c.v for m.zaki

8
C . V Particular Information Name: Mohamed Ali Zaki El Tanboli. Position: Civil Engineer. Date of Birth: 31/ 10/1960. Nationality: Egyptian. Phone No: 02/ 38240534 & &01000105891 Years of Experience: 30 Year. Education: B.Sc.Civil Engineer-Alex. University 1983. Previous Work History : Dec. 1985-Sep.1986: MEGICON . Site Engineer-(Kajima Corporation) The Education and Cultural Center (Opera House in Cairo) Responsible for Formwork &Steel Reinforcement site

Upload: mohamed-al-tanboli

Post on 10-Apr-2017

201 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C.V  for M.ZAKI

C . V

Particular InformationName: Mohamed Ali Zaki El Tanboli.Position: Civil Engineer.Date of Birth: 31/ 10/1960.Nationality: Egyptian.Phone No: 02/ 38240534 & &01000105891Years of Experience: 30 Year.Education: B.Sc.Civil Engineer-Alex. University 1983. Previous Work History :

Dec. 1985-Sep.1986: MEGICON . Site Engineer-(Kajima Corporation) The Education and Cultural Center (Opera House in Cairo) Responsible for Formwork &Steel Reinforcement siteSep.1986-Dec.1987: MEGICON . Senior Engineer (West Sebaiya Mine Development) Responsible for Construction of the Primary Crusher, Conveyors, Sub Station and 11 KV Line.Dec. 1987-Aug.1988: MEGICON . Senior Engineer (Grain Silos of Quss) Responsibilities included the site mobilization.excavation, Excavation, substructure works, compacting, and concrete patching Plant, erection of bins. Also was responsible for material

Page 2: C.V  for M.ZAKI

Procurement and handing over to the main contractor. (E.P.T)

Aug.1988-Aug.1989: MEGICON. Project Manager (Grain Silos of Edfu) Responsibilities included the site mobilization, Excavation, substructure works, compacting, and Concrete patching Plant, erection of bins. Also Was Responsible for material procurement and handing over to The main contractor. (E.P.T)

Aug.1989-Sep.1990: MEGICON . Senior Engineer. (Suez Thermal power Station) Responsible for Construction of the Turbine house, a fair faced Concrete building 14 meters&a12 meters high steel structure frame. The concrete basement supports a 2-m thick. Reinforced concrete Slab to carry the Turbine unit. The house includes a control room And Maintenance room. All fair faced concrete. Responsibility included coordinating pipe works and erection with Aalborg Boilers as a main contractor

Sep.1990-Oct.1991: ARAB INTERNATIONAL COMPANY Senior Engineer-(New Esna Barrages) Arab International Company as a main contractor. Responsible for Navigation locks Formwork, steel Reinforcement, casting of concrete, finishing and erection All embedded parts.Oct.1991-Mar.1992: MEGICON Megicon Office. Mar. 1992-Dec.1992: MEGICON. Construction Manager (Dokki Electrical Sub Station 66/11 KV Responsible for all construction works of the Sub-Station from the Excavation up to the handing over including all finishing. Etc. Main contractor Merlin gerin. (French company).Jan.1993-Mar.1994: MEGICON: Project Manager-(Private vela in al –Ahram Street). Responsible for construction of the Main building, The swimming pool, service building and the surrounding fence Including all finishing works and piping works for swimming poolApr.1994-Dec.1994: MEGICON . Project Manager in (Quality control Laboratory.) Responsibilities included the site mobilization.rebar, concrete patch Plant. All finishing. Works, erection of center air condition system, All The piping and fire system works.

Page 3: C.V  for M.ZAKI

Main Contractor (VALIO TECHNICAL ENG) Finland Company

Jan.1995-Oct.1995: MEGICON Project Manager in Hot Strip Mill Modemization. Main Contractor (Cegelect Company) (French Company) The Owner. (Egyptian for Iron and Steel Company) Responsibilities included construction works for the main building And Ventilation plants, Hydraulic room and Control rooms.

Nov.1995-Apr.1997: MEGICON. Construction Manager in EL –Kurimat thermal power stations 2X600 M W. Main Contractor :( Daelim Industrial CO.Ltd.) (Korean Company) Consultant :( Ebasco Company American) Responsibilities included construction of the Transformer, Foundation, boiler feed pump and Turbine building in addition to the Finishing works for the control building.May1997-Oct.1997: MEGICON General Construction Manager in (FLOAT GLASS PLANT) Main Contractor :( INGLEN ITALIAN COMPANY) . Consultant (ACE-MOT-MACDONALD) (BRITISH COMPANY) Responsibilities included construction works for the Raw material Area, batch house, crushing plant, Dolomite hopper area, belt Conveyors, sand hopper area, and Mixer structure foundation, the Industrial flooring, and all embedded parts.Nov1997-Feb1999: MEGICON.

Project Manager (Canary beatch villa) (investment villa) In Sues (Ain Al Soukna) Responsible for Construction of the Building Swimming pool, Finishing works, Land scap, Roads.Mar1999-Aug2000: MHDA. Construction Manager (Sina Cement Company) (Asic and Aresco Company) as a main contractor. Responsible for construction of the C.F.Silo (80m height), Kiln Piers, Breheater, Conveyors, Water Tank, Tunnel, Main Substation And all Foundation for Cement Equipment, and all embedded parts.Sep2000-Oct2002: MHDA.

Page 4: C.V  for M.ZAKI

Project Manager (WEST ZONE ARMY) Construction of R.C Shed and Sport Halls in S ALOM City.

Nov2002-Jan2004: MHDA. Mhda Office.

Feb2004-Dec2005: SHAMI AL HASNI. Project Manager (Girl school in King Saudi Arabian) Construction of Main Building, Finishing work, Land scap, Roads.

Ape 2006-Mar 2007: DETAC Site Manager (Al Sharqia Company) 6of October (Work Shoppe 13)(55000000)LE Construction of Main Building.Finshing work

Ape 2007-Dec 2007: DETAC. Project manager (AL ZEINA TISSUE COMPANY) Construction of main paper mill building. Reel Building.PulpBuilding Water Tank. Transformer and Electric Building.Boiller Building Hand over for all work to Erection Company (37000000) LE

Jan. 2008-Oct.2009;DETAC

Project manager (Complete production Store) 6 of October. (152000000)LE.Responsible for construction of main Building. Finishing work. Electric work. Fire alarm System. Duct work. And hand over for all work to Erection Company.Oct 2009-Sep 2010: DETAC

Project Manager (Chamber of Commerce Administrative Building)Construction of Main Building, Finishing work, Electric work, Pluming work, Fire work, Duct work, Land scab work

Nov 2010-Oct 2013:DETACProject Manager(Raya Plaza Building)(Raya Smart Building) Construction of main Building(pre stresses slab)Finshing work.Electric work.Duct work.Fire alarm System And hand over for all work to raya company

NOV 2013-NOW :DETAC

Page 5: C.V  for M.ZAKI

PROJECT MANAGER(Sokhna Projects - Hanging Gardens The project consists of establishing, executing, and handing over of The contract of the project which contains 6 items:-

Concrete Skeleton for Platform 4 ( 150 villas ) Arch. Finishes work for Platform 2-3-4 ( 450 villas ) Electrical works for Platform 2-3-4 ( 450 villas ) Plumping works for Platform 2-3-4 (450 villas ) Infrastructure works for Platform 2-3-4 Hard Scape works for Platform 2-3-4

Owner : Amer Group

Project

Manager

:

Contractor : DETAC Dar for trading and

construction