cv 22-11-2014 - 1 m
TRANSCRIPT
1
C.V
- Personal Information
● Name : Syed Ahmed Jibril Said ● Occupation : Electrical Engineer ● Nationality : Egyptian ● Address : Egypt - Sohag - Tama ●ID Number : 2350436081 ●Iqama : transferable ● source : Riyadh . K.S.A. ● Address K.S.A. : Malaz ● Mobile : 0966 - 0538679147 ● Email : ele_sayed @yahoo.com
- Qualifications ● Qualification : Bachelor of Engineering ● University : University of Assiut ● faculty : Engineering ● Department : Electrical Engineering ● Graduation Year : 2006 ● Grade : good • Graduation project : Arm robot design ● Years of Experience : 8 years
- Certificates & courses
● AutoCAD 2006 – 2D on ٢٠٠٦/ ١٠/ ٣٠
● Primavera V3.0 on ٢٠٠٦/ ١١/ ١٨
● ICDL - Information Technology & computer Science
● Certificate of practical experience ALWADI Trading &Contracting Co.
● Certificate of practical experience of ALALAMIA Contracting Co.
2
- Experience
- Experience - Saudi Arabia
October 2014 to Today
Senior Electrical Engineer (NKY Architect & Engineers Consultants )
• MINISTRY OF INTERIOR
PROJECT: KAP 2 ( KING ABDALLA PROJCT) FOR DEVELOPING THE
SECURITY LOCATION
Main contractor : ELSEIF COMPANY
- Construction project for developing the security location for ministry of
Interior
- Worked as senior site engineer
September / 2012 to October 2014
Senior Electrical Engineer (MBS Engineering Consultants )
• MINISTRY OF HIGHER EDUCATION - UNIVERSITY OF
DAMMAM
PROJECT: college of basic medical sciences – university of
Dammam
Main contractor : Al Kifah contracting Co
February / 2012 to August / 2012
Electrical Engineer (AL- DUHASHI EST)
• Fencing & lighting project water tanks holy sites Makkah
3
April / 2009 to January 2012
Electrical Engineer (Khalid Hamad contagious and Co.)
• Construction project police station Emarat Alyatema in the Emarat of
Alyatema
• Construction project Dart King Abdul Aziz in Ganadria
• Construction project airplanes hangar (air base)in Riyadh • operation and maintenance Wastewater Treatment stations Anayzah
(Qassim)
- Experience - Arab Republic of Egypt
December / 2008 to February 2009
Electrical Engineer Company International Contracting
• Street lighting project Alahly street Obour City - first Quarter
December / 2006 to December 2008
ᴏ Electrical Engineer (ALWADI Co. for Trading & Contracting)
• Sigma Factory project in 6 October City
• Construction project 25 Villa Lux housing Obour City the - Third
Quarter • project operation and maintenance British school fifth compound
• operation and maintenance Wastewater Treatment stations east of Cairo
(Rabaa aladawia – Al defaa aljawi - Zahraa Nasr City)
• A network design project low and medium voltage and Telephones to
Residential fifth compound - new Cairo
4
- Design work
- Design electrical work for Hanger the aircraft maintenance base of
King Abdul Aziz in Riyadh (aeromedical evacuation)
- Design electrical work for Dart King Abdul Aziz in Ganadria Riyadh
Municipality - Design electrical work Fencing & lighting project water tanks holy sites
Makah
- consulting offices that have been handling with
1 - Office of Saud Consult
2 - Office of Medical Services
3 - Riyadh Municipality 4 - Office of Barrett Consulting Engineers 5 - Agheis Consulting Engineers
- Acts Executive
- Major cable distribution system for the site
- grounding system for construction and equipment External lighting of buildings and site lighting
- power sockets of the buildings - Design loads for low voltage networks and medium voltage networks - Extensions of the security system and CCTV - phone system and intercom system - Extensions and installation of data systems - extension and installation of fire alarm - street lighting design and spending - Calculate the expected electrical loads for air conditioning systems - Estimation and Preparation of bills of quantities for electrical work - training technicians and labors on electrical works
5
- Skills
1 - work with program AutoCAD design and preparation of shop drawings 2 - DIALux 4.10 program for the design and distribution of lighting according to the specifications 3 - Studies Voltage drop and Design the main electrical distribution panels 4 - using Primavera to preparation schedules times 5 - Tenders study and estimation electrical work 6 - Preparation of technical studies and bills of quantities for electrical work according to the specifications 7 – air condition work studies and calculating required loads for operation 8 - prepare the necessary studies for light current work 9 – supervision for Execution electrical works 10 - training technicians and labors on electrical works 11 – good English spoken and written 12 - supervision for Execution of mechanical works (Fire fighting system - central air conditioning)
6
7
8
9
10
11
12
13
14