cvrd ect level 3 workshop rms express (advanced operations) module 7 of 9 september 09, 2013

12
CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

Upload: jon-veale

Post on 01-Apr-2015

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

CVRD ECT Level 3 WorkshopRMS Express (Advanced Operations)

Module 7 of 9

September 09, 2013

Page 2: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

Module

TrainingDate , Time

and Location

M1 ECT Standards March 04

M2 RMS Express – Intro & Basics March 18

M3 Connectors #1 April 08

M4 Connectors #2 May 06

M5 SuperComBox and Pelican Case Radio Kits June 03

M6 Field Visit to all EOC’s TBA

M7 RMS Express – Advanced Operation September 09

M8 EOC Radio Setup October 07

M9 ECT ‘Grab-n-Go-Kits’ November 04

Training will take place in either CVRD Board Room or PSD #213

Page 3: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013
Page 4: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

ECT Training – September 09, 2013

Page 5: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

Agenda• Opening remarks• Round table introductions with comments • RMS Station Setup• Basic Packet Architecture • RMS Express Program Operation

Page 6: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

Opening Remarks• CVRD ECT operational standards• Objectives of this session• Deployment Expectations

Page 7: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

Introductions• Name and Call Sign• Do you have a dedicated packet station?• Do you have a Kantronics TNC? Model?• Do you use a sound card modem for packet?• Is your packet station operational 24x7?• Do you update the RMS program regularly?• Rate your packet knowledge level (B, I, A)

Page 8: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

RMS Station Setup discussion1. Quick review of our earlier (basic) session as a refresher2. Review of install and update procedure3. Review of the P2P <Setup> screen and the disable function4. Setting transmit deviation with examples of why this is critical5. Recording the XMITLVL and labelling your radio / TNC package6. Actual testing of attendee radio / TNC packages for TX deviation7. Kantronics TNC setting <Display> command8. Simple Terminal9. Navigating the command list in your TNC10. Format to set <Daytime> command11. Changes within your TNC when you experiment (with another

program) and importance of having a base-line listing for your TNC12. RMS Express on a memory stick13. Whitelist maintenance schedule for each station

Page 9: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

Basic Packet Architecture1. Packet radio network in CRD, CVRD and WA-state2. Frequency plans3. Nodes4. Digipeating5. RMS Packet gateways6. Node stacks7. AX25 packet traffic protocol8. Peer-to-Peer connectivity

Page 10: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

RMS Express Program Operation1. Formatting a new message (WL2K versus P2P)2. Templates and Node scripting3. Importance of turning off certain features

• Auto add to contacts list• Read receipts• Auto connect• No CC or Bcc

• Sending message to the intended station• Replying to messages – no read receipts or CC• Maintenance of <Inbox and Trash>• Importance of leaving station in P2P mode• VE7SAG message mystery

Page 11: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013

VE7SAG message1. VE7SAG sent VE7AVV a P2P message.2. VE7AVV replied to VE7SAG

Page 12: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013