cv 2.0 marcel kok

17
Marcel Kok CV 2.0

Upload: marcel-kok

Post on 17-Jul-2015

328 views

Category:

Business


1 download

TRANSCRIPT

Page 1: Cv 2.0 marcel kok

Marcel Kok CV  

2.0  

Page 2: Cv 2.0 marcel kok

Summary Marcel Kok

2  25-­‐09-­‐13  

§  > 20 years of Supply Chain Management experience (line & support functions) in FMCG, High Tech, Consumer Electronics & Consumables

§  > 9 years of project management, consultancy & recruitment experience

§  International experience (Spain, Belgium & Germany)

§  Ability to communicate clear and open with all levels in & outside a company

§  High performance with excellent people skills

§  Integer, creative, humor, ownership

§  ‘What you see is what you get’

Page 3: Cv 2.0 marcel kok

Agenda

1 Introduction

2 Career

4 Strengths & opportunities

5 Profesional toolkit

6 Hobbies

7 Why me?

3  25-­‐09-­‐13  

3 Training & education

Page 4: Cv 2.0 marcel kok

1. Introduction Marcel Kok

4  25-­‐09-­‐13  

» My name is Marcel Kok. I have more then 20 years Supply Chain Management experience (line and support management functions) in FMCG, High Tech, Consumer Electronics, Healthcare & Chemicals.

My specialty is to improve the balance between people & processes in order to increase effectiveness and efficiency of supply chains.

My work best can be described as 'high performance with excellent people skills'. I am integer, creative, and demonstrate real ownership. I am able to communicate clear and open with all levels in & outside a company.

I would like to talk more with you about what I can offer you to increase the level of your supply chain.

Page 5: Cv 2.0 marcel kok

Summary

2. Career Timeline

5  25-­‐09-­‐13  

9 Years Line functions

5 Years Staff Functions

9 Years Consultancy & interim management

> 20 years Supply Chain

expertise

Comprehensive Supply Chain Management knowledge @

shippers & LSP’s

Page 6: Cv 2.0 marcel kok

2. Career Timeline Responsibility & achievements (I)

Process Improvers Managing partner

Owner supply chain consultancy, interim management and executive search company (6 FTE; HBO+). ü  Succesfully closed 9 long term interim management

assignments

ü  Succesfully closed 9 long term consultancy assignments.

ü  Repeating customer assigments ( > 1): 85%

6  25-­‐09-­‐13  

Ewals Cargo Care Manager Warehouse Responsible for daily operation of a 3 shift FMCG EDC / LDC warehouse operation for a Korean multinational (120 FTE; MBO/HBO). ü  Improved delivery performance (equiv. daily 50-70

FTL) from 94% of 99,8% (target 99,5%). ü  Decreased customer complaints to less then 1,5% of

total volume (target 2,0%).

Ewals Cargo Care Manager Engineering & Quality Responsible for EU related engineering solutions & maintain quality standards (12 FTE; HBO+). ü  Trained EU country management (>40 FTE) in

operational management techniques.

ü  Re-engineered Barcelona warehouse operation (automotive).

ü  Development & roll out of TQM (16 countries).

Philip Morris Manager Productivity & Quality Support Responsible for productivity improvement projects & Quality Assurance (40 FTE; MBO/HBO+). ü  Development & implementation of plant re-organization

(450 FTE).

ü  Developed multiple long term factory & logistics solutions for ‘factory master plan’. Investment budget > 250 mio € / 8 years period.

Page 7: Cv 2.0 marcel kok

2. Career Timeline Responsibility & achievements (II)

7  25-­‐09-­‐13  

Koninklijke Textiel Groep Twenthe

Logistic manager Responsible for textile manufacturing, printing, storage & delivery.

ü  Purchase and quality control of fabrics ü  Stock control standard semi manufactured product

Philip Morris Supervisor storage & distribution Responsible for planning, storage, returns & JIT delivery of tobacco to make-pack plant and to export department. ü  Improved tobacco delivery performance from 99,6 to

99,8%. (0,2% = +/- 250K €) ü  Installed self steering process department (15 FTE;

MBO/HBO).

Philip Morris Supervisor Quality Support Responsible for quality assurance total tobacco factory (26 FTE; MBO/HBO+) ü  Implemented self steering teams (reduction FTE’s from

32 to 26)

ü  Implemented integral KAM care system (>1950 FTE) ü  Implemented SAP incident & registration system

Breda University of Applied Sciences Bachelor Transport Studies.

ü  Thesis: ‘logistic improvement of metal company based on theory of constraints (E. Goldratt)’ Final grade 9.

ü  Graduated 1990. ü  Lecturer (ass) for 3 months after graduation

Page 8: Cv 2.0 marcel kok

3. My experience / knowledge Training & education: Process & People oriented (I)

8  25-­‐09-­‐13  

‘ Slimmer Leiding geven’ (smarter leadership)

2011 (People)

Process auditor ISO 9001-2000

2003 (Process)

Finance for non-financials

2000 (Process)

Leadership development program

1999 (People)

Business Administration (post HBO)

2000-1998 (Process)

AIB : Consolidated Standards for Inspection

2012 (Process)

Customer Transition & Integration (Project management)

2009 (Process)

Lean – Six Sigma (Green Belt)

2005 (Process)

Page 9: Cv 2.0 marcel kok

3. My experience / knowledge Training & education: Process & People oriented (II)

9  25-­‐09-­‐13  

1998 (People)

Effective leadership program

ISO 9002 auditor

1997 (Process)

Self steering teams & role as manager

1996 (People)

LEAN (Single Minute Exchange of Die)

1990 (Process)

Consultancy & training skills

1990 (Process)

Enlarging personal effectiveness

1997 (People)

Analytical technique to find disturbances

1998 (Process)

Page 10: Cv 2.0 marcel kok

Timeline  Tool  Kit  2  

4. Project Experience 5. Project Experience Successfully completed projects (I)

Product development

2011 Project leader

Set up & develop pallet management product

DC Building

2013-2011 Senior Project manager

Project ‘Trafalgar’: Build and start up state of the art warehouse. See details case study

Merger & integration

2011 Senior Project manager

Integration perishable company in LSP

Customer transition & Integration

2013 - 2012 Customer Transition & Integration manager

Implement 3 blue chip FMCG companies

Page 11: Cv 2.0 marcel kok

Timeline  Tool  Kit  2  

4. Project Experience 5. Project Experience Successfully completed projects (II)

Warehouse & distribution

reorganisation

2011 Senior Project manager

Reorganisation warehouse & distribution site (60 FTE)

Continuous

Improvement program

2010 Continuous improvement program manager FMCG

Improvement development & Implementation

Reorganization TD department

2010 Senior Project manager

Reorganization Technical Support department (45 FTE)

Refurbishment high

bay warehouse

2011 Project support

Refurbishment high bay warehouse FMCG (50.000 pallets)

Page 12: Cv 2.0 marcel kok

Timeline  Tool  Kit  2  

4. Project Experience 5. Project Experience Successfully completed projects (III)

Warehouse

improvement

2007 Senior Consultant

Implementation improvement proposals warehouse (200 FTE)

Warehouse integration

2007 Senior Project leader

Warehouse integration project (> 500 FTE)

Roster planning

2008 Project leader

Advice & implementation roster planning government (120 FTE)

Business unit start up

2009

Senior Project leader / Business Unit manager a.i.

Start up business unit Returns & Implementation of 3 return centres (> 350 FTE)

Page 13: Cv 2.0 marcel kok

Timeline  Tool  Kit  2  

4. Project Experience 5. Project Experience Successfully completed projects (IV)

Warehouse

improvement

1992  

Warehouse manager a.i.

Implementation improvement proposals warehouse ( > 12 FTE )

Warehouse & Transport

improvement

2004  

Senior Consultant

Advice & development information system delivery performance & advice warehouse operations (> 60 FTE)

Quality

management

2005  

Quality Control manager a.i.

Interim manager quality control (Site Tilburg > 120 FTE)

Operations management

2006  

Operations manager a.i.

Run day to day operations for major high tech customers (Site Apeldoorn > 750 FTE)

Page 14: Cv 2.0 marcel kok

5. Case Study / Project Testimonial How I successfully concluded project 'Trafalgar’

14  25-­‐09-­‐13  

Results

§  Warehouse build within scope, time & cost

§  Customers implemented according to plan

§  Certifications:

ü AIB certification ‘superior’

ü BREEAM certification ‘good’

My role: Senior project manager Assignment: “ build & start up of a state of the art warehouse “

Solution

§  Fully automatic high bay warehouse (35.000 plts)

§  Low bay warehouse (11.000 plts)

§  2 Fully automated layer pickers §  AIB norm used during design §  Design building: environmenal

friendly solutions

Challenge

§  Build & start up a multi client distribution centre in the Netherlands

§  Implement 3 blue chip FMCG customers

§  American Institute of Bakery (AIB) Certificate

§  BREAAM Certificate

Page 15: Cv 2.0 marcel kok

5. My experience / knowledge IT skills

15  25-­‐09-­‐13  

Office ERP WMS

TMS CRM/ Other

Very  good  Not   Basics  

Page 16: Cv 2.0 marcel kok

5. My experience / knowledge Languages

GERMAN Expandable

good basic knowledge

ENGLISH fluent in spoken

and written

DUTCH Mother tongue

16  25-­‐09-­‐13  

Page 17: Cv 2.0 marcel kok

Contact  informa?on  Thank  you  for  your  a,en.on.    

 

Marcel Kok

[email protected] nl.linkedin.com/in/marcelkok/

+31 (0)6 202 95 665

Trocaderostraat 9

6213 AD Maastricht

The Netherlands

17  25-­‐09-­‐13  25-­‐09-­‐13