Koontz Electric Company, Inc.,  (KECI),   welcomes  an  opportunity to make  your next  

project a success.  We maintain a professional and technical staff to support our 

experienced field craftsman.  We pledge to safely deliver a quality finished product in 

a timely manner, and at a competitive cost. 

KECI is a diversified heavy industrial electrical contractor.  We perform a wide array of 

contracts specifically chosen for technical and installation complexities. KECI’s team 

supports the total spectrum of power, control, and instrumentation system needs. We 

have proudly served Arkansas and the nation for over 50 years.  In just the last ten 

years we have completed over 500 projects in dollar volume exceeding $180 million.  

We have never  failed to complete a project. 

Numerous repeat customers, universal customer satisfaction, and our strong industry 

reputation, is positive feedback that our approach delivers.  A fervent commitment to 

safety, quality, timely schedules, and cost control, are the keys to our success and 

longevity. Our professional office and field staff, diverse work history and over five 

decades of experience, uniquely qualify us for the most challenging projects.

Koontz Electric Company, Inc. 1223 East Broadway Morrilton, Arkansas 72110 (501) 354-2526 http://www.koontzelectric.com

I N T RODUC T I ON

DELIVERY

OWNERS:

• U.S. Army Corps of Engineers• Dept. of Interior Bureau of Reclamation• Investor Owned Utilities• Cooperatives• Municipalities

MANUFACTURERS:

• GE Hydro• Voith Siemens Hydro• VA Tech• The James Leffel & Company

VENDORS:

• Siemens• General Electric• ELCO• North American Hydro• SCIPAR• HSQ Technologies• Basler• Eaton

FEATURES

POWER EXPORTATION:

• Switchyards• Substations• Transmission Lines• GSU Breakers• HV Circuit Breakers

POWER DISTRIBUTION:

• MV Switchgear• Transformers• ISO Phase Bus• Station Service

SPECIALTIES:

• Excitation Systems• Digital Governors• SCADA / DAS• PDA / VM• Instrumentation / Annunciators• Panel Fabrication• CCTV - Security• Fiber / CAT5 Comm

CONTRACTS:

• (EPC) Engineer-Procure-Construct• (DB) Design Build• (LSB) Lump Sum Bid• (GMP Guaranteed Maximum Price• (TM) Time & Material

PROFESSIONAL SERVICES:

• Design & Engineering• Project Management • Procurement Management• Safety & Quality Control

CONSTRUCTION SERVICES:

• Site Management• Site Safety & Health• Project Engineer• Quality Control• Electricians• Welders• Instrument Technicians• Programmers

CUSTOMERS

E XC I TAT ION   SYST EMS   EXP ER I ENC E  PROF I L E

R10PC20128 – New Melones Power Plant – Excitation Installation , Jamestown, CA. Removal of Existing Excitation System. Design, Furnish, and Installation of New Digital Excitation Systems. Prime Contract with the U.S. Department of the Interior, Bureau of Reclamation, Mid Pacific Office. Primary contact is Teena Clasper / Debra Keith 916-989-7223. R10PC20020 – Nimbus Dam - Excitation System Replacement, Sacramento, Ca. Removal of Existing and Design, Furnish, and Installation of Excitation Systems. Prime Contract with the U.S. Department of the Interior, Bureau of Reclamation, Mid Pacific Office. Scheduled to be completed in July 2011. Primary contact is Brenda Davis 916-978-5143. 07CC308082 – Hoover/Parker/Davis Dams, NV AZ CA - Hydroelectric Unit Control Modernization. Modernization includes removal and replacement of control switchboards, protective relay panels, excitation system, digital governor conversion, SCADA panel, Gen RTD panel, and associated wiring. Prime contract with Department Of Interior, Bureau of Reclamation, Lower Colorado Region. Scheduled completion date: April 20012. Prime contact is Denice Colwell 702-293-8234. ( 83 Units when completed ) 06CC602900 - Big Thompson Project - Excitation System Replacement, Colorado. Removal of Existing and Design, Furnish, and Installation of Excitation Systems for (11) Units - Big Thompson (unit 1), Estes (units 1,2,3), Flatiron (units 1,2,3), Pole Hill (unit 1), Mary’s Lake (unit 1), Green Mountain (units 1,2). Prime Contract with the U.S. Department of the Interior, Bureau of Reclamation, Great Plains Region. Scheduled to be completed in January 2010. Primary contact is Alma Bergerson 406-247-7801. ( 71 Units when completed ) W912HN-06-C-0008 - Station Service Rehabilitation at the John H. Kerr / Philpott Powerhouses, Virginia. The scope of work includes Exciter Retrofit at both powerhouses (3 Units). Prime Contract with the Corps of Engineers, Wilmington District. Scheduled to be completed in October 2007. Primary contact is Matthew Folk, ACO 434-738-6633 x270. ( 60 Units when completed ) DACW54-03-C-0005 – Turbine/Generator Rehabilitation Units 1-7 at the John H. Kerr Powerhouse, Virginia. The scope of work includes Exciter Retrofit for 7 main units. Subcontract with GE/Andritz Hydro. Scheduled to be completed in October 2010. Primary contact is Steve Jones, ACO 434-738-6633 x272. ( 57 Units when completed ) DACW01-01-C-0011 - Exciter retrofit of four units at the Jones Bluff Powerhouse, Selma, Alabama and the retrofit of three units at the Millers Ferry Powerhouse, Camden, Alabama, for the U.S. Army Corps of Engineers, Mobile District. Completed in March 2002, subcontract with VA Tech Voest MCE Corporation of Charlotte, NC, for the installation of the exciters. The Mobile District contact is Marty Chavers at (334) 875-4400 x411; VA Tech’s contact is Eduardo Sanches at (704) 943-4343. ( 50 Units to date ) DACW41-97-C-0031 - Exciter retrofit for one 42 MW generator at the Stockton Powerhouse, Sac River, Missouri, Kansas City District Corps of Engineers was completed in April 1998. A subcontract with Prime Power Incorporated of Mableton, GA, will be performed by Koontz Electric Co., Inc. The Kansas City District contact for reference is Butch Boban at telephone (417) 276-3196; Prime Power’s contact is Wayne Rand, telephone (770) 739-2561. ( 43 Units to date ) DACW63-95-C-0091 - Exciter retrofit for two 20 MW generators at the Whitney Powerhouse, Fort Worth District Corps of Engineers, was performed in 1996 for Siemens Power Corporation by Koontz Electric Co., Inc.; a subcontract. The Fort Worth District contact for reference is Mike Carver at (817) 694-3191. ( 42 Units to date )

E XC I TAT ION   SYST EMS   EXP ER I ENC E  PROF I L E

DACW45-94-C-0168 - Exciter retrofit for three 46.4 MVA units at the Gavins Point Powerplant, Omaha District, Corps of Engineers, was performed in 1995 for Siemens Power Corporation by Koontz Electric Co., Inc.; a subcontract. The Omaha District contact for reference is John Gardner at (402) 667-7875, Ext. 3002. ( 40 Units to date ) DACW03-94-C-0095- - Exciter retrofit for four 31 MVA units at the Dardanelle Powerplant, Little Rock District, Corps of Engineers, was performed for Siemens Power Corporation by Koontz Electric Co., Inc., in 1995; a subcontract. The Little Rock District contact for reference is Thomas Storm, Dardanelle Powerplant Superintendent at (501) 968-5008. ( 37 Units to date ) DACW45-93-C-5005 - Exciter retrofit for seven 103 MVA units at the Oahe Powerplant, Omaha District, Corps of Engineers, was performed for Siemens Power Corp. by Koontz Electric Co., Inc. in 1993-94; a subcontract. The Omaha District contact for reference is Ron Foss, Oahe Powerplant Director of Maintenance at telephone (605) 224-5864. ( 33 Units to date ) DACW68-91-C-0049 - Exciter retrofit for two 97 MVA and one 231 MVA hydroelectric units at the Dworshak Powerplant, Walla Walla District, Corps of Engineers, was performed for Siemens Energy Corp. by Koontz Electric Company, Inc., in 1992-1993: a subcontract. The Walla Walla District contact for reference is Roger Colgan at telephone (208) 476-1253. ( 29 Units to date ) DACW45-90-R-0030 - Exciter retrofit for eight 61.6 MVA hydroelectric units at the Big Bend Powerplant, Omaha District, Corps of Engineers, was performed for Siemens Energy Corp. by Koontz Electric Company, Inc., in 1992; a subcontract. The Omaha District contact for reference is Stu Cook, Chief Hydroelectric Branch at telephone (402) 221-4134. ( 26 Units to date ) DACW03-89-C-0042 - Exciter retrofit for two 48 MVA hydroelectric units at the Greers Ferry Powerplant, Little Rock District, Corps of Engineers, was performed for Siemens Energy & Automation by Koontz Electric Company, Inc., in 1990; a subcontract. The Little Rock District contact for reference is Conrad Miller, Chief, Hydroelectric Branch at telephone (501) 324-5711. ( 18 Units to date ) Exciter retrofit for four 40 MVA hydroelectric units at the Eufaula Powerplant, Tulsa District, Corps of Engineers, was performed for Siemens Energy & Automation by Koontz Electric Company, Inc., in 1989; a subcontract. The Tulsa District contact for reference is Jim Jackson, Chief Hydroelectric Branch at telephone (918) 581-6531. ( 16 Units to date ) DACW03-88-B-0002 Exciter retrofit for four 50 MVA hydroelectric units at the Table Rock Powerplant, Little Rock District, Corps of Engineers, was performed for Siemens Energy & Automation by Koontz Electric Company, Inc., in 1989; a subcontract.. The Little Rock District contract for reference is Conrad Miller, Chief, Hydroelectric Branch at telephone (501) 324-5711. ( 12 Units to date ) Exciter retrofit for eight 50 MVA hydroelectric units at the Bull Shoals Powerplant, Little Rock District, Corps of Engineers, was performed for Siemens Energy & Automation, by Koontz Electric Company, Inc., in 1989, a subcontract. The Little Rock District contact for reference is Conrad Miller, Chief, Hydroelectric Branch at telephone (501) 324-5711. ( 8 Units to date )

CONTRACT NO:

B O Y S E N   P OW E R   P L A N T   T R A N S F O RM E R   R E P L A C E M E N T S  

R10PC60069

KECI NO 10‐2245

JOB SITE LOCATION:

Located on Wind River About 20 Miles South of Thermopolis WyomingSouth of Thermopolis, Wyoming

OWNER:

Bureau of Reclamation

Great Plains Region

PO Box 36900

Billings MT 59107Billings, MT  59107

Contracting Officer:  Gerri Voto

T 406.247.7809

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

d1223 E Broadway

Morrilton, AR  72110

Project Manager:  James Zimmerman

T 501.354.2526 ext 135

F 501.354.2580

AWARD DATE / EST COMPLETION DATE:

September 2010 / January 2012

CONTRACT AMOUNT:

SUBCONTRACTORS:

Electrical Technologies

Oil Processing & Testing

Energy Transportation

Crane Services

$1,818,181

SCOPE OF WORK:

Furnish and install three single phase 4.16‐115/66.4kV, 4.45/5.866/7.333 

MVA GSU power transformers.  Remove and dispose of three existing 

transformers and one spare Furnish and install replacement insulated

Transformer Technologies

Transformer Disposal

transformers and one spare.  Furnish and install replacement insulated 

conductors.  Furnish and install jumper buses and accessories.  Furnish and 

install a distribution panel board.

CONTRACT NO / AWARD DATE:

W9127S‐10‐C‐0031 / September 2010

KECI NO 10‐2244

JOB SITE LOCATION:

Bull Shoals Dam

Lakeview, AR

Dardanelle Dam

1022 Dardanelle Dam

Dardanelle, AR  72834

OWNER:

US Army Corp of Engineers

Little Rock District

700 West Capitol Ave

Little Rock, Arkansas  72201

Point of Contact:  Chris Hicklin

T 870.431.5391

[email protected]

GENERAL CONTRACTOR:

Fuel Tank Maintenance Co, LLC

2400 Mill Drive

Cookeville, TN  38501

Point of Contact:  Peter Them

T 931.528.1137

F  931.520.3862

[email protected]

SUBCONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Jeff Ludwig

T 501.354.2526 ext 118

F  501.354.2580

INITIAL MOBILIZATION /  EST COMPLETION DATE:

November 2010 / March 2011

AWARDED / CURRENT CONTRACT AMOUNT:

$415,264 / $ 415,264

BU L L   S HOA L S   /  DA R DAN E L L E   POWE R HOU S E

SCOPE OF WORK:  

Koontz Electric has been awarded a design/build contract for the 

installation of the conduit system for a complete fire alarm system at 

(2) Corp. of Engineer power houses (Bull Shoals and Dardanelle).  

This includes all required risers, exposed conduits, surface mounted 

raceways, core drilling, concrete imaging.  This also includes 

installation of all conductors furnished by the fire alarm 

subcontractor to the following fire alarm devices:

•120‐Volt power to Fire Alarm Control Panel

•Raceway to all manual pull stations

•Raceway to all smoke detectors

•Raceway to all duct mounted smoke detectors

•Raceway system to annunciator panel

•Raceway system to Co2 system

•Raceway system to audio / visual signaling devices

CONTRACT NO  / AWARD DATE:

R10PC60024 / September 14, 2010

CANYON   F E R RY   S TAT I ON  S E RV I C E  REHAB

KECI NO 10‐2242

JOB SITE LOCATION:

Canyon Ferry Power Plant

17 Miles E of Helena

Lewis & Clark County MTLewis & Clark County, MT

OWNER:

Bureau of Reclamation

Great Plains Region

PO Box 36900

Billi M 59107Billings, Montana  59107

Contract Officer:  Gerri Votto‐Braun

T 406.247.7809

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

SCOPE OF WORK:

Principle components of the work consist of design, furnish, and install replacement 480‐volt station service distribution system. New equipment shall be installed as an integrated line‐up with all equipment to make 

t ti l W k i l d t d l t / t l t1223 E Broadway

Morrilton, AR  72110

Project Manager:  Paul Zimmerman

T 501.354.2526 ext 102

F 501.354.2580

system operational. Work includes to develop outage/cutover plan to accomplish work without plant black‐outs.  Disconnecting existing circuit (load) cables from Station Service Distribution Board D2B and reconnecting them to new Station Service Distribution Board D2B.  Removing and disposing of the following equipment:  Unit substation D2A including two dry‐type 7,200‐480‐volt, 750 KVA, 3 phase transformers designated K2C and K2D and three 480‐volt circuit breakers, 7,500‐volt disconnecting switches designated W2C‐115 and W2D‐215, two 7,500‐

INITIAL MOBILIZATION / EST COMPLETION DATE:

March 15, 2011 / May 2011

AWARDED / CURRENT CONTRACT AMOUNT:

$929,929 / $929,929 

g g , ,volt PCB oil‐filled potheads, 480‐volt Distribution Board D2B.  Furnishing and installing two 7,200/480‐volt, 1000kVA dry‐type transformers.  Furnishing and installing two 7,500‐volt disconnecting switches designated W2C‐115 and W2D‐215.  Furnishing and installing two 7,500‐volt cable terminators.  Furnishing and installing unit substation D2A including three 480‐volt, rack‐out style circuit breakers, minimum.  Furnishing and installing Distribution Board D2B including 70 circuit b k i i P id ith di t ib ti l b d ti

$ , / $ ,breakers, minimum.  Provide with distribution panel board sections as required.  Furnishing and installing monitoring equipment compatible with existing programmable logic controller (GE Fanuc Series 90‐70).  Furnishing and installing grounding cables, electrical conduit, conductors, and associated electrical equipment.  KECI will self perform all labor except for asbestos removal.  

CONTRACT NO:

W9128F‐10‐C‐0065

GARR I SON  DAM  POWERHOUSE  REHAB

W9128F 10 C 0065

KECI NO 10‐2240

JOB SITE LOCATION:

Garrison Dam Powerhouse

North Dakota

OWNER

SCOPE OF WORK:

Garrison Station Service Rehabilitation and Installation includes:

1. Remove existing Station Service 15kV switchgear and current limiting reactors in the erection bay and unit bays 1 & 2.  Includes all related feeder cables and control 

OWNER:

US Army Corps of Engineers

Omaha District

1616 Capitol Ave

Omaha, NE  68102‐4901

Contract Officer:  Lee McCormick

Alesha Cotton

wiring.

2. Remove existing Station Service 480V switchgear, eight (8) Station Service dry‐type transformers, 480V non‐segregated phase bus, and lighting voltage regulation cabinet in the    Erection Bay. Includes all related controls and feeder wiring.

3. Remove 15kV and 480V metering and relaying panels and associated wiring on the Station Service Switchboard in the control room.

4 R ll d t l i d bl i t d ith i ti 480V St tiAlesha Cotton

T 402.995.2488

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

P j t M P l Zi

4. Remove all power and control wire and cable associated with existing 480V Station Service switchgear to ancillary equipment.

5. Remove existing 480V switchgear housekeeping pads and replace with new pads sized for the new equipment configuration.  Includes miscellaneous concrete work, metal work, and core drilling.  Includes using existing embedded conduits and ground inserts in and around the new housekeeping pads.

6. Remove existing 15kV bus connections from iso‐phase bus and current limiting reactors (unit bays 1&2).

Project Manager:  Paul Zimmerman

T 501.354.2526 ext 102

F 501.354.2580

AWARD DATE / EST COMPLETION DATE:

August 2010 / January 2013

reactors (unit bays 1&2).

7. Install and test GF 15kV switchgear in erection bay and unit bays 1 & 2. Includes 15kV disconnects, current limiting reactors, bus‐work and related wiring. Includes all feeder cables and control wiring.

8. Install and test GF 480V switchgear, 15kV‐480V dry‐type transformers, and 480V non‐segregated bus in Erection Bay, and HRG equipment. Includes all related control wiring and feeder cables.

CONTRACT AMOUNT:

$3,886,688

9. Install new Station Service switchboard panels, relaying, annunciator, controls, mimic bus, and both front and rear panel equipment. Includes all related inter‐panel wiring and wiring to ancillary equipment.

10. Install new power cables and control wiring associated with new 480V switchgear to ancillary equipment. Includes new raceway equipment and core drilling as required.

11. Provide seismic calculations and data for all equipment mounting hardware.

12 Provide engineering installation testing of 15kV iso phase bus and non segregated12. Provide engineering, installation, testing of 15kV iso‐phase bus and non‐segregated bus connections to Station Service switchgear, disconnect switches, and current limiting reactors in unit bays 1 & 2.

13. Provide engineering, installation, testing, as‐built drawings for replacement in‐kind of motor control centers as indicated on the contract drawings and specifications.

CONTRACT NO:

W912DQ‐10‐C‐1034

KECI NO 10‐2238

JOB SITE LOCATION:

Stockton Dam

16435 E Stockton Lake Dr

Stockton, MO  65785

OWNER:

US Army Corps of Engineers

Kansas City District

Federal Building, CT‐C

601 E 12th ST  RM 647

Kansas City, Missouri  64106‐2896

Contract Officer:  Travida Byas

T 816.389.3814

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Heath Thompson

T 501.354.2526 ext 153

F 501.354.2580

SUB CONTRACTOR:

AC & DC Power Technologies

300 Cash Memorial BLVD

Forrest Park, GA  30297

T 404.361.3788

F 404.361.3791

AWARD DATE / EST COMPLETION DATE:

Feb 2011 / May 2011

CONTRACT AMOUNT:

$469,964

S T O C K T O N   D AM   P OW E R   G E N E R AT I O N   R E P L A C E M E N T

SCOPE OF WORK:

Koontz Electric is responsible for the removal and replacement of 

the existing 125VDC battery bank which consists of battery 

chargers, solid state inverters, 120VAC switchboard, 125VDC 

switchboards and all associated feeders.

CONTRACT NO / AWARD DATE:

R09PC20020/ November 25, 2009

KECI NO 09‐2235

JOB SITE LOCATION:

Nimbus Dam

Located on the American River

Sacramento, CA

OWNER:

US Department Of The Interior

Bureau of Reclamation

Mid Pacific Region

2800 Cottage Way

Room E‐1815

Sacramento, California  95825‐1898

Contract Specialist: Brenda Davis

(916)978‐5143

[email protected]

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  James Zimmerman

T 501.354.2526 ext 135

F  501.354.2580

INITIAL MOBILIZATION / COMPLETION DATE:

October 2010 / July 2011

AWARDED / REVISED CONTRACT AMOUNT:

$1,195,579 / $1,317,582

Price Increase Due to Government Requested & Approved Change Orders

N IM B U S  D AM   E X C I TAT I O N   S Y S T EM S   R E P L A C EM E N T

SCOPE OF WORK:  

Koontz Electric will modify and electrically isolate two existing rotating DC exciters.  Remove and dispose of existing voltage regulating equipment, cabinets, cables, and instrumentation not to be reused.  We will furnish and install two fully static digital excitation systems including power potential transformers, interrupter switches, excitation power circuit breakers, 5‐kilovolt power cable for excitation AC supply, cable for DC connection to machine field and other associated equipment.  Koontz will also furnish and install control wire and associated conduits for control protection and alarm circuits from excitation system equipment to interface terminal blocks within unit control board and furnish spare parts for excitations systems.

CONTRACT NO / AWARD DATE:

W91275‐09‐C‐0036 / November 20, 2009

Sub‐Contract No: 29‐0724717‐701.1

KECI NO 09‐2231

JOB SITE LOCATION:

Dardanelle Powerhouse

1022 Dardanelle Dam

Dardanelle, AR  72834

OWNER:

US Army Corp of Engineers

Little Rock District

700 West Capitol Ave

Little Rock, Arkansas  72201

Contracting Officers:  David A Glorit

T 479.667.0394

F  479.209.4016

[email protected]

GENERAL CONTRACTOR:

Van Hooks Electrical Service

4112 East Washington, Suite B

North Little Rock, AR  72114

Point of Contact:  Ron Van Hooks

T 501.541.3908

F  501.955.2920

SUBCONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Heath Thompson

T 501.354.2526 ext 153

F  501.354.2580

[email protected]

DARDAN E L L E  POWE RHOU S E   1 5KV CA B L E  R E P L A C EM EN T

INITIAL MOBILIZATION /  COMPLETION DATE:

September 2010 / December 2010

AWARDED / CURRENT CONTRACT AMOUNT:

$224,800 / $ 270,333

Price Increase Due to Government / Customer Requested & Approved Change Orders

SCOPE OF WORK:  

Koontz Electric Company, Inc. (KECI) was awarded the subcontract to replace the 15KV 1000MCM feeders from the existing transformers in the switchyard to Units 1 through 4 switchgear. 

This was accomplished by first taking down the #1 transformer in the switch yard that is fed by units #1 & #2.  KECI then removed the old cables, (6) per unit, from the transformer to the unit breakers. Modifications had to be made to each unit and to each transformers buss system.  Once POTHEADS were removed and new Micarta top hats installed, KECI was responsible for cutting, re drilling and prepping buss for new terminations.  KECI pulled in new 1000 KCMIL cables and terminated at each breaker section.  Finally, each cable was high potential tested to meet manufactures recommendations.

Once transformer #1 was completed, KECI repeated the same process for transformer #2 which is being fed by units #3 & #4.

Also noteworthy, was the removal and installation process by which KECI used an elaborate push/pull and pulley system allowing all wire to be pulled hundreds of feet through several offsets and elevation changes without and stress on the cables or the tray system. 

CONTRACT NO / AWARD DATE:

R10PC20128 / December 2009

KECI NO 09‐2125

JOB SITE LOCATION:

New Melones Power Plant

16805 Peoria Flat Rd

Jamestown, CA

Point of Contact:  Ben Richburg

T 530.934.7066

OWNER:

US Department of the Interior 

Bureau of Reclamation

Mid Pacific Office

2800 Cottage Way

Sacramento, CA  95825‐1898

Point of Contact:  Debra Keith

T  916.989.7223

[email protected]

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Jamie Zimmerman

T 501.354.2526 ext 118

F  501.354.2580

INITIAL MOBILIZATION / EST COMPLETION DATE:

January 2012 / May 2012

AWARDED / CURRENT CONTRACT AMOUNT:

$2,082,160  / $2,281,208

Price Increase Due to Government Requested & Approved Change Orders

NEW MELONES EXC I TAT ION  SYST EMS  REP LAC EMENT

SCOPE OF WORK:

• Furnish and install two new static excitation systems for 192MVA hydro‐electric generators.

• Furnish and install two new 540KVA power potential transformers.

• Modify existing excitation system AC and  DC Bus to accommodate new static excitation system.

• Refurbish existing collector rings and install new brushes.

• Furnish and install new conduit, conductors and instrumentation for power and control wiring.

• Field testing of new equipment.

• Train government personnel in operation and maintenance of new excitation system.

CONTRACT NO / AWARD DATE:

R09PC20R03 /  September 4, 2009

KECI Job No 09‐2122

JOB SITE LOCATION:

Folsom Dam and Power Plant

7794 Folsom Road

Folsom, CA  95630

OWNER:

Bureau of Reclamation ‐Mid Pacific Office

2800 Cottage Way, RME 1815

Sacramento, CA  95825‐1898

Don Neal

T  916.978.5144

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Jamie Zimmerman

T 501.354.2526 ext 135

F  501.354.2580

SUBCONTRACTORS:

Delta Star Inc.

270 Industrial Rd

San Carlos, CA  94070

Robert Smith

T  650.508.3313

Electrical Technologies

12335 W 53rd Ave, Suite 200

Arvada, CO  80002

Gerry Suman

T  303.462.0317

INITIAL MOBILIZATION / COMPLETION DATE:

March 2010 / February 2011

F O L S OM   P OW E R   P L A N T   T R A N S F O RM E R   R E P L A C E M E N T

AWARDED / CURRENT CONTRACT AMOUNT:

$4,499,994  / $4,629,707

Price Increase Due to Government Requested & Approved Change Orders

SCOPE OF WORK:  

This project included the design, fabrication, installation and startup of two GSU Transformers, K1A and K2A at the Bureau of Reclamation’s Folsom Powerplant in Folsom, CA.  K1A is a three‐phase, 60‐hertz, outdoor, generator step‐up type unit.  This unit has a capacity of 80MVA and a voltage rating of 115/13.8kV.    K2A is a three‐phase, 60‐hertz, outdoor, generator step‐up type unit.  This unit has a capacity of 80MVA and a voltage rating of 230/13.8kV.

Koontz Electric purchased the new transformers from Delta Star and worked closely with their engineering department and the Bureau of Reclamation to ensure specification requirements were met.

Upon arrival to site the transformers were inspected, assembled, processed and tested.  This required close coordination with heavy haulers, crane operators, transformer service technicians and plant personnel.  Once the transformers were onsite, Koontz was responsible for removing the existing units from service and storing them in long term storage.  Koontz worked within the Bureau’s Hazardous Energy program to ensure personnel safety throughout the project.  Along with the units, Koontz also removed existing cooling water piping, surge arresters and all other associated appurtenances.

Once removed, Koontz Electric installed the two units, including high side jumper bus connections, low side isolated phase bus connections, grounding, and anchoring.  The anchor system itself was a custom engineered seismic rated system, which required extensive design and a challenging installation.  Once installed, the units underwent final testing and were turned over to the Bureau for operation. 

After the new transformers were in operation for 6 months, Koontz Electric was required to dispose of the old, stored transformers according to all state and federal regulations.

CONTRACT NO / AWARD DATE:

09CC101676 / March 11, 2009

KECI NO 08‐2198

JOB SITE LOCATION:

Bureau Of Reclamation

Construction Engineering Group

HWY 155 Industrial Area

Warehouse B, Door 6

Grand Coulee, WA  99133

Point of Contact:  George Marrs

T  509.633.9414

F 509.633.9330

OWNER:

US Department of the Interior 

Bureau of Reclamation

Contracting Officer PN‐3700

1150 N Curtis RD, Suite 100

Boise, ID  83706‐1234

Contracting Officer:  Terry Ford

T  208.378.5364

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Jamie Zimmerman

T 501.354.2526 ext 135

F  501.354.2580

SUBCONTRACTOR:

Electrical Technologies

12335 W 53rd Ave Suite 200

Arvada, CO  80002

Oil Processing & Testing

Point of Contact:  Gerry Suman

T 303.462.0317

G R A N D   C O U L E E  G SU T R A N S F O RM E R   R E P L A C EM E N T

INITIAL MOBILIZATION / EST COMPLETION DATE:

August 2009 / July 2011

AWARDED / CURRENT CONTRACT AMOUNT:

$5,656,219 /  $5,656,219 

SCOPE OF WORK:

This project included the design, fabrication, installation and startup of three single phase GSU Transformers, designated as K10A at the Bureau of Reclamation’s Grand Coulee Right Powerplant in Grand Coulee, WA.  K10A is a bank of three single phase, 60‐hertz, outdoor, generator step‐up type units.  Each unit has a capacity of 50MVA and a voltage rating of 230/13.8kV.

Koontz Electric purchased the new transformers from WEG Electric and worked closely with their engineering department and the Bureau of Reclamation to ensure specification requirements were met.

Upon arrival to site the transformers were inspected, assembled, processed and tested.  This required close coordination with heavy haulers, crane operators, transformer service technicians and plant personnel.  Once the transformers were onsite, Koontz was responsible for removing the existing units from service and storing two of them in long term storage.  Koontz worked within the Bureau’s Hazardous Energy program to ensure personnel safety throughout the project.  Along with the units, Koontz also removed existing cooling water piping, surge arresters and all other associated appurtenances.

Once removed, Koontz Electric installed the three new units, including high side jumper bus connections, low side isolated phase bus connections, grounding, and anchoring.  The anchor system itself was a custom engineered seismic rated system, which required extensive design and a challenging installation.  Once installed, the units underwent final testing and were turned over to the Bureau for operation.

Koontz Electric was required to dispose two of the old the old transformers according to all state and federal regulations.

CONTRACT NO / AWARD DATE:

08CC603670 / March 18, 2008

KECI NO 07‐2186

JOB SITE LOCATION:

Fremont Canyon Powerplant

45 Miles Southwest of Casper

Natrona County, Wyoming

OWNER:

US Department of the Interior 

Bureau of Reclamation

Great Plains Region

PO Box 36900

316 North 26th Street

Billings, MT  59101

Contact Person:  Alma Bergerson

T  406‐247‐7801

F 406‐247‐7798

[email protected]

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Jeff Ludwig

T 501.354.2526 ext 118

F  501.354.2580

INITIAL MOBILIZATION / COMPLETION DATE:

April 2008 / May 2010

AWARDED / CURRENT CONTRACT AMOUNT:

$4,193,710 / $4,188,292

Government Requested & Approved Contract Modification

F R EMON T   C AN YON   T R A N S F O RM E R  R E P L A C EM EN T

SCOPE OF WORK:  

This project included the design, fabrication, installation and startup of 

six single phase GSU Transformers.  The transformers are grouped 

together in banks of three, designated KY1A and KY2A, at the Bureau 

of Reclamation’s Fremont Canyon Powerplant near Alcova, WY.  KY1A 

and KY2A are banks of three single phase, 60‐hertz, outdoor, generator 

step‐up type units.  Each unit has a capacity of 11.5MVA and a voltage 

rating of 115/66.4kV.    

Koontz Electric purchased the new transformers from WEG Electric and 

worked closely with their engineering department and the Bureau of 

Reclamation to ensure specification requirements were met.

Upon arrival to site the transformers were inspected, assembled, 

processed and tested.  This required close coordination with heavy 

haulers, crane operators, transformer service technicians and plant 

personnel.  Once the transformers were onsite, Koontz was 

responsible for removing the existing units from service and moving 

them to storage offsite.  This was a challenge, as space at the Fremont 

Powerhouse is very limited.  The powerhouse is accessed by a small 

tunnel that is over a quarter mile long.  Transport trucks were required 

to back down the length of the narrow, downhill tunnel to offload and 

pickup of the transformers.  

Once removed, Koontz Electric installed the six new units, including 

low side jumper bus connections, grounding, and anchoring.  This 

project also included the installation and termination of control cables 

from the transformers to the control room in the powerhouse.  Once 

installed, the units underwent final testing and were turned over to the 

Bureau for operation.  

Koontz Electric was required to dispose of six old transformers 

according to all state and federal regulations.

CONTRACT NO / AWARD DATE:

07CC308082 / July 2007

KECI NO 07‐2180

JOB SITE LOCATION:

Hoover Dam:  Clark County, NV

Davis Dam:  Mohave County, AZ

Parker Dam:  San Bernadino County, CA

OWNER:

US Department of the Interior 

Bureau of Reclamation

Lower Colorado Region

PO Box 61470

Boulder City, NV  89006

Denise Colwell 

T 702‐293‐8234

F 702‐293‐8499

[email protected]

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Dean Hoover

T 501.354.2526 ext 110

F  501.354.2580

INITIAL MOBILIZATION / EST. COMPLETION DATE:

October 2007 / April 2012

ORIGINAL TASK ORDER CONTRACT AMOUNT:

$470,014

CURRENT CONTRACT AMOUNT (14 TASK ORDERS TO DATE):

$4,237,934

Based on performance, Koontz Electric Company, Inc. has been awarded an additional 13 task orders to date. Government requested & approved all contract modifications.

HOOV E R  DAM  UN I T   CON T RO L  MOD E R N I Z AT I O N

SCOPE OF WORK:

Contract 07CC308082: Installation Service for Hydroelectric Unit Control Modernization at Hoover, Davis and Parker Dams (IDIQ). 26 Units total at three power plants, scheduled from fall 2007 until spring 2012.  Fourteen task orders, and twenty‐two units have been completed to date.

Each Unit Control Modernization includes removal and replacement of control switchboards, protective relay panels, excitation system, digital governor conversion, SCADA Panel, Gen RTD Panel, and associated wiring.   Units range from 15 to 50 MVA.

Outage time is critical, and with careful planning and maximum pre‐outage preparation, we reduced that time to three weeks for two units.  All outages have been completed on time.

CONTRACT NO / AWARD DATE:

W9128F‐10‐C‐0065 / January 2006

KECI NO 05‐2163

JOB SITE LOCATION:

Various Powerhouses & Pumping

Stations for the Big Thompson

Project in Colorado: 

Big Thompson Unit 1

Estes Units 1,2,3

Flatiron Units 1,2,3

Pole Hill Unit 1

Mary’s Lake Unit 1

Green Mountain Units 1,2

OWNER:

US Department of the Interior 

Bureau of Reclamation

Great Plains Region

316N. 26th St. Room 2031

Billings, MT 59101

Alma Bergerson, CO

T  406‐247‐7801

F 406‐247‐7338

[email protected]

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Jeff Ludwig

T 501.354.2526 ext 118

F  501.354.2580

INITIAL MOBILIZATION / COMPLETION DATE:

January 2006 / September 2010

AWARDED / CURRENT CONTRACT AMOUNT:

$3,995,000 / $4,335,982

Price Increase Due to Government Requested & Approved Change Orders

B I G   T HOMP S ON ‐ E XC I T E R   S Y S T EM S   R E P L A C EM EN T

SCOPE OF WORK:  Koontz Electric performed the following work: 

• The removal of (11) existing complete excitation systems for (6) different powerhouse locations.

• The removal of all control and power cables associated with the existing exciters.

• Design, furnish, install and test (11) new digital exciters.

• Design, furnish, install and test new PPT’s and interrupter switches for each new digital exciter.

• Design, furnish, install, and test new power and control cables and conduit for each new digital exciter.

• Provide cable scheme to completely integrate new excitation equipment to existing powerhouse controls.

• Testing , start‐up and commissioning of new digital exciter systems.

CONTRACT NO / AWARD DATE:

W912HN‐06‐C‐0008/ September 27, 2005

KECI NO 05‐2166

JOB SITE LOCATION:

John H Kerr PowerhouseNear Boydton, VA on the Roanoke River,Mechlenberg Co., VAPhilpott PowerhouseBassett, VA

OWNER:

U.S. Army Corps of Engineers

Wilmington District

5460 Buggs Island Road

Boydton, VA 23917‐9801

Matthew Folk, ACO 

T 434‐738‐6633 x270

[email protected]

GENERAL CONTRACTOR:

Koontz Electric Company, Inc

1223 E Broadway

Morrilton, AR  72110

Project Manager:  Dean Hoover

T 501.354.2526 ext 110

F  501.354.2580

INITIAL MOBILIZATION / COMPLETION DATE:

March 2006 / July 2010

AWARDED / REVISED CONTRACT AMOUNT:

$4,519,870 / $6,014,870.91

Price Increase Due to Government Requested & Approved Change Orders

P H I L P O T T   /   K E R R   S TAT I O N   S E R V I C E   R E H A B I L I TAT I O N

SCOPE OF WORK:  

Rehabilitation of Station Service Turbine Generators at the Philpott

(Secondary Unit) and John H. Kerr (Units A & B) Hydroelectric 

Powerhouses in Virginia.   The scope of work included turbine and 

wickett gate refurbishment, generator rewinds, governor retrofits, 

and excitation retrofits.  KECI rehabilitated two 1250 kVA, 480V 

stations service units at John H. Kerr Powerhouse and one 750kVA, 

480V station service unit at Philpott Powerhouse. KECI 

rehabilitated the  existing station service alternating current hydro‐

generator complete with new stator windings, new coolers, housing 

modifications, new RTDs, new speed sensor and transmitters, new 

interconnecting control wiring to the closest terminal cabinet, and 

all associated accessories. KECI refurbished thrust and guide 

bearings. KECI Removed and disposed of asbestos control wiring to 

the closest terminal cabinet. KECI replaced the existing rotating 

exciter and voltage regulator with a new static exciter fed from a 

new PPT tap of the generator output bus. KECI replaced the 

existing analog electric Proportional Integral Derivative (P‐I‐D) 

governors to electronic digital P‐I‐D. KECI replaced all cooling water 

piping with new. Finally, KECI replaced the penstock butterfly valve 

at the Philpott plant.

CONTRACT NO / AWARD DATE:

DACW54‐03‐C‐0005 / February 2003

KECI NO 02‐2142

JOB SITE LOCATION:

John H Kerr PowerhouseTurbine / Generator Units 1‐7Near Boydton, VA on the Roanoke River,Mechlenberg Co., VA

OWNER:

U.S. Army Corps of Engineers

Wilmington District

5460 Buggs Island Road

Boydton, VA 23917‐9801

Matthew Folk, ACO 

T 434‐738‐6633 x270

[email protected]

GENERAL CONTRACTOR:

General Electric Company Hydro1 River Road, Bldg 2‐4333Schenectady, NY 12345Project Manager:  Bob ReynoldsT 518‐385‐8596

INITIAL MOBILIZATION / EST. COMPLETION DATE:

September 2003/ May 2011

AWARDED / CURRENT CONTRACT AMOUNT:

$6,372,604 / $7,834,771.75

Price Increase Due to Government Requested & Approved Change Orders

JH KERR  POWERHOUSE  REHAB

SCOPE OF WORK:  This project is a $46 million plus major renovation for 

replacement of turbines, restacking and rewinding of generators, 

replacement of GSU transformers and extensive balance of plant 

equipment. The general contractor is General Electric Company 

Hydro, Lachine, Quebec, Canada. Koontz Electric Company was 

award a subcontract by General Electric for the balance of plant 

electrical work. The work consists of:

1. Removing existing GSU transformers and installing (1) 15 MVA and 

(6) 41 MVA new GFE up‐rated transformers, 15kV iso‐phase bus and 

115kV high voltage connection to the switchyard cables.

2. 13,800 volt metal clad switchgear to provide an alternative station 

service power source. The switchgear is connected into existing 

generator iso‐phase bus.

3. Furnish and install a new 2 MVA unit substation. The unit 

substation transformer is fed from the 13,800 volt switchgear above. 

The 480 volt switchgear portion of the unit substation is operated 

synchronized to existing station service generators.

4. Replace the existing 480 volt distribution switchboard with new 

2,000 amp bus switchboard and distribution breakers.

5. Replace the existing telephone relay annunciator system with 

state of the art sequence of events recorder and annunciator system.

6. Replace reactor grounding for generators with new high 

impedance transformer grounding equipment.

7. Install GFE static exciters for all units.

8. Install Digital Governors for all units.

9. Perform all wiring for generator and turbine auxiliaries.

10.Perform asbestos abatement work. (subcontracted)

11.Dispose of PCB bushings.

Koontz Electric Company, Inc. welcomes an opportunity to make your next project a success. We

maintain a professional and technical staff to support our expert field team of technicians and

craftsman. Please contact any one of the Koontz Management team listed below for more information.

Koontz Electric Company, Inc. 1223 East Broadway Morrilton, Arkansas 72110 (501) 354-2526 http://www.koontzelectric.com

Name Title Cell Phone Email

Benny Koontz President / CEO, Ext. 111 (501) 977-6086 [email protected]

Dean Hoover Vice President / COO, Ext. 110 (501) 977-6063 [email protected]

W. Mark Day Vice President / CFO, Ext. 104 (501) 977-6528 [email protected]

Don Barnett Business Development, Ext. 133 (501) 289-0720 [email protected]

Jeff Ludwig Project Manager, Ext. 118 (501) 977-6098 [email protected]

Keith Foster Project Manager / Estimator, Ext. 113 (501) 977-6107 [email protected]

Jamie Zimmerman Project Engineer, Ext. 135 (501) 977-6538 [email protected]

Paul Zimmerman Project Engineer, Ext. 102 (501) 977-6545 [email protected]

Koontz Electric Company, Inc. 1223 East Broadway Morrilton, Arkansas 72110 501-354-2526 http://www.koontzelectric.com