cv - isham bin mohd deros @ idrus - updated 08102016
TRANSCRIPT
1Curriculum Vitae
PERSONAL
PARTICULARS
Name : Isham Bin Mohd Deros @ Idrus Gender : Male
Address : 14, Jalan Rambai 5, Nationality : Malaysian
Taman Kota Masai, Religion : Islam
81700 Pasir Gudang. Status : Married
Race : Malay Tel (H/P) : +6019-2622258
Date of Birth : 04th July 1983 E-mail : [email protected]
IC No. : 830704-01-5423
EDUCATIONAL BACKGROUND / PERSONAL QUALIFICATION
Level : Diploma of Engineering (Mechanical) Name of Institution : Universiti Teknologi Malaysia (UTM)
Completion Date : June 2001 – December 2004
Isham Bin Mohd Deros @ Idrus
2Curriculum Vitae
Level : Certi f ied IRCA Lead Auditor Quality Management System ISO 9001:2015Certificate number : LAC/Q10042Name of Institution : Internatinal Register of Certificated Auditor,
Guardian Independent Certification Pte. Ltd. Singapore.Completion Date : July 28, 2016Cert. Expired Date : July 28, 2019
Level : CSWIP 3.1 Welding InspectorCertificate number : 63139
Name of Institution : TWI Training & Certification (S. E. Asia) Sdn Bhd
Completion Date : February 17, 2012
Cert. Expired Date : February 17, 2017
CSWIP Official : http://www.cswip.com/verification/index.jsp
Level : PCN Welding Inspector Level 2 (W-WI2) & Radiographic Interpretation (Dense Metals & Light Metals) PCN number : 308215
Name of Institution : British Institute OF Non-Destructive Test (BINDT)
Completion Date : February 11, 2010 & December 15, 2015
Cert. Expired Date : July 10, 2016 & December 14, 2020
BINDT Official :
http://www.bindt.org/Certification/PCN_Certification_Verification§
Level : BGAS-CSWIP Blast & Painting Operative Level 5A & 5BCertificate number : 262K/633823 & 262L/633823
Name of Institution : TWI Training & Certification (S. E. Asia) Sdn Bhd
Completion Date : March 4, 2015
Cert. Expired Date : March 4, 2020
CSWIP Official : http://www.cswip.com/verification/index.jsp
Level : Magnetic Particle Testing (MT) & Liquid Penetrant Testing (PT) Level 2Certificate number : AIES/MT/1008/2015 & AIES/PT/1008/2015Name of Institution : American Society of Non-Destructive Testing - ASNT by Advance Integrated Engineering Solution Pte. Ltd., Singapore.
Isham Bin Mohd Deros @ Idrus
3Curriculum Vitae
Completion Date : October 2, 2015Cert. Expired Date : October 1, 2018
Level : Ultrasonic Testing (UT) Level 2Certificate number : AIES/UT/1008/2015Name of Institution : American Society of Non-Destructive Testing - ASNT by Advance Integrated Engineering Solution Pte. Ltd., Singapore.Completion Date : October 16, 2015Cert. Expired Date : October 15, 2018
TRAINING & COURSE ATTENDED
1. Mis-BOSET (Petronas Approved).
• Expired on October 2017.
2. ExxonMobil LPS (Loss Prevention System) Course.
• Expired on September 2018.
3. CSWIP Magnetic Particle Inspection (MPI) Attendance Course. (September 2012)
• TWI JB.
4. NIOSH – OSFAM Safety Passport SICW (NOSP) – Passport No. W028597J02
• Expired on 1st March 2016.
5. CIDB Kad Pendaftaran Personel Binaan. – Kad No. 155809
• Expired on 05th May 2015.
6. Intertek i-Learn Course. - Completed on 11/04/2016.
• GRM Training for the Resources.
• HSE Charter.
• IS HSE Charter DVA.
• Operational Systems for the Technical Specialist.
• Safety Awareness Series : Stop Work Authority.
• TIS TS Charter 2015 DVA.
• TS Charter 2015 (English).
7. International Register of Certified Auditor (IRCA).
• Auditor / Lead Auditor Course for Quality Management System ISO 9001 : 2015.
SUMMARY OF EXPERIENCE
More than 9 years’ experience involving in supervision, coordination, inspection and NDE in fabrication of
Jacket, Module, Topsides, and other related activities. Experiences including, source inspections, shop
Isham Bin Mohd Deros @ Idrus
4Curriculum Vitae
fabrication and construction project in welding and engineering inspections for Module, Jacket, Topsides
Structure and associated pipe work and pipelines of Oil & Gas Platforms, Steel Structure, Riser, Sub-sea
Equipment, Storage Tank, Pressure Vessel and End Fittings for Flexible Pipes fof Jumper & Water Injection.
Directly perform an inspection and also independent in monitoring and interpretation of inspection activities.
Familiar with International Codes and Standards such as AWS, API, ASME, ASTM, BS EN, ANSI and Client’s
Specification such as DEP, PTS and MPDS.
SCOPE OF WORK
1. Witness - The act of observing and giving an account of inspections and/or tests
performed by others. Typical Items Witnessed - Functional testing, hydrostatic
testing, nondestructive testing, and other special tests.
2. Verify - The act of proving that a function or requirement has been met by
examining objective evidence. This evidence can be in the form of documentation
or confirmed by witnessing or performing a function. Typical Items Verified - QA/QC
program implementation, welding procedures/qualification records, inspection/test
procedures, installation procedures, and material certifications.
3. Perform - Personal performance of a task or function. Typical Items Performed -
Visual inspections, dimensional inspections, document review, shipping release
inspection.
WORKING EXPERIENCES
1. Company Name : Intertek Moody (M) Sdn. Bhd.
Designation : Third Party Inspector (Freelance)
Period : January 2015 – Present
Project Involved : 1) Final Dimension and Inspection of PCSB BESAR X-Panel and Jacket
Piling and Conductor Make-Up, SAW Circumference weld.
2) Mechanical and Chemical Test for Broke Dockyard Es Stock Testing.
3) External Three Layer Polyethylene (3LPE) pipe coating for DAEWOO
B405b CAFC Algeria Project and Rapid Petronas Project.
4) Source Inspection of flanges at Galperti Sdn. Bhd. for Technip Gorgon
Project Barrow Island LNG Plant.
5) Witnessed EMEPMI Guntong C Ball Valves Impact Test.
6) Witnessed Hydrostatic Test piping for Wash Water Skid Petronas KNPG-
B Topside Phase II Project.
7) Final Inspection of GRE and GRP pipes and fitting for Technip NRSP Complex
Project.
Isham Bin Mohd Deros @ Idrus
5Curriculum Vitae
8) Witnessed mechanical and chemical test for Proyecto Hidroelectrico
Ituango Project.
9) Final Inspection for Stop Log Gates Lot 1.4 HHI Shaquiq Steam Power
Plant Project.
10) Witnessed mechanical and chemical test of materials for Jacket &
Topside Petronas SK316 Project.
11) Welding & inspection monitoring of cementing float collar & float shoes for
Hess Project at Oilstates Asia Pte. Ltd.
12) Sling & wire rope inspections and testing for Saipem’s Gina Krog Project.
13) WPQT and WQT for Koambo Project.
14) Witnessed of grout cube testing for Vasai East Project, India at Setsco Lab.
15) Source inspections for wire rope and sling for Petrobras project at Kiswire.
16) Source inspections for Sapura Kencana ABACUS check valves at Panaflo
Controls Pte. Ltd. Singapore.
17) Seafastening for Diving Vessel equipment for Sapura Acergy, Badamyar,
Myanmar Project.
18) Final inspection for Novus Sealing’s Spiral Wound and Camprofile Gaskets for
RAPID Petronas Project.
19) FAT for Actuated Ball Valves for ExxonMobil Malaysia Development Project at
Matco Asia Pte. Ltd., Singapore.
20) Final Inspection of Float and Plug Subsea Equipment for Qatar Shell Project at
Haliburton Malaysia Sdn. Bhd.
21) FAT for Boat Landing Platform and Gangway Access Ladder for ENI Angola
Project.
22) Hydrotest and Final Inspection for GRE pipe spools of Total Kaombo Project
at NOV FGS.
Client : 1) MMHE Sdn. Bhd.
2) Broke Dockyard.
3) Daewoo Pte. Ltd.
4) Chevron.
5) Exxon Mobil Exploration & Production Malaysia Inc.
6) Petronas Carigali.
7) Technip.
8) Hyundai Heavy Industries.
9) MMHE-ATB.
10) CCSM - CTCI Chiyoda Synerlitz Mie
11) HESS
12) Saipem
Isham Bin Mohd Deros @ Idrus
6Curriculum Vitae
13) Sapura Kencana - KHL
14) Petrobras
15) Sapura Acergy
16) Sinopec Engineering Group (SEG)
17) Wood Groups
18) Qatar Shell
19) Bumi Armada Berhad
Work Description1. Perform and witness inspection activities as per Inspection Request by Client.
2. Perform source surveillance inspections to verify, witness, monitor and perform specific activities as
per client’s specification and standard apply to the work instruction order.
3. Review project’s procedures, NDE procedure, purchase order, delivery order, packing list,
manufacturer approve drawings and witness mechanical and chemical lab tests.
4. Ensure and understand of NDE’s certification and NDE’s project requirement.
5. Reports all inspection activities and non-conformance issue to Client during inspection visit.
6. Release and issue Inspection Release Certificates (IRC) and Certificates of Conformance (COC)
related to inspection items.
7. Issue Outstanding Work List (OWL) if any.
8. Check and review all reporting documents.
9. Ensure inspection documentation is in order.
10. All inspection performed may witness, verify, or perform inspections depending on client’s
requirement and project’s ITP applied.
2. Company Name : Velosi (M) Sdn. Bhd.
Designation : Third Party Inspector & Source Inspection Inspector / Shell Client
Representative (Freelance).
Period : December 2014 - Present
Project Involved : 1) NDE Witness on Spreader Beam / Bar Design for LQ Lifting of
Malikai TLP Project.
2) WPQT for qualified new WPS on SK 316 Development Project.
3) Witness on SSCC Test for BG India MB Platform & Pipeline Project
4) Malikai Hull Storage Tanks.
5) Malikai Hydraulic Oil Tank.
6) Pressure vessels and heat exchanger for Besar-A Project.
7) Perform source inspection and specific activities of Gas Dew Pointing,
LQ Hot Water, Fabrication of anodes, manufacturing of Flexible pipes
end fitting jumper, safety signage, manufacturing of hydraulic oil storage
tank & liquid transfer pump and helideck aluminum pancake for SSPC
Isham Bin Mohd Deros @ Idrus
7Curriculum Vitae
Malikai TLP Project.
7) Witnessed Mechanical Test, Chemical Test and Corrosion Test
carried out for PT Technic Maharalela South Project.
8) Bolt and Nuts final inspection for TGAST Project.
9) Witnessed Monorails Load Test for Malikai TLP Project.
10) Fabrication of Mounded Bullet Vessel for Rapid Petronas Project at
MMHE ATB.
Client : 1) TMJV Malikai
2) TMJV SK 316
3) ISSPL (IRCLASS Systems & Solutions Pte. Ltd.)
4) Sabah Shell Petroleum Company (SSPC)
5) Technip / Total
6) PCSB
7) SAMSUNG
8) MMHE
9) Punj Lloyd
Work Description1. Perform and witness inspection activities as per Inspection Request by Client.
2. Review project’s procedures, NDE procedure, purchase order, delivery order, packing list,
manufacturer approve drawings and witness mechanical and chemical lab tests.
3. Ensure and understand of NDE’s certification and NDE’s project requirement.
4. Reviewed RT films, hydrostatic test all testing required as stated in the approved ITP.
5. As an inspector for Sabah Shell Petroleum Company (SSPC) - Malikai Project, source inspection
personnel to visit supplier or vendor facilities for monitoring, witness, verify and endorse the
inspection activities to ensure its comply with the Shell’s DEP and project specification standard.
5. Reports all inspection activities and non-conformance issue to Client during inspection visit.
6. Release and issue Inspection Release Certificates (IRC) and Certificates of Conformance
(COC) related to inspection items.
7. Issue Outstanding Work List (OWL) if any.
8. Check and review all reporting documents.
9. Ensure inspection documentation is in order.
10. All inspection performed may witness, verify, or perform inspections depending on client’s
requirement and project’s ITP applied.
3. Company Name : Setsco Services Pte. Ltd. Singapore
Designation : Inspection Test Assurance (ITA) / Expeditor (Freelance)
Period : April 2014 - Present
Project Involved : Civil Structure Steel Fabrication
Isham Bin Mohd Deros @ Idrus
8Curriculum Vitae
1) Fusionpolis 2A – Tower A & B Project
2) Bedok Hawker Centre Project
3) Changi International Airport Terminal 4
4) Changi International Airport Terminal 1 - Extension and Re-construction
5) Gallery Hotel Project
6) Dulwich College - Bukit Batok
7) Kranji Camp Block 605 Project
Client : 1) GS Engineering & Construction Corporation
2) TGG Pte. Ltd.
3) Takenaka Corporation
4) Web Structures Pte. Ltd.
5) KTP Consultant Pte. Ltd.
6) SembCorp Pte. Ltd.
Work Description
1. As an ITA and Expeditor on behalf of Client Representative for Projects at YHL Engineering Sdn Bhd.
2. Reviewing and approved the Project Specification, welding sequences for distortion control, welding
procedure, Inspection & Testing requirements based on the applicable construction codes like as per
AWS D1.1 Structural Welding Code - Steel.
3. To act on behalf of client or for the assigned job or project (activities involved - witnessing and
verification works as Welding Procedure Qualification Test, Welding Procedure Specification,
Mechanical Testing, Welding Inspection (Before, During and After), dimensional and fit-up verification,
NDT methods (UT, RT, MPI & DPI) and document review.
4. Shall carry out inspection as per ITP and report the result of inspection.
5. Perform daily inspection as a hold point personnel during fabrication of items such as a material
inspection, fit-up inspection, visual inspection, painting inspection and inspection release note (IRN)
documents upon request.
6. Witness and review of NDT carried out by NDT firm and destructive testing for material sampling.
7. Ensure all conditions are enforced to issue a release note and trigger the material receipt function in
Maximum when the release note is issued.
8. Provide the SCM engineer with all necessary information for the approval of the supplier’s invoices
(with focus on delivery of documentation).
9. Receive & forward the supplier’s calls for inspections to the project QC engineer and, as applicable,
to the client (as per the requirement of the ITP), monitor the progress of the inspections, ensure that
the inspection report are received, reviewed, agreed & logged. Forward the finding(s), if any, to the
supplier. Keep up to date a two weeks look ahead inspection plan.
10. To identify any non-conformance at site and raise NCR.
11. Review and witness of all the related document and inspection carried out at YHL and ensure all
inspection documentation is in order and compile them as a final documentation index.
Isham Bin Mohd Deros @ Idrus
9Curriculum Vitae
4. Company Name : MMHE (Malaysia Marine & Heavy Engineering Sdn Bhd)
Designation : Structural Welding Inspector
Period : January 2013 - March 2014
Project Involved : Damar A Topside & Hook-Up C.O.W Offshore Campaign.
Client : EMEPMI (ExxonMobil Exploration & Production Malaysia Inc).
Work Description
1. As an authorize personnel in the Contractor organization to accept or reject inspected items.
2. Shall ensure timely issuance of reports upon completion of inspections.
3. Shall check & review to ensure that all inspections reports are correct before submission to Client.
4. Shall carry out inspection as per ITP and report the result of inspection.
5. To identify any non-conformance at site and raise NCR.
6. To issue Quality Action Note (QAN) during daily routine surveillance.
7. Ensure inspection documentation is in order and compile them as a final documentation index.
5. Company Name : Bureau Veritas (M) Sdn Bhd
Designation : Third Party Inspector
Period : May 2012 - December 2012
Project Involved : Building Interior and Steel Fabrication Structure
Cleveland Clinic Abu Dhabi, Dubai, UAE.
Client : Samsung C&T JV and SixCo.
Work Description
1. Material Conformity Inspection :
• Mill certificate for raw materials (validity & traceability) against approved material submittal
and samples.
2. Test Witness during Fabrication Process e.g :
• Shelves (e.g non-destructive / destructive tests on deflection / flexure, lateral load
performance.)
3. Assembly Conformity Inspection :
• Sizes / dimension of the casework.
• General arrangement of assembly.
• Installation.
• Finishes.
4. Storage and Handling Condition Assessment :
• Condition of storage yard and controlled environment conditions.
• Method of handling.
5. Work Progress / Milestone Monitoring :
• Record of the state of works progress and/or studies drawn up during inspections in factory
Isham Bin Mohd Deros @ Idrus
10Curriculum Vitae
(supply by the fabricator) against the estimated schedule at the date of inspection (by
Contractor).
• Record Deviations.
6. Pre-shipment Inspection :
• QC tagging & traceability of assembled caseworks, packaging and overall condition, overall
dimension, eventual damages.
6. Company Name : Escon Engineering Services
Designation : Freelance Welding Inspector at FMC Technologies, Nusa Jaya.
Period : 2nd November 2011 – 4th November 2012
Project Involved : Laggan Tormore (AP – K001) Termination Head Subsea Equipment.
Client : Total Clov
Work Description
1. As a witness and verifier Inspector for GTAW welding process of Termination Head KC4.2 -12, ID 9,
UCON-H.
2. Inspect visually, layer by layer for GTAW process during joining the Super Duplex material and F14
special material.
3. Make sure weld joint was following the WPS during welding.
4. Witness and verify the welding process of Orbital Automatic GTAW Welding Machine and PWHT.
5. Interpreted PWHT chart to make sure the entire heating, holding and cooling rate were accepted
base on Client’s spec.
7. Company Name : Teguh Mechanical & Engineering Sdn Bhd
Designation : QC Inspector (Structure)
Period : October 2011 – April 2012
Project Involved : Telok A & B (Jackets)
Client : EMEPMI (ExxonMobil Exploration and Production Malaysia Inc.)
Work Description
1. Follow up progress for Inspection Test Plan (ITP), WPS, WQT and Material Verification Certificate
(MVR) with mill certificate and Material Acceptance Certificate from MMHE and client.
2. Monitor and inspect Welder Qualification Test (WQT) for SMAW (6G, 6GR), SAW (1G) and FCAW
(3G, 4G). Perform bend test for test piece sample with witnesses from MMHE and client.
3. Monitor and perform visual inspection before and after cutting the material. Make sure drawing
number, piece mark, plate number, and heat number is tally with drawing.
4. Draw the welding information box (WIB) at weld joint for traceability.
5. Request dimensional survey for DC report before do the Fit-up inspection with MMHE QA Inspector
and client.
6. Inspect fitter progress before tack weld the joint to make sure correct piece mark number, electrode
Isham Bin Mohd Deros @ Idrus
11Curriculum Vitae
and pre-heating is using follow by the respective WPS.
7. Perform fit-up inspection with MMHE QA Inspector with witness from client. Checking and inspect the
root gap, root face, misalignment, long shim orientation, piece mark numbers and material.
8. Monitor by randomly checking weld consumable, weld polarity and pre-heat requirement during
welding process is follow the WPS.
9. Perform visual inspection and prepare documentation follow by the ITP requirement.
10. Request NDT as per NDT Matrix and follow the repair procedure if joint rejected.
11. Prepare Work Completion Information Report (WCIR) before release to painting. Any punch list
should be noted.
12. Check weld summary with DCC to make sure no outstanding report.
8. Company Name : Pristine Potential Sdn Bhd
Designation : QC Inspector (Piping)
Period : October 2010 – September 2011
Project Involved : Gumusut Kakap FPS Project (Top Side)
Client : MMHE, Sarawak Shell Petroleum Company (SSPC), MISC.
Work Description
1. Monitoring and continue inspect at electrode’s store whether consumable are proper handling,
storage, baking and recording according method and requirements of project.
2. Inspect fit up condition such as bevel preparation, bevel type, mismatch, root gap, root face,
cleanliness and alignment according to specification acceptance criteria and preparing document.
3. Inspect welder whether they got certified welder’s pass before commence welding and welding on
correct position according their certified welder’s pass.
4. Inspect grade, size, type and identity of material before cut and after cut according to drawing’s
requirement and preparing document.
5. Carry out visual inspection base on specification are use after welding finished and preparing
documents.
6. Make sure weld area are proper protection from rain, moisture, wind and any kind of matter that will
make welds worst during welding.
7. Do surveillance due to avoid cheating before and during welding progress throughout welder,
consumable and any kind of method or things that offend the requirement’s projects and
specifications.
8. Verify outgoing material after demolition process until it reached at disposal area and preparing
documents.
9. NDT method arrangement base on project requirement and NDT matrix. (UT, RT, PWHT and Hydro
Test)
10. Follow up repairs if occurs and re-arrange NDT.
11. Preparing punch list if any.
Isham Bin Mohd Deros @ Idrus
12Curriculum Vitae
9. Company Name : Thermotest Sdn. Bhd.
Designation : Pre-heat & Post Weld Heat Treatment (PWHT) Technician.
Period : July 2009 - September 2010
Project Involved : Gumusut Kakap FPS Project (Hull & Top Side)
Client : MMHE, Sarawak Shell Petroleum Company (SSPC), MISC.
Work Description
1. Do preparation for heating element equipment such as a heater, thermocouple welder and heat
treatment unit and insulation fiber.
2. Setting up heat treatment unit Ampere and Voltage to get the correct temperature needed
during welding proses.
3. Communicate with foreman welder to make sure we follow a good progress.
4. Follow WPS for heating element as per requirement.
5. Excellent skills in various PWHT surface.
6. Excellent skills in handling PWHT equipment.
7. Excellent skills of handling heating element equipment by the use of gas burners, oxy gas
flames, electric blankets, induction heating and by heating in a furnace.
10. Company Name : Esstar Vision Sdn Bhd
Designation : QC Inspector (Mechanical)
Period : October 2008 – June 2009
Project Involved : Johor Petroleum Island, Malaysia
Client : Asia Petroleum Hub Sdn Bhd
Work Description
1. Reads and interprets materials, such as work orders, inspection manuals, and blueprints, to
determine inspection and test procedures.
2. Analyzes and interprets sample data.
3. Estimates and records operational data.
4. Completes necessary procedures to satisfy licensing requirements, and indicates
concurrence with acceptance or rejection decisions.
5. Confers with vendors and others regarding inspection results, recommends corrective
procedures, and compiles reports of results, recommendations, and needed repairs.
6. Tests and measures finished products, components, or assemblies for functioning,
operation, accuracy, or assembly to verify adherence to functional specifications.
7. Inspects materials, products, and work in progress for conformance to specifications, and
adjusts process or assembly equipment to meet standards.
8. Starts and operates finished products for testing or inspection.
9. Reads dials and meters to ensure that equipment is operating according to specifications.
Isham Bin Mohd Deros @ Idrus
13Curriculum Vitae
10. Collects samples for testing, and computes findings.
11. Marks items for acceptance or rejection, records test results and inspection data, and
compares findings with specifications to ensure conformance to standards.
12. Perform visual examination of the entire body of Pressure Vessel / Heat
Exchanger for the final visual inspection. Witness and indirectly involve on
advanced NDT methods for internal visual examination using the NDT
method of corrosion mapping, ultrasonic thickness measurement and flaw
detection and MFL screening.
13. Discards or rejects products, materials, and equipment not meeting specifications.
11. Company Name : Nian Cemerlang Sdn. Bhd.
Designation : QC Inspector (Structural)
Period : November 2007 – July 2008
Project Involved : Mopu Store Tank
Client : Single Buoy Mooring Inc. (SBM)
Work Description
1. Responsible to reporting all activities to QC coordinator.
2. Familiarization to the code, specification and procedure.
3. Review and endorse all report after inspection.
4. Perform Material Verifications, monitoring cutting and as per drawing and specification.
5. Check material preparation, fit-up, welding and NDT to ensure compliance with drawing,
code and specification.
6. Check dimensional and leveling before and after welding.
7. Computerized and reviewed weld summary.
12. Company Name : Syarikat SteelCon Sdn Bhd
Designation : QC Inspector (Structural)
Period : January 2007 – September 2007
Project Involved : All project in workshop and site.
Client : Depend on Project
Work Description
1. Responsible to reporting all activities to QA/QC Manager.
2. Familiarization to the code, specification and procedure.
3. Liaise with client and owner representative on week-by week.
4. Monitoring Welding Procedure Qualification Test (WPQT) & WQT.
5. Check material preparation, fit-up, welding and request NDT to ensure its compliance.
6. Clear any punch list with client and owner.
7. Check dimensional and leveling before and after welding.
Isham Bin Mohd Deros @ Idrus
14Curriculum Vitae
8. Computerized and reviewed weld summary.
13. Company Name : Sri Paka Engineering Sdn Bhd
Designation : QC Inspector (Structural)
Period : April 2006 – December 2006
Project Involved : All project in workshop and site.
Client : Self Erecting Drilling Tender (Tioman T10)
Work Description
1. Obtained all relevant documentation or ensure it relevant specification and codes, procedure
copies such like WPS, WPQT, Inspection and Test Plan (ITP), Drawing, Color Coding, request
form and other procedures should be approved by client.
2. Perform (GIIR) Good Inward Inspection Report on all incoming material check type, heat
number, condition, size and quality of material (tubular, plate and etc).
3. Perform Welder Qualification Test (WQT) and Welding procedure Qualification Test (WPQT).
4. Perform (MVR) Material Verification Report. Verification of Material prior to cut and fabrication
as per requirement.
5. Perform Fit-Up and Dimension Inspection prior to weld as per drawing and specification.
6. Surveillance during welding to verify compliance with procedure.
7. Monitoring electrodes issuance (Backing & holding temperatures and times to be issued
recorded).
8. Carried out visual and dimensional inspection prior to client inspection and ensure weldment
and parent metal area are clean as per specification.
9. Request for NDT as per specification.
10. Perform straightness, leveling, diagonal and vertically dimensional inspection before and after
welding.
11. Up-date all daily reports (MVR, Fit Up, Visual, Dimensional, NDT and etc) into summary sheets.
12. Monitoring and supervision to ensure all the activities should base on client specifications,
codes or standard and site change. Try to minimize welding repair percentage and improve the
work.
13. Monitor NDT primarily (UT / MPI) Inspection.
14. Attend meeting with client / consultant and project management team to solve a problem and
achieve the project schedule.
15. Complete up-dating and filing final documentation.
Isham Bin Mohd Deros @ Idrus
15Curriculum Vitae
REFERENCES
Name : Zafrul Azmi Osman
Designation : Operation Manager
Company : Intertek Moody (M) Sdn. Bhd.
Tel. No. : +60125196649
Name : Awangko Saadenan
Designation : Project Operation Manager
Company : Velosi (M) Sdn. Bhd.
Tel. No. : +60356337111
Name : Ariel D. Cabawatan
Designation : Inspection Manager
Company : Setsco Services Pte. Ltd., Singapore.
Tel. No. : +6598736595 / +6568950623
Isham Bin Mohd Deros @ Idrus
16Curriculum Vitae
Name : Sugumar Varatha
Designation : Quality Engineer
Company : Sabah Shell Petroleum Company (SSPC)
Tel. No. : +60126307523
Name : Selamat Haji Omar
Designation : Lead QA/QC Coordinator
Company : MMHE (Malaysia Marine & Heavy Engineering Sdn Bhd.)
Tel. No. : +60137476223
Name : Hamdan Alham
Designation : Operation Manager
Company : BUREAU VERITAS South East Asia Region Sdn. Bhd., Kuala Lumpur, Malaysia
Tel. No. : +60124887284
Name : Mohd Farid Bin Tumiran
Designation : Structural Inspector
Company : ExxonMobil Exploration and Production Malaysia Inc.
Tel. No. : +60126635670
Isham Bin Mohd Deros @ Idrus