Current Status of the Korean ETS
20 March 2017
Minyoung Kim
Greenhouse Gas Inventory and Research Center (GIR)
Contents
I. KETS Overview
II. Latest Policy Developments regarding KETS
III. KETS in Attaining Korea’s NDC Target
IV. Way Forward
I. KETS Overview
4
Brief History of KETS
Enacted the Act (May ‘12) and the Enforcement Decree (Nov. ‘12) on the Allocation and
Trading of Greenhouse Gas Emission Permits
Established the 1st Master Plan for the Korean Emissions Trading Scheme (KETS) (Jan. ’14)
and the National Allocation Plan for the 1st Phase (Sep. ’14)
Official launch of KETS (Jan. ’15)
Set Korea’s 2030 NDC target to 37% below BAU emissions (June '16)
Restructured the governance of KETS (June ’16):
(before) Ministry of Environment → (after) Ministry of Strategy and Finance
Established the 2nd Master Plan for KETS (Jan. ’17)
5
KETS Coverage and Governance
Inclusion thresholds: companies > 125,000 tCO2/year or facilities > 25,000 tCO2/year
GHG covered: 6 Kyoto gases (CO2, CH4, N2O, HFCs, PFCs, SF6)
Allocation method: mainly grandfathering (GF) but benchmark (BM) for some sectors
Free allocation: 1st Phase - 100%, 2nd Phase - 97%, 3rd Phase - less than 90%
Flexibility mechanisms: banking, borrowing and offsets
Sectors and entities covered: 26 sub-sectors with 600 entities (as of Feb. ‘17)
Coverage
MoSF oversees overall implementation Four ministries regulate their designated sectors GIR provides technical support
Governance
Role Responsible body
- Establishment of the Master/Allocation Plan MoSF
- Selection of liable entities - Allocation and cancellation of allowances
Each responsible ministry
- Market oversight (market stabilization measures) MoSF
- Assessment (including feasibility of offset projects) Each responsible ministry
- Approval of submissions, banking and borrowing- Imposition of penalties
Each responsible ministry
- Support for cap setting and Master/Allocation Plan establishment- KETS registry management
GIR
6
Operational Performance
KETS market results for the 1st Phase (Jan. ‘15~Mar. ‘17)
524 liable entities out of 525 successfully submitted permits for compliance (June ‘16)
- A total of 539 MtCO2e was allocated to the entities and they emitted a total of 543 MtCO2e
The total traded volume was 18.7 MtCO2e
- KAUs 5.3 MtCO2e / KCUs 3.1 MtCO2e / KOCs 10.2 MtCO2e
Over 10 MtCO2e of Korean Offset Credits (KOCs) flowed into the trading market
- 74 offset projects were approved with a total of 15.6 MtCO2e of KOCs
Price trend: (O1-2 ’15) KRW 10k (USD 8) (Q3-4 ’15) KRW 12k (USD 11)
(Q1-2 ’16) KRW 16k (USD 14) (Q3-4 ’16) KRW 18k (USD 15)
(Q1 ’17) KRW 22k (USD 19) ※ KRW 1,000 ≒ USD 0.87 as of 13 Mar. 2017
Korean Allowance Unit (KAU) Korean Credit Unit (KCU) Korean Offset Credit (KOC)
II. Latest Policy Developments
regarding KETS
8
Operational Plan by Phase
1st Phase (‘15~’17) 2nd Phase (‘18~’20) 3rd Phase (‘21~’25)
Allocation
100% free allocation, no auctioning
mainly grandfathering-based
allocation except for 3 sub-sectors
(grey clinker, oil refineries, aviation)
97% free allocation, 3% auctioned
wide application of benchmarks
less than 90% free allocation,
more than 10% auctioned
mainly benchmark-based allocation
Offset
projects
diversifying domestic and CDM
project methodologies
promoting offset projects by reducing
entry requirements for small scale
projects
promoting domestic offset projects
- developing more projects by sector
promoting overseas offset projects
- allowing offset credits from
overseas projects for compliance
drawing up guidelines on overseas
credits in accordance with the Paris
Agreement negotiations
diversifying methodologies for
overseas projects
MRV
setting up the MRV mechanisms
expanding verification bodies/verifiers
revising the emission report form for
benchmark-based allocation
updating the MRV standards
capacity building for verifiers
adopting international MRV standards
Trading
market
designating the Korean Exchange
(KRX) as an allowance exchange
implementing market stabilization
measures
launching regular auctions
considering adopting a market maker
scheme
allowing third party participation in
the trading market
Intl.
cooperation
and
incentives
international cooperation with the EU,
China and Japan
incentives for emission reduction
facilities
pursuing bilateral cooperation by
developing local emission reduction
projects
investing auction profits into
environmentally friendly projects
considering ETS linkage
diversifying investment portfolios
9
Main Policy Developments
Wide application of benchmark-based allocation for incentivizing facility and equipment
innovation
- (1st Phase) 3 sub-sectors (2nd Phase) minimum 5~6 sub-sectors
Unified allocation for new and the expansion of existing facilities
- (1st Phase) pre- and additional allocation (2nd Phase) additional allocation only
Allocation
Promoting overseas offset projects in preparation for the post-2020 global carbon market
Allowing overseas offset credits from CDM projects by Korean entities for compliance
- (before) planned from the 3rd Phase (’21~’25) (after) allowed from the 2nd Phase (’18~’20)
Offset projects
Promoting market functions by launching and implementing regular auctions
- (1st Phase) 100% free allocation (2nd Phase) 97% free allocation + 3% auctioned
(3rd Phase) less than 90% free allocation + more than 10% auctioned
Trading market
III. KETS in Attaining
Korea’s NDC Target
11
Meeting Korea’s 2030 NDC Target
KETS approach Actions taken for meeting the NDC target
Restructured the governance for responding to
climate change (June ’16)
- GHG emission reduction policy-making:
Office for Government Policy Coordination
- Overall KETS implementation: MoSF
Established the Climate Change Response
Master Plan and the 2030 National GHG
Emission Reduction Roadmap (Dec. ’16)
Drafting the 2nd National Allocation Plan in
accordance with the 2030 NDC target which will
be established by the end of June 2017
(MoSF and GIR)
12
Greenhouse Gas Inventory and Research Center (GIR)
Organizational structure Role for KETS
System
s
13
GIR’s Role for KETS
Support for cap setting and allocation plan making: technical support and advisory services
1st Master Plan for KETS (’14)
National Allocation Plan for the 1st Phase (’14)
Revised National Allocation Plan for the 3rd Compliance Year in the 1st Phase (’17)
National Allocation Plan for the 2nd Phase (’17) (in progress)
KETS registry management: data management and system maintenance
National Greenhouse Gas Management System (NGMS)
Emission Trading Registry System (ETRS)
Offset Registry System (ORS)
IV. Way Forward
15
Toward the Global Carbon Market
Promote overseas offset projects by accepting their credits for compliance from the 2nd phase
Enlarge the range of applicable offset credits and draw up guidelines in accordance with
the Paris Agreement negotiations
Promote international cooperation projects in preparation for the globally linked carbon market
Develop a bilateral cooperation model based on relationships strengthened through Official
Development Assistance (ODA) projects
Contribute to building the market by actively participating in the Paris Agreement negotiations
*Image source: ICAP (2017) Emissions Trading Worldwide: Status Report 2017
Proactive international cooperation to meet the NDC target by using international market mechanisms and to prepare for the future global carbon market
16
Korea-EU ETS Project
Agreement on Korea-EU ETS project (Feb. 2015)
- (period) 1 Jan. 2016 ~ 31 Dec. 2018 (3 years)
- (purpose) information and experience exchange on
allocation·trading·auction, carbon price modelling,
mitigation technologies, etc.
Kick-off ceremony (8 July 2016)
Projects in 2016
- Technical workshop on BM factor development (Aug.)
- Carbon price modelling workshop (Oct.)
- Technical workshop on new mitigation technologies (Nov.)
- EU visit on BM allocation (Belgium and Germany) (Dec.)
Projects in 2017
- EU visit on auctioning and technical workshops on ETS
compliance & trading strategies, verification and model
development regarding carbon price modelling, etc.
Korea-EU joint platform for information and experience exchange regarding ETS
*Image source: http://www.kets-project.eu
17
Korea∙China∙Japan Cooperation Forum
Information exchange platform in preparation for the linked carbon market
Trilateral meeting hosted by Tsinghua University and the Beijing Exchange to share each country’s
progress and discuss possible cooperation strategies (28 Mar. 2016, Beijing)
- unanimous decision to build a platform for information exchange regarding ETS and ETS linkage
by holding annual meetings/workshops among representatives (research∙government∙industry)
from each country
1st Cooperation Forum Meeting
(13~14 Sep. 2016, Beijing)
- discussed roadmap and research
targets for future carbon pricing
mechanisms among the participants
2nd Cooperation Forum Meeting
(Sep. 2017, South Korea)
- date and agenda (tbc)
*Image source: ICAP (2017) Emissions Trading Worldwide: Status Report 2017
Thank you