CUSHMAN FLOATING SURFACE COLLECTOR SMOLT EVALUATION
Pre-Proposal MeetingPG14-0665FDecember 16, 2014
2
AGENDA
• Introductions 5 min• Purchasing Guidelines 10 min• Project Overview 30 min
• Objectives• Methods• Approach• Schedule• Deliverables
• Question and Answer 30 min
• Optional Site Visit 60 min
3
PRE-SUBMITTAL QUESTIONS
• In writing via email to Senior Buyer Joseph Parris
• [email protected]• By 2:00 pm, Friday, December 26, 2014
• Responses: 5:00 pm, Monday Dec. 29, 2014
• www.TacomaPurchasing.org
4
BACKGROUND
• FERC Requirement• Monitor downstream passage annually
for the term of the amended license using marked groups of juvenile coho salmon
• Status• Implementation is new• No programs in place
5
PREVIOUS STUDY
• 2008 • Meridian Environmental and
LGL Limited
• Radio Telemetry• George Adams Hatchery
Coho
• Key Conclusions• Wide variation of
movements• 46% detected near
forebay array• 17% from Release 1• 81% from Release 2• 37 % from Release 3
– Approached Forebay from shorelines
6
PERFORMANCE METRICS
• System Survival
• PIT Tags• Released near head of
reservoir • Collected in FSC and
passed downstream of Cushman Project
• Extenuating Factors
• Examples:• Residualism • Predation
– Characterize co-variates
7
PERFORMANCE METRICS
• Fish Capture Efficiency
• PIT Tags/Active Tags• Released near FSC• Cross “start line”• Collected in FSC and
passed downstream of Cushman Project
• Paired groups• Passive and active
tags• Assumption that they
behave the same and cross “start line in similar proportions”
8
CONSULTANT OBJECTIVES
1. Create Database• System Survival• Fish Capture Efficiency• Co-variates• Weekly Reporting
2. Measure Fish Capture Efficiency• Multiple release groups of PIT tagged fish• Subsample with active tags to estimate Zone of Influence• Provide Behavioral Information
3. Analytical and Statistical Support• Study setup• Weekly updates• Report writing
9
APPROACH
• Study Fish Origin• Release Timing• Flexibility left to proposer• Equipment type (radio or acoustic)• Staffing Plan
• Tacoma field staff assistance• Combination of staff• All contractor staff
– RFP states this is for tagging, but could extend to other tasks as well
10
SCHEDULE
Action Date
Advertize RFP December 9, 2014
Pre-Proposal Meeting December 16, 2014
Questions Due December 26, 2014
Responses Posted December 29, 2014
Proposal Due January 6, 2015
Open Proposals January 6, 2015
Selection Advisory Committee January 6 - 16, 2015
Public Utility Board Approval January 28, 2015
Finalize Contract February 4, 2015
Notice to Proceed February 11, 2015
Draft Annual Report October 31, 2015
Final Annual Report December 31, 2015
11
DELIVERABLES
• Weekly summary statistics• System Survival, FCE, Travel Time, and
Residence Time by release group
• Draft Annual Report • PowerPoint of Draft Results• Final Annual Report• Proofed Telemetry Data
Records
12
EVALUATION OF PROPOSALS
• Firm’s Experience• Minimum of 5 similar projects
• Proposed Scope and Methods• Principle Investigator Experience
• Minimum 10 years experience
• Key Support Staff• Define roles and responsibilities
• Schedule• Location – Response Time• Billing Rates and Estimated Hours• Response to Questions
• Technology specifically planned• Additional Studies that would aid in providing data for this
project• Additional Tasks outside of Scope of Work?
• RFP Compliance and Completeness
13
QUESTIONS