.K.Pardhi , MTS

8. IMPORTANT VISITORS:

1. Shri Rajat Nagar, Capt. And Shri A.R. Kamble, Commander from NDY, Mumbai visited CWPRS on 14th December, 2018.

2. Shri R.N.Dixit, Under Secretary (GWE), MoWR, RD&GR, New Delhi visited CWPRS on 18th December, 2018.

3. Shri Neeraj Dixit, SO(E) and Shri Meghraj Singh, SO(E) from AERB visited CWPRS on 19th December 2018.

9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS

Sl. No.

Name of Person Designation Group Division Date

New Entrants

1. Shri S.B. Sonawane LA - II C SMA 14.12.2018

2. Shri R.B. Jadhav LA - II C

PH-III 20.12.2018

3. Kum R.V. Bapardekar LA - II C Admn 21.12.2018

4. Shri H.S. Patil LA - II C CPC 24.12.2018

5. Shri A.K. Padwal LA - II C SWH 26.12.2018

6. Shri Amit Kumar LDC C CPC 04.12.2018

Promotions

1. Shri D.T. Gaikwad LIO A LIBIS 26.12.2018

Retirement

1. Mrs. Mariamma Abraham Steno-I B SED 31.12.2018

Voluntary Retirement

NIL

Repatriation/Transfer

NIL

Resignation

NIL

Demises

1. Shri Balkrishna D. Mate MTS C CPC 03.12.2018

Page 10: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

10

10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: ( 2 Nos.)

1. Training course on “Hydromet Network Design and Instrumentation” organized during

03th – 07th December 2018 at CWPRS, Pune.

2. Training Course on “Computer basics and IT Usages (batch IX - XI combined” organized during

11th -13th December 2018 at CWPRS Pune.

Page 11: CWPRS MONTHLY INFORMATION BULLETINcwprs.gov.in/WriteReadData/file/mib/MIB december 2018.pdf · Government of India Ministry of Water Resources River Development & Ganga Rejuvenation

CWPRS Information Bulletin December, 2018

11

11. OTHER INFORMATION: “ Hindi Karyashala” organized on 05.12.2018 at CWPRS, Pune.