CWPPRA Terracing and Marsh Creation South of Big Mar Project (BA-24) Project Kickoff Meeting April 17, 2013

Upload: megan

Post on 24-Feb-2016

48 views

Category:

Documents


0 download

DESCRIPTION

CWPPRA Terracing and Marsh Creation South of Big Mar Project (BA-24). Project Kickoff Meeting April 17, 2013. Meeting Goals. Review project background Discuss project features and potential changes or additional features to investigate - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

CWPPRA Terracing and Marsh Creation

South of Big Mar Project(BA-24)

Project Kickoff Meeting

April 17, 2013

Page 2: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Meeting Goals• Review project background• Discuss project features and potential changes

or additional features to investigate• Discuss engineering and design tasks

necessary to reach 30% design milestone• Discuss other Phase 1 tasks – landrights,

permits, NEPA• Develop a schedule for Phase 1 tasks to reach

30% design

Page 3: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Background

• Developed to restore the marsh platform scoured by Hurricane Katrina

• Will work in concert with the Lake Lery Shoreline Protection Project (BS-16) to reinforce the historic Lake Lery Shoreline

• Terraces will reduce wave fetch in the large open water areas and promote conditions conducive to growth of marsh vegetation and submerged aquatic vegetation.

• Will also benefit from freshwater, sediments, and nutrients provided by the Caernarvon Freshwater Diversion Project.

Page 4: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Address other projects in the area

Page 5: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)
Page 6: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)
Page 7: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Terracing

• ~ 65,000 linear feet of terraces (50 acres)

Project Features

Marsh Creation

335 acres of marsh created and restored

Page 8: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Marsh Creation

• Approximately 2.5 M cubic yards of material would be dredged from a borrow site proposed in Lake Lery

• Retention levees gapped/degraded to support estuarine fisheries access and to achieve a functional marsh

• Pipeline layout initial design:

Project Features (Cont.)

Page 9: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Project Features (Cont.)

• Terraces LF was not based on the standard >>> 250 ft apart, 70.2 LF per acre

– which would result in 67,883 LF comprising 967 acres of terraces

• GIS effort was conducted that placed the terraces 300-400 feet apart with 65,000 LF of terraces in approximately 1,000 acres.

Top Width ft 15.0 Side Slope 1V:5.0 H Length of Terraces lf d) 65,000 Height of Material Quantity (b - a + c) ft e) 4.4

Volume of Material yd3 394,771

Vegetative Plantings 5 ft spacing 2rows per side 2rows on crest 78,006total plants req'd

Terraces

Page 10: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

• Benefits: 307 net acres of intermediate marsh over 20 years.

• Fully funded cost = $23,843,953• Phase 1 cost = $2,258,696• Approved for Phase 1 funding by the CWPPRA

Task Force on January 24, 2013.

Benefits/Costs

Page 11: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Design Considerations

• Configuration of terracing

• Borrow Area/Dredge pipe route

• Dewater locations

• Gapping vs. degrading

• Tidal creeks

• Identify additional /alternative areas that would benefit from terraces or marsh creation

Page 12: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

CRMS Locations

Page 13: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Engineering & Design and other Phase 1 Tasks

• Surveys • Wave analysis – same borrow area• Geotechnical Investigation• Gage Installation• Landrights• NEPA• Permit Application• Cultural Resources

Page 14: CWPPRA  Terracing and Marsh Creation              South of Big Mar Project (BA-24)

Discussion