CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain Future Cort Lambson, P.E. Project Manager November 1, 2017

Upload: others

Post on 06-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

CUWCD’sCentral Utah Project Bonneville Unit

Water Supply Variability StudyPreparing for an Uncertain Future

Cort Lambson, P.E.

Project Manager

November 1, 2017

Page 2: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Acknowledgement:HDR Engineering;

Principle Investigator:Steve Thurin, P.E. Senior Water Resources EngineerTed Shannon, P.E. (Modeling Guru Supreme)

The CUP – Bonneville Unit Water Supply

Variability Study is an opportunistic, proactive

example of responsible water system

management

Page 3: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

• the Central Utah Project is complex & approaching full demand

3

PERSPECTIVE & BACKGROUND

Page 4: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

THE Central Utah Project

4

Page 5: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

5

CUP – M&I

CUP – ULS

PERSPECTIVE & BACKGROUND• The CUP Supply was planned to have a multi-year carry-over.

Customer agencies are planning on the CUP supplies to carry

them through drought periods

Source: 2014 Conservation Plan Update - JVWCD

Page 6: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

PERSPECTIVE & BACKGROUND

• Protect What We Have

• Use It Wisely

• Provide For The Future

6

CUWCD is one of Utah’s water districts that established this center

Source: www.prepare60.com

Page 7: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

7CUPSIM Water Supply Variability Study 2015. All information subject to change.

PERSPECTIVE & BACKGROUND

Page 8: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Variability in Hydrologic period of record• 1979 Municipal & Industrial (M&I) System EIS: 1931 – 1973

• 1987 Final Supplement to M&I System EIS: 1931 - 1973

• 1998 CUPCA – Provo River Simulation Model (PROSIM): 1950-1989

• 2004 Supplement to the 1988 Definite Plan Report for the Bonneville Unit: 1950-1999

8

0

50

100

150

200

250

300

350

400

450

1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020

An

nu

al M

ean

Dis

char

ge (

cfs)

Water Year

Long-term NSIP Station near M&I System Area

Source: USGS

Page 9: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

9CUPSIM Water Supply Variability Study 2015. All information subject to change.

“standing on shoulders”

Page 10: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

What Were THE GOALS OF this study?

10CUPSIM Water Supply Variability Study 2015. All information subject to change.

IMPROVE the reliability of the Central Utah Project water supply

operations by:

1) Evaluating the combinations of meteorological and operational conditions

that stress the system.

2) Understanding the sensitivity to conditions that are more adverse than

those that have been observed.

3) Developing a tool to aid in operating the system in advance of adverse

conditions.

Page 11: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

What Were THE GOALS OF this study?

11CUPSIM Water Supply Variability Study 2015. All information subject to change.

The goal was NOT to develop the perfect and ultimate

DROUGHT Scenario that will please everyone and stress the

system exactly as the future will!

Instead, the multiple scenarios that were developed, will

provide indications of the kinds of Droughts that might be

experienced, and can be adjusted and tweaked in “What If”

scenarios to estimate possible shortage situations.

.

Page 12: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Project Purpose

• 1. Improve understanding of severe drought

conditions.

• Develop tool and procedures to aid in

recognizing and responding to potential adverse

conditions.

• 2. Examine the likelihood of future lower inflows

• Estimate the kinds of extreme drought

scenarios which could occur.

• 3. Aid in decision making

• Protect the reliability of water supplies by

proactive response.

• Predict the magnitude of water supply impacts.

• 4. Educate the public about the potential for supply

variability

12

Page 13: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Study Components

• Evaluate and Select Model Platform

• Develop Conceptual Model

• Implement on Selected Platform

• Develop Historical Hydrology

• Develop Adverse Hydrology

• Develop Predictive Model Capabilities

13CUPSIM Water Supply Variability Study 2015. All information subject to change

Page 14: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

RiverWare© was Selected

• General purpose river system simulator

• Widely used and accepted

• Fully maintained and supported

• Allows inclusion of detailed policies

• Relatively easy to use

14CUPSIM Water Supply Variability Study 2015. All information subject to change

Page 15: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

15CUPSIM Water Supply Variability Study 2015. All information subject to change

System Overview and

CUPSIM Model Schematic

Page 16: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Historical Hydrology

Inflows and Demands taken from PROSIM Model plus Bonneville Unit Definite Plan Report, which extensively verified the M&I System supply

Data Extended to 1950 – 2009 by correlation

15 Inflow Nodes, 20 Demands, 5 Reservoirs (with up to four accounts each)

16CUPSIM Water Supply Variability Study 2015. All information subject to change

Page 17: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Adverse Hydrology Development

Three Datasets Developed – 60 years of ADVERSE Hydrology:•

• Observed Resampled Approach

• Paleo Sampled Approach

• Downscaled GCM Projected Approach

17CUPSIM Water Supply Variability Study 2015. All information subject to change

Page 18: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Observed Hydrology

18CUPSIM Water Supply Variability Study 2015. All information subject to change

0

50,000

100,000

150,000

200,000

250,000

300,000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005

An

nu

al V

olu

me

in a

cre

-fee

t

Historic Annual Natural Flow - CUPSIM Node 1

Historic Annuals Historic Average

Page 19: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Observed Resampled Hydrology

19CUPSIM Water Supply Variability Study 2015. All information subject to change

0

50,000

100,000

150,000

200,000

250,000

300,000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010

An

nu

al V

olu

me

in a

cre-

feet

Historic and Adjusted Annual Flow - CUPSIM Node 1

Historic Annuals Adjusted Annuals

Historic Average Adjusted Average

All flows in the Strawberry and Duchesne River basins are 25% less in years 2001-2009

Page 20: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Paleo Hydrology

• Weber River Study developed 576 years of naturalized data.

• A subsequent Bear River study developed 1,200 years. This has not yet been incorporated

• A study of the upper Provo River is expected soon.

20

Page 21: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

• ADD PALEO STUDY SLIDES

21

0

50000

100000

150000

200000

250000

300000

14

29

14

44

14

59

14

74

14

89

15

04

15

19

15

34

15

49

15

64

15

79

15

94

16

09

16

24

16

39

16

54

16

69

16

84

16

99

17

14

17

29

17

44

17

59

17

74

17

89

18

04

18

19

18

34

18

49

18

64

18

79

18

94

19

09

19

24

19

39

19

54

19

69

19

84

19

99

An

nu

al V

olu

me

in a

cre

-fee

tPaleo Simulated Natural Flow 1429 - 2004

Page 22: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

22

0

50,000

100,000

150,000

200,000

250,000

300,000

1431 1436 1441 1446 1451 1456 1461 1466 1471 1476 1481 1486 1491 1496 1501 1506 1511

An

nu

al V

olu

me

in a

cre-

feet

Historic and Paleo Simulated Natural Flow 1450-1511

Page 23: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

PALEO Sampled Hydrology

23CUPSIM Water Supply Variability Study 2015. All information subject to change

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005

An

nu

al V

olu

me

in a

cre

-fe

et

Historic and Adjusted Annual Flow - CUPSIM Node 1

Historic Annuals Adjusted Annuals

Historic Average Adjusted Average

Page 24: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

GCM Projected Future scenarios

24CUPSIM Water Supply Variability Study 2015. All information subject to change

Page 25: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

GCM Projected Future scenarios

25CUPSIM Water Supply Variability Study 2015. All information subject to change

Page 26: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

GCM Projected Hydrology

26CUPSIM Water Supply Variability Study 2015. All information subject to change

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Per

cen

t o

f m

on

thly

ru

no

ff

CMIP3 Runoff Changes - Miroc3_2_medres (B1)

CMIP3 1950-2009 CMIP3 2020-2079 Natural Flow 1950-2009

Page 27: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

GCM Projected Hydrology

27CUPSIM Water Supply Variability Study 2015. All information subject to change

0

50,000

100,000

150,000

200,000

250,000

300,000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005

An

nu

al V

olu

me

in a

cre

-fe

et

Historic and Adjusted Annual Flow - CUPSIM Node 1

Historic Annuals Adjusted Annuals

Historic Average Adjusted Average

Page 28: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Summary of Adverse Hydrology

28CUPSIM Water Supply Variability Study 2015. All information subject to change

0

50,000

100,000

150,000

200,000

250,000

300,000

0 10 20 30 40 50 60

AN

NU

AL

VO

LUM

E, IN

ACR

E-FE

ET

DRIEST TO WETEST YEARS

Historic and Adjusted Annual Natural Flow - CUPSIM Node 1 - Ordered

Historic

Observed Resampled

Paleo Sampled

GCM Projected

0

50,000

100,000

150,000

200,000

250,000

300,000

0 10 20 30 40 50 60

AN

NU

AL

VOLU

ME,

IN A

CRE-

FEET

DRIEST TO WETTEST YEARS

Historic and Adjusted Annual Natural Flow - CUPSIM Node 1 - Ordered

Historic

Observed Resampled

Paleo Sampled

GCM Projected

Page 29: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

CUPSIM Model Results

29CUPSIM Water Supply Variability Study 2015. All information subject to change

0

50000

100000

150000

200000

250000

300000

35000019

50

1954

1958

1962

1966

1970

1974

1978

1982

1986

1990

1994

1998

2002

2006

2010

2014

2018

2022

2026

2030

2034

2038

2042

2046

2050

2054

2058

2062

2066

Volu

me

[acr

e-fe

et]

Date

CUPSIM Model SimulationJordanelle Reservoir Storage: Historical vs. Paleo Sampled

Adverse

Historical

Adverse Average

Historical Average

Averages:Historical : 219,000 acre-ftAdverse: 193,000 acre-ftDifference : -12%

Page 30: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

CUPSIM Model Results

30CUPSIM Water Supply Variability Study 2015. All information subject to change

-

20,000

40,000

60,000

80,000

100,000

120,000

140,000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005

An

nu

al D

ive

rsio

ns

(acr

e-f

ee

t)

Year

CUPSIM Model SimulationAnnual CUP M&I System Demands and Diversions: Paleo Sampled

Demand

Diversion

Average AnnualDemand : 109,400 acre-ftDiversion: 107,800 acre-ftDifference : -2%

Page 31: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

CUPSIM Model Results

31CUPSIM Water Supply Variability Study 2015. All information subject to change

0

50000

100000

150000

200000

250000

300000

35000019

50

1954

1958

1962

1966

1970

1974

1978

1982

1986

1990

1994

1998

2002

2006

2010

2014

2018

2022

2026

2030

2034

2038

2042

2046

2050

2054

2058

2062

2066

Volu

me

[acr

e-fe

et]

Date

CUPSIM Model SimulationJordanelle Reservoir Storage: Historical vs. Downscaled GCM

Adverse

Historical

Adverse Average

Historical Average

Averages:Historical : 219,000 acre-ftAdverse: 197,000 acre-ftDifference : -11%

Page 32: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

CUPSIM Model Results

32CUPSIM Water Supply Variability Study 2015. All information subject to change

-

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005

An

nu

al D

ive

rsio

ns

(acr

e-f

ee

t)

Year

CUPSIM Model SimulationAnnual CUP M&I System Demands and Diversions: Downscaled GCM

Demand

Diversion

Average AnnualDemand : 113,600 acre-ftDiversion: 104,000 acre-ftDifference : -8%

Page 33: CUWCD’s Central Utah Project Bonneville Unit Water Supply ......2017/11/01  · CUWCD’s Central Utah Project Bonneville Unit Water Supply Variability Study Preparing for an Uncertain

Questions?

• Cort Lambson, CUWCD Project Manager• Phone: 801-226-7100

• Email: [email protected]

• Steve Thurin, HDR Project Manager• Phone: 435-659-1872

• Email: [email protected]

33CUPSIM Water Supply Variability Study . All information subject to change.