Dissemination Workshop on Joint Crediting Mechanism between Cambodia-Japan Current status of the JCM development in Cambodia Presented by Mr. Leang Sophal Vice Chief of GHG Inventory and Mitigation Office Department of Climate Change General Secretariat of National Council for Sustainable Development 1 27 January 2016, Phnom Penh, Cambodia

Upload: others

Post on 14-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Dissemination Workshop on Joint Crediting Mechanism between Cambodia-Japan

Current status of the JCM development in Cambodia

Presented by Mr. Leang SophalVice Chief of GHG Inventory and Mitigation Office

Department of Climate ChangeGeneral Secretariat of National Council for Sustainable Development

1

27 January 2016, Phnom Penh, Cambodia

Topic Outline

1. Background of JCM2. JCM Implementation in Cambodia3. JCM document4. Capacity Building Needs 5. Conclusion

2

- The initial communication on Join Crediting Mechanism (JCM) was started in 2012- Bilateral signing signing ceremony of Low Carbon Partnership between Kingdom of Cambodia and Government of Japan was held on 11 April 2014

3

1. Background of JCM

A JCM Committee was established . Each member is a representative of a line ministry.

4

1. Background of JCM

5

No. Name & Surname Government Position Role in JC Contact Address1 ឯ.ឧ. េ� សុភាព

H.E. Sao SopheapCabinet director and Advisor of MoE, Ministry of Environment

Co-chair Tel: +855 (0) 12 971 222Email: [email protected]

2 ឯ.ឧ. ទិន ពន�កH.E. Tin Ponlok

General Secretary, General Secretariat of National Council for Sustainable Development

Member and alternate

Tel: +855 (0) 12 915351Email: [email protected]

3 ឯ.ឧ. េខៀវ បូរ�ន

H.E. Khieu BorinAssistant to MoE Member Tel: +855 (0) 99 806767

Email: [email protected] បណ� ិត សរ ចិ្រតា

Dr. Sar Chetra Deputy Secretary General,Ministry of Agriculture, Forestry and Fisheries

Member Tel: +855 (0) 12 253928Email: [email protected]

5 េលាក េប៉ា នមិល

Mr. Por NimolDeputy Director GeneralMinistry of Mine and Energy

Member Tel: +855 (0) 11808305Email: [email protected]

6 េលាក ្រពាប ច័ន�វ�បុល

Mr. Prep ChanvibolDirectorDepartment of road transportation,Ministry of Public Work and Transport

Member Tel: +855 (0) 11 909146Email: [email protected]

7 េលាក ែវ�ន េគៀហាក់

Mr. Ven KeahakDirectorDepartment of Science and Technology,Ministry of Industry and Handicraft

Member Tel: +855 (0) 12 595860Email: [email protected]

List of JC members – Cambodia

The First Meeting of Joint Committee of JCM between Cambodia and Japan was held on 16 -01- 2015 in Phnom Penh

Objectives: (1) To review and clarify any concerns may raise by each side, (2) To introduce JC members and adopt JC co-chairs, and (3) To review and adopt the draft texts for JCM

6

1. Background of JCM

Establishing JCM Secretariat (Cambodia side and Japanese side)

CambodiaClimate Change Department

JapanMitsubishi UFJ Research and Consulting Co., Ltd.

7

Review and adopt the draft texts for JCM The approved documents can be seen herehttps://www.jcm.go.jp/kh-jp/rules_and_guidelines

Announcement of Observers-From Japan: JICA, OECC, IGES,GEC-From Cambodia: GDACP, Department of Pollution Control, and CCD

1. Background of JCM

JCM Secretariat-Cambodia

8

Name Title Email Telephone

Mr. Sum Thy Director of DCC [email protected] (855) 16907764

Mr. Uy Kamal Deputy Director, DCC [email protected] (855) 12 283 956

Ms. KhlokVichetratha

Deputy Director, DCC [email protected]

Mr. Leang Sophal Vice Chief of Office [email protected] (855) 12 246 192

Mr. Sum Cheat Officer [email protected] (855)12 850164

Ms. Khov Bopharoth Assistant [email protected]

(855)78663688

Working to IGES and OECC to conduct feasibility studies for JCM, capacity building workshops for public and private sector i.e. To support a launch of the JC secretariat and operation of the JCM, to support understanding the JCM methodologies, to calculate emission factor for electricity grid systems, to survey on developing the JCM model projects, to organize dissemination JCM and technology workshops, etc.,

Study meeting on Calculation of an EF for electricity systems 10-02-15, Phnom Penh

NAMA working group meeting on recent development of JCM in Cambodia 30-01-15, Phnom Penh

9

1. Background of JCM

2. JCM Project in Cambodia

10

2015Project Name Introduction of High Efficiency LED Lighting Utilizing Wireless

NetworkProject Participant -Minebea Co., Ltd

-Shukaku Inc./Oversea Cambodian Investment Cooperation (OCIC)/Siem Reap provincial hall/APSARA

Location 1. Phnom Penh City Center, Phnom Penh, Cambodia2. Diamond Island, Phnom Penh, Cambodia/Chroy Chang Va,

Phnom Penh3. Siem Reap, Cambodia4. Angkor Wat, Siem Reap, Cambodia

Financing 50% from government of Japan

Estimated GHG Emission Reduction

2016 (Expectation)Project Name 1. Energy Saving at Phnom Penh Water Supply Authority

(Cambodia) by Improving Efficiency of Water Treatment Plants

2. Solar renewable energy (Not specific name)

JCM document

• IGES provides us the JCM document in English, including the rule, rule of procedure, guideline;

• Secretariat of JC Cambodia has translated in Khmer;

• JCM document in Chart

11

3. Capacity Building Needs

Improving communication and information platform and network with local potential stakeholders,

Improving national GHG inventory system,

Establishing national registration and MRV system,

Conducting the current GHG mitigation policy and gap analysis and recommendation,

12

13

JCM is a win-win approach in context of climate change response, technology transfer, and economic and environmental sustainable development;

JCM is an effective and a comparative tool with NAMA in achieving GHG emission reduction as identified in country’s INDC;

JCM is aligned with low carbon development path way of the host country;

MoEJ decided to support one more JCM Model project for this fiscal year. The project location is in Phnom Penh International School by installing solar on the roof. In addition, JDI also conducted the JCM feasibility study on renewable energy at Bavet special economic zone with capacity of 5-6 MW.

4. Conclusion